Statement of Evidence of David John Robert Smith for Waka Kotahi – Traffic (Te Pūtahi Ladies Mile Plan Variation)

Primary traffic evidence by Dave Smith, Technical Director – Transportation Planning at Abley, for NZTA (Waka Kotahi) as submitter on QLDC's Te Pūtahi Ladies Mile (TPLM) Plan Variation. Using March 2023 TomTom data, it finds weekday peak delays of 2–6 minutes westbound (AM) and 3–10 minutes eastbound (PM) on SH6, with the lane merges either side of the Shotover Bridge as the bottlenecks. It puts bridge capacity at about 1,590 vehicles per lane per hour, below the 1,700 used by QLDC's expert Colin Shields, and notes Waka Kotahi does not intend to upgrade or duplicate the bridge. Modelling shows bridge flows at or above capacity even with the assumed shift to a 20–21% public transport mode share (from 3.3%), and concludes TPLM will further worsen SH6 intersection performance. Risks identified are NZUP delivery timing, local bus priority, behaviour change and the timing of schools and commercial activity. It recommends nine planning-provision matters, including signalised and urbanised 60 km/h SH6 intersections, completion of key NZUP components before any development, Stalker Road bus priority, monitoring, travel planning and Integrated Transport Assessments. It does not mention mass rapid transit.

What the document says

Context and purpose: This is the primary statement of evidence of David John Robert Smith (Technical Director – Transportation Planning, Abley Limited) for NZTA (Waka Kotahi), a submitter on QLDC's Te Pūtahi Ladies Mile (TPLM) Variation to the Operative District Plan, heard by an Independent Hearing Panel under the Resource Management Act 1991 (p.1–2). Mr Smith states he has maintained the Queenstown Lakes Tracks Transportation Model since 2012, was technical lead for the Queenstown Integrated Transport Programme Business Case and led modelling for the Queenstown Business Case (pp.11–12). The model was updated to a 2022 base year with forecasts to 2053 to support ORC's Wakatipu Public Transport Business Case, and interacts with a WSP public transport model (pp.12–13). Modelling for TPLM was 'handle-turning' on inputs supplied by Mr Shields (pp.6–7).

Current performance: March 2023 weekday TomTom data (Appendix A, prepared by Mat Collins, reviewed by Dave Smith, 11 October 2023) show AM peak delays of 2–6 minutes on SH6 westbound, 3.5–12 minutes on Stalker Road and 45 seconds–5 minutes on Howards Drive; PM peak delays of 3–10 minutes SH6 eastbound and 1–16 minutes on Hawthorne Drive (p.8). About 90% of peak-direction delay occurs on the approach side of the Shotover Bridge (p.8).

Capacity: Mr Smith estimates Shotover Bridge capacity at 1,590 vehicles per lane per hour (1,560 using Austroads), within a 1,515–1,600 range, versus 1,700 quoted by Mr Shields from Waka Kotahi's submission, which he describes as an upper limit for a rural corridor (pp.9–10). Performance deteriorates before theoretical capacity is reached (p.10).

Future investment: The NZUP Queenstown package includes signals between SH6/6A and Hawthorne Drive, westbound bus lanes on Ladies Mile, a Howards Drive roundabout with underpass, bus lanes between Hardware Lane and SH6/6A, and SH6A improvements (pp.10–11). Timing is uncertain, and Waka Kotahi does not intend to upgrade, replace or duplicate the Shotover Bridge, so 'removing people from their cars and attracting them to public transport is essential to increasing the people movement capacity of the corridor' (p.11).

Impacts: With TPLM, modelled bridge flows are 1,814 westbound AM (+14%) and 1,923 eastbound PM (+21%) without mode shift; with the WSP-modelled mode shift, 1,581 westbound AM and 1,710 eastbound PM (+8%) (p.14). Sidra modelling shows up to 209 vehicles queued on SH6 east of Stalker Road (about 1.5 km) and a combined queue of about 341 vehicles or 2.4 km; 2053 SH6 westbound AM delay of 16–17 minutes (pp.15). He concludes TPLM 'will result in further deterioration in the performance of the key intersections along SH6 Ladies Mile' (p.16).

Risks: delivery of NZUP; local bus priority; behaviour change, as the assessment relies on a shift to 20–21% public transport mode share across the bridge from a 3.3% journey-to-work share; and timing of schools and employment within TPLM (pp.17–18).

