[
  {
    "id": "qts-001",
    "code": "QTS-001",
    "title": "Wakatipu Transportation Strategy",
    "shortTitle": "Wakatipu Transportation Strategy",
    "summary": "Joint strategy of Queenstown Lakes District Council (QLDC), Transit New Zealand and Otago Regional Council (ORC) setting the direction for Wakatipu transport to 2026. It warns that under a 'do nothing' approach Frankton Road (SH6A) would carry bumper-to-bumper traffic averaging 20 km/h by 2026, and states there is no 'business-as-usual' option of private cars meeting future growth. The strategy combines four measures: travel demand management; roading development (a 'people corridor' on Frankton Road with bus priority lanes and access management, a Frankton Flats arterial network and state highway intersection upgrades, and investigation and route protection of an 'eastern route' to Gorge Road and a Boyd Road link for after 2026); passenger transport (a high-frequency bus system, about every four minutes on Frankton Road when fully implemented, with ferry and park-and-ride); and parking management (completing Man Street and Gorge Road parking, about 1,250 spaces, CBD parking management and commuter parking constraint). A bus system is recommended for its responsiveness and cost effectiveness compared with other types of systems. Parking measures are estimated to shift about 20% of car trips to passenger transport by 2026. An implementation plan assigns lead agencies across 2007-2010, 2011-2015, 2016-2026 and post-2026. No mass rapid transit is mentioned.",
    "documentType": "Transport strategy",
    "documentForm": "Joint transport strategy (summary publication with implementation plan)",
    "year": 2007,
    "publishedDate": "2007-11",
    "documentStatus": "Not stated",
    "geographicScope": "Wakatipu Basin; Frankton Road (SH6A); Queenstown CBD; Frankton Flats; Kelvin Heights; Gorge Road",
    "owner": "QLDC, ORC and Transit New Zealand",
    "citation": "Wakatipu Transportation Strategy (2007).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/sudkcbm4/pc21_wakatipu_transport_strategy.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/sudkcbm4/pc21_wakatipu_transport_strategy.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc"
    ],
    "searchText": "qts-001 wakatipu transportation strategy wakatipu transportation strategy joint strategy of queenstown lakes district council (qldc), transit new zealand and otago regional council (orc) setting the direction for wakatipu transport to 2026. it warns that under a 'do nothing' approach frankton road (sh6a) would carry bumper-to-bumper traffic averaging 20 km/h by 2026, and states there is no 'business-as-usual' option of private cars meeting future growth. the strategy combines four measures: travel demand management; roading development (a 'people corridor' on frankton road with bus priority lanes and access management, a frankton flats arterial network and state highway intersection upgrades, and investigation and route protection of an 'eastern route' to gorge road and a boyd road link for after 2026); passenger transport (a high-frequency bus system, about every four minutes on frankton road when fully implemented, with ferry and park-and-ride); and parking management (completing man street and gorge road parking, about 1,250 spaces, cbd parking management and commuter parking constraint). a bus system is recommended for its responsiveness and cost effectiveness compared with other types of systems. parking measures are estimated to shift about 20% of car trips to passenger transport by 2026. an implementation plan assigns lead agencies across 2007-2010, 2011-2015, 2016-2026 and post-2026. no mass rapid transit is mentioned. context and purpose. the wakatipu transportation strategy (november 2007) is the outcome of the wakatipu transportation study, undertaken in partnership by queenstown lakes district council (qldc), transit new zealand (a predecessor of nzta (waka kotahi)) and otago regional council (orc) (p.4). it responds to rapid growth: the usually resident wakatipu population is forecast to rise from 14,148 (2006) to 31,443 (2026), peak day population from 46,354 to 86,781, and employment from 6,494 ftes (2005) to 16,101 (p.3). it traces its direction to the future link strategy 2005 and aims for a strategy 'based on strong support for passenger transport' (p.4). method. the study ran in four stages: problem identification, assessment of individual options, a combined draft strategy consulted on in may 2007, and completion of the strategy (p.4). a 'do nothing' scenario is included for context only: by 2026 frankton road would have bumper-to-bumper traffic averaging 20 km/h, with major intersection delays (pp.1, 4). risk management principles include staging 'big ticket/no going back' items, monitoring, retaining options for future generations and periodic review (p.4). the strategy. four complementary measures are proposed (p.5). (a) travel demand management: school, business and event travel plans and promotion of alternatives to the car (p.8). (b) roading: frankton road as a 'people corridor' with bus priority lanes in each direction and an access management plan (pp.5, 8); investigation and protection of a new route on the west bank of the shotover river linking tuckers beach road and hansen road to gorge road, which also offers a hazard-management role (p.8); kelvin heights access improvements (p.9); a frankton flats arterial network and seven upgrade projects including the kawarau falls bridge replacement, sh6/sh6a, glenda drive and grants road intersections and humphrey street (p.9); and protection of a boyd road link for construction after 2026 (p.10). (c) passenger transport: 'a bus system is recommended due to its ability to respond to changing demands and cost effectiveness compared to other types of systems' (p.10), with buses about every four minutes on frankton road when fully implemented (p.10), supported by ferry services and park-and-ride (pp.5-7). (d) parking: legibility, better short-stay management and long-stay (commuter) constraint once high-quality passenger transport is in place, including completing man street and gorge road parking (1,250 spaces), a cbd parking strategy, a residential parking scheme and park-and-ride at gorge road, frankton flats and kelvin heights; these are estimated to transfer about 20% of car trips to passenger transport by 2026 (p.12). timing and implementation. the short term focuses on low-cost measures and feasibility of major projects such as sh6a bus priority; passenger transport projects proceed in the medium term; the eastern route and boyd road are protected for construction after 2026 (p.7). the document notes 'strong potential' for private enterprise to bring forward bus and ferry services and some roading links (p.7). implementation is led by qldc, orc and transit new zealand, with a colour-coded implementation plan (pp.12-13): transit leads sh6a and state highway components, qldc/orc jointly lead passenger transport initiatives, and qldc leads tdm, parking, the eastern route, frankton flats arterials and kelvin heights. the plan schedules partial then full public transport priority on sh6a, buses at 10-minute frequency in 2011-2015 rising gradually to four minutes in 2016-2026, and ferry facilities and services (p.13). no costs, benefit-cost ratios or patronage forecasts are given. mass rapid transit: the document does not mention mass rapid transit. its passenger transport recommendation is a high-frequency bus system with bus priority on frankton road, chosen for flexibility and cost effectiveness 'compared to other types of systems' (p.10); those other systems are not named or assessed in this summary document. joint transport strategy (summary publication with implementation plan) wakatipu transportation strategy (2007). wakatipu basin; frankton road (sh6a); queenstown cbd; frankton flats; kelvin heights; gorge road not stated (published final strategy) no mass rapid transit reference; recommends a high-frequency bus service with frankton road bus priority. an ordinary bus service is not mass rapid transit. do-nothing: bumper-to-bumper traffic on frankton road averaging 20 km/h by 2026 (pp.1, 4) usually resident population 14,148 (2006) to 31,443 (2026) (p.3) peak day population 46,354 (2006) to 86,781 (2026) (p.3) employment 6,494 ftes (2005) to 16,101 (2026) (p.3) bus frequency of about every four minutes on frankton road when fully implemented (p.10) man street and gorge road parking providing 1,250 spaces (pp.6, 12) parking measures estimated to transfer about 20% of car trips to passenger transport by 2026 (p.12) seven frankton flats state highway/arterial upgrade projects including kawarau falls bridge replacement (p.9) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/sudkcbm4/pc21_wakatipu_transport_strategy.pdf qldc, orc and transit new zealand none transport strategy not stated 2007 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta prepared orc orc prepared qldc qldc prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner introduce a full travel demand management programme (school, business and event travel plans; tdm manager; marketing and awareness). full introduction of a travel demand management programme short term (2007-2010) onwards not assessed qldc qldc investigate bus priority and access management on frankton road (sh6a) through scheme feasibility, assessment and designation. scheme feasibility / scheme assessment; scheme designation 2007-2010 not assessed nzta waka kotahi nzta implement partial public transport priority on sh6a with intersection upgrades, then full public transport priority. implementation of partial pt priority - with intersection upgrades partial 2011-2015; full 2016-2026 not assessed nzta waka kotahi nzta upgrade the sh6/sh6a intersection to include bus priority measures. it will be upgraded to provide buses with a fast route through the intersection scheme design 2007-2010; implementation 2011-2015 not assessed nzta waka kotahi nzta implement high-quality bus services and stops, integrated ticketing and transport centres in the cbd and frankton; raise frequency from 10 minutes to about every 4 minutes. increase frequency of buses gradually up to 4mins 2007-2026 (4-minute frequency by 2026) not assessed qldc qldc investigate and protect land for ferry facilities, then construct ferry facilities and introduce ferry services between kelvin heights and queenstown cbd. investigation into ferry related infrastructure will take place in the short term investigation short term; services longer term not assessed qldc qldc provide park-and-ride at gorge road, frankton flats and kelvin heights. serving park 'n' ride sites on gorge road, frankton flats and kelvin heights limited facilities short term; ongoing medium term not assessed qldc qldc complete man street and gorge road parking (1,250 spaces), adopt a cbd parking management strategy and a residential parking scheme. completion of man street and gorge road parking, providing 1250 spaces short to medium term not assessed qldc qldc introduce constraint on long-stay (commuter) parking once enhanced passenger transport is in place. introduction of parking constraint for long stay (commuter) parking medium term not assessed qldc qldc investigate and protect an eastern route between frankton and queenstown cbd via the west bank of the shotover river to gorge road; construction after 2026. be protected to cater for potential growth investigation now; construction post-2026 not assessed qldc qldc build the frankton flats arterial link road network, partly by developers. construction of sections of link road by developers 2007-2026 not assessed qldc qldc deliver frankton flats state highway components: glenda drive and grant road roundabouts, a new two-lane kawarau river bridge and humphrey street upgrade. construct new kawarau river 2-lane bridge 2007-2015 not assessed nzta waka kotahi nzta investigate and protect a boyd road link (potential frankton bypass) for construction after 2026. further investigated and protected for construction after 2026 post 2026 not assessed nzta waka kotahi nzta prepare a concept plan for a kelvin heights route parallel to peninsula road, delivered mainly by developers through subdivision; peninsula road duplication longer term. concept plan for route running parallel to peninsula road 2007-2026 not assessed qldc qldc monitor the effects of individual projects and review the strategy periodically. review the strategy periodically ongoing not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2007-11-01",
    "cover": {
      "src": "/covers/QTS-001.webp",
      "srcset": "/covers/QTS-001.webp 400w, /covers/QTS-001-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-001/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-001/QTS-001-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-002",
    "code": "QTS-002",
    "title": "10 Year Plan 2015-2025 (Volume 1: Overview and Activities; Volume 2: supporting documents)",
    "shortTitle": "10 Year Plan 2015-2025",
    "summary": "QLDC's 2015-2025 Ten Year Plan (Long Term Plan), adopted 30 June 2015, sets the Council's ten-year activities, budgets and financial strategy. Transport is framed largely as strategy rather than itemised capital: the plan allows 'over $184m for roading, footpaths and transport, spread over ten years' (Vol 1 p.50), brings the Eastern Access Road forward with an $8.30m budget increase (Vol 1 pp.10-11), records consultation on a draft Queenstown Town Centre Transport Strategy, and reports that 51.4% of 311 submitters opposed higher parking charges, after which Council decided it 'will not increase parking cost in isolation' (Vol 1 p.50). Volume 2's capital table lists the Eastern Access Road ($13.3m) and road renewals but no parking, public transport or cycleway lines in the portion read. No mass rapid transit reference was found.",
    "documentType": "Statutory plan",
    "documentForm": "Ten Year Plan / Long Term Plan (two volumes)",
    "year": 2015,
    "publishedDate": "2015-06-30",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "10 Year Plan 2015-2025 (Volume 1: Overview and Activities; Volume 2: supporting documents) (2015).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/tmdnitqh/qldc-2015-2025-ten-year-plan-volume-1.pdf",
      "https://www.qldc.govt.nz/media/110l3trm/qldc-2015-2025-ten-year-plan-volume-2.pdf",
      "https://www.qldc.govt.nz/media/o3ikleym/qldc-2015-2025-ten-year-plan-volume-1.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-002 10 year plan 2015-2025 (volume 1: overview and activities; volume 2: supporting documents) 10 year plan 2015-2025 qldc's 2015-2025 ten year plan (long term plan), adopted 30 june 2015, sets the council's ten-year activities, budgets and financial strategy. transport is framed largely as strategy rather than itemised capital: the plan allows 'over $184m for roading, footpaths and transport, spread over ten years' (vol 1 p.50), brings the eastern access road forward with an $8.30m budget increase (vol 1 pp.10-11), records consultation on a draft queenstown town centre transport strategy, and reports that 51.4% of 311 submitters opposed higher parking charges, after which council decided it 'will not increase parking cost in isolation' (vol 1 p.50). volume 2's capital table lists the eastern access road ($13.3m) and road renewals but no parking, public transport or cycleway lines in the portion read. no mass rapid transit reference was found. context and purpose. the 2015-2025 ten year plan is qldc's statutory long term plan under the local government act 2002, adopted on 30 june 2015 (vol 1 p.8). volume 1 (overview and activities) carries the mayor's and chief executive's messages and activity statements; volume 2 holds the financial strategy, the 2015-2045 infrastructure strategy, financial statements and policies (vol 2 contents). transport. the chief executive identifies roading as the biggest cost at $118m (vol 1 p.6), and the transport activity allows 'over $184m for roading, footpaths and transport, spread over ten years' (vol 1 p.50). the eastern access road (eastern arterial route) across frankton flats was brought forward to 2015/16-2016/17 with a capital increase of $8,300,176 ($1,561,489 in 2015/16 and $6,738,675 in 2016/17) (vol 1 pp.10-11); volume 2's capital expenditure table shows it at $13.3m in total ($5.0m 2015/16, $8.3m 2016/17) (vol 2 pp.12-13). other wakatipu transport capital in that table is renewals: sealed road surfacing $14.6m, unsealed road metalling $7.1m, pavement rehabilitation $4.5m, crown range and glenorchy road resurfacing, and the edith cavell bridge ($4.34m, 2024/25). no itemised capital line for parking, public transport, the town centre or cycleways was found in the text read. strategy, parking and public transport. a draft queenstown town centre transport strategy was consulted on (closing may 2015) with no budget attached (vol 1 p.50). a proposal to make all-day parking 'more expensive and less convenient in downtown queenstown' drew 311 submissions, '51.4% saying we should not increase parking charges', and council decided it 'will not increase parking cost in isolation' (vol 1 p.50). the plan anticipates 'improved provision of public transport services in the wakatipu' and a wānaka public transport business plan with otago regional council (vol 1 p.49), with transport funded from local and central government sources; no nzta subsidy figure is stated. what followed. mass rapid transit: the text read contains no reference to mass rapid transit. ten year plan / long term plan (two volumes) 10 year plan 2015-2025 (volume 1: overview and activities; volume 2: supporting documents) (2015). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted (volume 2 marked 'audited') no reference to mass rapid transit found in the text read roading, footpaths and transport 'over $184m' over ten years (vol 1 p.50) roading the biggest cost at $118m (vol 1 p.6) eastern access road capital increase $8,300,176 (vol 1 pp.10-11); $13.3m total in capex table (vol 2 pp.12-13) parking consultation: 311 submissions, 51.4% opposed higher parking charges (vol 1 p.50) wakatipu sealed road surfacing $14.621m over ten years (vol 2 pp.12-13) edith cavell bridge $4.34m in 2024/25 (vol 2 pp.12-13) not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2015 bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published adam feeley signatory qldc qldc vanessa van uden signatory qldc qldc bring forward and construct the eastern access road across frankton flats, with an $8.30m capital increase ($13.3m total) capital cost and funding increased by $8,300,176 2015/16-2016/17 not assessed qldc qldc finalise the queenstown town centre transport strategy after consultation draft strategy consulted on, consultation closing may 2015 not assessed qldc qldc do not increase central queenstown parking charges in isolation, following the 51.4% opposition in consultation council has decided it will not increase parking cost in isolation not assessed qldc qldc improve provision of public transport services in the wakatipu improved provision of public transport services in the wakatipu not assessed qldc qldc prepare a wānaka public transport business plan with otago regional council covering scheduled services business plan with the otago regional council after 2026 (services) not assessed qldc qldc wakatipu road renewals: sealed road surfacing $14.6m, unsealed metalling $7.1m, pavement rehabilitation $4.5m wakatipu - sealed road surfacing 14,621 2015/16-2024/25 not assessed qldc qldc edith cavell bridge works, $4.34m edith cavell bridge 4,340 2024/25 not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2015-06-30",
    "cover": {
      "src": "/covers/QTS-002.webp",
      "srcset": "/covers/QTS-002.webp 400w, /covers/QTS-002-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-002/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-002/QTS-002-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-002/QTS-002-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-003",
    "code": "QTS-003",
    "title": "Annual Report 2015/2016",
    "shortTitle": "Annual Report 2015/2016",
    "summary": "QLDC's 2015/16 Annual Report reports performance against year one of the 2015-2025 Ten Year Plan. Council capital expenditure was $14.4m below estimate (p.6); $8.2m of roading capital was delivered (p.61). The Eastern Access Road route was finalised, design peer reviewed and NZTA funding secured, with $1.25m spent and $2.9m carried forward (pp.5, 11, 60). The report records a CBD parking review, Frankton and central Queenstown parking changes, a district Transport Strategy aiming to make public transport 'affordable, reliable and accessible', and initial investigation of park and ride for Queenstown (pp.5, 60). Several roading cost KPIs were not met (p.62). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2016,
    "publishedDate": "2016-10-06",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Report 2015/2016 (2016).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/e5rhk5um/qldc-annual-report-1516.pdf",
