QTS-001 · Transport strategy · 2007

Wakatipu Transportation Strategy

Joint strategy of Queenstown Lakes District Council (QLDC), Transit New Zealand and Otago Regional Council (ORC) setting the direction for Wakatipu transport to 2026. It warns that under a 'do nothing' approach Frankton Road (SH6A) would carry bumper-to-bumper traffic averaging 20 km/h by 2026, and states there is no 'business-as-usual' option of private cars meeting future growth. The strategy combines four measures: travel demand management; roading development (a 'people corridor' on Frankton Road with bus priority lanes and access management, a Frankton Flats arterial network and state highway intersection upgrades, and investigation and route protection of an 'eastern route' to Gorge Road and a Boyd Road link for after 2026); passenger transport (a high-frequency bus system, about every four minutes on Frankton Road when fully implemented, with ferry and park-and-ride); and parking management (completing Man Street and Gorge Road parking, about 1,250 spaces, CBD parking management and commuter parking constraint). A bus system is recommended for its responsiveness and cost effectiveness compared with other types of systems. Parking measures are estimated to shift about 20% of car trips to passenger transport by 2026. An implementation plan assigns lead agencies across 2007-2010, 2011-2015, 2016-2026 and post-2026. No mass rapid transit is mentioned.

What it said and where we are (as at October 2026)

Cover of the Wakatipu Transportation Strategy: an aerial view of Queenstown, Lake Wakatipu and the Remarkables, with the line “If we do nothing, by 2026 there will be bumper to bumper traffic on Frankton Road, travelling an average speed of 20km/h.”
Cover, Wakatipu Transportation Strategy, QLDC/ORC/Transit NZ, November 2007
What the 2007 strategy said, and where things stand in October 2026
What the 2007 strategy saidWhere we are, Oct 2026
Do nothing and Frankton Road averages 20 km/h by 2026 (cover, p.4)On a bad day in 2025 the ~7 km trip took over 23 minutes (about 18 km/h); peak trips have exceeded 80 minutes. The average was about 8 minutes.Sources: QTS-130 p.26, QTS-224 p.2
Bus priority lanes in each direction on Frankton Road (p.5, p.13)No bus lanes on Frankton Road. Corridor bus lanes were cut from the NZ Upgrade package in 2023–24.Sources: Newsroom (opens in new tab), QTS-130 p.26
A bus about every 4 minutes on Frankton Road (p.10, p.13)Route 1 runs about every 15 minutes.Source: ORC (opens in new tab)
Park-and-ride at Frankton and Gorge Road by 2010 (p.13)None operating; a Ladies Mile proposal was deferred.Source: QLDC (opens in new tab)
About 20% of car trips moved to public transport by 2026 (p.12)About 3% of district commuters took the bus to work in the 2023 Census, though bus trips passed 2 million in 2025/26.Sources: QTS-200, QTS-204
New Kawarau Falls Bridge and Frankton Flats roads (p.9, p.13)Done: bridge 2018, Glenda Drive roundabout 2015, Hawthorne Drive 2017. The SH6/6A intersection is under construction to 2028.Sources: NZTA, Kawarau Falls Bridge (opens in new tab), NZTA, Glenda Drive (opens in new tab), NZTA, Queenstown package (opens in new tab)

As at 20 Oct 2026

What the document says

Context and purpose. The Wakatipu Transportation Strategy (November 2007) is the outcome of the Wakatipu Transportation Study, undertaken in partnership by Queenstown Lakes District Council (QLDC), Transit New Zealand (a predecessor of NZTA (Waka Kotahi)) and Otago Regional Council (ORC) (p.4). It responds to rapid growth: the usually resident Wakatipu population is forecast to rise from 14,148 (2006) to 31,443 (2026), peak day population from 46,354 to 86,781, and employment from 6,494 FTEs (2005) to 16,101 (p.3). It traces its direction to the Future Link Strategy 2005 and aims for a strategy 'based on strong support for passenger transport' (p.4).

Method. The study ran in four stages: problem identification, assessment of individual options, a combined draft strategy consulted on in May 2007, and completion of the strategy (p.4). A 'do nothing' scenario is included for context only: by 2026 Frankton Road would have bumper-to-bumper traffic averaging 20 km/h, with major intersection delays (pp.1, 4). Risk management principles include staging 'big ticket/no going back' items, monitoring, retaining options for future generations and periodic review (p.4).

The strategy. Four complementary measures are proposed (p.5). (A) Travel demand management: school, business and event travel plans and promotion of alternatives to the car (p.8). (B) Roading: Frankton Road as a 'people corridor' with bus priority lanes in each direction and an access management plan (pp.5, 8); investigation and protection of a new route on the west bank of the Shotover River linking Tuckers Beach Road and Hansen Road to Gorge Road, which also offers a hazard-management role (p.8); Kelvin Heights access improvements (p.9); a Frankton Flats arterial network and seven upgrade projects including the Kawarau Falls Bridge replacement, SH6/SH6A, Glenda Drive and Grants Road intersections and Humphrey Street (p.9); and protection of a Boyd Road link for construction after 2026 (p.10). (C) Passenger transport: 'A bus system is recommended due to its ability to respond to changing demands and cost effectiveness compared to other types of systems' (p.10), with buses about every four minutes on Frankton Road when fully implemented (p.10), supported by ferry services and park-and-ride (pp.5-7). (D) Parking: legibility, better short-stay management and long-stay (commuter) constraint once high-quality passenger transport is in place, including completing Man Street and Gorge Road parking (1,250 spaces), a CBD parking strategy, a residential parking scheme and park-and-ride at Gorge Road, Frankton Flats and Kelvin Heights; these are estimated to transfer about 20% of car trips to passenger transport by 2026 (p.12).

