QLDC staff briefing to a Council workshop on 14 July 2026, presented by the Strategy Planning Manager (Transport). Part A covers the Otago Central Lakes Transport Network Plan (TNP), a consolidated all-mode plan for the sub-region due in early September 2026, and how it relates to NZTA (Waka Kotahi)'s Strategic Network Plan (SNP), the proposed Regional Deal and ORC public transport planning. The SNP is described as limited to the state highway network around Frankton, and both plans are said to recognise that major transport projects have not attracted committed funding. A slide on 'Offline Mass Rapid Transport' states that Whakatipu will need either more road capacity for public transport vehicles or an off-line system, and lists QLDC's requirements for it. Part B sets out the transport section of the Infrastructure Strategy: significant issues, objectives, an enabling toolkit (travel demand management, parking management, network planning, ITS), area programmes for Wānaka ($53M short term), Queenstown Town Centre ($60M short term; $346M medium term) and Whakatipu ($73M medium term), and three investment pathways (Reactive $120M; Progressive and Aggressive $650M each), on top of about $300M of continuous low-cost programmes over ten years. Alternative funding (development contributions, IFFA levies, time-of-use charging, tolls) is said to be needed.
What the document says
Context and purpose. This is a Queenstown Lakes District Council (QLDC) Council briefing/workshop item, 'Item 1: Transport Strategy Update', held on Tuesday 14 July 2026, with 30 minutes of presentation and 60 minutes of discussion (p1). It was prepared by Tony Pickard, Strategy Planning Manager (Transport), on 25 June 2026 and reviewed and authorised by Tony Avery, General Manager, Property and Infrastructure, on 3 July 2026 (p1). Its stated purpose is to update councillors on several transport workstreams, including external programmes, and to clarify the overlaps between the Otago Central Lakes Transport Network Plan and the NZTA (Waka Kotahi) Strategic Network Plan (p1). Attachment A is a slide presentation, 'Transforming Transport: Transport Planning and Investment', in two parts (pp2-3).
Part A: Transport Network Plan. The slides note that alignment is needed across several workstreams in this LTP cycle: QLDC strategy planning, the Way to Go (W2G) programme with ORC and NZTA, the Otago Central Lakes (OCL) Regional Deal, the LTP/RLTP/NLTP, the Infrastructure Strategy and NZTA's Strategic Network Plan (p5). The TNP is meant to bring earlier single-location or single-mode strategies together into one document describing the current state, a vision and a future state, with projects and actions to close the gap, covering all of Queenstown Lakes District and key Central Otago centres and corridors, for all modes (pp6-7). Deliverables are due in early September 2026 (p9). The SNP is described as limited to the state highway network in and around Frankton. Common features are that major transport projects have not attracted committed funding through existing mechanisms and that a different funding approach is required (p10). 'Offline Public Transport' is listed as a link with the proposed Regional Deal (p11). ORC public transport planning slides cover Wānaka/Upper Clutha and sub-regional services. They state that the TNP will look at options for a future multi-modal PT network integrating buses, active travel and offline solutions (p14). An indicative Wānaka service is costed at $1,172,700 with a BCR of 1.1 (p15). A timeline shows the Upper Clutha service launching in LTP Year 2 and an OCL sub-regional service in LTP Year 4 (p17).
Part B: Infrastructure Strategy (transport). Significant issues include growth outpacing capacity, investment processes unsuited to the task, a local ratepayer base too small to fund a network serving many tourists, a vulnerable network with few alternative routes, environmental effects, and affordability. Central government support is described as insufficient, so levels of service are now dropping (p21). Under the strategic direction, NZTA will focus on GPS-led improvements around Frankton, and ORC on service improvements in the Whakatipu Basin, sub-regional services and possibly Wānaka. The slide adds: 'At the time of writing, this may also include a first national aerial network to provide predominantly public transport services' (p22). QLDC must either find new ways to fund the planned programme or prioritise part of it, possibly focusing on Wānaka, the Queenstown Town Centre or the Whakatipu Basin (p22). An enabling toolkit covers TDM, parking management plans for Queenstown, Frankton and Wānaka, network planning, and ITS to enable time-of-use charging and tolls (p23).