      "https://www.qldc.govt.nz/media/cwnhs43y/annual-report-summary-15-16.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-003 annual report 2015/2016 annual report 2015/2016 qldc's 2015/16 annual report reports performance against year one of the 2015-2025 ten year plan. council capital expenditure was $14.4m below estimate (p.6); $8.2m of roading capital was delivered (p.61). the eastern access road route was finalised, design peer reviewed and nzta funding secured, with $1.25m spent and $2.9m carried forward (pp.5, 11, 60). the report records a cbd parking review, frankton and central queenstown parking changes, a district transport strategy aiming to make public transport 'affordable, reliable and accessible', and initial investigation of park and ride for queenstown (pp.5, 60). several roading cost kpis were not met (p.62). no mass rapid transit reference was found. context and purpose. the annual report accounts for qldc's 2015/16 performance against the first year of the 2015-2025 ten year plan. it was signed by the mayor and chief executive on 6 october 2016 (p.20). transport. 'there is $8.2m of capital work for roading' (p.61). council-wide capital expenditure was $14.4m below estimate (p.6). the eastern access road route around frankton flats was finalised (p.5), its design reviewed and peer reviewed with nzta funding secured (p.60); hawthorne drive / eastern access road spend was $1.25m with $2.9m carried forward to 2016/17 (p.11). the district transport strategy 'aims to make public transport affordable, reliable and accessible', cbd parking was reviewed, and 'initial steps have also been undertaken to investigate park and ride options for queenstown' (p.60). parking changes were made in frankton and central queenstown (p.5). performance. sealed road maintenance cost $214.55/km against a $129 target and unsealed $98.37/km against $85 (not met); sealed road closures 0.25 per month (met); satisfaction with sealed roads 59% and footpaths 57% (pp.62-63). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report annual report 2015/2016 (2016). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read roading capital work $8.2m (p.61) capital expenditure $14.4m below estimate (p.6) eastern access road spend $1.25m; $2.9m carried forward to 2016/17 (p.11) sealed road maintenance $214.55/km vs $129 target (p.62) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2016 bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published mike theelen signatory qldc qldc vanessa van uden signatory qldc qldc carry forward $2.9m of eastern access road / hawthorne drive budget to 2016/17 $2.9m was carried forward 2016/17 not assessed qldc qldc investigate park and ride options for queenstown initial steps have also been undertaken to investigate park and ride options not assessed qldc qldc review cbd parking review of cbd parking not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2016-10-06",
    "cover": {
      "src": "/covers/QTS-003.webp",
      "srcset": "/covers/QTS-003.webp 400w, /covers/QTS-003-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-003/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-003/QTS-003-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-003/QTS-003-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-004",
    "code": "QTS-004",
    "title": "Queenstown Transport Taskforce Report",
    "shortTitle": "Queenstown Transport Taskforce Report",
    "summary": "Final report (February 2017) of the Queenstown Transport Taskforce, a volunteer group of local industry representatives and residents established by Shaping Our Future after public forums in 2015, with a second forum on the draft in November 2016. It sets a 2046 vision of an 'innovative, functional, integrated, multi-modal and sustainable transport system'. Its main recommendation is that Queenstown Lakes District Council (QLDC) lead the creation of a single Transport Entity of QLDC, NZTA and Otago Regional Council (ORC) to plan, fund and implement transport improvements. The entity would pursue integrated strategic and spatial planning, a district-wide long-term transport strategy including a Wakatipu masterplan, protection of public transport corridors and hubs, a shift from private and rental cars to public transport and innovative modes (e.g. automated shared vehicles, e-bikes, water taxis, mass rapid transit, monorail), commuter cycling corridors, progressive pedestrianisation of the CBD, and new funding sources such as a visitor levy or congestion charging. More detailed recommendations cover bus priority or a dedicated public transport corridor Frankton-CBD, behaviour research, parking management, community culture and funding. The report includes a baseline analysis and KPIs.",
    "documentType": "Community report",
    "documentForm": "Community taskforce report with recommendations",
    "year": 2017,
    "publishedDate": "2017-02",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown CBD; Frankton and Frankton Flats; Arrowtown; Glenorchy; Kingston (with relevance to Upper Clutha)",
    "owner": "Community organisation",
    "citation": "Queenstown Transport Taskforce Report (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.shapingourfuture.org.nz/s/Queenstown-Transport-2017-Report.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.shapingourfuture.org.nz/s/Queenstown-Transport-2017-Report.pdf"
    ],
    "documentTypeCode": "community-report",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "shaping-our-future",
      "central-government-ministers",
      "qldc"
    ],
    "searchText": "qts-004 queenstown transport taskforce report queenstown transport taskforce report final report (february 2017) of the queenstown transport taskforce, a volunteer group of local industry representatives and residents established by shaping our future after public forums in 2015, with a second forum on the draft in november 2016. it sets a 2046 vision of an 'innovative, functional, integrated, multi-modal and sustainable transport system'. its main recommendation is that queenstown lakes district council (qldc) lead the creation of a single transport entity of qldc, nzta and otago regional council (orc) to plan, fund and implement transport improvements. the entity would pursue integrated strategic and spatial planning, a district-wide long-term transport strategy including a wakatipu masterplan, protection of public transport corridors and hubs, a shift from private and rental cars to public transport and innovative modes (e.g. automated shared vehicles, e-bikes, water taxis, mass rapid transit, monorail), commuter cycling corridors, progressive pedestrianisation of the cbd, and new funding sources such as a visitor levy or congestion charging. more detailed recommendations cover bus priority or a dedicated public transport corridor frankton-cbd, behaviour research, parking management, community culture and funding. the report includes a baseline analysis and kpis. context and purpose. shaping our future held transport forums in wanaka and queenstown in may 2015 (103 attendees) and set up taskforces in july 2015; a second public forum on the draft report in november 2016 drew over 90 participants, and the report states the recommendations and vision were agreed by the community (p.5). the queenstown transport taskforce comprises volunteers from local industry and residents (p.5). its scope is the wakatipu basin, glenorchy, arrowtown and kingston, focused on integrated spatial planning, public transport, community culture and funding (p.5). baseline. the report notes daily visitor numbers exceed the resident population of about 30,000 by 60% on average (48,000 people) and 215% at peaks (94,500), citing a 2014 economic development report (pp.3, 14); topography limits road expansion; and the ratepayer base is inadequate to maintain or extend key infrastructure (p.3). it cites qldc's expectation of a total resident population of about 150,000 by 2045 (p.3). over 5,000 cars enter the town centre between 7 and 11am (march 2014); sh6 at frankton averaged 20,000 vehicles per day at the end of 2015 and 24,000 in early 2016, with a peak of 28,500 (pp.14-15); about 1,000 cars park all day in the town centre and around 80% of 458 on-street short-stay parks are occupied during the day (p.15). the existing bus service is described as poorly used by residents (p.15). vision. 'the queenstown lakes district has an innovative, functional, integrated, multi-modal and sustainable transport system that supports a thriving, healthy community and enhances the visitor experience' (pp.1, 9), with sub-visions for integrated strategic planning, public transport and community culture (pp.16, 19, 21). recommendations. (1) qldc to lead the establishment of a single transport entity of qldc, nzta and orc, with independence, authority, expertise, funding and accountability, citing vancouver 2040, marlborough roads and auckland transport as examples (pp.3, 11). (2) the entity to deliver integrated strategic planning; spatial planning including mixed use and densification; leadership on new technology; an integrated district-wide long-term transport strategy including a wakatipu masterplan, identification and protection of public transport corridors and hubs, and 'a fundamental transformation' to public transport and innovative modes 'e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail, etc.'; commuter cycling and walking corridors; progressive cbd pedestrianisation; and collective funding sources such as a visitor levy, congestion charging and central government funding (p.4). (3) the shaping our future steering group to present the report to the minister of transport (p.4). detailed recommendations (pp.12-14) include an integrated strategic plan with a frankton flats priority, affordable worker accommodation, scenario planning, behavioural research, bus priority measures 'or dedicated public transport corridor where possible, initially frankton - cbd', incentives and real-time information, public transport hubs for bus and water transport, commuter cycling facilities, parking management and progressive reduction of on-street parking, community engagement, and investigation of funding solutions including third-party funding agreements. each theme has kpis, such as public transport patronage on selected routes exceeding private vehicle use (p.20) and 60% of school children using active, public or school transport (p.22). mass rapid transit: the report refers to mass rapid transit only in passing, listing 'gondolas, monorail' among 'innovative forms of transport' in its recommended shift away from private cars (p.4). it also recommends a 'dedicated public transport corridor where possible, initially frankton - cbd' (p.12) and identifies limited 'space/land available for a key transport corridor between frankton and queenstown' as a delivery issue (p.20). it does not assess mass rapid transit. community taskforce report with recommendations queenstown transport taskforce report (2017). wakatipu basin; queenstown cbd; frankton and frankton flats; arrowtown; glenorchy; kingston (with relevance to upper clutha) final report mentions mass rapid transit among innovative modes that could replace car use; recommends a dedicated frankton-cbd public transport corridor where possible. e-bikes and water taxis in the same list are not mass rapid transit. the taskforce's integrated strategy recommendation calls for 'a fundamental transformation from the use of private/rental cars and campervans to public transport and innovative forms of transport, e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail, etc.' (p.4), alongside 'identification, protection and development of key public transport corridors and transport hubs needed now and into the future' (p.4). under public transport it recommends 'identification and development of bus priority measures (or dedicated public transport corridor where possible), initially frankton - cbd' (p.12). among potential issues it lists 'space/land available for a key transport corridor between frankton and queenstown and around the basin' (p.20). no route, cost or technology assessment is given. \"a fundamental transformation from the use of private/rental cars and campervans to public transport and innovative forms of transport, e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail, etc.\" (p.4) | \"identification and development of bus priority measures (or dedicated public transport corridor where possible), initially frankton - cbd\" (p.12) | \"space/land available for a key transport corridor between frankton and queenstown and around the basin.\" (p.20) daily visitors exceed residents (about 30,000) by 60% on average (48,000 total) and 215% at peaks (94,500) (pp.3, 14) qldc expects total resident population of about 150,000 by 2045 (p.3) over 5,000 cars enter the town centre 7-11am (march 2014) (p.14) sh6 frankton about 20,000 vpd end 2015, 24,000 early 2016, peak 28,500 (p.15) about 1,000 cars park all day in the town centre; about 80% of 458 on-street short-stay parks occupied (p.15) forums: 103 attendees (may 2015); over 90 participants on the draft (nov 2016) (p.5) a separate study cost was not requested. https://www.shapingourfuture.org.nz/s/queenstown-transport-2017-report.pdf community organisation passing community report final 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. shaping our future shaping our future prepared shaping our future shaping our future published central government / ministers central government / ministers recipient lead the establishment of a single transport entity of qldc, nzta and orc to oversee planning, funding and implementation of transport improvements. qldc to lead the establishment of a single transport entity not assessed qldc qldc develop integrated strategic planning and spatial planning, including mixed-use zones and densification within urban boundaries. integrated strategic planning not assessed take a leadership role in using new technology for a proactive, flexible transport system. mandate for the transport entity to take a leadership role in the use of new technology not assessed develop an integrated district-wide long-term transport strategy, including a wakatipu basin masterplan and identification and protection of key public transport corridors and hubs. development of an integrated district wide long-term transport strategy not assessed pursue a fundamental shift from private and rental cars to public transport and innovative modes such as automated shared vehicles, e-bikes, water taxis and mass rapid transit. e.g. automated shared vehicles, e-bikes, water taxis, gondolas, monorail not assessed provide safe commuter cycling and walking corridors linking key destinations, residential areas and the trails network, with end-of-trip facilities. provide a framework of direct, clearly signed and safe commuter cycling facilities not assessed progressively pedestrianise the queenstown cbd and design new town centres to be pedestrian friendly. the queenstown cbd should be progressively pedestrianised progressive not assessed explore and secure collective additional funding sources, e.g. a visitor levy, congestion charging and central government funding. explore and secure collective sources of additional funding not assessed present the transport report to the minister of transport. shaping our future steering group to present the transport report to the minister of transport not assessed shaping our future shaping our future prepare an integrated strategic plan for the wakatipu basin with an initial priority on frankton flats, including protection of transport corridors and hubs and analysis of bridge pressures. with an initial focus on the frankton flats as a priority initial focus not assessed qldc qldc provide affordable worker accommodation close to employment, initially at gorge road and also frankton. provision of affordable worker accommodation close to place of employment not assessed qldc qldc undertake scenario planning and identify growth triggers to support forward planning and funding. identification of triggers for various growth scenarios not assessed qldc qldc commission behavioural research on resident and visitor travel and an analysis of growth and critical congestion areas. behavioural study of residents and visitors not assessed qldc qldc identify and develop bus priority measures or a dedicated public transport corridor, initially frankton-cbd, later the wider basin. or dedicated public transport corridor where possible), initially frankton - cbd initially; medium to long term wider basin not assessed qldc qldc encourage public transport use through incentives, real-time information and launching key routes such as airport/frankton to cbd. launch and celebrate 1 or 2 key routes short term not assessed qldc qldc create safe, sheltered public transport hubs for bus and water transport and trial pop-up park and ride. create public transport hubs that are safe, sheltered and attractive not assessed qldc qldc manage parking to support public transport, develop off-street facilities and an integrated parking guidance system, and progressively reduce on-street parking. progressive reduction in availability of on-street parking progressive not assessed qldc qldc build community and visitor awareness and engage the community in solutions, including subsidised or free public transport. build community and visitor awareness of existing public transport services not assessed qldc qldc investigate funding solutions and an alternative integrated funding model, including wider third-party funding agreements with developers. investigate funding solutions for public transport not assessed qldc qldc main document pdf",
    "sortDate": "2017-02-01",
    "cover": {
      "src": "/covers/QTS-004.webp",
      "srcset": "/covers/QTS-004.webp 400w, /covers/QTS-004-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-004/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-004/QTS-004-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-005",
    "code": "QTS-005",
    "title": "Regional Public Transport Plan Otago 2014 - Addendum: Wakatipu Basin Public Transport",
    "shortTitle": "Regional Public Transport Plan Otago 2014",
    "summary": "Addendum by Otago Regional Council (ORC) amending the Regional Public Transport Plan Otago 2014 to put in place a new Wakatipu Basin bus network following the 2016/17 Wakatipu Public Transport Network Review and the need to contract services under NZ Transport Agency's Public Transport Operating Model (PTOM). It sets out 14 amendments: a simplified four-route network (Arrowtown-Frankton-Queenstown-Arthurs Point; Fernhill/Sunshine Bay-Queenstown-Airport-Remarkables Park; Kelvin Heights-Frankton-Five Mile; Jacks Point-Frankton-Shotover Country-Lake Hayes Estate) operating 15-60 minute frequencies, a flat fare for GoCard users and a three-zone cash fare, two PTOM contract units, collaboration with the Ministry of Education and Queenstown Airport Corporation, and supporting measures such as new ticketing, journey planner and bike racks. Success is stated to rely on QLDC addressing the availability of low-cost parking and on a QLDC financial contribution. It targets 50% farebox recovery in the long term and cites a 20% mode-share goal from the 2007 Wakatipu Transport Strategy. Medium to long term projects are deferred to the Queenstown Integrated Transport Programme Business Case. The network was expected to commence in the third quarter of 2017, subject to funding approvals.",
    "documentType": "Statutory plan",
    "documentForm": "Regional public transport plan addendum (amendments to RPTP 2014)",
    "year": 2017,
    "publishedDate": "2017-05",
    "documentStatus": "Not stated",
    "geographicScope": "Wakatipu Basin; Queenstown; Frankton; Arrowtown; Arthurs Point; Fernhill/Sunshine Bay; Kelvin Heights; Jacks Point; Lake Hayes Estate; Queenstown Airport",
    "owner": "ORC",
    "citation": "Regional Public Transport Plan Otago 2014 - Addendum: Wakatipu Basin Public Transport (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/7491/rptp-addendum-wakatipu-basin-may-2017.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/7491/rptp-addendum-wakatipu-basin-may-2017.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "parking"
    ],
    "organisationIds": [
      "orc",
      "qldc",
      "nzta"
    ],
