QTS-005 · Statutory plan · 2017

Regional Public Transport Plan Otago 2014 - Addendum: Wakatipu Basin Public Transport

Addendum by Otago Regional Council (ORC) amending the Regional Public Transport Plan Otago 2014 to put in place a new Wakatipu Basin bus network following the 2016/17 Wakatipu Public Transport Network Review and the need to contract services under NZ Transport Agency's Public Transport Operating Model (PTOM). It sets out 14 amendments: a simplified four-route network (Arrowtown-Frankton-Queenstown-Arthurs Point; Fernhill/Sunshine Bay-Queenstown-Airport-Remarkables Park; Kelvin Heights-Frankton-Five Mile; Jacks Point-Frankton-Shotover Country-Lake Hayes Estate) operating 15-60 minute frequencies, a flat fare for GoCard users and a three-zone cash fare, two PTOM contract units, collaboration with the Ministry of Education and Queenstown Airport Corporation, and supporting measures such as new ticketing, journey planner and bike racks. Success is stated to rely on QLDC addressing the availability of low-cost parking and on a QLDC financial contribution. It targets 50% farebox recovery in the long term and cites a 20% mode-share goal from the 2007 Wakatipu Transport Strategy. Medium to long term projects are deferred to the Queenstown Integrated Transport Programme Business Case. The network was expected to commence in the third quarter of 2017, subject to funding approvals.

What the document says

Context and purpose. Otago Regional Council (ORC) adopted its Regional Public Transport Plan (RPTP) in December 2014 and signalled a review of Wakatipu Basin services, which also aligned with the need to contract services under NZ Transport Agency's Public Transport Operating Model (PTOM) (p.4). This May 2017 addendum implements the outcome of the Wakatipu Basin Public Transport Network Review and feedback from strategic partners QLDC, NZ Transport Agency and Queenstown Airport (p.4). Table 1 lists 14 amendments to specific RPTP pages (p.4).

Problems. Patronage is declining; barriers include network complexity, poor integration with other modes, cost, an over-supply of relatively cheap car parking and a dominant car culture (p.10); bus travel is far slower than car travel because of congestion, meandering routes and low frequency (p.11).

The new network (stage one). The objective is a core network that helps address congestion on key corridors, with affordable, direct, regular services and a simple fare structure, contributing to 'the wider objectives of a 20 percent mode share for public transport, walking and cycling in Queenstown', a target footnoted as set through the Wakatipu Transport Strategy 2007 (p.13). Design principles include direct routes, coordinated timetables, few transfer points at Frankton and Queenstown, and investigating integration of water ferry/taxi services (p.14). Stage one simplifies routes, reduces fares and coordinates school transport with the Ministry of Education (p.15). Four routes are proposed (p.15) with initial frequencies of 15 minutes (Sunshine Bay-Remarkables Park), 30/60 minutes peak/off-peak (Arrowtown-Arthurs Point and Lake Hayes-Jacks Point) and 60 minutes (Five Mile-Kelvin Heights), and desirable minimum frequencies of 15-30 minutes, organised into two PTOM units (pp.17, 20). The network was expected to commence in the third quarter of 2017 (p.15). Supporting investment includes bus priority at key points, encouraging QLDC to reduce low-cost parking, a new ticketing system, journey planner, timetable information, bike racks, and bus shelters and stops with QLDC and NZTA (p.16).

Fares and funding. A flat fare for GoCard customers and a three-zone cash fare are introduced; concessions are limited to GoCard, child and SuperGold off-peak (pp.5, 17). Fares are to be set through ORC's Annual Plan 2017/18 (pp.18, 21). ORC targets 50% farebox recovery over the long term, acknowledging this may not be achievable in the short to medium term (pp.11, 18). The first phase prioritises everyday local trips; its success 'relies on QLDC addressing the availability of low cost parking', and a QLDC financial contribution to public transport is assumed (p.7). Implementation requires funding approval from NZTA and the ORC and QLDC Annual Plans 2017/18 (p.23).