Area programmes: Wānaka/Upper Clutha corridor, active travel, optimisation and PT infrastructure, $53M short term and $20M (to be confirmed) medium term (p24). Queenstown Town Centre: arterial route Stages 3 and 2, a PT interchange, parking for a modelled shortfall of 1,100 spaces, and street upgrades, $60M short term and $346M medium term (p25). Whakatipu: Arthurs Point Crossing (the existing historic bridge is at end of life; a toll should be considered), Malaghans corridor, park and ride at the eastern, southern and western network limits, active travel and vulnerable roads, short term to be confirmed and $73M medium term (p26). The slide notes that road capacity freed by ORC's fleet improvements is likely to be absorbed by induced demand (p26).
Three pathways are set out (pp27-28). Reactive: toolkit plus essential replacements, $120M. Progressive: Wānaka first, then Queenstown and Whakatipu, $650M. Aggressive: Wānaka and Queenstown accelerated in the first ten years, $650M. All are in addition to continuous low-cost, low-risk programmes of about $300M over ten years (p28). The slides state that traditional LTP and NLTP pathways are unlikely to be sufficient and that the programme will not be funded wholly by rates (pp27-28).
Mass rapid transit: The paper deals with the topic directly but briefly. Slide 18, 'Offline Mass Rapid Transport', states that 'Whakatipu will need an alternative to either the current road network, to create more capacity for PT vehicles, or an off-line system'. It lists QLDC's requirements: a service that supports planned growth areas, a fully protected route, integration with other modes, complementing rather than replacing planned interventions, affordability and accessibility (p18). Offline PT is also listed under the Regional Deal (p11) and ORC planning (p14), and the strategy slide refers to a possible 'first national aerial network to provide predominantly public transport services' (p22). The paper does not name mass rapid transit, identify a route, cost or programme for offline MRT, or include it in the pathway costings.
Key figures
- Wānaka / Upper Clutha programme: $53M short term (Y1-3); $20M (TBC) medium term (Y4-10) (p24)
- Queenstown Town Centre programme: $60M short term (Y1-3); $346M medium term (Y4-10) (p25)
- Whakatipu programme: TBC short term; $73M medium term (Y4-10) (p26)
- Modelled Queenstown Town Centre parking shortfall of 1,100 spaces (p25)
- Pathway improvement programme totals: Reactive $120M; Progressive $650M; Aggressive $650M (p28)
- Toolkit projects $20M and Arthurs Point Crossing $80M in Y1-3 under all pathways (p28)
- Continuous and low-cost low-risk programmes approximately $300M over ten years, additional to the improvement programme (p28)
- Indicative Wānaka PT service cost $1,172,700; BCR 1.1 (p15)
- Presentation 30 minutes; questions/discussion 60 minutes (p1)
Rapid transit
Mass rapid transit means light rail, gondola/cable car, bus rapid transit and similar dedicated rapid-transit technologies. It does not include ordinary bus services or ferries.
Substantive. Discusses, assesses, recommends or programmes mass rapid transit.
States Whakatipu will need more road capacity for PT or an off-line system; sets QLDC requirements; notes possible national aerial network; uncosted.
A dedicated slide, 'Offline Mass Rapid Transport' (p18), states that 'Whakatipu will need an alternative to either the current road network, to create more capacity for PT vehicles, or an off-line system'. It lists 'QLDC requirements from PT': a service that supports planned growth areas, a fully protected route, integration with other transport modes, complementing rather than replacing planned interventions, affordability and accessibility. 'Offline Public Transport' is listed as one of four links with the proposed Regional Deal (p11). Under ORC public transport planning, the TNP 'will include looking at options for future a multi-modal PT network including integration between buses, active travel and offline solutions', with 'Offline Mass Rapid Transport' as a further bullet (p14). The Infrastructure Strategy direction slide says ORC's role 'may also include a first national aerial network to provide predominantly public transport services' (p22). The document does not name a technology, route, operator, cost or timeframe. Offline MRT is not included in the Reactive, Progressive or Aggressive pathway costings (p28).
"Whakatipu will need an alternative to either the current road network, to create more capacity for PT vehicles, or an off-line system." (p.18) | "QLDC requirements from PT: Service that supports planned growth areas; Fully protected route; Integrated with other transport modes; Complements planned interventions, not replaces them; Affordable; Accessible" (p.18) | "At the time of writing, this may also include a first national aerial network to provide predominantly public transport services." (p.22) | "the TNP will include looking at options for future a multi-modal PT network including integration between buses, active travel and offline solutions." (p.14)
Files
- Open Main document (PDF, 1.5 MB) Opens in a new tab.
Main document
Public copies
Publisher’s own file.
Actions recorded
Complete the Otago Central Lakes Transport Network Plan (current state, vision, desired future state, aspirational network plan and implementation plan).
