QTS-108 · Statutory plan · 2025
Annual Plan 2025-2026 (Mahere ā tau), 1 July 2025 - 30 June 2026
QLDC's 2025/26 Annual Plan, year two of the 2024-2034 Long Term Plan, reduces transport capital by $6.1m, to $23.6m against $29.6m in the LTP, 'to align with subsidised transport budgets approved by NZTA and re-prioritise non-subsidised 'local share' budgets' (pp.16, 37). Named transport capital projects of $500k or more are mostly renewals, plus Arterial Stage One ($958,622), Crown Range resilience ($685,501) and Transport Model Replacement ($567,861) (p.18). Public transport is left to Otago Regional Council, which is increasing bus frequency and adding a route (p.9). No mass rapid transit reference was found.
What the document says
Context and purpose. The 2025/26 Annual Plan sets the budget for year two of the 2024-2034 Long Term Plan and was adopted on 26 June 2025 (p.5). It notes the opening of the Town Centre Arterial Road in late January 2025 (p.3).
Transport. Transport capital asset expenditure is $23.6m against $29.6m in the LTP, a variance of $(6.1)m; roading and footpaths capital is $23.2m against $29.5m, 'Decrease to align with NZTA Sub Funding' (p.37). The narrative explains the change as being 'to align with subsidised transport budgets approved by NZTA and re-prioritise non-subsidised 'local share' budgets' (p.16). Grants and subsidies fall from $26.0m to $20.0m, reflecting a 'Reduction in NZTA roading subsidy' (p.32). Transport operating expenditure is $47.4m against $49.2m (p.36). Parking facilities capital rises to $411k from $160k (p.37). The list of projects of $500k or more (p.18) is dominated by renewals (Whakatipu sealed road resurfacing $2.93m, Wānaka $1.73m, rehabilitation and metalling), plus unsubsidised minor improvements (Whakatipu $1.18m, Upper Clutha $0.73m), Crown Range resilience $685,501, Arterial Stage One $958,622 and Transport Model Replacement $567,861; the stated total is $16,812,955. Arterial Stages 2-3, active travel capital and travel demand management are not itemised.
Public transport and parking. Council aims to 'encourage alternative transport options like walking, cycling, and public transport'; 'Otago Regional Council is increasing bus service frequency and introducing a new route from mid-year' (p.9). The transport improvement fund, to subsidise public transport and its infrastructure, has a closing balance of $604k (p.42). The plan refers to reopening the Stanley and Ballarat Street car parks (p.9).
Mass rapid transit: No reference to mass rapid transit was found in the pages read (to p.47 of at least 81).
Key figures
- Transport capital $23.6m vs $29.6m LTP, variance $(6.1)m (p.37)
- Roading and footpaths capital $23.2m vs $29.5m (p.37)
- Transport operating expenditure $47.4m vs $49.2m (p.36)
- Arterial Stage One $958,622; Transport Model Replacement $567,861; Crown Range Resilience $685,501 (p.18)
- Parking facilities capital $411k vs $160k (p.37)
Files
- Open Main document (PDF, 6.5 MB) Opens in a new tab.
Main document
- Open Part 2 (PDF, 7.5 MB) Opens in a new tab.
Part 2
Public copies
Actions recorded
Reduce transport capital by $6.1m to align with NZTA-approved subsidised budgets and reprioritise local share
Not assessed · QLDC · 2025/26
to align with subsidised transport budgets approved by NZTA
Arterial Stage One close-out, $958,622
Not assessed · QLDC · 2025/26
Arterial Stage One: $958,622
Replace the transport model, $567,861
Not assessed · QLDC · 2025/26
Transport Model Replacement
Crown Range resilience works (Whakatipu), $685,501
Not assessed · QLDC · 2025/26
Crown Range Resilience
Parking facilities capital $411k; reopen Stanley and Ballarat Street car parks
Not assessed · QLDC · 2025/26
reopening of the Stanley and Ballarat Street car parks
Increase bus service frequency and introduce a new route
Not assessed · ORC · From mid-2025
Otago Regional Council is increasing bus service frequency
Study cost
Not separately commissioned. This is an internal or corporate document.
Citation
Annual Plan 2025-2026 (Mahere ā tau), 1 July 2025 - 30 June 2026 (2025).