Relationship to other work. A short-term business case is being developed, and the medium to long term investment programme is being developed through the Queenstown Integrated Transport Programme Business Case (QITPBC), described as an umbrella for transport business cases by ORC, NZTA and QLDC; future public transport projects are to come from the QITPBC (p.19).

Mass rapid transit: The addendum says nothing about mass rapid transit or any offline public transport between Frankton and the Town Centre. It is a bus network plan (with ferry/water taxi integration to be investigated) and defers medium to long term public transport projects to the QITPBC (p.19).

Key figures

  • Four-route Wakatipu network in two PTOM contract units (pp.15, 20)
  • Initial frequencies 15 to 60 minutes; desirable minimum 15 to 30 minutes (p.17)
  • Long-term farebox recovery target of 50% (pp.11, 18)
  • Mode share objective of 20% for public transport, walking and cycling, set through the Wakatipu Transport Strategy 2007 (p.13)
  • New network expected to commence in the third quarter of 2017 (p.15)

Files

Public copies

Publisher’s own file.

Actions recorded

  • Introduce a new subsidised Wakatipu bus network of four simplified routes with regular frequencies.

    Not assessed · ORC · Third quarter of 2017

    We anticipate the new network structure to commence within the third quarter of 2017

  • Introduce a flat fare for GoCard customers and a three-zone cash fare, with simplified concessions.

    Not assessed · ORC · With new network (2017)

    A zonal fare structure will be introduced

  • Set Wakatipu fare levels through ORC's Annual Plan process, consulting on fares in the draft Annual Plan 2017/18.

    Not assessed · ORC · Annual Plan 2017/18

    Fares will be defined in Council's Annual Plan process for 2017/18

  • Procure services through two PTOM contract units (Units 6 and 7).

    Not assessed · ORC

    Table 7.6 - Unit 6

  • Work with the Ministry of Education on a coordinated approach to school transport.

    Not assessed · ORC

    Council will work collaboratively with the Ministry of Education

  • Work with Queenstown Airport Corporation to plan for and manage the impacts of flight scheduling on services to and from the airport.

    Not assessed · ORC

    Council will work collaboratively with the Queenstown Airport Corporation

  • Investigate the feasibility of integrating water ferry/taxi services into the Wakatipu public transport network.

    Not assessed · ORC

    Investigate the feasibility of integrating Water Ferry/Taxi Services

  • Address the availability of low-cost parking, which inhibits public transport use; ORC to encourage and support QLDC to reduce it.

    Not assessed · QLDC

    relies on QLDC addressing the availability of low cost parking

Show all 15 actions
  • Provide a QLDC financial contribution towards public transport.

    Not assessed · QLDC

    a financial contribution towards the provision of Public Transport will be provided by QLDC

  • Introduce a new ticketing system, journey planner, timetable information, improved website, online GoCard top-ups and bike racks on all buses.

    Not assessed · ORC

    Introduction of a new ticketing system

  • Install bus shelters, seating, consistent stop signage, tactile guides and pavement access at stops; invest in bus priority at key points.

    Not assessed · NZTA

    Working with QLDC and NZTA to ensure; the installation of bus shelters

  • Develop a business case for the short-term improvements to obtain NZTA funding.

    Not assessed · ORC

    A business case is being developed for the proposed improvements

  • Develop the medium to long term programme and future public transport projects through the Queenstown Integrated Transport Programme Business Case.

    Not assessed · NZTA · Medium to long term

    being developed as part of the wider Queenstown-Integrated Transport Programme Business Case

  • Obtain funding approval from the NZ Transport Agency and the ORC and QLDC Annual Plans 2017/18.

    Not assessed · NZTA · 2017/18

    will require funding approval to be obtained

  • Target long-term farebox recovery of 50%.

    Not assessed · ORC · Long term

    The ORC will target a long term farebox recovery level of 50%

Study cost

Not separately commissioned. This is an internal or corporate document.

Citation

Regional Public Transport Plan Otago 2014 - Addendum: Wakatipu Basin Public Transport (2017).