Timing and implementation. The short term focuses on low-cost measures and feasibility of major projects such as SH6A bus priority; passenger transport projects proceed in the medium term; the eastern route and Boyd Road are protected for construction after 2026 (p.7). The document notes 'strong potential' for private enterprise to bring forward bus and ferry services and some roading links (p.7). Implementation is led by QLDC, ORC and Transit New Zealand, with a colour-coded implementation plan (pp.12-13): Transit leads SH6A and state highway components, QLDC/ORC jointly lead passenger transport initiatives, and QLDC leads TDM, parking, the eastern route, Frankton Flats arterials and Kelvin Heights. The plan schedules partial then full public transport priority on SH6A, buses at 10-minute frequency in 2011-2015 rising gradually to four minutes in 2016-2026, and ferry facilities and services (p.13). No costs, benefit-cost ratios or patronage forecasts are given.

Mass rapid transit: The document does not mention mass rapid transit. Its passenger transport recommendation is a high-frequency bus system with bus priority on Frankton Road, chosen for flexibility and cost effectiveness 'compared to other types of systems' (p.10); those other systems are not named or assessed in this summary document.

Key figures

  • Do-nothing: bumper-to-bumper traffic on Frankton Road averaging 20 km/h by 2026 (pp.1, 4)
  • Usually resident population 14,148 (2006) to 31,443 (2026) (p.3)
  • Peak day population 46,354 (2006) to 86,781 (2026) (p.3)
  • Employment 6,494 FTEs (2005) to 16,101 (2026) (p.3)
  • Bus frequency of about every four minutes on Frankton Road when fully implemented (p.10)
  • Man Street and Gorge Road parking providing 1,250 spaces (pp.6, 12)
  • Parking measures estimated to transfer about 20% of car trips to passenger transport by 2026 (p.12)
  • Seven Frankton Flats state highway/arterial upgrade projects including Kawarau Falls Bridge replacement (p.9)

Files

Public copies

Publisher’s own file.

Actions recorded

  • Introduce a full travel demand management programme (school, business and event travel plans; TDM manager; marketing and awareness).

    Not assessed · QLDC · Short term (2007-2010) onwards

    Full introduction of a travel demand management programme

  • Investigate bus priority and access management on Frankton Road (SH6A) through scheme feasibility, assessment and designation.

    Not assessed · NZTA · 2007-2010

    Scheme Feasibility / Scheme Assessment; Scheme Designation

  • Implement partial public transport priority on SH6A with intersection upgrades, then full public transport priority.

    Not assessed · NZTA · Partial 2011-2015; full 2016-2026

    Implementation of partial pt priority - with intersection upgrades

  • Upgrade the SH6/SH6A intersection to include bus priority measures.

    Not assessed · NZTA · Scheme design 2007-2010; implementation 2011-2015

    it will be upgraded to provide buses with a fast route through the intersection

  • Implement high-quality bus services and stops, integrated ticketing and transport centres in the CBD and Frankton; raise frequency from 10 minutes to about every 4 minutes.

    Not assessed · QLDC · 2007-2026 (4-minute frequency by 2026)

    Increase Frequency of Buses gradually up to 4mins

  • Investigate and protect land for ferry facilities, then construct ferry facilities and introduce ferry services between Kelvin Heights and Queenstown CBD.

    Not assessed · QLDC · Investigation short term; services longer term

    Investigation into ferry related infrastructure will take place in the short term

  • Provide park-and-ride at Gorge Road, Frankton Flats and Kelvin Heights.

    Not assessed · QLDC · Limited facilities short term; ongoing medium term

    serving park 'n' ride sites on Gorge Road, Frankton Flats and Kelvin Heights

  • Complete Man Street and Gorge Road parking (1,250 spaces), adopt a CBD parking management strategy and a residential parking scheme.

    Not assessed · QLDC · Short to medium term

    Completion of Man Street and Gorge Road parking, providing 1250 spaces

Show all 15 actions
  • Introduce constraint on long-stay (commuter) parking once enhanced passenger transport is in place.

    Not assessed · QLDC · Medium term

    Introduction of parking constraint for long stay (commuter) parking

  • Investigate and protect an eastern route between Frankton and Queenstown CBD via the west bank of the Shotover River to Gorge Road; construction after 2026.

    Not assessed · QLDC · Investigation now; construction post-2026

    be protected to cater for potential growth

  • Build the Frankton Flats arterial link road network, partly by developers.

    Not assessed · QLDC · 2007-2026

    Construction of sections of Link Road by developers

  • Deliver Frankton Flats state highway components: Glenda Drive and Grant Road roundabouts, a new two-lane Kawarau River bridge and Humphrey Street upgrade.

    Not assessed · NZTA · 2007-2015

    Construct New Kawarau River 2-lane Bridge

  • Investigate and protect a Boyd Road link (potential Frankton bypass) for construction after 2026.

    Not assessed · NZTA · Post 2026

    further investigated and protected for construction after 2026

  • Prepare a concept plan for a Kelvin Heights route parallel to Peninsula Road, delivered mainly by developers through subdivision; Peninsula Road duplication longer term.

    Not assessed · QLDC · 2007-2026

    Concept plan for route running parallel to Peninsula Road

  • Monitor the effects of individual projects and review the strategy periodically.

    Not assessed · NZTA · Ongoing

    Review the strategy periodically

Study cost

A study cost has been requested under the Official Information Act or LGOIMA. No figure has been received.

Citation

Wakatipu Transportation Strategy (2007).

Spotted an error in this entry? Tell us