    "searchText": "qts-005 regional public transport plan otago 2014 - addendum: wakatipu basin public transport regional public transport plan otago 2014 addendum by otago regional council (orc) amending the regional public transport plan otago 2014 to put in place a new wakatipu basin bus network following the 2016/17 wakatipu public transport network review and the need to contract services under nz transport agency's public transport operating model (ptom). it sets out 14 amendments: a simplified four-route network (arrowtown-frankton-queenstown-arthurs point; fernhill/sunshine bay-queenstown-airport-remarkables park; kelvin heights-frankton-five mile; jacks point-frankton-shotover country-lake hayes estate) operating 15-60 minute frequencies, a flat fare for gocard users and a three-zone cash fare, two ptom contract units, collaboration with the ministry of education and queenstown airport corporation, and supporting measures such as new ticketing, journey planner and bike racks. success is stated to rely on qldc addressing the availability of low-cost parking and on a qldc financial contribution. it targets 50% farebox recovery in the long term and cites a 20% mode-share goal from the 2007 wakatipu transport strategy. medium to long term projects are deferred to the queenstown integrated transport programme business case. the network was expected to commence in the third quarter of 2017, subject to funding approvals. context and purpose. otago regional council (orc) adopted its regional public transport plan (rptp) in december 2014 and signalled a review of wakatipu basin services, which also aligned with the need to contract services under nz transport agency's public transport operating model (ptom) (p.4). this may 2017 addendum implements the outcome of the wakatipu basin public transport network review and feedback from strategic partners qldc, nz transport agency and queenstown airport (p.4). table 1 lists 14 amendments to specific rptp pages (p.4). problems. patronage is declining; barriers include network complexity, poor integration with other modes, cost, an over-supply of relatively cheap car parking and a dominant car culture (p.10); bus travel is far slower than car travel because of congestion, meandering routes and low frequency (p.11). the new network (stage one). the objective is a core network that helps address congestion on key corridors, with affordable, direct, regular services and a simple fare structure, contributing to 'the wider objectives of a 20 percent mode share for public transport, walking and cycling in queenstown', a target footnoted as set through the wakatipu transport strategy 2007 (p.13). design principles include direct routes, coordinated timetables, few transfer points at frankton and queenstown, and investigating integration of water ferry/taxi services (p.14). stage one simplifies routes, reduces fares and coordinates school transport with the ministry of education (p.15). four routes are proposed (p.15) with initial frequencies of 15 minutes (sunshine bay-remarkables park), 30/60 minutes peak/off-peak (arrowtown-arthurs point and lake hayes-jacks point) and 60 minutes (five mile-kelvin heights), and desirable minimum frequencies of 15-30 minutes, organised into two ptom units (pp.17, 20). the network was expected to commence in the third quarter of 2017 (p.15). supporting investment includes bus priority at key points, encouraging qldc to reduce low-cost parking, a new ticketing system, journey planner, timetable information, bike racks, and bus shelters and stops with qldc and nzta (p.16). fares and funding. a flat fare for gocard customers and a three-zone cash fare are introduced; concessions are limited to gocard, child and supergold off-peak (pp.5, 17). fares are to be set through orc's annual plan 2017/18 (pp.18, 21). orc targets 50% farebox recovery over the long term, acknowledging this may not be achievable in the short to medium term (pp.11, 18). the first phase prioritises everyday local trips; its success 'relies on qldc addressing the availability of low cost parking', and a qldc financial contribution to public transport is assumed (p.7). implementation requires funding approval from nzta and the orc and qldc annual plans 2017/18 (p.23). relationship to other work. a short-term business case is being developed, and the medium to long term investment programme is being developed through the queenstown integrated transport programme business case (qitpbc), described as an umbrella for transport business cases by orc, nzta and qldc; future public transport projects are to come from the qitpbc (p.19). mass rapid transit: the addendum says nothing about mass rapid transit or any offline public transport between frankton and the town centre. it is a bus network plan (with ferry/water taxi integration to be investigated) and defers medium to long term public transport projects to the qitpbc (p.19). regional public transport plan addendum (amendments to rptp 2014) regional public transport plan otago 2014 - addendum: wakatipu basin public transport (2017). wakatipu basin; queenstown; frankton; arrowtown; arthurs point; fernhill/sunshine bay; kelvin heights; jacks point; lake hayes estate; queenstown airport not stated (adopted addendum, may 2017) no mass rapid transit reference; bus network plan that defers medium to long term projects to the qitpbc. ordinary bus services are not mass rapid transit. four-route wakatipu network in two ptom contract units (pp.15, 20) initial frequencies 15 to 60 minutes; desirable minimum 15 to 30 minutes (p.17) long-term farebox recovery target of 50% (pp.11, 18) mode share objective of 20% for public transport, walking and cycling, set through the wakatipu transport strategy 2007 (p.13) new network expected to commence in the third quarter of 2017 (p.15) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/7491/rptp-addendum-wakatipu-basin-may-2017.pdf orc none statutory plan not stated 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. parking parking supply, pricing and management. orc orc prepared orc orc published introduce a new subsidised wakatipu bus network of four simplified routes with regular frequencies. we anticipate the new network structure to commence within the third quarter of 2017 third quarter of 2017 not assessed orc orc introduce a flat fare for gocard customers and a three-zone cash fare, with simplified concessions. a zonal fare structure will be introduced with new network (2017) not assessed orc orc set wakatipu fare levels through orc's annual plan process, consulting on fares in the draft annual plan 2017/18. fares will be defined in council's annual plan process for 2017/18 annual plan 2017/18 not assessed orc orc procure services through two ptom contract units (units 6 and 7). table 7.6 - unit 6 not assessed orc orc work with the ministry of education on a coordinated approach to school transport. council will work collaboratively with the ministry of education not assessed orc orc work with queenstown airport corporation to plan for and manage the impacts of flight scheduling on services to and from the airport. council will work collaboratively with the queenstown airport corporation not assessed orc orc investigate the feasibility of integrating water ferry/taxi services into the wakatipu public transport network. investigate the feasibility of integrating water ferry/taxi services not assessed orc orc address the availability of low-cost parking, which inhibits public transport use; orc to encourage and support qldc to reduce it. relies on qldc addressing the availability of low cost parking not assessed qldc qldc provide a qldc financial contribution towards public transport. a financial contribution towards the provision of public transport will be provided by qldc not assessed qldc qldc introduce a new ticketing system, journey planner, timetable information, improved website, online gocard top-ups and bike racks on all buses. introduction of a new ticketing system not assessed orc orc install bus shelters, seating, consistent stop signage, tactile guides and pavement access at stops; invest in bus priority at key points. working with qldc and nzta to ensure; the installation of bus shelters not assessed nzta waka kotahi nzta develop a business case for the short-term improvements to obtain nzta funding. a business case is being developed for the proposed improvements not assessed orc orc develop the medium to long term programme and future public transport projects through the queenstown integrated transport programme business case. being developed as part of the wider queenstown-integrated transport programme business case medium to long term not assessed nzta waka kotahi nzta obtain funding approval from the nz transport agency and the orc and qldc annual plans 2017/18. will require funding approval to be obtained 2017/18 not assessed nzta waka kotahi nzta target long-term farebox recovery of 50%. the orc will target a long term farebox recovery level of 50% long term not assessed orc orc main document pdf",
    "sortDate": "2017-05-01",
    "cover": {
      "src": "/covers/QTS-005.webp",
      "srcset": "/covers/QTS-005.webp 400w, /covers/QTS-005-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-005/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-005/QTS-005-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-006",
    "code": "QTS-006",
    "title": "Queenstown Integrated Transport Programme Business Case (2017 programme business case)",
    "shortTitle": "Queenstown Integrated Transport Programme Business",
    "summary": "Programme business case prepared by Abley Transportation Consultants for the NZ Transport Agency with investment partners Queenstown Lakes District Council (QLDC), Otago Regional Council (ORC) and Queenstown Airport Corporation, bringing together earlier Frankton Flats, Town Centre and Wakatipu public transport business cases. It defines two problems: growth causing unreliable trips and worsening customer experience, and car dominance harming liveability. SH6A was operating at 88% of its 28,500 vehicles/day theoretical capacity, expected to reach 100% by 2026. From about 100 options, nine programmes and four short-listed variants were assessed; stakeholders selected the 'Balanced Public Transport and Active Modes Focus' programme. It combines committed works, bus priority on SH6A, public transport service and hub improvements, park and ride, a water taxi/ferry network, a mass rapid transit corridor from Frankton to the town centre, a town centre arterial, active travel investment, a parking strategy and town centre pedestrianisation. Estimated cost is $447-647 million with a BCR of 0.7-1.0. Outcomes by 2045 include 30% alternative mode share and a 16-minute travel time saving. The MRT corridor ($160 million expected cost) is placed in the long term (2027 or beyond), represents 41% of programme cost and is identified as an opportunity for private investment or alternative funding.",
    "documentType": "Programme business case",
    "documentForm": "Programme business case (NZTA template), filed as Attachment A to an agenda Item 10 'Queenstown Integrated Transport Strategy', with a two-page summary as Attachment B",
    "year": 2017,
    "publishedDate": "2017-06-16",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Town Centre; Frankton; Frankton Flats; SH6A (Frankton Road) corridor; SH6/Ladies Mile; Wakatipu Basin",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Integrated Transport Programme Business Case (2017).",
    "featured": true,
    "featuredOrder": 6,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf"
    ],
    "documentTypeCode": "programme-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "orc",
      "queenstown-airport-corporation",
      "qldc"
    ],
    "searchText": "qts-006 queenstown integrated transport programme business case (2017 programme business case) queenstown integrated transport programme business programme business case prepared by abley transportation consultants for the nz transport agency with investment partners queenstown lakes district council (qldc), otago regional council (orc) and queenstown airport corporation, bringing together earlier frankton flats, town centre and wakatipu public transport business cases. it defines two problems: growth causing unreliable trips and worsening customer experience, and car dominance harming liveability. sh6a was operating at 88% of its 28,500 vehicles/day theoretical capacity, expected to reach 100% by 2026. from about 100 options, nine programmes and four short-listed variants were assessed; stakeholders selected the 'balanced public transport and active modes focus' programme. it combines committed works, bus priority on sh6a, public transport service and hub improvements, park and ride, a water taxi/ferry network, a mass rapid transit corridor from frankton to the town centre, a town centre arterial, active travel investment, a parking strategy and town centre pedestrianisation. estimated cost is $447-647 million with a bcr of 0.7-1.0. outcomes by 2045 include 30% alternative mode share and a 16-minute travel time saving. the mrt corridor ($160 million expected cost) is placed in the long term (2027 or beyond), represents 41% of programme cost and is identified as an opportunity for private investment or alternative funding. context and purpose. the queenstown integrated transport programme business case (qitpbc), version 4 dated 16 june 2017, was prepared by abley transportation consultants and commissioned by the nz transport agency (p.12), now nzta (waka kotahi). it brings together the frankton flats strategic case (2015), the queenstown town centre pbc (2016) and the wakatipu basin public transport network pbc (2016) into one programme (p.13). the investment partners are nzta, qldc, orc and queenstown airport corporation (p.43). the pdf is an agenda attachment ('item 10: queenstown integrated transport strategy', p.1) and ends with a two-page summary dated 25/07/2017 (pp.127-128). problem and objectives. population rose 65% from 2001 to 2013; airport passengers grew 200% since 2005 to nearly 1.8 million; queenstown has over 2,000 rental vehicles (p.10). sh6a operates at 88% of a theoretical capacity of 28,500 vehicles per day, expected to reach 100% by 2026, and is severely constrained by topography (p.10). 77% of peak inbound town centre journeys are by car and 13% by public transport (p.11). the problem statements (weighted 67%/33% in the summary, p.127) concern trip unreliability and car dominance. investment objectives include a 20% reduction in single-occupant vehicles into the town centre, a 30% increase in people moved on sh6/sh6a, pm peak travel time variability no worse than 5 minutes, and 80% bus punctuality by 2025 (p.59). options. about 100 options from stakeholder workshops were reduced to 45; twenty were discounted through a fatal-flaw test (p.62). nine programmes were assessed (pp.63-64); stakeholders preferred 'balanced 1', refined into four variants (p.64). indicative results: balanced infrastructure focus $241-337m, bcr 0.6-0.9 (p.69); balanced active modes focus $241-338m, bcr 0.9-1.3 (p.70); balanced pt focus $417-601m, bcr 0.7-1.1 (p.71); balanced pt and active modes focus $447-647m, bcr 0.7-1.0 (p.72). costs are high level, without site visits, and include a 15% allowance for development, consenting and land (p.68). recommended programme. the balanced pt and active modes focus programme was selected (p.73). table 16 lists its contents (p.75): committed works (eastern access road, kawarau falls bridge, grant road to kawarau falls bridge stage 1, pt improvements stage 1 with a $2 flat fare, maas stage 1); pt improvements stage 2 (services, ev fleet, town centre and frankton hubs); park and ride; a water taxi/ferry network; an mrt corridor; sh6a bus priority; ladies mile improvements; a queenstown town centre arterial; a quail rise to hansen road link; grant road to kawarau falls bridge stage 2; a shotover river bridge (arthurs point) duplication; the wakatipu active travel network; frankton track upgrade; town centre pedestrianisation; maas stage 2; a parking strategy; workplace travel plans; a growth management strategy review and an integrated land use and transport masterplan. qldc will separately review the district plan, increase town centre density, develop a network operating framework and create a single transport entity (pp.73-74). the staging timeline places most items between 2018 and 2026, and the mrt corridor and shotover river bridge in the long term, '2027 or beyond' (p.79). outcomes and economics. by 2045: 30% alternative mode share (up from 15%), 329 public transport passengers per hour and 223 fewer vehicles per hour (7%) frankton to queenstown, a 16-minute travel time reduction and 3-minute am peak variability (p.11). the indicative bcr uses a 40-year benefit period and 6% discount rate: present value costs $303m (bcr 1.0) to $436m (bcr 0.7) (p.88); with benefits varied by plus or minus 30%, bcrs range 0.8-1.3 (low cost) and 0.5-0.9 (upper cost) (p.88). the investment profile is high/medium/low (p.92). funding shares are nzta 70% ($313.1m), orc 4% ($18.6m) and qldc 26% ($115.7m) of the $447.5m expected total (p.95). value capture tools (development contributions, financial contributions, targeted rates) are discussed (pp.93-94). delivery. detailed business cases are proposed for 2017/18 for grant road to kawarau falls bridge stage 2, sh6a corridor, water taxi/ferry network, the active travel network and the town centre and pt hub (p.96). the wakatipu transport governance group oversees delivery, with nzta as sponsor (pp.96-97). key risks are topography, land cost, and failure to achieve reduced private vehicle use (pp.86-87). mass rapid transit: the qitpbc is substantive on mrt. the recommended programme includes a 'mass rapid transit corridor (e.g. gondola, light rail etc) from frankton to town centre' (p.75), described among core elements as 'a mass rapid transit (gondola)' (p.73). its expected cost is $160m (95th percentile $240m) (p.95) and, with water taxis/ferries or on its own, it is said to represent 41% of programme cost and to offer opportunity for private investment or alternative funding (pp.11, 85, 93). demand analysis suggests extra sh6a person capacity is needed by 2040, which 'can be delivered in the form of mrt' (p.77). mrt is a long-term activity (2027 or beyond, p.79), dependent on monitoring and trigger points still to be developed (p.77), and has no detailed business case in table 18 (p.96). programme business case (nzta template), filed as attachment a to an agenda item 10 'queenstown integrated transport strategy', with a two-page summary as attachment b nzta (waka kotahi). queenstown integrated transport programme business case (2017). queenstown town centre; frankton; frankton flats; sh6a (frankton road) corridor; sh6/ladies mile; wakatipu basin version 4 (revision table lists revision 4 as 'fourth draft') recommended programme includes a mass rapid transit corridor from frankton to the town centre; long term (2027+), $160m, suited to private or alternative funding. mrt is one of the defining differences between the short-listed programmes: the pt-focused variants add a 'fully separated and mass rapid transit' option with an integrated transport hub (p.64), costed at $160m (p.65). the recommended balanced pt and active modes focus programme lists an 'mrt corridor: mass rapid transit corridor (e.g. gondola, light rail etc) from frankton to town centre' (p.75), and the programme overview names 'a mass rapid transit (gondola)' among core supply elements (p.73). the assessment credits mass rapid transit with the 'ability to move high volumes of people', rates feasibility 'medium - due to mass rapid transit corridor', and says it 'provides opportunity for alternative funding mechanisms' (p.72). peak hour analysis (figure 31) finds that by 2040 additional sh6a person capacity is required 'and this can be delivered in the form of mrt' (p.77); if traffic keeps rising, 'the most notable' further intervention 'is the introduction of a mass rapid transit corridor', with trigger points to be developed in later business cases (p.77). the mrt corridor is scheduled for '2027 or beyond' (p.79). figure 37 gives an expected cost of $160m and 95th percentile of $240m, entered in the nzta (hno) funding column (p.95), while the text says the mrt corridor 'represents 41% of the total programme cost' and is a good opportunity for private investment (pp.11, 85, 93). av trials could serve hotels from the 'mass rapid transit hub' (p.83). no mrt detailed business case is scheduled (p.96). \"mass rapid transit corridor (e.g. gondola, light rail etc) from frankton to town centre.\" (p.75) | \"increased public transport reliability and choice through addition of bus priority on sh6a corridor, a mass rapid transit (gondola) and an extensive water taxi network.\" (p.73) | \"a mass rapid transit corridor provides a good opportunity to attract private investment or alternative funding arrangements, and represents 41% of the total programme cost.\" (p.11) | \"this suggests that at 2040 additional person movement capacity is required on sh6a and this can be delivered in the form of mrt.\" (p.77) | \"if traffic volumes continue to increase, further interventions will be required. the most notable of these, is the introduction of a mass rapid transit corridor.\" (p.77) | \"mass rapid transit corridor (gondola) provides ability to move high volumes of people\" (p.72) recommended programme cost $447-647 million (expected $447.5m; 95th percentile $646.9m) (pp.11, 93, 95) recommended programme bcr 0.7-1.0; pv cost $303m-$436m; 40-year, 6% discount (p.88) sensitivity (benefits +/-30%): bcr 0.8-1.3 at low cost, 0.5-0.9 at upper cost (p.88) mrt corridor expected cost $160m; 95th percentile $240m (p.95) mrt corridor said to represent 41% of total programme cost (pp.11, 85, 93) sh6a at 88% of 28,500 vpd theoretical capacity; 100% expected by 2026 (p.10) 77% of peak inbound town centre trips by car, 13% by public transport (p.11) 2045 outcomes: 30% alternative mode share (from 15%); 329 pt passengers/hour; 223 fewer vehicles/hour (7%); 16-minute travel time saving; 3-minute am variability (p.11) short-list: infrastructure focus $241-337m bcr 0.6-0.9; active modes focus $241-338m bcr 0.9-1.3; pt focus $417-601m bcr 0.7-1.1 (pp.69-71) funding shares: nzta 70% ($313.1m), orc 4% ($18.6m), qldc 26% ($115.7m) (p.95) queenstown town centre arterial $72m expected (p.95) queenstown airport nearly 1.8 million passengers in year to june 2017 (p.10) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf nzta substantive programme business case draft 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta commissioned abley abley prepared orc orc partner queenstown airport corporation qac partner qldc qldc partner matthew noon prepared by abley abley robyn hyde prepared by orc orc dave smith reviewed by abley abley complete committed works: eastern access road, sh6 kawarau falls bridge and grant road to kawarau falls bridge stage one. committed committed (2017) not assessed deliver pt improvements stage one: higher frequency and coverage, $2 flat fare, minor infrastructure and better luggage carriage. the otago regional council is committed to a number of improvements committed (2017) not assessed orc orc deliver mobility as a service stage one (journey planning app) and stage two (integrated booking and payment). mobility as a service stage 1 stage 1 2017; stage 2 2022 not assessed nzta waka kotahi nzta develop and implement a parking strategy, including parking pricing changes and supply and controls. pricing 2018; supply and controls 2020 not assessed qldc qldc introduce a subsidised water taxi service, expanding to a ferry network with infrastructure at four locations; prepare a detailed business case. water taxi/ferry network 2017/18 staged commencing 2018 dbc 2017/18; water taxi 2019; ferry network 2023 not assessed nzta waka kotahi nzta upgrade frankton track, including sealing and lighting the existing path. upgrade frankton track including sealing and lighting existing path 2020 not assessed nzta waka kotahi nzta deliver grant road to kawarau falls bridge stage two (four-laning, sh6/6a upgrade, frankton pt hub and park and ride) via a detailed business case. includes 4 laning, intersection upgrade and frankton pt hub dbc 2017/18; implementation 2020/21 not assessed nzta waka kotahi nzta deliver ladies mile corridor improvements for residential access from howards drive, stalker road, lower shotover road and tucker beach road. sh6 corridor and access improvements for residential traffic 2021 not assessed nzta waka kotahi nzta deliver sh6a corridor improvements including bus priority (bus borders, widening, intersection upgrades with signal priority) via a detailed business case. sh6a corridor improvements 2017/18 2020/21 nzta dbc 2017/18; implementation 2020/21 (timeline shows 2022) not assessed nzta waka kotahi nzta deliver pt improvements stage two: further frequency and coverage increases and fleet renewal to ev. 1.4m pa over 10 years 2023 not assessed orc orc build public transport hubs at frankton and in the town centre (stanley street). queenstown hub is on stanley st frankton 2021; town centre 2023 not assessed nzta waka kotahi nzta provide park and ride services at frankton, ladies mile, jacks point and arrowtown, and a rental car park and ride. the provision of parking facilities at appropriate locations frankton 2021; rental car 2023; other locations 2025 not assessed nzta waka kotahi nzta investigate and construct a queenstown town centre arterial (stages 1 and 2) enabling pc50 and a town centre pt hub, through the town centre and pt hub dbc. queenstown town centre and pt hub 2017/18 2022/23 nzta dbc 2017/18; implementation 2022/23 not assessed nzta waka kotahi nzta build a quail rise to hansen road link road as an alternative to sh6 to enable housing supply. 2022 not assessed qldc qldc develop the wakatipu active travel network, including an additional shotover river crossing, cycle hire and end-of-trip facilities. wakatipu active travel network 2017/18 2020/22 nzta, qldc dbc 2017/18; implementation 2020/22 not assessed nzta waka kotahi nzta introduce queenstown workplace travel plans with major businesses. 2025 not assessed qldc qldc pedestrianise the town centre, restricting vehicle access and relocating parking. queenstown town centre pedestrianisation 2026 not assessed qldc qldc deliver a mass rapid transit corridor from frankton to the town centre. mrt corridor long term (2027 or beyond) not assessed duplicate the shotover river bridge at arthurs point (one-lane crossing for all modes). shotover river bridge long term (2027 or beyond) not assessed qldc qldc review the growth management strategy 2007. not assessed qldc qldc develop an integrated land use and transport masterplan. development of an ovearching integrated land use and transport plan not assessed nzta waka kotahi nzta review the district plan for mixed use and travel-oriented development and increase town centre density. reviewing the district plan to encourage mixed used not assessed qldc qldc develop a network operating framework. development of a network operating framework not assessed qldc qldc create a single transport entity for the wakatipu basin to support integrated delivery. the creation of a single transport entity not assessed qldc qldc implement a monitoring programme and develop trigger points (in later business cases) for further interventions, most notably the mrt corridor. a careful monitoring programme will be implemented ongoing not assessed develop a stakeholder engagement and communication plan following approval of the qitpbc. a stakeholder engagement and communication plan will be developed after qitpbc approval not assessed nzta waka kotahi nzta monitor investment objectives annually (mode share, people throughput, travel time reliability, bus punctuality, resident and visitor satisfaction). annually annually not assessed nzta waka kotahi nzta consider value capture mechanisms (development contributions, financial contributions, targeted rates) in funding proposals. value capture mechanisms should be considered as part of a funding proposal not assessed qldc qldc main document pdf",