Not assessed · QLDC · Deliverables due early September 2026
Deliverables due early September 2026
Include in the TNP actions common to the TNP and NZTA's Strategic Network Plan, especially travel demand and parking management.
Not assessed · QLDC
The TNP will include actions that are common to both, especially Travel Demand and Parking Management
Through the TNP, examine options for a future multi-modal Whakatipu PT network integrating buses, active travel and offline solutions.
Not assessed · QLDC · Relevant to rapid transit
the TNP will include looking at options for future a multi-modal PT network including integration between buses, active travel and offline solutions
Provide an offline (or road-capacity) PT alternative for Whakatipu meeting QLDC requirements: supports growth areas, fully protected route, integrated, complementary, affordable, accessible.
Not assessed · Relevant to rapid transit
Whakatipu will need an alternative to either the current road network... or an off-line system
Take Upper Clutha and OCL sub-regional PT investigations to Council, then into ORC LTP work programme development.
Not assessed · ORC · July 2026; Aug-Sep 2026
Upper Clutha and OCL sub-regional PT investigations goes to Council
Procure an Upper Clutha PT operator, launch the service in LTP Year 2 and improve to up to 8 trips per day in Years 3-10.
Not assessed · ORC · LTP Y1-Y10
Upper Clutha service improvements up to 8 trips per day (LTP Y3-Y10)
Launch the OCL sub-regional PT service in LTP Year 4 and improve it towards the preferred option in Years 5-10.
Not assessed · ORC · LTP Y4-Y10
OCL sub-regional service launch (LTP Y4)
Develop parking management plans for Queenstown, Frankton and Wānaka, and monitor occupancy to inform further changes.
Not assessed · QLDC
Parking Management Plans are being developed for areas within Queenstown, Frankton & Wānaka
Show all 20 actions
Improve transport technology (ITS) to enable parking monitoring, time-of-use charging, tolls and variable network controls.
Not assessed · QLDC
Technology is also required to enable Time of Use Charging, Tolls and variable controls
Deliver Wānaka / Upper Clutha corridor improvements, active travel routes, network optimisation and PT infrastructure supporting ORC services.
Not assessed · QLDC · Short term (Y1-3) $53M; medium term (Y4-10) $20M (TBC)
Public transport infrastructure will be provided to support investment from the ORC
Progress the remaining Queenstown arterial route stages now (Stage 3 to establish the full route, then Stage 2) and secure property early.
Not assessed · QLDC · Short/medium term
the remaining stages of the arterial route should be progressed now
Create a central Queenstown public transport interchange.
Not assessed · QLDC · Short/medium term
PT Interchange will create a central public transport hub
Provide town centre parking to meet a modelled 1,100-space shortfall through one large or several smaller facilities.
Not assessed · QLDC · Short/medium term
A modelled shortfall of 1,100 spaces could be met through one large facility or multiple smaller facilities
Progressively upgrade key Queenstown town centre streets into safer, more accessible, people-focused spaces.
Not assessed · QLDC · Short/medium term
Street Upgrades will progressively transform key streets
Build a new Arthurs Point Crossing to replace the end-of-life historic bridge; consider tolling it.
Not assessed · NZTA · Y1-3 ($80M in all pathways)
A toll should be considered for the Arthurs Point Crossing
Make low-cost Malaghans corridor improvements and upgrade the Queenstown-Arrowtown route via Arthurs Point, starting at Gorge Road.
Not assessed · QLDC
Improvements to the route between Queenstown and Arrowtown via Arthurs Point should include intersection upgrades
Provide park and ride facilities at the eastern, southern and western network limits, interfacing with PT services.
Not assessed · NZTA · Medium term (Y4-10)
Park and Ride facilities at key network limits (Eastern, Southern, Western)
Complete key Whakatipu active travel routes, address vulnerable low-use roads, and deliver network optimisation (e.g. Road 10 formation, Quail Rise Link, Hawthorne Dr).
Not assessed · QLDC · Medium term (Y4-10)
Network Optimisation will be achieved through targeted interventions
Choose an investment pathway (Reactive $120M, Progressive $650M or Aggressive $650M) for the transport improvement programme.
Not assessed · QLDC · Y1-10
Three principal transport planning pathways have been identified
Explore alternative funding: development contributions, IFFA levies, time-of-use charging, tolls, and private and central government sources.
Not assessed · QLDC · As the capital programme is developed
significant opportunities to fund through Development Contributions, IFFA levies, time of use charging and tolls
Study cost
Not separately commissioned. This is an internal or corporate document.
Citation