Queenstown Integrated Transport Programme Business
“Increased public transport reliability and choice through addition of bus priority on SH6A corridor, a Mass Rapid Transit (gondola) and an extensive water taxi network.”
p.1
Evidence
Mass rapid transit (MRT) means light rail, gondola/cable car, bus rapid transit and similar dedicated rapid-transit technologies. It does not include ordinary bus services or ferries. Queenstown business cases since 2017 have assessed gondola, light rail and bus rapid transit options, and this page lists the records.
44 records
“Increased public transport reliability and choice through addition of bus priority on SH6A corridor, a Mass Rapid Transit (gondola) and an extensive water taxi network.”
p.1
“Other options being explored through the Mass Rapid Transport Solution between Frankton and Queenstown include light rail and a gondola.”
p.Vol 2 pp.36-37
“Most respondents preferred using the existing route along SH6A (Frankton Road) for a high capacity public transport system – 58% of respondents, over a Gondola along Queenstown Hill. – 42% of respondents.”
p.52
“The fifth option is an 'offline' option involving mass rapid transit (gondola/ferries) and hence is assessed separately.”
p.2
“Board to approve that off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028.”
p.205
“another step-wise intervention, possibly an MRT system such as a gondola, will then be required to meet the travel demand between Frankton and Queenstown Central.”
p.22
“Overall, the design response to increased travel and public transport demand in the future is to increase the capacity of on road public transport and to then provide an off-line system (likely a gondola) once the SH6A corridor has reached capacity.”
p.86
“Road based public transport services will eventually reach capacity. Therefore a "future offline PT" package has been included to demonstrate the benefits associated with providing additional capacity on the Franklin [sic] to Queenstown corridor. This consists of a future off-line gondola connection.”
p.10
“An off-road option (most likely gondola) would be required in the longer term to provide any additional step-change in capacity, but was not taken forward to the Preferred Programme in the Queenstown Business Case as it falls well outside of the next few NLTP periods.”
p.134
“Gondola can provide sufficient capacity but only when operating a very high frequencies (240 departures per hour or 15 sec headway).”
p.151
“Any future proposals such as a PT gondola in Queenstown should align with transport planning and investment and integrate with the existing network.”
p.53
“A fundamental transformation from the use of private/rental cars and campervans to public transport and innovative forms of transport, e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail, etc.”
p.4
“Mass rapid transit corridor (e.g. Gondola, light rail etc) from Frankton to town centre.”
p.75
“A mass transit solution (such as a gondola, ferry or light rail system) between Frankton and the Queenstown Town Centre will be studied and planned, with construction expected around or beyond 2037.”
p.10
“c. Gondola completed”
p.123
“Future proof for other transport modes such as light rail and/or a gondola linking the town centre and Queenstown Airport”
p.052
“42% prefer a gondola along Queenstown Hill from Frankton to Queenstown to other options proposed”
p.7
“Gondola lines / base station (private)”
p.3
“Programme Option 4: Mass transit (gondola) within 10 years and active modes focus... Specifically a gondola service linking Lake Hayes Estate, Frankton and the Queenstown Town Centre that could be extended into growth areas if demand supports this in the long-term.”
p.13
“This is important when significant investments (e.g. gondola) are proposed”
“High-capacity public transport options are currently being investigated and include, but are not limited to, trackless trams, double decker buses and gondolas to improve access within Te Kirikiri/Frankton, to Queenstown and across the Wakatipu Basin.”
p.44
“Note: B options for gondola & ferry not yet modelled. Models tend to underpredict connective networks & favour one-seat ride networks (cf. Panmure in Auckland).”
p.28
“Board to approve that off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028.”
p.23
“Public transport should be multi-modal and include a combination of bus service improvements, water-based public transport options and new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit).”
p.150
“None”
p.12
“a Mass Rapid Transit (MRT) corridor between Queenstown and Frankton (Figure 5 indicates a gondola over Queenstown Hill as a MRT option, though bus rapid transit and light rail are also suggested).”
p.11
“An additional scenario, Gondola MRT, was tested under the previous round of demand sets but was omitted for implementability reasons before this update.”
p.3
“This document is technically poor as it does not present enough evidence on the assessment that has been conducted. In addition, it is not clear if the gondola will proceed.”
p.47
“Appendix B5 Technical Note 30: High Capacity Public Transport”
p.3
“Gondola lines/base station (private)”
Figure 21 legend p59; Figure 22 legend p60
“Given the rapid growth occurring in Queenstown, an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period. This will allow a lead time for investigation, consultation, land acquisition, design, procurement and construction.”
p.11
“In addition, given the rapid growth occurring in Queenstown, an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period. This will allow a lead time for investigation, consultation, land acquisition, design, procurement, and construction.”