    "sortDate": "2017-06-16",
    "cover": {
      "src": "/covers/QTS-006.webp",
      "srcset": "/covers/QTS-006.webp 400w, /covers/QTS-006-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-006/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-006/QTS-006-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-007",
    "code": "QTS-007",
    "title": "Queenstown Integrated Transport Programme Business Case - 4. Recommended Programme (page extract)",
    "shortTitle": "Queenstown Integrated Transport Programme Business",
    "summary": "One-page image extract of section 4.1 'Programme overview' of the Queenstown Integrated Transport Programme Business Case (Version 4, 16 June 2017). It records that stakeholders selected the Balanced Public Transport and Active Modes Focus programme as the recommended programme, and lists its core elements: completing planned infrastructure upgrades; bus priority on SH6A, 'a Mass Rapid Transit (gondola)' and an extensive water taxi network; active travel investment including an extra Shotover River crossing; improved public transport routes, frequency and fares; Mobility as a Service and workplace travel plans; a parking strategy; and town centre pedestrianisation. It also lists QLDC activities outside the formal programme.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Single-page image extract of a programme business case",
    "year": 2017,
    "publishedDate": "2017-06-16",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre; Frankton; SH6A corridor; Shotover River",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Integrated Transport Programme Business Case - 4. Recommended Programme (page extract) (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf",
    "publicSourceConfidence": "same document",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf"
    ],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "qldc"
    ],
    "searchText": "qts-007 queenstown integrated transport programme business case - 4. recommended programme (page extract) queenstown integrated transport programme business one-page image extract of section 4.1 'programme overview' of the queenstown integrated transport programme business case (version 4, 16 june 2017). it records that stakeholders selected the balanced public transport and active modes focus programme as the recommended programme, and lists its core elements: completing planned infrastructure upgrades; bus priority on sh6a, 'a mass rapid transit (gondola)' and an extensive water taxi network; active travel investment including an extra shotover river crossing; improved public transport routes, frequency and fares; mobility as a service and workplace travel plans; a parking strategy; and town centre pedestrianisation. it also lists qldc activities outside the formal programme. this single page is printed page 72 (pdf page 73) of the queenstown integrated transport programme business case (qitpbc), version 4, dated 16 june 2017 and prepared for the nz transport agency, now nzta (waka kotahi). it states that in the final workshop stakeholders confirmed actions, an initial implementation timeline and optimal investment, and selected the 'balanced pubic [sic] transport and active modes focus' programme. core elements are grouped as supply (planned upgrades such as the sh6 kawarau falls bridge and sh6/6a interim upgrade; bus priority on sh6a, a mass rapid transit (mass rapid transit) and an extensive water taxi network; active travel investment including an additional shotover river crossing), productivity (improved public transport routes, frequency and fares with improved infrastructure; mobility as a service and workplace travel plans) and demand (a comprehensive parking strategy; pedestrianisation of the town centre). qldc activities outside the formal programme include reviewing the district plan, increasing town centre density and developing a network operating framework; the list continues on the next page, which is not included. no costs or timing appear on this page; see qitpbc for those. mass rapid transit: the page names 'a mass rapid transit (gondola)' as a core supply element of the recommended programme, alongside sh6a bus priority and a water taxi network. single-page image extract of a programme business case nzta (waka kotahi). queenstown integrated transport programme business case - 4. recommended programme (page extract) (2017). queenstown town centre; frankton; sh6a corridor; shotover river extract of version 4 lists mass rapid transit as a core element of the queenstown integrated transport programme business case recommended programme. the extract's only mrt reference is in the list of core supply elements: 'increased public transport reliability and choice through addition of bus priority on sh6a corridor, a mass rapid transit (gondola) and an extensive water taxi network' (p.1, printed p.72 of qitpbc). cost, timing and the mrt route are not on this page; the full qitpbc describes the corridor as running from frankton to the town centre. \"increased public transport reliability and choice through addition of bus priority on sh6a corridor, a mass rapid transit (gondola) and an extensive water taxi network.\" (p.1) costed with the parent document. https://www.qldc.govt.nz/media/yrlhbqnm/queenstown-integrated-transport-strategy.pdf nzta substantive business case chapter or appendix final 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta commissioned abley abley prepared complete planned infrastructure upgrades (sh6 kawarau falls bridge, sh6/6a interim upgrade) and new roading links where they support new areas. completion of existing planned infrastructure upgrades not assessed add bus priority on sh6a, mass rapid transit and an extensive water taxi network. not assessed invest in active travel, including sealing and lighting tracks and an additional shotover river crossing. a significant investment in active travel not assessed improve public transport routes, frequency and fares with improved infrastructure. significantly improved public transport services not assessed introduce mobility as a service and workplace travel plans. introduction of mobility as a service and workplace travel plans not assessed adopt a comprehensive parking strategy and pedestrianise the town centre. a comprehensive parking strategy not assessed review the district plan, increase town centre density and develop a network operating framework. will be undertaken by qldc as part of their normal activities not assessed qldc qldc page extract (image) image",
    "sortDate": "2017-06-16",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-007/",
    "files": [
      {
        "label": "Page extract (image)",
        "kind": "jpg",
        "url": "https://files.movequeenstown.nz/library/QTS-007/QTS-007-F1.jpg"
      }
    ]
  },
  {
    "id": "qts-008",
    "code": "QTS-008",
    "title": "Queenstown Town Centre Parking Indicative Business Case",
    "shortTitle": "Queenstown Town Centre Parking Indicative Business",
    "summary": "Indicative business case prepared by Rationale Limited for Queenstown Lakes District Council (QLDC) as one of a set of business cases making up the Queenstown Town Centre Masterplan programme. It finds town centre parking is at about 90% occupancy at 1pm, that circulating traffic searching for parking contributes around 30% of town centre congestion, and that cheap or free parking undermines public transport. From a longlist of options, three programmes were shortlisted and Programme 6 (multiple new and upgraded fringe parking sites with 'appropriate supply') was preferred. The programme combines intelligent transport systems, enforcement, marketing, demand management pricing, conversion of free on-street parking to paid parking, park and ride (at least 600 spaces, 2018-2026), bike parking and new or upgraded off-street parking buildings on the town centre fringes. The ten-year cost is about $56.7 million, of which $42.9 million is for parking buildings that may be privately funded, leaving about $14.1 million to QLDC. Parking was assessed within the wider masterplan programme, which achieved a BCR range of 2.5-4.7. The case seeks endorsement to proceed to a detailed business case and proposes a QLDC-NZTA-ORC alliance to oversee transport projects. It refers in passing to a future mass rapid transit solution, possibly mass rapid transit or light rail, from 2037, and reproduces a masterplan schedule showing mass rapid transit planning from 2028 and construction by 2037.",
    "documentType": "Indicative business case",
    "documentForm": "Indicative business case (parking), part of Town Centre Masterplan programme",
    "year": 2017,
    "publishedDate": "2017-10",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre and fringes; Frankton Road (SH6A) approach",
    "owner": "QLDC",
    "citation": "QLDC. Queenstown Town Centre Parking Indicative Business Case (2017). Rationale job number J000621.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/ndylzizc/parking-business-case-qtc.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ndylzizc/parking-business-case-qtc.pdf"
    ],
    "documentTypeCode": "indicative-business-case",
    "topics": [
      "active-travel",
      "bus",
      "park-and-ride",
      "parking",
      "roads",
      "its"
    ],
    "organisationIds": [
      "qldc",
      "rationale",
      "nzta"
    ],
    "searchText": "qts-008 queenstown town centre parking indicative business case queenstown town centre parking indicative business indicative business case prepared by rationale limited for queenstown lakes district council (qldc) as one of a set of business cases making up the queenstown town centre masterplan programme. it finds town centre parking is at about 90% occupancy at 1pm, that circulating traffic searching for parking contributes around 30% of town centre congestion, and that cheap or free parking undermines public transport. from a longlist of options, three programmes were shortlisted and programme 6 (multiple new and upgraded fringe parking sites with 'appropriate supply') was preferred. the programme combines intelligent transport systems, enforcement, marketing, demand management pricing, conversion of free on-street parking to paid parking, park and ride (at least 600 spaces, 2018-2026), bike parking and new or upgraded off-street parking buildings on the town centre fringes. the ten-year cost is about $56.7 million, of which $42.9 million is for parking buildings that may be privately funded, leaving about $14.1 million to qldc. parking was assessed within the wider masterplan programme, which achieved a bcr range of 2.5-4.7. the case seeks endorsement to proceed to a detailed business case and proposes a qldc-nzta-orc alliance to oversee transport projects. it refers in passing to a future mass rapid transit solution, possibly mass rapid transit or light rail, from 2037, and reproduces a masterplan schedule showing mass rapid transit planning from 2028 and construction by 2037. context and purpose. this indicative business case (ibc), rev 2.3 (october 2017), was prepared by rationale limited for queenstown lakes district council. it is one of a set of business cases forming the queenstown town centre masterplan programme, alongside public and passenger transport, town centre arterial routes, the spatial framework and public realm, and community and civic facilities (p.7). it seeks endorsement to develop a detailed business case for the preferred programme (p.13). problems and benefits follow an investment logic map completed at a stakeholder workshop in march 2017 (p.9). evidence. town centre parking is around 90% full at 1pm; circulating traffic searching for parking contributes about 30% of congestion; the cost of congestion in queenstown in 2016 was estimated at $35 million and forecast to more than double in 30 years; free and cheap parking and low penalties ($12 fines) discourage mode shift (pp.10, 16). the 2016 inventory was 5,605 spaces, 42% of them public free all-day (p.14). the document records qldc's parking fee changes from december 2017 and march 2018, timed with the $2 bus fare introduced with orc and nzta (p.19). options. a longlist of programmes was assessed by multi-criteria analysis to a shortlist of programmes 5, 6 and 7 plus the do-minimum. programme 6 (multiple new and upgraded sites, appropriate supply) scored highest; programme 7 (one large car park) scored lower on congestion, environment and risk (pp.85-86). a single large parking site and unlimited supply are excluded from scope (p.90). preferred programme. components include an its operations centre, communications network, on-street data gathering, variable message signs, its in existing and new car parks, conversion of free on-street parking to paid parking with resident schemes, ride-share parking, variable pricing, bike parking, a digital interface potentially linked to the 'choice' app and mobility as a service, technology-assisted enforcement, possible higher penalties, marketing and communications, park and ride (at least 600 spaces, construction spread 2018-2026), and off-street changes on the town centre fringes (pp.92-102). modelling by abley (appendix 11) proposes removing 312 on-street spaces by 2025 and building about 400 off-street spaces (lakeview and boundary street, or the recreation ground), then removing 170 more by 2045 and adding about 700 (skyline, private, 350; ballarat street, 350). modelled 1pm paid parking occupancy in the walking zone is 64% (2025) and 74% (2045), below the 85% kpi (pp.107-110). parking buildings are to be designed for possible later conversion to other uses (p.100). economic, commercial and financial cases. parking was assessed within the wider masterplan programme, with a bcr range of 2.5-4.7 (pp.11, 117). the ten-year cost is $56,743,000: dbc/parking strategy $0.1m, technology phase 1 $5.4m, phase 2 $8.3m, parking buildings $42.9m (may be funded privately), leaving about $14.1m to qldc (p.123). indicative revenue modelling shows a 350-space ballarat street building ($25m) needs about $6.27/hour to break even in 10 years and a 242-space boundary street building ($17.8m) about $6.73/hour (pp.125-126). funding assumptions: private operator for buildings, nzta subsidy for park and ride, qldc for on-street, inventory and technology (with nzta and orc as potential partners), and possible central government/tourism infrastructure fund support (p.126). the document states qldc cannot afford the programme without support and innovative arrangements (p.126). management case. a planning and delivery alliance of qldc, nzta and orc is suggested, being progressed by the three chief executives (pp.127-128); monthly reporting, risk register updates, change management, a new qldc parking management strategy and formal masterplan consultation in march 2018 are proposed (pp.128-130). mass rapid transit: the document makes passing references only. citing beca's demand projections, it states that 'a mass rapid transit solution may be required from 2037 onwards' (p.34) and that the mass transit solution 'is not yet identified but it could include a gondola or light rail service' (p.72). the masterplan implementation schedule reproduced in the case (figure 64) shows 'gondola planning' from 2028 to 2034 and 'gondola construction' completing in 2037 (p.113). it does not assess mrt, which falls to other masterplan business cases. other references are to the existing skyline gondola (parking at its base and 350 new parks at skyline), which is not mass rapid transit, and to 'gondola' among modes in a mobility-as-a-service concept (p.140). the risk register includes a mitigation to 'include pt benefits (ie. gondola landing)' in the arterials mca (p.152). indicative business case (parking), part of town centre masterplan programme qldc. queenstown town centre parking indicative business case (2017). rationale job number j000621. queenstown town centre and fringes; frankton road (sh6a) approach rev 2.3 (2nd qldc revision) notes mass rapid transit may be required from 2037; reproduces a schedule of planning from 2028-2034 and construction to 2037. the parking ibc treats mass transit as a future context rather than a subject of its own analysis. drawing on beca's projected demand by mode graphic (figure 17), it states that 'a mass rapid transit solution may be required from 2037 onwards' (p.34). in explaining 'appropriate supply' it notes the need for car travel to stabilise while other modes accommodate growth, 'ultimately a mass transit solution', which 'is not yet identified but it could include a gondola or light rail service (for example)' (p.72). the masterplan implementation schedule reproduced as figure 64 shows 'gondola planning' (2028-2034) and 'gondola construction' (to 2037) in an 'arterials / gondola' row (p.113). no route, cost or responsible agency for mrt is given. the masterplan risk register (appendix 7) records, for the arterials, a mitigation to 'include pt benefits (ie. gondola landing) within mca for stage 2 option 4.1' (p.152). other references concern the existing skyline gondola and parking near its base (pp.40, 90). \"the graphic below demonstrates this demand and highlights that a mass rapid transit solution may be required from 2037 onwards.\" (p.34) | \"ultimately a mass transit solution (shown in green). the mass transit solution is not yet identified but it could include a gondola or light rail service (for example).\" (p.72) | \"gondola planning... gondola construction... 2037\" (p.113) | \"include pt benefits (ie. gondola landing) within mca for stage 2 option 4.1 to justify as the preferred option.\" (p.152) town centre parking around 90% full at 1pm (p.10) parking circulation contributes around 30% of town centre congestion (p.10) estimated 2016 cost of congestion in queenstown $35 million (p.10) 2016 parking inventory 5,605 spaces (p.14) ten-year programme cost $56,743,000, incl. $42,920,000 parking buildings that may be privately funded (p.123) estimated cost to qldc about $14.1 million after privately funded buildings (p.123) masterplan programme bcr range 2.5-4.7 (pp.11, 117) park and ride: at least 600 spaces, 2018-2026 (p.98) 312 on-street spaces removed and ~400 off-street added by 2025; 170 removed and ~700 added by 2045 (pp.107-109) implementation schedule: gondola planning 2028-2034, construction to 2037 (p.113) modelled 1pm paid occupancy 64% (2025) and 74% (2045) vs 85% kpi (pp.107-110) ballarat st building 350 parks, ~$25m; boundary st 242 parks, $17.8m (p.125) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/ndylzizc/parking-business-case-qtc.pdf qldc passing indicative business case final 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. traffic systems intelligent transport systems and traffic signals. qldc qldc commissioned rationale rationale prepared ben smith prepared by rationale rationale gavin flynn project manager rationale rationale adam feeley reviewed by qldc qldc tom lucas reviewed by rationale rationale edward guy approved by rationale rationale tom lucas approved by rationale rationale develop a detailed business case and parking strategy for the preferred parking programme (programme 6), budgeted at $100,000. detailed business case/ parking strategy $100,000... 