Recommendations: signals at SH6/Stalker Road and Howards Drive with a 60 km/h urbanised corridor; further design and modelling; staging non-residential development early; completing key NZUP components before any development; Stalker Road and local bus priority; traffic monitoring and travel planning; Integrated Transport Assessments for all consent applications; and ongoing Way to Go collaboration (pp.18–24).

Mass rapid transit: The document says nothing about mass rapid transit. Its people-moving solution for the Shotover Bridge constraint is bus priority through NZUP and wider public transport investment.

Key figures

  • SH6 westbound AM peak delay 2–6 min; SH6 eastbound PM peak delay 3–10 min (March 2023 TomTom) (p.8)
  • Stalker Road AM delay 3.5–12 min; Hawthorne Drive PM delay 1–16 min (p.8)
  • Approximately 90% of peak-direction SH6 delay occurs on the approach side of the Shotover Bridge (p.8)
  • Shotover Bridge theoretical capacity 1,590 veh/lane/hr (1,560 Austroads; range 1,515–1,600) vs 1,700 used by Mr Shields (pp.9–10)
  • Modelled bridge flows with TPLM, no mode shift: 1,814 WB AM (+14%), 1,923 EB PM (+21%) (p.14)
  • Modelled bridge flows with mode shift: 1,581 WB AM, 1,710 EB PM (+8%) (p.14)
  • SH6 east approach to Stalker Road: up to 209 vehicles queued (~1.5 km); combined ~341 vehicles / 2.4 km (p.15)
  • 2053 modelled SH6 westbound AM delay 16–17 min with TPLM (p.15)
  • Assumed PT mode share across Shotover Bridge 20–21% vs current 3.3% journey-to-work share (p.17)

Files

Public copies

Publisher’s own file.

Actions recorded

  • Upgrade SH6 / Stalker Road intersection to manage conflicting demands, preferably to traffic signals, and include this in planning provisions.

    Not assessed · QLDC

    the SH6 / Stalker Road should be upgraded to traffic signals

  • Build the NZUP SH6 / Howards Drive intersection as a signalised intersection rather than a roundabout, and include an upgrade requirement in planning provisions.

    Not assessed · NZTA

    should be built as a signalised intersection

  • Reduce SH6 speed environment to 60 km/h and urbanise the corridor so it is self-explaining.

    Not assessed · NZTA

    accompanied by a reduction in the speed environment along SH6 to 60 kph

  • Undertake additional design work and modelling testing signals, a 60 km/h corridor and signalisation of roundabout approaches, plus PM peak impacts west of the Shotover Bridge.

    Not assessed · QLDC

    I recommend that additional design work and modelling be undertaken

  • Retain or enhance objectives 49.2.5 and 49.2.6 and other mechanisms supporting early establishment of non-residential activity (schools, town centre) within TPLM.

    Not assessed · QLDC · Before substantial residential development

    retaining or enhancing objectives 49.2.5 and 49.2.6

  • Complete key NZUP components (Howards Drive upgrade, Ladies Mile westbound bus lanes, SH6 bus lanes Shotover Bridge to SH6/6A) before any development; add to staging rules 49.5.10, 49.5.33, 49.5.50.

    Not assessed · NZTA · Prior to any development

    should in my view be completed prior to any development

  • Install northbound bus priority on Stalker Road and further bus priority through Shotover Country and Lake Hayes Estate; add Stalker Road requirement to staging rules.

    Not assessed · Prior to development

    I recommend that northbound bus priority be installed on Stalker Road

  • Undertake regular, ongoing traffic monitoring to measure success of initiatives reducing private vehicle reliance.

    Not assessed · QLDC · Ongoing as TPLM is established

    regular traffic monitoring be undertaken as TPLM is established

Show all 11 actions
  • Integrate effective, ongoing travel planning with regular monitoring into the Transport Interventions Plan.

    Not assessed · QLDC · Ongoing

    integrated into the Transport Interventions Plan

  • Require an Integrated Transport Assessment for all development resource consent applications in TPLM.

    Not assessed · QLDC

    Integrated Transport Assessment be a requirement for all development resource consent applications

  • Continue collaboration between Way to Go partners to coordinate transport infrastructure delivery with TPLM staging.

    Not assessed · Way to Go · Ongoing

    ongoing collaboration between the Way to Go partners is fundamental

Study cost

A study cost has been requested under the Official Information Act or LGOIMA. No figure has been received.