p.82
“No current plans to implement full rapid service, but: • we want to enhance key spines, where the combined service may approach rapid standards • we support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies”
p.56
“No current plans to implement full rapid service, but: • We want to enhance key spines, where the combined service may approach rapid standards • We support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies”
p.58
“We support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies”
p.88
“Long term: Offline PT (e.g. gondola) is the only remaining viable option”
p.8
“Long term: Offline PT (e.g. gondola) is the only remaining viable option”
p.6
“Whakatipu will need an alternative to either the current road network, to create more capacity for PT vehicles, or an off-line system.”
p.18
“Figure 13 'Optioneering approach': PT options 'Bus lane', 'Busway', 'Gondola'; Gondola marked pass under Rapid Transit Spine, Balanced Multi-Modal and Resilient and Future-Focussed”
p.36
“The QSNP identifies that demand will exceed the capacity provided by other modes, and that an off-line public transport system will be required. The QSNP is agnostic to the technology.”
p.2
“The landscape is moving, with various alternative proposals, including gondolas.”
The release includes buses and gondolas or cable cars in the outcome of moving more people in less space.
It also says the GPS 2027 public transport activity class will not exclude offline mass rapid transit or passenger ropeways, and that ORC will update the regional public transport plan to include them if deemed necessary.
“Please note that the Mass Rapid Transit Gondola was not part of the NZUP Queenstown Package and so could not be a part of any scope reduction consideration.”
p.3
Records that name light rail or a trackless tram.
15 records
“Mass rapid transit corridor (e.g. Gondola, light rail etc) from Frankton to town centre.”
p.75
“ultimately a mass transit solution (shown in green). The mass transit solution is not yet identified but it could include a gondola or light rail service (for example).”
p.72
“A mass transit solution (such as a gondola, ferry or light rail system) between Frankton and the Queenstown Town Centre will be studied and planned, with construction expected around or beyond 2037.”
p.10
“Preservation of mass transit corridor options to enable future growth.”
p.10
“Future proof for other transport modes such as light rail and/or a gondola linking the town centre and Queenstown Airport”
p.052
“Other options being explored through the Mass Rapid Transport Solution between Frankton and Queenstown include light rail and a gondola.”
p.Vol 2 pp.36-37
“The Recommended Programme is the common elements of Programme Option 3 (trackless trams and bus network) and Programme Option 4 (gondola and bus network) with a high capacity public transport system.”
p.13
“High-capacity public transport options are currently being investigated and include, but are not limited to, trackless trams, double decker buses and gondolas to improve access within Te Kirikiri/Frankton, to Queenstown and across the Wakatipu Basin.”
p.44
“Gondola & Trackless Tram Max the options most likely to provide close to 100% reliable travel times.”
p.31
“Board to approve that off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028.”
p.23
“Public transport should be multi-modal and include a combination of bus service improvements, water-based public transport options and new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit).”
p.150
“The physical widening required to accommodate bus lanes over the full length of Frankton Road would result in significant social (loss of housing and property), environmental, and financial (approx. $400M) impacts.”
p.85
“a Mass Rapid Transit (MRT) corridor between Queenstown and Frankton (Figure 5 indicates a gondola over Queenstown Hill as a MRT option, though bus rapid transit and light rail are also suggested).”
p.11
“The Trackless Tram option achieved the highest mode shift because of a lower 'mode penalty' but is largely interchangeable with the Bus Max option in terms of infrastructure. Feasibility issues with the Trackless Tram option led to Bus Max being preferred.”
p.4
“The system is designed to be scalable and can be upgraded as demand increases to higher capacity buses and modes, such as a trackless tram.”
p.1 (printed p.86)
Records that name bus rapid transit.
3 records
“Public transport should be multi-modal and include a combination of bus service improvements, water-based public transport options and new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit).”
p.150
“Road based public transport services will eventually reach capacity. Therefore a "future offline PT" package has been included to demonstrate the benefits associated with providing additional capacity on the Franklin [sic] to Queenstown corridor. This consists of a future off-line gondola connection.”
p.10
“a Mass Rapid Transit (MRT) corridor between Queenstown and Frankton (Figure 5 indicates a gondola over Queenstown Hill as a MRT option, though bus rapid transit and light rail are also suggested).”
p.11
A ferry is not mass rapid transit. These records mention a ferry or water taxi in that discussion.
Ferry transport sets out the business-case findings on ferry and water transport.