2017/18 2017/18 not assessed qldc qldc establish an operations centre for its parking interventions (real-time monitoring, adjusting charges, vms updates), aligned with or part of the proposed transport operation centre. an operations centre is proposed to provide day-to-day operation of the its parking interventions not assessed provide a communications network linking all its parking interventions, combining upgrades to existing networks and new infrastructure. a communications network is required to link all its interventions not assessed implement on-street real-time parking data gathering (sensors/cctv) and review on-street hourly rates through six-monthly occupancy surveys. this monitoring and price adjustment is an ongoing (6 monthly) process ongoing (6-monthly reviews) not assessed qldc qldc install variable message signs on approaches to queenstown (including sh6 and sh6a between the shotover river and queenstown) and at parking decision points and facilities. it is proposed that a combination of sign types is implemented not assessed apply its interventions to existing off-street car parks: layout redesign to maximise spaces, occupancy detection and smart signage. it is proposed that more effective use of existing off-street car parks... is made through its interventions not assessed incorporate its technology (smart entry gates, occupancy detection, smart signage) in proposed parking buildings at boundary street, ballarat street and lakeview. it is proposed that its technology is incorporated into the proposed car parking buildings not assessed convert free uncontrolled on-street parking to controlled paid parking (sensors, payment machines, line markings), staged to convert 50% of free all-day and 100% of restricted all-day spaces. a staged approach is proposed to convert 50% of free all day and 100% of restricted all day on-street parking staged to 2025 and 2045 not assessed qldc qldc create a resident parking zone scheme reserving some controlled on-street spaces for local residents, with numbers and locations set through consultation. potentially rolled out progressively once a resident parking zone scheme is created not assessed qldc qldc allocate a proportion of on-street parking to ride-share users, with an identification system (stickers or rfid tags) for participating vehicles. a proportion of on-street parking is proposed to be allocated for ride-share users not assessed introduce demand management through increased and variable (time and occupancy dependent) parking pricing, less free parking and a hypothecated fund subsidising public transport. introducing flexible time and occupancy dependent parking prices not assessed qldc qldc develop a new qldc parking management strategy as part of the detailed business case. it is proposed that a new qldc parking management strategy will be developed with detailed business case not assessed qldc qldc provide additional covered and uncovered bike parking at strategic locations and consider re-purposing underground parking as an end-of-trip facility. additional bike parking is proposed in strategic locations around queenstown not assessed deliver a digital interface (websites and apps) for parking information and remote booking, possibly linked to public transport for a 'mobility as a service' approach with nzta. in association with the new zealand transport agency not assessed nzta waka kotahi nzta increase parking enforcement personnel and use technology-assisted enforcement; enforcement and inventory management to be done within qldc. increased enforcement area and inventory management will be done within qldc not assessed qldc qldc consider increased parking infringement penalties, which would require changes to legislation, or escalating hourly rates for long stays. changes to legislation to allow increased penalties not assessed run a marketing and communications programme: maps and leaflets, tourist information, staff training, airport/hotel marketing and workplace and school travel plan workshops. it is proposed that a programme of marketing and communications is implemented not assessed deliver integrated park and ride facilities (at least 600 spaces) for commuters, visitors and campervans, possibly renamed 'transport hubs'; nzta subsidy assumed eligible. the construction programme of the park and ride areas is based on likely demand, and spread between 2018 and 2026 2018-2026 not assessed remove 312 on-street spaces with the new arterials and public realm works and provide about 400 off-street spaces (lakeview 200 and boundary street +200, or recreation ground 400). approximately 400 off-street parking spaces will need to be constructed by 2025 not assessed remove a further 170 on-street spaces with additional public realm works and provide about 700 more off-street spaces (skyline private 350; ballarat street/community heart 350). approximately additional 700 off-street parking spaces will need to be constructed by 2045 by 2045 not assessed engage a private development partner to design, build, fund and operate the new parking buildings (about $42.9m), with qldc potentially providing land. a private operator may be engaged to fund the new parking buildings establishment and operations not assessed enhance and repurpose existing off-street sites: boundary street, ballarat street, stanley street, warren park, athol street and queenstown gardens parking. enhancement of existing parking sites at boundary street, ballarat street and stanley street, warren park not assessed implement user-type management: commuter, shopper, event and visitor demand management, tourist operator pick-up/drop-off, coach and bus layover, special needs and freight spaces. user type management actions including commuter, shopper, events and visitor demand management not assessed fund the parking technology programme (phase 1 $5.4m, phase 2 $8.3m) and on-street and inventory management changes, with nzta and orc as potential partners. qldc are assumed to be funding the technology programme, with potential partners in nzta and orc 2018/19-2023/24 not assessed qldc qldc test eligibility for central government investment, including the tourism infrastructure fund. further work should be done to test eligibility not assessed establish a qldc commercial team and consider engaging commercial advisers on structuring and operating commercial parking facilities. qldc may benefit from establishing a commercial team detailed business case phase not assessed qldc qldc manage procurement in two phases: services for the detailed business case, then services and products to deliver the programme to 2050. qldc will manage the procurement process using their existing policies and procedures to 2050 not assessed qldc qldc work through land use designations for qldc-owned parking sites and develop a consenting strategy with planning and legal advisers. the next logical step will be to work through land use designations not assessed qldc qldc adopt a planning and delivery alliance of qldc, nzta and orc to oversee transport-related masterplan projects; discussion being progressed by the three chief executives. it is suggested that this approach be adopted as quickly as possible as quickly as possible not assessed nzta waka kotahi nzta update the programme risk register monthly and develop a change management plan and a detailed project management plan. it is recommended that it be updated every month monthly; with detailed business case not assessed hold formal consultation on the full draft masterplan programme. a formal consultation period is scheduled for march 2018 march 2018 not assessed qldc qldc plan mass rapid transit, as shown in the masterplan implementation schedule (figure 64) under 'arterials / gondola'. gondola planning 2028... 2034 2028-2034 not assessed construct mass rapid transit, shown in the masterplan implementation schedule as completing in 2037. gondola construction... 2037 2034-2037 not assessed develop a benefits management plan, testing kpis, benchmarks and measurement intervals, through the detailed business case. the benefits management plan for this project should be further informed through the detailed business case detailed business case phase not assessed main document pdf",
    "sortDate": "2017-10-01",
    "cover": {
      "src": "/covers/QTS-008.webp",
      "srcset": "/covers/QTS-008.webp 400w, /covers/QTS-008-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-008/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-008/QTS-008-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-009",
    "code": "QTS-009",
    "title": "Annual Report 2016/2017",
    "shortTitle": "Annual Report 2016/2017",
    "summary": "QLDC's 2016/17 Annual Report records capital expenditure $10.8m below estimate, mostly timing (p.7). Roading and footpath capital was $15.795m (p.71). Eastern Access Road stage one opened with a temporary seal, $7.8m spent in the year (pp.4, 31, 71). The airport park and ride 'now provides paid parking for 150 vehicles and a free shuttle service to and from the airport', with $0.9m recorded (pp.32, 71). Frankton parking changes were made and $715,077 was carried forward for the Queenstown Town Centre strategy (pp.11, 32). Several roading KPIs were missed, including fatal and serious crashes (15 against <13). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2017,
    "publishedDate": "2017-10-26",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Report 2016/2017 (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/bfuha3zy/qldc-annual-report-1617-nov3-web.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-009 annual report 2016/2017 annual report 2016/2017 qldc's 2016/17 annual report records capital expenditure $10.8m below estimate, mostly timing (p.7). roading and footpath capital was $15.795m (p.71). eastern access road stage one opened with a temporary seal, $7.8m spent in the year (pp.4, 31, 71). the airport park and ride 'now provides paid parking for 150 vehicles and a free shuttle service to and from the airport', with $0.9m recorded (pp.32, 71). frankton parking changes were made and $715,077 was carried forward for the queenstown town centre strategy (pp.11, 32). several roading kpis were missed, including fatal and serious crashes (15 against <13). no mass rapid transit reference was found. context and purpose. the annual report covers year two of the 2015-2025 ten year plan, signed 26 october 2017 (p.22). transport. council capital expenditure was $10.8m below estimate for the year, mostly timing differences (p.7). roading and footpaths capital was $15.795m (p.71) eastern access road stage one opened with a temporary seal and final surfacing due in october 2017 (pp.4, 31), with $7.8m spent on construction (p.71). the airport park and ride 'now provides paid parking for 150 vehicles and a free shuttle service to and from the airport' (p.32), with a further $0.9m recorded (p.71). parking was removed from sh6 and glenda drive and a 48-hour limit applied in residential frankton (p.32). $715,077 was carried forward for the queenstown town centre strategy (p.11). performance. sealed road maintenance $164.75/km; unsealed $110.22/km; fatal and serious crashes 15 against a target of fewer than 13; roading requests resolved on time 77% against 95%; smooth travel 89% (pp.71-74). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report annual report 2016/2017 (2017). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $10.8m below estimate (p.7) roading and footpaths capital $15.795m (p.71) eastern access road construction $7.8m (p.71) airport park and ride 150 spaces, free shuttle; $0.9m (pp.32, 71) fatal and serious crashes 15 vs <13 target (pp.71-74) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2017 bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc complete eastern access road final surfacing final surfacing was due october 2017 october 2017 not assessed qldc qldc operate airport park and ride: 150 paid spaces with free airport shuttle ($0.9m) paid parking for 150 vehicles and a free shuttle service 2016/17 not assessed qldc qldc carry forward $715,077 for the queenstown town centre strategy queenstown town centre strategy 715,077 2017/18 not assessed qldc qldc main document pdf",
    "sortDate": "2017-10-26",
    "cover": {
      "src": "/covers/QTS-009.webp",
      "srcset": "/covers/QTS-009.webp 400w, /covers/QTS-009-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-009/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-009/QTS-009-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-010",
    "code": "QTS-010",
    "title": "Queenstown Public and Passenger Transport Facilities Indicative Business Case",
    "shortTitle": "Queenstown Public and Passenger Transport",
    "summary": "Indicative business case (Rev 2.6, November 2017) prepared by Rationale Limited for Queenstown Lakes District Council (QLDC) as part of the Queenstown Town Centre Masterplan programme, drawing on Beca's Passenger Transport Requirements report. It finds that SH6A is at 88% of capacity (100% by 2026), buses are frequently late due to congestion, the Camp Street bus hub is at capacity and a new hub is needed by 2023, and peak-hour PT mode share must rise from 5% (2018) to 22% (2025) and 41% (2045). Of three shortlisted programmes, Programme 5, an on-street interchange on Stanley Street with 6-8 bus bays and a passenger building, was preferred over an 11-bay off-street option on cost, operational and safety grounds. The programme also reallocates coach, taxi and loading zones, adds bus priority, develops ferry wharves and scheduled ferry services, ITS and marketing. It costs about $33.8 million, with NZTA funding assumed at 51% FAR and PPP options to be investigated; the wider masterplan BCR is 1.7. The case recommends acceptance and progression to a Detailed Business Case in 2018. It explicitly proposes that a mass transit solution (mass rapid transit. The source also names a ferry, which is not mass rapid transit,) between Frankton and the town centre be studied and planned, with construction around or beyond 2037, and notes a designation may be required for the route.",
    "documentType": "Indicative business case",
    "documentForm": "Indicative business case (public and passenger transport facilities), part of Town Centre Masterplan programme",
    "year": 2017,
    "publishedDate": "2017-11",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre (Stanley, Camp, Shotover Streets); Frankton Road (SH6A) corridor; Frankton Arm of Lake Wakatipu; Frankton",
    "owner": "QLDC",
    "citation": "QLDC. Queenstown Public and Passenger Transport Facilities Indicative Business Case (2017). Rationale job number J000621 (as printed in QA statement; file path refers to J000622).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/gkjjihjm/public-and-passengertransport-facilities-business-case.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/gkjjihjm/public-and-passengertransport-facilities-business-case.pdf"
    ],
    "documentTypeCode": "indicative-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "freight",
      "its",
      "coach"
    ],
    "organisationIds": [
      "qldc",
      "beca",
      "rationale",
      "nzta"
    ],
    "searchText": "qts-010 queenstown public and passenger transport facilities indicative business case queenstown public and passenger transport indicative business case (rev 2.6, november 2017) prepared by rationale limited for queenstown lakes district council (qldc) as part of the queenstown town centre masterplan programme, drawing on beca's passenger transport requirements report. it finds that sh6a is at 88% of capacity (100% by 2026), buses are frequently late due to congestion, the camp street bus hub is at capacity and a new hub is needed by 2023, and peak-hour pt mode share must rise from 5% (2018) to 22% (2025) and 41% (2045). of three shortlisted programmes, programme 5, an on-street interchange on stanley street with 6-8 bus bays and a passenger building, was preferred over an 11-bay off-street option on cost, operational and safety grounds. the programme also reallocates coach, taxi and loading zones, adds bus priority, develops ferry wharves and scheduled ferry services, its and marketing. it costs about $33.8 million, with nzta funding assumed at 51% far and ppp options to be investigated; the wider masterplan bcr is 1.7. the case recommends acceptance and progression to a detailed business case in 2018. it explicitly proposes that a mass transit solution (mass rapid transit. the source also names a ferry, which is not mass rapid transit,) between frankton and the town centre be studied and planned, with construction around or beyond 2037, and notes a designation may be required for the route. context and purpose. this indicative business case (ibc), rev 2.6 'qldc/nzta updates' (november 2017), was prepared by rationale limited for queenstown lakes district council (qldc) as part of the queenstown town centre masterplan programme (p.7). much of the programme detail is drawn from beca's public and passenger transport requirements report (appendix 8) and abley's modelling (appendix 7) (pp.97, 114). it notes that orc manages public transport services, while qldc and nzta need to provide supporting facilities (p.7). evidence. the district is forecast to grow by 29% (residents) and 25% (visitors) in ten years; sh6a between frankton and the town centre is at 88% of its 28,500 vehicles/day capacity and expected to reach 100% by 2026; up to 60% of morning-peak and 77% of afternoon-peak buses run late; camp street is at capacity and a new hub is required by 2023 (p.7). modelling indicates peak-hour pt mode share must rise from 5% in 2018 to 22% in 2025 and 41% in 2045, plus 'the use of a new mass rapid transit solution by 2045' (pp.8-9). options. a long list (table 18) included a do-minimum plus option with 'alternate passenger transport modes such as gondola and water taxi' (p.86). shortlisted programmes 1, 5 and 6 were compared; programme 6 (11-bay off-street interchange bounded by ballarat, stanley and shotover streets) scored highest against objectives (70%) but was marked down for land cost, bus access, pedestrian and night-time safety concerns, so programme 5 (on-street stanley street) was preferred (pp.93-95). stanley street was favoured partly because it allows 'easy access to the lake for potential water-based transport or up turner street for a potential gondola to the airport' (p.91). preferred programme. camp street is expanded to four bays as an interim (about two years), then a 6-8 bay stanley street interchange with an approximately 800 m2 passenger building, bus priority and restricted private access is delivered by 2023, requiring at least stage 1 of the new arterials (pp.96-98). coach parking on camp street is removed; passenger transport, taxi and loading zones are reallocated; inter-city buses move to stanley street (pp.100-101). water taxis grow by 2023, wharves are upgraded, all frankton arm piers become pontoons by 2027 and a scheduled ferry network is expected by 2030 (pp.112, 116-118). bus priority on frankton road is recommended by 2023 (p.116). bus services reach maximum practical frequency by 2025, and the frankton road bus service is expected to reach capacity around 2035 even with ferries (p.118). economic, commercial and financial cases. the programme sits within the masterplan bcr of 1.7 and is assessed as 'high' and potentially 'very high' results alignment (pp.11, 134-135). 2045 modelling estimates 300 peak-hour frankton road passengers by bus/water taxi and 490 by mass rapid transit (p.129). the cost is $33,848,000: dbc $75,000, marketing $156,000, property $5.2m, public ferry wharf $5.7m, stanley street interchange $22.7m, all loaded in 2017/18-2023/24 (p.139). nzta funding is assumed at 51% far, with ppp, orc/nzta its co-investment and possible central government funding (pp.12, 139-140). qldc is reaching its debt ceiling (p.140). procurement is in two phases, with qldc working with nzta and orc through a steering group (p.137). management case. a qldc-nzta-orc alliance is proposed, with the chief executives' next meeting on 6 december 2017 (pp.141-142); risk, benefits and change management plans, march 2018 consultation and further studies are planned (pp.144-146). mass rapid transit: this is the most explicit of the 2017 rationale business cases. table 1 states that 'a mass transit solution (such as a gondola, ferry or light rail system) between frankton and the queenstown town centre will be studied and planned, with construction expected around or beyond 2037' (p.10). the mid-term section recommends that the feasibility of frankton-queenstown mass rapid transit 'is studied and planning takes place' (p.118); the 2023-2035 map shows 'gondola planning and construction underway' along a route over queenstown hill (p.118), and the schedule shows planning from 2028-2034 and construction to 2037 (p.114). the consenting strategy notes 'a designation may be required to secure the future mass rapid transit route' (p.137). the demand graphic is cited as indicating mrt 'may be required from 2040 onwards' (p.54). mrt is not costed in the $33.8 million programme. indicative business case (public and passenger transport facilities), part of town centre masterplan programme qldc. queenstown public and passenger transport facilities indicative business case (2017). rationale job number j000621 (as printed in qa statement; file path refers to j000622). queenstown town centre (stanley, camp, shotover streets); frankton road (sh6a) corridor; frankton arm of lake wakatipu; frankton rev 2.6 (qldc/nzta updates) recommends a frankton-town centre mass rapid transit option be studied and planned; construction around or beyond 2037. the source also names a ferry, which is not mass rapid transit. the ibc treats mass transit as a planned long-term element of the public transport strategy, outside its costed programme. table 1 lists 'mass transit solution: a mass transit solution (such as a gondola, ferry or light rail system) between frankton and the queenstown town centre will be studied and planned, with construction expected around or beyond 2037' (p.10). modelling assumes 'the use of a new mass rapid transit solution by 2045' (p.9) and 490 peak-hour frankton road passengers by mass rapid transit in 2045 (p.129). the mid-term (2023-2035) section states that the frankton road bus service 'is expected to reach capacity around 2035 even with improved ferry services. a gondola could be introduced provide an additional option for travel between frankton and queenstown. we recommend the feasibility of this is studied and planning takes place' (p.118). the accompanying map shows 'gondola planning and construction underway' and a mass rapid transit route from the pt hub to frankton near the airport (p.118); figure 66 shows planning from 2028-2034 and construction to 2037 (p.114). the stanley street hub was preferred partly because it allows 'up turner street for a potential gondola to the airport' (p.91), and the scope encourages 'further investigation into previously identified gondola facilities' (p.97). the consenting strategy notes 'a designation may be required to secure the future mass rapid transit route' (p.137). the demand graphic is cited as 'from 2040 onwards' (p.54). \"a mass transit solution (such as a gondola, ferry or light rail system) between frankton and the queenstown town centre will be studied and planned, with construction expected around or beyond 2037.