QTS-097 · Policy review · 2024Draft
Queenstown Road Pricing Proof-of-Concept Study
Public source URL not yet recorded.
Proof-of-concept study by Abley for QLDC, developed with officers from QLDC, ORC and NZTA (Waka Kotahi) through four workshops, testing whether road pricing could help Queenstown's congested network. It states that earlier business case work found a 'clear deficit' between what infrastructure and public transport improvements can deliver and what is needed, and that public transport improvements alone will be insufficient. Network performance was agreed as the primary objective. Of three short-listed concepts, the preferred is Concept B: five charging gates (SH6A east of Marina Drive, Gorge Road, Fernhill, Shotover River Bridge, Kawarau Falls Bridge), $5 in the weekday peaks and $2 interpeak, one charge per trip. Indicative analysis on 2023 data estimates a 10–17% reduction in SH6A traffic, shorter 95th-percentile travel times, 300,000–400,000 extra annual bus boardings and about $27m annual net revenue (other figures in the report differ). It concludes road pricing 'appears' feasible and recommends further investigation, including equity, tourist impacts, detailed modelling and staged public engagement. The study states there is no enabling legislation and that it does not constitute Council policy. It does not mention mass rapid transit.
What the document says
Context and purpose: The Whakatipu Basin population is expected to double in 30 years, with an 80% increase in housing and 45% in employment (p.2). Recent business cases (QBC 2021, QPTBC 2024, TDM SSBC 2023) identified solutions, but also 'a clear deficit between what the infrastructure and public transport improvements can deliver, and what is required to maintain acceptable network function', and funding remains uncertain (p.2). QLDC, as part of Way to Go, commissioned this proof of concept (PoC) to understand how road pricing might support transport objectives (p.7). It is 'for conceptualisation and framing only' and 'does not constitute Council policy' (pp.2, 7). There is no enabling legislation; the GPS 2024 signals time-of-use charging reform (pp.2, 13–14).
Method: Four facilitated workshops with QLDC, ORC and NZTA officers set principles and objectives, generated and shortlisted concepts, considered complementary measures and future-proofing (pp.7, 15). Analysis used elasticities from Stockholm (-0.87) and Gothenburg (-0.69), TomTom origin–destination data calibrated to NZTA counts, MBCM diversion rates (40% of trip reductions to PT), a $0.75 transaction cost and a 50% revenue reduction for variable pricing (pp.20–21). Equity and environmental impacts were out of scope (p.8).
Context findings: The QBC found SH6A practical capacity was exceeded on about 140 days in 2019 (p.9). Business case analysis 'indicated that the public transport improvements alone will be insufficient to maintain an acceptable transport network level of service', and there is a risk that mode shift will not be achieved through 'pull' measures alone, since buses largely use the same congested network (pp.9–10).
Options: Six concepts were reduced to three (p.18): A, a single SH6A gate (17–24% SH6A reduction, $10m net revenue, but diversion via Gorge Road and the one-lane Edith Cavell Bridge); B, multiple gates (10–17%, 95th-percentile SH6A time 25→20 min, $27m, 300–400k new PT boardings); C, multiple zones (11–18%, $35m, 400–900k boardings) (p.21). Stakeholders preferred B as more targeted, user-centric and legible (p.23). Gates: SH6A east of Marina Drive, Gorge Road, Fernhill, Shotover River Bridge, Kawarau Falls Bridge; $5 peak (7–10am, 4–7pm), $2 interpeak, weekdays, capped at one charge per trip (p.23).
Future years: Against QPTBC 2039 scenarios, maintaining 2023-equivalent performance needs about $15 peak charge with minimal PT (Do Minimum) or about $10 with Bus Max, each generating about $40m net revenue (p.25). Road pricing 'can make a significant contribution to achieving the target mode share' but is 'not a complete solution' (p.26). Three of the five gates are on state highways, so NZTA could set charges with revenue returned to the region (p.27).