21 records
“A fundamental transformation from the use of private/rental cars and campervans to public transport and innovative forms of transport, e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail, etc.”
p.4
“Increased public transport reliability and choice through addition of bus priority on SH6A corridor, a Mass Rapid Transit (gondola) and an extensive water taxi network.”
p.73
“Increased public transport reliability and choice through addition of bus priority on SH6A corridor, a Mass Rapid Transit (gondola) and an extensive water taxi network.”
p.1
“A mass transit solution (such as a gondola, ferry or light rail system) between Frankton and the Queenstown Town Centre will be studied and planned, with construction expected around or beyond 2037.”
p.10
“Frankton Rd - 300 passengers by bus/water taxi (up to 7-8 buses plus water taxi) and 490 passengers by Mass Rapid Transit.”
p.141
“Potential role of alternative funding mechanisms (e.g. MRT)”
p.20
“Programme Option 4: Mass transit (gondola) within 10 years and active modes focus... Specifically a gondola service linking Lake Hayes Estate, Frankton and the Queenstown Town Centre that could be extended into growth areas if demand supports this in the long-term.”
p.13
“Note: B options for gondola & ferry not yet modelled. Models tend to underpredict connective networks & favour one-seat ride networks (cf. Panmure in Auckland).”
p.28
“Board to approve that off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028.”
p.23
“Package two delivers an additional public transport mode (besides bus and ferry services). Further work is required to determine whether a gondola or road-based (light rail/bus rapid transit) solution delivers more benefits.”
p.151
“The fifth option is an 'offline' option involving mass rapid transit (gondola/ferries) and hence is assessed separately.”
p.2
“suggesting ferries are unlikely to form the Mass Rapid Transit option for this business case.”
p.30
“An additional scenario, Gondola MRT, was tested under the previous round of demand sets but was omitted for implementability reasons before this update.”
p.3
“Gondola lines/base station (private)”
Figure 21 legend p59; Figure 22 legend p60
“Investigation of off-line public transport route to supplement the bus and ferry based public transport network.”
p.28
“Investigation of off-line public transport route to supplement the bus and ferry based public transport network”
p.121
“New high-capacity high-frequency public transport modalities, major streetscape upgrades, and secondary cycle networks feature in this option, in addition to the targeted expansions and network effectiveness interventions described in previous options.”
p.51
“Mode neutrality: public transport will be delivered using the most appropriate mode (e.g. bus, ferry, rail, cable/rope technologies, etc.) to meet demand, purpose, community need and value for money.”
p.52
“Additionally, there may be a future study of the case for other modes to serve this area, including an off-line option and a direct ferry service.”
p.64
“We support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies”
p.88
“The conversation around mass rapid transport become key solutions which are being explored.”
p.20
The record discusses mass rapid transit and does not name one of the options above.
20 records
“The graphic below demonstrates this demand and highlights that a mass rapid transit solution may be required from as early as 2038 onwards.”
p.59
“Also, within the scope of the Business Case is the identification of potential High Capacity Water Transport and mass rapid transit (MRT) options. This is to ensure that the SH6A interventions are appropriately sized and whether the long-term solution for the corridor is to provide either of these solutions.”
p.Appendix B (App A-G file p.24)
“High capacity mass transit: This includes step change service provision such as large scale fleet expansion and/or off-line high capacity services.”
p.13
“Long term MRT _ mid-block crossing”
p.20
“Offline PT Service Improvements' is under further investigation beyond 2030 ($262M)”
p.6
“Future offline public transport services that provide a further step change in capacity along with additional resilience and experiential benefits. This will require the development of offline public transport hubs in both Frankton and Queenstown.”
p.15
“Offline PT infrastructure and service improvements.”
p.4
“Future proofed/protected corridor and terminal locations”
p.5
“Preservation of mass transit corridor options in the longer term to enable future growth.”
p.Vol 2 p.43
“such a move is not feasible given the geology of the area and the costs involved, preferring instead to pursue a strong mode shift strategy that will require 40% of all trips to be made by bus (and other modes) along this corridor, and 60% by 2048.”
p.15
The review says the SH6/SH6A Queenstown offline high-capacity public transport implementation project was removed from the State Highway Investment Proposal 2024–34 because of other Government Policy Statement priorities and the likelihood of funding in the next three years.
“Prioritise and sequence major land transport projects: Restore affordability by timing major road and rapid transit investments based on demonstrated demand and cost benchmarking, while using low-cost and targeted improvements first to lift network performance.”
p.14
“the most credible long-term way of increasing capacity on the Frankton to Queenstown corridor once surface bus operations reach practical limits" (s8.4)”
Records provision for a future offline public transport solution in the preferred strategy.
“1. Frankton to Town Centre / Topography, property and congestion limit road capacity. / Short term: bus, access and safety improvements. Long term: offline PT as the viable capacity option.”
p.7
“Long term: offline PT as the viable capacity option.”
p.7
“Maximise the existing bus network and shift to higher capacity public transport (bus and offline).”
p.1
Offline PT Frankton–Queenstown as later step change; technology not named.
Offline PT Frankton–Queenstown as later step change; technology not named.
“Offline public transport" and "Protect future high-capacity corridors" listed under 'Sequence step-change improvements”
p.3