\" (p.10) | \"the bus service along frankton road is expected to reach capacity around 2035 even with improved ferry services. a gondola could be introduced provide an additional option for travel between frankton and queenstown. we recommend the feasibility of this is studied and planning takes place\" (p.118) | \"a designation is only required for the pt hub if the land cannot be secured. however, a designation may be required to secure the future mass rapid transit route.\" (p.137) | \"easy access to the lake for potential water-based transport or up turner street for a potential gondola to the airport.\" (p.91) | \"the use of a new mass rapid transit solution by 2045 to supplement buses, ferries and coaches.\" (p.9) | \"encourages further investigation into previously identified gondola facilities that connect with the proposed community heart and new public transport facilities on stanley street.\" (p.97) programme cost $33,848,000 (p.139) stanley st interchange and associated works $22,693,000 (p.139) public ferry wharf $5,699,000; property $5,225,000 (p.139) masterplan programme bcr 1.7 (p.11) sh6a at 88% of 28,500 vpd; 100% by 2026 (p.7) up to 60% (am) and 77% (pm) peak buses late (p.7) peak-hour pt mode share 5% (2018) to 22% (2025) and 41% (2045) (p.8) 2045 frankton rd peak hour: 300 by bus/water taxi, 490 by mass rapid transit (p.129) frankton road bus service at capacity around 2035 (p.118) shortlist scores vs objectives: p1 18%, p5 56%, p6 70% (p.93) average fare reduction $5.20 to $2 (p.7) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/gkjjihjm/public-and-passengertransport-facilities-business-case.pdf qldc substantive indicative business case final 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. freight freight and loading. traffic systems intelligent transport systems and traffic signals. coach coach and visitor shuttle services. qldc qldc commissioned beca beca prepared rationale rationale prepared nzta waka kotahi nzta partner ben smith prepared by rationale rationale gavin flynn project manager rationale rationale gavin flynn reviewed by rationale rationale tom lucas reviewed by rationale rationale edward guy approved by rationale rationale accept the public and passenger transport facilities ibc and progress the project to the detailed business case phase, aligned with the masterplan projects; dbc to be completed in 2018 ($75,000). the queenstown town centre public and passenger transport facilities ibc be accepted. the project be progressed to the detailed business case (dbc) phase. dbc completed in 2018 not assessed qldc qldc expand camp street to a 4-bay bus facility as an interim measure with an expected two-year life. the preferred way forward is to build the camp street 4 bay facility initially immediate (late 2017) not assessed obtain demand information from orc to set interim arrangements and confirm the stanley street hub is sufficient to 2050. qldc will need clear assurance form orc regarding the level of demand dbc stage not assessed qldc qldc establish an on-road public transport interchange on stanley street (shotover to ballarat) with 6-8 bus bays and an interchange building; nzta funding assumed at 51% far. establishment of an on-road public transport interchange at stanley street with 6-8 bus bays and an interchange building, by 2023. by 2023 (2022/23 in schedule) not assessed nzta waka kotahi nzta implement bus priority measures, including bus lanes, along stanley street from frankton road to the interchange, with restricted private vehicle access. bus priority measures along stanley street from frankton road... by 2023. by 2023 not assessed introduce bus priority measures on frankton road. it is recommended that bus priority measures are introduced on frankton road by 2023. by 2023 not assessed add a mid-block signalised pedestrian crossing on stanley street and signalise and expand the stanley-memorial-gorge-shotover intersection, removing camp street coach parking. a new mid-block signalised pedestrian crossing is proposed not assessed provide new passenger transport (coach/shuttle) zones on shotover street (2) and duke street (1), with shotover street footpath expansion and duke/brecon corner works. new allocation includes: 2 zones along shotover street; 1 zone along duke street. not assessed relocate inter-city bus stops to stanley street between ballarat and beetham streets. inter-city buses will be re-located to stanley street not assessed provide additional day-time taxi ranks (shotover and ballarat streets) and late-night taxi ranks (14 bays on stanley street). additional taxi ranks are proposed not assessed increase passenger and goods loading zones (3 on shotover street, 1 on camp street). it is proposed to increase the number of loading zones in the town not assessed re-purpose camp street after public transport moves to stanley street. re-purposing of camp street after public transport moves into stanley street after stanley street hub opens not assessed develop a public ferry wharf near the town centre ($5.7m), evaluating location options a-e in the dbc with guidance from orc and nzta. the benefit of the wharf development currently programmed for 2018/19 programmed 2018/19; spend 2019/20-2023/24 not assessed qldc qldc grow the water taxi fleet and commence a wharf upgrade programme focused on queenstown town centre, the gardens and kelvin heights. a growth in water taxi fleet and services is expected to meet the increased demand by 2023 by 2023 not assessed upgrade all frankton arm piers envisaged for scheduled ferries to pontoons and establish a scheduled ferry network, possibly linking the frankton wharf to the airport. by 2027, all piers within frankton arm... a scheduled ferry network/system is expected to be established by 2030. pontoons by 2027; ferry network by 2030 not assessed provide park and ride facilities outside queenstown (shotover bridge and jack's point shown) to feed bus routes. park and ride (p&r) facilities are needed to enable people to drive to and from the bus route mid-term (2023-2035) not assessed upgrade the frankton track and extend a safe cycling route into the town centre. upgrading frankton track and extending a safe route into the town centre. not assessed study and plan mass rapid transit between frankton and the queenstown town centre. the source also names a ferry, which is not mass rapid transit. a mass transit solution (such as a gondola, ferry or light rail system)... will be studied and planned construction expected around or beyond 2037 not assessed study the feasibility of mass rapid transit between frankton and queenstown and undertake planning so construction could be completed in the long term. we recommend the feasibility of this is studied and planning takes place planning 2028-2034; completion around or beyond 2035 (2037 in schedule) not assessed further investigate previously identified mass rapid transit facilities connecting with the community heart and the stanley street pt facilities, at the detailed design stage. encourages further investigation into previously identified gondola facilities detailed design stage not assessed consider a designation to secure the future mass rapid transit route as part of the consenting strategy. a designation may be required to secure the future mass rapid transit route not assessed qldc qldc seek legal and planning advice on rma consenting and designation requirements for the programme. qldc will need to seek legal and planning advice dbc phase not assessed qldc qldc deliver intelligent transport systems (real-time signage, traveller apps, mobility as a service, integrated smart ticketing), with possible shared investment by orc and nzta. orc and nzta may also have an interest in the its solutions not assessed nzta waka kotahi nzta deliver marketing and communications on transport options (tourist information, maps, website, airport and hotel marketing). marketing and communications $156,000 2018/19-2019/20 ($156,000) not assessed qldc qldc acquire property for the programme ($5.2m). property costs $5,225,000 2019/20 not assessed qldc qldc investigate ppp arrangements for the pt facility and commercial lease revenue around the hub. potential commercial leases around the bus hub should be further investigated in the detailed business case dbc phase not assessed qldc qldc work with nzta and orc so all eligible parts of the programme receive the appropriate subsidy. qldc also needs to work closely with nzta and orc dbc phase not assessed nzta waka kotahi nzta assemble a qldc commercial team to shape procurement; steering group of qldc, nzta and orc to plan, review and appoint suppliers. a commercial team assembled by qldc would play a key role not assessed nzta waka kotahi nzta confirm a transport planning and delivery alliance of qldc, nzta and orc; chief executives' next meeting on 6 december 2017. the next meeting on this topic is due to occur on 6 december 2017. next meeting 6 december 2017 not assessed nzta waka kotahi nzta update the risk register early in detailed planning to assign responsibilities to partners; develop benefits register, benefits management plan and change management plan. it is recommended that it be updated again in the early part of the detailed planning phase early detailed planning phase not assessed hold formal consultation on the full draft masterplan programme. a formal consultation period is scheduled for march 2018 march 2018 not assessed qldc qldc next steps: pedestrian cameras and public life survey, martin jenkins economic study, arterial stage 3 design, transport modelling tool, march 2018 parking survey, and work on active transport movements. the following steps are also planned to better inform this project 2018 not assessed qldc qldc monitor the first three months of the new orbus service and discuss the choice app's performance with nzta and orc. monitoring of the first three months of the new orbus service operations from november 2017 not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2017-11-01",
    "cover": {
      "src": "/covers/QTS-010.webp",
      "srcset": "/covers/QTS-010.webp 400w, /covers/QTS-010-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-010/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-010/QTS-010-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-011",
    "code": "QTS-011",
    "title": "Queenstown Town Centre Masterplan Programme Business Case",
    "shortTitle": "Queenstown Town Centre Masterplan Programme",
    "summary": "Draft programme business case (Rev 2.5, November 2017) prepared by Rationale Limited for Queenstown Lakes District Council (QLDC). It brings together the town centre arterials, parking and public and passenger transport facilities indicative business cases, the spatial framework, public realm improvements and a Community Heart into one integrated Queenstown Town Centre Masterplan investment story to 2050. The strategic case cites SH6A between Frankton and the town centre operating at 88% of its 28,500 vehicles/day capacity (expected 100% by 2026), active and public transport below 13% of inbound travel, and parking-search traffic causing 30% of town centre congestion. Seven programmes were assessed; Programme 6 (new arterials, Stanley Street PT hub, appropriate parking supply and town centre improvements) is preferred. The programme costs about $385 million over ten years, with a BCR of 1.7, although the incremental analysis favours Programme 3 and an NZTA reviewer raised concerns about patronage assumptions. QLDC's borrowing capacity is a binding constraint, so PPPs, Crown funding and deferral are proposed. An alliance of QLDC, NZTA and ORC is proposed, and detailed business cases are to follow in 2018. The programme includes 'Preservation of mass transit corridor options', and its implementation schedule shows mass rapid transit planning from 2028 and mass rapid transit construction completing in 2037.",
    "documentType": "Programme business case",
    "documentForm": "Programme business case (town centre masterplan)",
    "year": 2017,
    "publishedDate": "2017-11",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Town Centre; Frankton Road (SH6A) corridor; Lake Wakatipu (ferry); Wakatipu Basin",
    "owner": "QLDC",
    "citation": "QLDC. Queenstown Town Centre Masterplan Programme Business Case (2017). Rationale job number J000612.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/pxiluzv0/qt-town-centre-masterplan-programme-business-case.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/pxiluzv0/qt-town-centre-masterplan-programme-business-case.pdf"
    ],
    "documentTypeCode": "programme-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "its"
    ],
    "organisationIds": [
      "qldc",
      "rationale",
      "nzta",
      "beca"
    ],
    "searchText": "qts-011 queenstown town centre masterplan programme business case queenstown town centre masterplan programme draft programme business case (rev 2.5, november 2017) prepared by rationale limited for queenstown lakes district council (qldc). it brings together the town centre arterials, parking and public and passenger transport facilities indicative business cases, the spatial framework, public realm improvements and a community heart into one integrated queenstown town centre masterplan investment story to 2050. the strategic case cites sh6a between frankton and the town centre operating at 88% of its 28,500 vehicles/day capacity (expected 100% by 2026), active and public transport below 13% of inbound travel, and parking-search traffic causing 30% of town centre congestion. seven programmes were assessed; programme 6 (new arterials, stanley street pt hub, appropriate parking supply and town centre improvements) is preferred. the programme costs about $385 million over ten years, with a bcr of 1.7, although the incremental analysis favours programme 3 and an nzta reviewer raised concerns about patronage assumptions. qldc's borrowing capacity is a binding constraint, so ppps, crown funding and deferral are proposed. an alliance of qldc, nzta and orc is proposed, and detailed business cases are to follow in 2018. the programme includes 'preservation of mass transit corridor options', and its implementation schedule shows mass rapid transit planning from 2028 and mass rapid transit construction completing in 2037. context and purpose. this draft programme business case (pbc), rev 2.5 (november 2017), was prepared by rationale limited for queenstown lakes district council (qldc). it integrates the town centre arterial routes, parking, and public and passenger transport facilities business cases (appendices 11-13), a spatial framework, public realm improvements and a community heart (p.7). it seeks approval to take the programme and project business cases into detailed planning (p.13). commercial, financial and management elements are to be agreed between qldc, nz transport agency (nzta), otago regional council (orc) and central government (p.7). case for change. evidence cited includes sh6a between frankton and the town centre at 88% of its 28,500 vehicles/day theoretical capacity, expected to reach 100% by 2026; active and public transport accounting for less than 13% of inbound travel and under 2% of people using the bus to work; town centre parking at capacity, with 30% of congestion from parking search; and rapid population and visitor growth (p.9). investment objectives include town centre spend (2017 baseline $400 million) and visitor numbers (18,000/day) (p.49). options. seven programmes, from status quo to 'most ambitious', were built from the project business case options (table 15, p.102) and assessed by mca. programme 7 (with community heart) rated highest but lacked detail, so programme 6 was preferred while preserving land for the community heart (p.103). programme 6 comprises new arterials from melbourne street to one mile roundabout, fringe parking buildings and expanded paid parking, park and ride, a 6-8 bay stanley street pt hub, wharf facilities for waterborne transport, preservation of mass transit corridor options, public realm upgrades, technology, active travel and marketing (pp.10, 110). the case for arterial stage 3 rests largely on wider economic benefits of removing traffic from shotover street; its revised option 3b estimate is $47.7 million, about $50 million lower than before (pp.110-114). economic case. abley's eem-based analysis gives the preferred programme a bcr of 1.7 (sensitivity range 1.2-2.2) (pp.132-133). the incremental analysis shows programme 3 (arterial stages 1 and 2) as preferred because increments to programmes 4 and 6 fall below 1; the document argues programme 6 benefits are conservative (p.132). abley attributes 96% of road user benefits to stages 1 and 2 (p.139). nzta reviewer graeme bellis noted concerns about predicted pt patronage and the elasticity method, and the need for better models (pp.133-134). for 2045 the modelling estimates frankton road peak-hour inbound pt of 300 by bus/water taxi plus 490 by mass rapid transit (p.141). the programme is assessed as 'high' and potentially 'very high' results alignment (pp.136-138). implementation. figure 66 (p.144) shows stanley street interchange by 2023, 5-10 minute bus frequency on frankton road, parking restrictions from 2018, park and ride construction 2018-2026, scheduled ferries from 2024 and a lake-wide ferry network from 2030, arterial construction to 2023, and 'gondola planning' 2028-2034 then 'gondola construction' to 2037. the construction sequencing schedule dated 13 october 2017 sets parking buildings, arterial designation and stages, ferry wharves, the pt interchange (2022/23), public realm streets and the community heart across 2018/19-2027/28 (p.145). financial and management cases. the programme is about $384.7 million over ten years: ppp $46.2m, qldc-only $36.8m, qldc 49%/nzta far 51% $224.2m (including arterials $139.7m and pt hubs $23.9m), and qldc 70%/far 30% $77.5m (p.12). qldc's draft ltp capital programme would require additional borrowing of around $700 million (stated as $750 million on p.11) against a maximum capacity of around $330 million; recommended steps are to reduce or defer, seek bulk crown funding and use ppps (p.150). proposed funding partners are set out by project (p.152). a qldc-nzta-orc alliance with a steering group is proposed (pp.147, 156); consultation is scheduled for march 2018 and dbcs for january-october 2018 (pp.158-160). mass rapid transit: the pbc includes 'preservation of mass transit corridor options to enable future growth' as a programme component (p.10) and states 'a mass rapid transit solution may be required from around 2040' (p.81). its implementation schedule shows planning from 2028-2034 and construction to 2037 (p.144), and the 2035+ pt strategy map lists 'gondola completed' with a 'gondola / light rail' route between the town centre pt hub and frankton (p.123). the hub is to allow for 'a potential gondola link' (p.97). consents and purchases for 'the mass transit corridor' are to be proactively managed (p.148), and mrt is listed as a new asset type for asset management (p.135). mrt is not costed in table 1, and no mode, route or responsible agency is confirmed. programme business case (town centre masterplan) qldc. queenstown town centre masterplan programme business case (2017). rationale job number j000612. queenstown town centre; frankton road (sh6a) corridor; lake wakatipu (ferry); wakatipu basin draft rev 2.5 (qldc/nzta updates) includes preserving a mass rapid transit corridor; schedule shows planning from 2028-2034 and construction by 2037; not costed. mrt is part of the programme narrative but is not costed or assessed. the executive summary lists 'preservation of mass transit corridor options to enable future growth' among programme deliverables (p.10). citing beca's demand graphic, it states 'a mass rapid transit solution may be required from around 2040' (p.81). the implementation schedule (figure 66) shows 'gondola planning' from 2028 to 2034 and 'gondola construction' completing in 2037 (p.144). the 2035+ public and passenger transport strategy map lists 'c. gondola completed' and shows a 'gondola / light rail' line between the town centre pt hub and frankton/the airport, alongside a target pt mode share of 20% peak (p.123). the pt project is described as future-proofing 'a potential gondola link' (p.97). the modelling assumes 490 peak-hour passengers on frankton road by mass rapid transit in 2045 (p.141). the property strategy says consents and purchases for 'the mass transit corridor' will be 'proactively managed' (p.148), and asset management must prepare for 'a mass rapid transit solution' (p.135). the risk register includes 'include pt benefits (ie. gondola landing) within mca for stage 2 option 4.1' (p.172). \"preservation of mass transit corridor options to enable future growth.\" (p.10) | \"the graphic below demonstrates this demand and highlights that a mass rapid transit solution may be required from around 2040.\" (p.81) | \"frankton rd - 300 passengers by bus/water taxi (up to 7-8 buses plus water taxi) and 490 passengers by mass rapid transit.\" (p.141) | \"where consents and purchases are required, such as for the arterial upgrade and the mass transit corridor, this will be proactively managed through advice from the partners planning, commercial and legal advisers.