Engagement and recommendations: A staged approach is proposed: Council briefing (Stage 0), key stakeholders, public engagement and a deliberative democracy process (pp.28–30). The study 'does not recommend that the scheme concept be implemented without further investigation', and lists equity, tourist impacts, pre-requisites (viable PT alternatives) and revenue hypothecation for further work (pp.31–32). Key findings: road pricing could reduce congestion, increase PT mode share and generate net revenue (p.32).
Mass rapid transit: The document says nothing about mass rapid transit. Complementary measures discussed are bus-based (the QPTBC 'Bus Max' option), active modes, trip timing and travel demand management.
Key figures
- Population expected to double in 30 years; housing +80%, employment +45% (p.2)
- Preferred five-gate scheme: $5 AM/PM peak, $2 interpeak, weekdays, max one charge per trip (p.23)
- Executive summary: SH6A AM peak traffic -8 to -14%, PM -7 to -12%; travel times -18%/-20%; +170,000–250,000 PT boardings; ≈$22m annual revenue (p.3)
- Concept B: SH6A traffic -10 to -17%; 95th percentile SH6A time 25→20 min; $27m annual net revenue; 300–400k new annual PT boardings (p.21)
- Concept A: -17 to -24%, $10m; Concept C: -11 to -18%, $35m (p.21)
- 2023 preferred concept at $5: ~$11m net revenue, SH6A 25→19 min (Table 4.4, p.25)
- 2039: ~$15 peak charge needed with QPTBC Do Minimum, ~$10 with Bus Max, each ~$40m net revenue (p.25)
- SH6A practical capacity exceeded on ~140 days in 2019 (QBC, cited p.9)
- Assumed transaction cost $0.75 per charging event (p.20)
Files
- Open Main document (PDF, 2.2 MB) Opens in a new tab.
Main document
Actions recorded
Investigate road pricing further; do not implement the scheme concept without further investigation of equity, social acceptability and detailed modelling.
Not assessed · Way to Go
road pricing is feasible and further investigation is recommended
Undertake detailed transportation modelling addressing PoC limitations (variable pricing, diversion, travel times, base/future year alignment).
Not assessed · If taken forward
detailed transport modelling addressing these limitations is undertaken
Assess equity impacts on low-income and car-dependent households and identify mitigations, including minimal discounts/exemptions.
Not assessed · If scheme advanced
further modelling and analysis is recommended if the scheme is to be advanced
Assess tourist impacts and the cost share between residents and visitors.
Not assessed
perceived cost share between residents and visitors was appropriately assessed
Determine scheme pre-requisites: viable PT alternatives and infrastructure upgrades programmed to align with any scheme introduction.
Not assessed · Prior to any scheme
Having viable and attractive alternatives... was seen as desirable
Hypothecate net revenue to transport system maintenance, operation and enhancement; consider NZTA setting charges with revenue returned to the region.
Not assessed · NZTA
Allocating all revenue generation to system maintenance, operation and enhancements
Stage 0: hold briefing workshop with Councillors and QLDC Executive to socialise PoC findings.
Not assessed · QLDC · Before further public engagement
it is recommended that a briefing workshop is held with Councillors and QLDC Executive
Stage 1–2: engage key stakeholders and the public to build understanding of congestion and social licence before socialising road pricing.
Not assessed · QLDC
Stage 1 – Key Stakeholder Engagement... Stage 2 – Public Engagement
Show all 10 actions
Stage 3: use a two-phase deliberative democracy process with broader consultation, delivered by qualified practitioners (e.g. IAP2).
Not assessed · QLDC · Dependent on Council timeline
a two-phase approach is recommended that combines a deliberative democracy approach
Consider bringing forward analysis so QLDC concerns inform Government time-of-use charging legislation decisions (Q3 2024 Action Plan).
Not assessed · QLDC · Q3 2024
bringing forward development and analysis activity may be warranted
Study cost
A study cost has been requested under the Official Information Act or LGOIMA. No figure has been received.
Citation
QLDC. Queenstown Road Pricing Proof-of-Concept Study (2024). QLDC-J074.