\" (p.148) | \"c. gondola completed\" (p.123) | \"a dedicated public transport corridor, allowing flexibility to future proof public transport facilities. for example: easy access to the lake for potential water-based transport or a potential gondola link.\" (p.97) programme cost $384,702,000 over 10 years (p.12) programme bcr 1.7; sensitivity 1.2-2.2 (pp.132-133) incremental bcr analysis favours programme 3 (p.132) sh6a at 88% of 28,500 vpd capacity, 100% by 2026 (p.9) active and pt less than 13% of inbound travel; under 2% bus to work (p.9) town centre arterials $139,684,000 (p.12) arterial stage 3 revised estimate $47.7m, about $50m lower (p.114) 96% of road user benefits from arterial stages 1 and 2 (p.139) 2045 frankton rd peak hour: 300 by bus/water taxi plus 490 by mass rapid transit (p.141) qldc additional borrowing need ~$700m vs capacity ~$330m (p.150; $750m on p.11) target pt mode share 2035+: 20% peak, 10% interpeak (p.123) gondola planning 2028-2034; construction to 2037 (p.144) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/pxiluzv0/qt-town-centre-masterplan-programme-business-case.pdf qldc substantive programme business case draft 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. traffic systems intelligent transport systems and traffic signals. qldc qldc commissioned rationale rationale prepared nzta waka kotahi nzta partner ben smith prepared by rationale rationale gavin flynn project manager rationale rationale gavin flynn reviewed by rationale rationale graeme bellis reviewed by nzta waka kotahi nzta john row reviewed by beca beca tom lucas reviewed by rationale rationale edward guy approved by rationale rationale gareth noble contributor designate the new town centre arterial route (melbourne street to one mile roundabout). arterial route designation 2018/19; completion of the arterial designation processes from july 2018 to june 2020 2018/19 in schedule; designation process july 2018 to june 2020 not assessed qldc qldc acquire land for the town centre arterials. land acquisition 2019/20 2019/20 not assessed qldc qldc construct arterial stage 1 (melbourne street to henry street), commencing construction by july 2020. stage 1: melbourne st to henry st; commence arterial construction by july 2020 2020/21-2021/22 not assessed nzta waka kotahi nzta construct arterial stage 2 (henry street to man street). stage 2: henry st to man st 2021/22-2022/23 not assessed nzta waka kotahi nzta construct arterial stage 3 (man street and thompson street to one mile), using revised option 3b (estimate $47.7m), and progress its design to better capture benefits. stage 3: man st and thompson st (to one mile) 2022/23-2023/24 not assessed nzta waka kotahi nzta build the boundary street parking building, potentially designed, built and operated by a private development partner. parking building (boundary st) 2018/19-2019/20 not assessed build the ballarat street/project connect parking building, potentially via a private development partner. parking building (ballarat st/project connect) 2020/21 not assessed deliver parking interventions and technology (phase 1 and phase 2), including smart parking management, apps and its signage. parking interventions/technology (phase 1)... (phase 2) phase 1 2018/19-2019/20; phase 2 2020/21-2023/24 not assessed qldc qldc introduce parking restrictions in two stages and expand the town centre paid parking area. parking restrictions (i) 2018... parking restrictions (ii) stage i 2018; stage ii about 2021-2025 not assessed construct park and ride facilities in stages; park and ride may be eligible for nzta investment at 51% far. park and ride construction 2018-2026 (milestones 2018, 2020, 2021, 2023, 2025, 2026) not assessed nzta waka kotahi nzta build a new 6-8 bay public transport hub (stanley street interchange), with nzta contribution assumed at 51% far and possible private commercial edges. stanley st interchange 2022/23 2022/23 (2023 milestone) not assessed nzta waka kotahi nzta increase bus frequency, reaching 5-10 minute frequency on frankton road. increasing frequency... 5-10 minute frequency frankton rd from 2017; 5-10 minute frequency after 2023 not assessed develop public ferry wharves and pontoons (queenstown town centre, gardens and kelvin heights by 2024; all lake wharf pontoons by 2027). public ferry wharves; qtc / gardens / kh wharf pontoons 2024; all lake wharf pontoons 2027 2018/19 and 2021/22-2024/25; pontoons 2024 and 2027 not assessed nzta waka kotahi nzta grow the water taxi fleet and introduce scheduled ferry services (qtc/gardens/kelvin heights/kelvin park from 2024; lake-wide scheduled ferry network from 2030). scheduled ferry qtc / gardens / kelvin heights / kelvin park... scheduled ferry network (lake) 2024; 2030 not assessed preserve mass transit corridor options to enable future growth. preservation of mass transit corridor options to enable future growth. not assessed plan mass rapid transit (shown on the 2035+ map as a 'gondola / light rail' route between the town centre pt hub and frankton). gondola planning 2028... 2034 2028-2034 not assessed construct mass rapid transit, shown as completed in the 2035+ public and passenger transport strategy. gondola construction... 2037 2034-2037 not assessed proactively manage consents and property purchases required for the mass transit corridor through the partners' planning, commercial and legal advisers. where consents and purchases are required, such as for the arterial upgrade and the mass transit corridor not assessed nzta waka kotahi nzta deliver the sequenced public realm upgrades (upper beach street, rees street and the mall first, through to earl street and marine parade), with cost shared qldc/nzta 49/51 or 70/30. public realm upgrades... 2018/19... 2027/28 2018/19-2027/28 not assessed nzta waka kotahi nzta prioritise the gardens to gondola axis, beach street axis to pt hub and cycle trails if needed for affordability, delivering remaining streets and open spaces from 2028/29. prioritising the gardens to gondola axis, beach st axis to pt hub and cycle trails balance from 2028/29 not assessed qldc qldc develop the community heart (memorial hall replacement and related facilities), with a detailed business case to inform the programme 7 option. community heart (memorial hall replacement etc) 2020/21 not assessed qldc qldc deliver mobility as a service, travel management and queenstown workplace travel plans (table 1 costs $0.26m, $8.9m and $0.5m). mobility as a service $260,000... queenstown workplace travel plans $507,000 10-year programme not assessed nzta waka kotahi nzta deliver the wakatipu active travel network and improved town centre walking and cycling routes and facilities ($22.8m). wakatipu active travel network $22,844,000 10-year programme not assessed nzta waka kotahi nzta run marketing communications campaigns to better educate people on transport options. marketing communications campaigns to better educate people on transport options. not assessed develop the detailed business cases, including micro-simulation, incremental bca, a benefits allocation framework, the thompson street to one mile link and investigation of a public transport only programme. development of the required detailed business cases between january and october 2018 january-october 2018 not assessed nzta waka kotahi nzta complete the spatial framework and design guidelines for the town centre. completion of the spatial framework by early 2018 early 2018 (february 2018 in executive summary) not assessed qldc qldc progress parking building and public realm design procurement and financial feasibility to meet the scheduled construction dates. completion of the parking buildings and public realm... construction procurement documentation... by june 2018 by june 2018 (executive summary) not assessed qldc qldc adopt a transport alliance of qldc, nzta and orc with a steering group to oversee delivery and appoint suppliers for transport projects; chief executives to meet 6 december 2017. this discussion is now being progressed by the chief executives from qldc, nzta and orc as quickly as possible; next ce meeting 6 december 2017 not assessed nzta waka kotahi nzta agree funding apportionment and enter formal multi-party funding agreements, driven by a benefits allocation framework. the funding breakdown needs to be discussed further and agreed between investors detailed planning phase not assessed nzta waka kotahi nzta manage affordability: reduce or defer programme elements, make a case for bulk crown funding and use ppp delivery for some capex projects. make a case for bulk crown funding; use ppp delivery for some capex projects ltp 2018 process not assessed qldc qldc gareth noble to retain the nominal role of programme risk manager; develop a programme risk management plan and project risk registers. it is recommended that gareth retain the nominal role of risk manager until each project moves into implementation not assessed qldc qldc hold a formal consultation period on the full draft masterplan programme. a formal consultation period is scheduled for march 2018 march 2018 not assessed qldc qldc develop a benefits register and benefits management plan, and a change management plan, as part of the detailed business case. this map will be used to generate a benefit register for regular reporting and a benefits management plan detailed business case phase not assessed install pedestrian cameras and complete a second public life survey. completion of a second public life survey in january 2018. january 2018 not assessed qldc qldc progress the martin jenkins economic study on the value of the queenstown experience and the cost of its degradation. progression of an economic study being undertaken by martin jenkins not assessed identify the best transport modelling tool for people, cyclist and vehicle movements in the town centre. identification of the best form of transport modelling tool not assessed qldc qldc complete a town centre parking survey. completion of a town centre parking survey in march 2018. march 2018 not assessed qldc qldc monitor the first three months of the new orbus service and discuss performance of the choice app with nzta and orc. monitoring of the first three months of the new orbus service operations from november 2017 not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2017-11-01",
    "cover": {
      "src": "/covers/QTS-011.webp",
      "srcset": "/covers/QTS-011.webp 400w, /covers/QTS-011-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-011/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-011/QTS-011-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-012",
    "code": "QTS-012",
    "title": "Queenstown Integrated Transport Programme Business Case (2018 presentation)",
    "shortTitle": "Queenstown Integrated Transport Programme Business",
    "summary": "Abley slide presentation, dated 21 March 2018, summarising the Queenstown Integrated Transport Programme Business Case (QITPBC) prepared for partners NZTA, QLDC, ORC and Queenstown Airport Corporation. It covers PBC development, the evidence base (problem statements weighted 67% and 33%, traffic growth on SH6/SH6A, airport and tourism growth, Thinkplace liveability findings, mode share and parking occupancy), the nine programmes assessed and the selection of the Balanced PT and Active Modes Focus programme. A peak hour demand versus capacity chart for SH6A adds water taxis from 2019, PT Stage 2 and ferries from 2023, and 'MRT 2040'. A map shows an indicative MRT corridor 'Beyond 2027'. Stated outcomes are 30% alternative mode share (up from 15%), a 16-minute Queenstown-Frankton travel time reduction and 3-minute variability in the 2045 AM peak. Conclusions stress partner commitment, the 'potential role of alternative funding mechanisms (e.g. MRT)', the risk that private vehicle use does not fall, and inter-agency alignment.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Slide presentation of the QITPBC",
    "year": 2018,
    "publishedDate": "2018-03-21",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Town Centre; Frankton; SH6A (Frankton Road); SH6; Wakatipu Basin",
    "owner": "NZTA",
    "citation": "Queenstown Integrated Transport Programme Business Case (2018).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "Public source URL not yet recorded.",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "abley",
      "nzta",
      "orc",
      "queenstown-airport-corporation",
      "qldc"
    ],
    "searchText": "qts-012 queenstown integrated transport programme business case (2018 presentation) queenstown integrated transport programme business abley slide presentation, dated 21 march 2018, summarising the queenstown integrated transport programme business case (qitpbc) prepared for partners nzta, qldc, orc and queenstown airport corporation. it covers pbc development, the evidence base (problem statements weighted 67% and 33%, traffic growth on sh6/sh6a, airport and tourism growth, thinkplace liveability findings, mode share and parking occupancy), the nine programmes assessed and the selection of the balanced pt and active modes focus programme. a peak hour demand versus capacity chart for sh6a adds water taxis from 2019, pt stage 2 and ferries from 2023, and 'mrt 2040'. a map shows an indicative mrt corridor 'beyond 2027'. stated outcomes are 30% alternative mode share (up from 15%), a 16-minute queenstown-frankton travel time reduction and 3-minute variability in the 2045 am peak. conclusions stress partner commitment, the 'potential role of alternative funding mechanisms (e.g. mrt)', the risk that private vehicle use does not fall, and inter-agency alignment. context. this 21-slide deck by abley, with contact details for dave smith (p.21), presents the queenstown integrated transport programme business case (qitpbc). the footer dates it 21 march 2018, nine months after the business case (version 4, 16 june 2017). slide 3 lists the pbc partners as nzta, qldc, orc and qac; the audience and venue are not stated. evidence base. problems and benefits are restated: growth causing trip unreliability and worse customer experience (67%) and car dominance affecting liveability (33%) (p.4). a traffic table shows 2012 to 2016 aadt growth, e.g. sh6a west of frankton about 17,863 to 23,925 vehicles per day (p.5). further slides show airport passenger and tourism spend trends (p.6), sh6a and sh6 traffic against theoretical capacity (pp.7-8), projected households and jobs to 2045 (p.9), thinkplace survey findings that journey times are unpredictable and public transport is 'expensive, unreliable and infrequent' (p.10), 7am-11am mode share to the town centre (overall about 77% car occupants and 13% public transport) and 2016 parking occupancy of about 87-92% at midday (p.11). programme development. nine programmes were developed, from do minimum to do maximum (p.12); a programme assessment slide traces balanced 1 to the selected 'balanced pt & active modes focus' (p.13). a map shows the recommended programme, with an 'mrt corridor (indicative)' between frankton and the town centre labelled 'beyond 2027' (p.14). an sh6a peak hour demand versus capacity chart (persons per hour, 2016-2048) shows road, pt, water taxi and mrt capacity against low, expected and high growth, with 'water taxis 2019', 'pt stage 2 and water ferries 2023' and 'mrt 2040' (p.15). the recommended programme timeline places the mrt corridor at '2027 or beyond' (p.16). a version of the chart adds a line annotated '5% growth per annum?!' (p.17), and a further slide is headed 'recommended programme delivered earlier' (p.18). stated outcomes are 30% alternative mode share (up from 15%), a 16-minute travel time reduction between queenstown and frankton and 3-minute variability in the 2045 am peak (p.19). conclusions (p.20): partner commitment is critical; 'potential role of alternative funding mechanisms (e.g. mrt)'; the key risk is that the reduction in private vehicle use is not achieved; agencies must integrate and align; and the pbc provides a foundation for district transport planning (e.g. the gr2kb dbc). mass rapid transit: the deck shows an indicative mrt corridor from frankton to the town centre 'beyond 2027' (p.14), mrt capacity added to sh6a in 2040 (p.15), and mrt as an example of alternative funding (p.20). slides 17-18 suggest that faster growth (5% a year) would bring the need, and the programme, forward, but the deck gives no explanation in text. slide presentation of the qitpbc queenstown integrated transport programme business case (2018). queenstown town centre; frankton; sh6a (frankton road); sh6; wakatipu basin not stated shows indicative frankton-town centre mrt corridor beyond 2027, mrt capacity on sh6a from 2040, and mrt as alternative funding example mrt appears in three places. the recommended programme map shows an 'mrt corridor (indicative)' linking frankton and the queenstown town centre, labelled 'beyond 2027' (p.14), and the programme timeline lists 'mrt corridor' under 'long term 2027 or beyond' (p.16). the 'sh6a peak hour demand vs capacity' chart adds mrt capacity labelled 'mrt 2040' on top of road, public transport and water taxi capacity, set against low, expected and high growth (p.15); a second version adds a line annotated '5% growth per annum?!' rising to meet the mrt capacity around 2040 (p.17), followed by a slide headed 'recommended programme delivered earlier' (p.18). the conclusions list 'potential role of alternative funding mechanisms (e.g. mrt)' (p.20). the mode is not named in the slide text. \"potential role of alternative funding mechanisms (e.g. mrt)\" (p.20) | \"mrt 2040\" (p.15) | \"mrt corridor (indicative)\" (p.14) | \"5% growth per annum?!\" (p.17) problem weighting: trip unreliability 67%, car dominance 33% (p.4) sh6a west of frankton aadt about 17,863 (2012) to 23,925 (2016) (p.5) 7am-11am town centre mode share about 77% car occupants, 13% public transport (p.11) 2016 parking occupancy: on-street 89% (10am), 87% (1pm); off-street 91%, 92% (p.11) outcomes: 30% alternative mode share (up from 15%); 16-minute queenstown-frankton travel time reduction; 3-minute variability in 2045 am peak (p.19) mrt capacity shown on sh6a from 2040 (p.15) costed with the parent document. public source url not yet recorded. nzta substantive business case chapter or appendix not stated 2018 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. abley abley prepared nzta waka kotahi nzta partner orc orc partner queenstown airport corporation qac partner qldc qldc partner abley abley published dave smith presenter abley abley main document pdf",
    "sortDate": "2018-03-21",
    "cover": {
      "src": "/covers/QTS-012.webp",
      "srcset": "/covers/QTS-012.webp 400w, /covers/QTS-012-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-012/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-012/QTS-012-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-013",
    "code": "QTS-013",
    "title": "Queenstown Town Centre Spatial Framework",
    "shortTitle": "Queenstown Town Centre Spatial Framework",
    "summary": "Five-part spatial framework (Version 7, final issue, 14 June 2018) prepared by LandLAB for Queenstown Lakes District Council (QLDC) as the spatial and public realm component of the Queenstown Town Centre Masterplan. It sets the vision 'Supporting a thriving heart to Queenstown, now and in the future', informed by the masterplan Investment Logic Map and community engagement (289 responses in July-August 2017). Twelve 'key moves' (including a blue-green lakefront, a civic axis and Community Heart, the 'Gardens to Gondola' pedestrian connection, laneways, Horne Creek, town centre arterials as a catalyst and an integrated public transport and active travel network) inform five design strategies for precincts, streetscape, movement, open space and built form. The movement strategy redirects traffic onto the town centre arterials, creates a Stanley Street on-street transport interchange, relocates 30% then over 60% of on-street parking to the edge of the centre, adds cycle routes and water-based access, and seeks to 'future proof' for light rail and/or a mass rapid transit linking the town centre and Queenstown Airport. A four-stage implementation plan (2019-2028) and ten priority projects sequence the arterials, parking buildings, PT hub, ferry infrastructure and public realm upgrades. It includes 'progressive investigation of mass rapid transit options' in Stage One and early works for a potential Mass Rapid Transit terminal in Stage Two. No costs are given.",
    "documentType": "Spatial plan",
    "documentForm": "Town centre spatial framework and masterplan (5 parts)",
    "year": 2018,
    "publishedDate": "2018-06-14",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre (historic core, Stanley Street, lakefront, Lakeview, Gorge Road); Frankton Arm of Lake Wakatipu",
    "owner": "QLDC",
    "citation": "QLDC. Queenstown Town Centre Spatial Framework (2018).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/frankton-to-queenstown-queenstown-town-centre-masterplan",
    "publicSourceConfidence": "landing page",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/frankton-to-queenstown-queenstown-town-centre-masterplan",
      "https://www.qldc.govt.nz/media/j3pjxc4u/tcsf-part-1-introduction.pdf",
      "https://www.qldc.govt.nz/media/sqahj5hk/tcsf-part-2-vision-and-key-moves.pdf",
      "https://www.qldc.govt.nz/media/nkagv24s/tcsf-part-3-town-centre-design-strategies.pdf",
      "https://www.qldc.govt.nz/media/lbqamiar/tcsf-part-4-the-masterplan-web.pdf",
      "https://www.qldc.govt.nz/media/5ainu13m/tcsf-part-5-implementation-strategy-web.pdf"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "coach"
    ],
    "organisationIds": [
      "qldc",
      "landlab",
      "nzta"
    ],
    "searchText": "qts-013 queenstown town centre spatial framework queenstown town centre spatial framework five-part spatial framework (version 7, final issue, 14 june 2018) prepared by landlab for queenstown lakes district council (qldc) as the spatial and public realm component of the queenstown town centre masterplan. it sets the vision 'supporting a thriving heart to queenstown, now and in the future', informed by the masterplan investment logic map and community engagement (289 responses in july-august 2017). twelve 'key moves' (including a blue-green lakefront, a civic axis and community heart, the 'gardens to gondola' pedestrian connection, laneways, horne creek, town centre arterials as a catalyst and an integrated public transport and active travel network) inform five design strategies for precincts, streetscape, movement, open space and built form. the movement strategy redirects traffic onto the town centre arterials, creates a stanley street on-street transport interchange, relocates 30% then over 60% of on-street parking to the edge of the centre, adds cycle routes and water-based access, and seeks to 'future proof' for light rail and/or a mass rapid transit linking the town centre and queenstown airport. a four-stage implementation plan (2019-2028) and ten priority projects sequence the arterials, parking buildings, pt hub, ferry infrastructure and public realm upgrades. it includes 'progressive investigation of mass rapid transit options' in stage one and early works for a potential mass rapid transit terminal in stage two. no costs are given. context and purpose. the queenstown town centre spatial framework was prepared by landlab 'solely for queenstown lakes district council' (part 1 p.2, document control). version 7 (rev 007, '100% final issue') is dated 14 june 2018, after six drafts from january 2018. it is published in five parts: introduction, vision and key moves, town centre design strategies, the masterplan, and implementation strategy. it sits alongside the 2017 rationale business cases for the arterials, parking and public and passenger transport, and is to be supported by public realm design guidelines (appendix a) (pp.002, 004). context and evidence. the framework notes queenstown's population is expected to grow from 30,000 to 70,000 by 2035, with a typical daily visitor population of about 70,000 rising to about 110,000 at peak (pp.001, 008). it uses the masterplan investment logic map, which attributes 30% of the problem weighting to limited transport access 'creating congestion and frustration for visitors, and stopping residents coming to town' (p.010). engagement from 10 july to 4 august 2017 drew 289 responses, generally supportive, with concerns about the arterial alignment and the community heart (p.069). key moves and strategies. the twelve key moves include a blue green lakefront, the civic axis and community heart precinct, the gardens to gondola connection (a pedestrian-priority link to the skyline gondola), a fine-grain laneway network, horne creek, expanded open space, north-south and east-west streets, town centre arterials as a catalyst, a network of places, and an integrated public transport and active travel network (pp.017-041). the movement strategy aims to 'incentivise and prioritise' walking, cycling and public transport; it proposes the arterials bypass, a stanley street interchange between ballarat and shotover streets, coach re-routing to shotover street, park and ride outside the town centre, increased bus frequency, cycle networks, water-based access on the western lakefront, and relocation of 30% (short term) and more than 60% (long term) of on-street parking to the edge of the centre (p.052). the interchange concept is detailed at pp.054-055. implementation. the plan has four stages: stage one 2019-2022 (arterial designation and stage one, parking management, stanley street bus priority, camp street cycle lane, park street-hotops rise cycle lane by 2020, ferry/water taxi infrastructure, boundary and ballarat street parking buildings, street upgrades, council offices); stage two 2022-2023 (arterial stage two, pt hub completion, ballarat street and village green); stage three 2023-2025 (arterial stage three, full pt hub operation, shotover/duke passenger transport hub, lakefront, completion of ferry network to frankton and kelvin heights); and stage four 2025-2028 (lake esplanade, church and earl streets, community heart, pt optimisation) (pp.095-096, 100-104). ten priority projects are listed (p.099). two stage two options are 'to be confirmed through dbc' (pp.101-102). implementation depends on partnership with nzta and orc and the private sector, with three-yearly monitoring and reviews aligned with the ltp (p.105). the document contains no cost estimates, bcrs or patronage forecasts. mass rapid transit: the framework refers to mrt in its movement strategy and implementation plan, though briefly. the movement strategy includes 'future proof for other transport modes such as light rail and/or a gondola linking the town centre and queenstown airport' (p.052), and its map labels a 'potential gondola link to airport' (p.053). stage one includes 'progressive investigation of mass rapid transit options using the progressed corridor planning' (p.095). both stage two options list 'mass rapid transit: initial developments / early works for mass rapid transit terminal potential', with mass rapid transit symbol near gorge road and an arrow labelled 'airport connection (gondola)' (pp.101-102). most other references are to the skyline gondola and the gardens to gondola pedestrian connection (key move 003). town centre spatial framework and masterplan (5 parts) qldc. queenstown town centre spatial framework (2018). queenstown town centre (historic core, stanley street, lakefront, lakeview, gorge road); frankton arm of lake wakatipu version 7 / rev 007 - 100% final issue future-proofs for mass rapid transit to the airport; stages an investigation (2019-22) and early works for a terminal (2022-23). the framework does not analyse mrt, but it provides for it spatially and in its staging. the movement strategy states the town centre should 'future proof for other transport modes such as light rail and/or a gondola linking the town centre and queenstown airport' (p.052), and its map shows a 'potential gondola link to airport' (p.053). the implementation plan lists, for stage one (2019-2022), 'progressive investigation of mass rapid transit options using the progressed corridor planning' (p.095). the stage two (2022-2023) plans, both options 'to be confirmed through dbc', include 'mass rapid transit: initial developments / early works for mass rapid transit terminal potential'. the maps show mass rapid transit symbol beside gorge road near memorial and shotover streets and an arrow labelled 'airport connection (gondola)' (pp.101-102). no route, mode decision, cost or responsible agency is given. separately, key move 003 'gardens to gondola connection' and priority project 07 are a pedestrian street link between queenstown gardens and the existing skyline gondola via brecon street (pp.023, 099), not a transit proposal. \"future proof for other transport modes such as light rail and/or a gondola linking the town centre and queenstown airport\" (p.052) | \"progressive investigation of mass rapid transit options using the progressed corridor planning.\" (p.095) | \"mass rapid transit initial developments / early works for mass rapid transit terminal potential\" (p.101) | \"airport connection (gondola)\" (p.101) | \"potential gondola link to airport\" (p.053) population expected to grow from 30,000 to 70,000 by 2035 (p.008) typical daily visitor population ~70,000; peak ~110,000 (p.001) 289 engagement responses, 10 july-4 august 2017 (p.069) 30% of on-street parking relocated to edge of centre short term; 60%+ long term (p.052) stanley street interchange cross-section: 57% vehicles / 43% pedestrians (p.055) four implementation stages: 2019-2022, 2022-2023, 2023-2025, 2025-2028 (p.096) 10 priority projects (p.099) park street to hotops rise cycle lane by 2020 (p.095) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/frankton-to-queenstown-queenstown-town-centre-masterplan qldc substantive spatial plan final 2018 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. coach coach and visitor shuttle services. qldc qldc commissioned landlab landlab prepared cory manson prepared by landlab landlab henry crothers reviewed by landlab landlab henry crothers approved by landlab landlab gabrielle tabron client representative qldc qldc peter hansby client representative qldc qldc scott greenhalgh contributor landlab landlab designate and design the new town centre arterial route and construct stage one between melbourne and henry streets (frankton/melbourne signalised intersection, melbourne street upgrade, melbourne-henry link, henry street upgrade). the designation and design of the new arterial route will pave the way for construction of the first stage between melbourne and henry streets. stage one 2019-2022 not assessed continue parking management changes: remove free parking around the town centre, apply priority pricing and introduce parking management technology and digital signage. ongoing removal of free parking around the town centre and applying priority pricing stage one 2019-2022; further rollout stage two not assessed provide bus priority access along stanley street with new bus interchange facilities. bus priority access along stanley street with new bus interchange facilities. stage one 2019-2022 not assessed upgrade camp street to a pedestrian-oriented shared space with a new cycle lane. upgrades to camp street, including a new cycle lane. stage one 2019-2022 not assessed deliver active travel projects (signage, shared paths, access route upgrades), including the park street to hotops rise cycle lane. including the park street to hotops rise cycle lane by 2020 cycle lane by 2020; continuing through later stages not assessed commence ferry/water taxi network infrastructure at multiple locations across lake wakatipu's frankton arm, with new water-based access to the town centre. commencement of ferry/water taxi network infrastructure development in multiple locations across lake wakatipu's frankton arm. stage one 2019-2022 not assessed build new multi-storey parking buildings at boundary street then ballarat street on the town fringes. new parking buildings at boundary street then ballarat street stage one 2019-2022 not assessed improve town centre spaces in upper and lower beach street, brecon street, lake esplanade and the mall, with a new shared zone in rees street. improvement of town centre spaces in upper and lower beach street, brecon street, lake esplanade, a mall upgrade stage one 2019-2022 not assessed construct new council offices and potential associated community heart facilities; potentially replace queenstown memorial hall subject to the arterial route chosen. construction of the new council offices and the potential associated community heart facilities. stage one 2019-2022 not assessed qldc qldc progressively investigate mass rapid transit options using the progressed corridor planning. progressive investigation of mass rapid transit options using the progressed corridor planning. stage one 2019-2022 not assessed deliver arterial stage two and complete the stanley street public and passenger transport zone and public transport hub (fernhill servicing constrained until stage three). completion of the new public transport hub on stanley street stage two 2022-2023 not assessed undertake initial developments/early works for a potential mass rapid transit terminal, shown with an 'airport connection (gondola)' near gorge road; options to be confirmed through the dbc. mass rapid transit initial developments / early works for mass rapid transit terminal potential stage two 2022-2023 not assessed develop ballarat street and the village green, more efficient passenger transport spaces, further parking technology and wayfinding (including from gorge road). development of ballarat street and the village green. stage two 2022-2023 not assessed deliver arterial stage three (thompson and man streets, thompson link, one mile roundabout gateway), enabling full operation of the pt hub including fernhill services. the third stage of the arterial route will be delivered during this time stage three 2023-2025 not assessed transition shotover and duke streets to a pedestrian-focused passenger transport hub for tourist operations. shotover street transitions to a more pedestrian focused space stage three 2023-2025 not assessed deliver the fernhill-lakeview cycle path, lakefront improvements (steamer wharf to one mile), recreation ground edge upgrade and horne creek improvements. development of the fernhill lakeview cycle path upgrade. stage three 2023-2025 not assessed complete the ferry/water taxi network infrastructure across the frankton arm, including frankton and kelvin heights. completion of the ferry/water taxi network infrastructure in multiple locations across lake wakatipu's frankton arm, including frankton and kelvin heights. stage three 2023-2025 not assessed deliver lake esplanade, church street and earl street improvements, develop the community heart precinct and optimise public transport services. a range of town centre improvements in lake esplanade, church and earl street. stage four 2025-2028 not assessed future-proof for mass rapid transit linking the town centre and queenstown airport. not assessed re-route interstate, intercity and tourist coaches along shotover street, locate park and ride outside the town centre and increase bus frequency. locate new 'park and ride' facilities outside the town centre not assessed relocate on-street parking to the edge of the centre: 30% in the short term and over 60% in the long term. 30% of on-street parking relocated to edge of centre... +60% of on-street parking relocated to edge of centre. short term; long term not assessed deliver key move 003 / priority project 07, the gardens to gondola connection: a pedestrian-priority street link between queenstown gardens and the skyline gondola via brecon street. gardens to gondola connection street upgrade to provide connection between gardens and gondola brecon street upgrade in stage one not assessed increase partnership with nzta and orc on town centre projects, strengthen links with the private sector and continue stakeholder and community consultation. increasing partnership with new zealand transport agency (nzta) and otago regional council (orc) ongoing not assessed nzta waka kotahi nzta monitor outcome targets and formally review the masterplan every three years, aligned with the long term plan process. the master plan will be subject to formal reviews every three years every three years not assessed qldc qldc part 1 pdf part 2 pdf part 3 pdf part 4 pdf part 5 pdf",
    "sortDate": "2018-06-14",
    "cover": {
      "src": "/covers/QTS-013.webp",
      "srcset": "/covers/QTS-013.webp 400w, /covers/QTS-013-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-013/",
    "files": [
      {
        "label": "Part 1",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-013/QTS-013-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-013/QTS-013-F2.pdf"
      },
      {
        "label": "Part 3",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-013/QTS-013-F3.pdf"
      },
      {
        "label": "Part 4",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-013/QTS-013-F4.pdf"
      },
      {
        "label": "Part 5",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-013/QTS-013-F5.pdf"
      }
    ]
  },
  {
    "id": "qts-014",
    "code": "QTS-014",
    "title": "Ten Year Plan 2018-2028 | He Mahere Kahurutaka 2018-2028 (Volumes 1 and 2)",
    "shortTitle": "Ten Year Plan 2018-2028 | He Mahere Kahurutaka",
    "summary": "QLDC's 2018-2028 Ten Year Plan made the decade's largest transport commitments. Volume 2's capital table (p.11) includes the Queenstown Town Centre Arterial ($148.8m, NZTA assumed to fund 80% or $119.0m), town centre pedestrianisation ($49.5m), Queenstown parking improvements ($48.0m), public transport hubs ($25.5m), Wakatipu walking and cycling ($26.0m), travel management ($5.5m) and water taxi/ferry infrastructure ($6.1m), within a $330.2m Town Centre Masterplan programme. NZTA was assumed to fund $242m over ten years, unconfirmed until 2019 (Vol 1 p.23). The growth assumptions note that 'Other options being explored through the Mass Rapid Transport Solution between Frankton and Queenstown include light rail and a gondola' (Vol 2 pp.36-37), the first QLDC corporate-plan reference to mass rapid transit found in this set.",
    "documentType": "Statutory plan",
    "documentForm": "Ten Year Plan / Long Term Plan (two volumes)",
    "year": 2018,
    "publishedDate": "2018-06-28",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Ten Year Plan 2018-2028 | He Mahere Kahurutaka 2018-2028 (Volumes 1 and 2) (2018).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/kuflheq4/qldc-10-year-plan-2018-2028-volume-1-22jun18.pdf",
      "https://www.qldc.govt.nz/media/og1cecm2/qldc-10-year-plan-2018-2028-volume-2-21jun18.pdf",
      "https://www.qldc.govt.nz/media/2y2fne3j/qldc-10-year-plan-2018-2028-response-summary-jun18-v5.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-014 ten year plan 2018-2028 | he mahere kahurutaka 2018-2028 (volumes 1 and 2) ten year plan 2018-2028 | he mahere kahurutaka qldc's 2018-2028 ten year plan made the decade's largest transport commitments. volume 2's capital table (p.11) includes the queenstown town centre arterial ($148.8m, nzta assumed to fund 80% or $119.0m), town centre pedestrianisation ($49.5m), queenstown parking improvements ($48.0m), public transport hubs ($25.5m), wakatipu walking and cycling ($26.0m), travel management ($5.5m) and water taxi/ferry infrastructure ($6.1m), within a $330.2m town centre masterplan programme. nzta was assumed to fund $242m over ten years, unconfirmed until 2019 (vol 1 p.23). the growth assumptions note that 'other options being explored through the mass rapid transport solution between frankton and queenstown include light rail and a gondola' (vol 2 pp.36-37), the first qldc corporate-plan reference to mass rapid transit found in this set. context and purpose. adopted on 28 june 2018 (vol 1 p.12), the 2018-2028 plan was described as the council's most ambitious. volume 1 sets out the vision ('you don't waste time in traffic, you have great transport options', p.4), consultation outcomes and activity statements; volume 2 contains the financial strategy, infrastructure strategy, assumptions and the capital programme. transport capital. volume 2's capital expenditure table (p.11, $000, ten-year totals) lists: queenstown town centre arterial 148,802; queenstown town centre pedestrianisation 49,459; queenstown parking improvements 47,994; public transport improvements stage 2 (public transport hubs) 25,450; wakatipu walking and cycling improvements 26,002; travel management queenstown 5,522; ladies mile development (housing infrastructure fund) 6,295; water taxi/ferry network infrastructure 6,114. volume 1 records $148.8m of arterial roading development, with nzta assumed to fund 80% ($119.0m) and stage three (man st to one mile) at risk of slipping beyond ten years (p.4); a $330.2m town centre masterplan programme over ten years (p.19); $26.0m for town centre cycle links after $2.5m was brought forward; $3.7m wānaka active transport subject to business cases (p.13); $7.9m crown range and glenorchy roads; and mt aspiring road with $0.1m allowed and $4.9m deferred pending an updated business case (p.15). nzta was assumed to fund $242m over ten years and 51% of other district transport; its commitment would not be confirmed until 2019, and if it fell short council would revert to a reduced $698m programme (vol 1 p.23). parking and public transport. if nzta funding fell short the council might be unable to deliver the rest of the masterplan, including 'parking, public transport, street upgrades, and walking/cycling facilities' (vol 1 p.23). 'improvements to queenstown's public transport system' are among the projects driving debt to $441m by year six (vol 1 p.32). what followed. the 2019/20 and 2020/21 annual plans deferred much of the parking and masterplan programme (see ap1920, ap2021) mass rapid transit: in the growth assumptions (section 6.2), volume 2 states that the integrated programme will deliver 'huge improvements to provision of public transport' and that 'other options being explored through the mass rapid transport solution between frankton and queenstown include light rail and a gondola' (pp.36-37). this is a passing reference; no budget, timing or capital line is attached to it. ten year plan / long term plan (two volumes) ten year plan 2018-2028 | he mahere kahurutaka 2018-2028 (volumes 1 and 2) (2018). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted notes a frankton-queenstown mass rapid transit solution being explored; unfunded. volume 2's growth assumptions (section 6.2) state that the integrated transport programme will see 'huge improvements to provision of public transport' and that 'other options being explored through the mass rapid transport solution between frankton and queenstown include light rail and a gondola' (pp.36-37). the passage then turns to active travel networks and education programmes. no capital line, budget or timeframe is attached; the capital table (p.11) funds public transport hubs ($25.5m) and travel management ($5.5m) but no rapid transit. \"other options being explored through the mass rapid transport solution between frankton and queenstown include light rail and a gondola.\" (p.vol 2 pp.36-37) queenstown town centre arterial $148.802m over ten years (vol 2 p.11); nzta assumed 80% = $119.0m (vol 1 p.4) queenstown town centre pedestrianisation $49.459m (vol 2 p.11) queenstown parking improvements $47.994m (vol 2 p.11) public transport improvements stage 2, public transport hubs $25.450m (vol 2 p.11) wakatipu walking and cycling improvements $26.002m (vol 2 p.11) travel management queenstown $5.522m (vol 2 p.11) water taxi/ferry network infrastructure $6.114m (vol 2 p.11) town centre masterplan $330.2m over ten years (vol 1 p.19) nzta assumed to fund $242m over ten years, unconfirmed until 2019 (vol 1 p.23) not separately commissioned. this is an internal or corporate document. qldc passing statutory plan adopted 2018 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc build the queenstown town centre arterial, $148.8m, with nzta assumed to fund 80% ($119.0m) queenstown town centre arterial 148,802 stage 3 may slip beyond ten years not assessed qldc qldc queenstown town centre pedestrianisation, $49.5m queenstown town centre pedestrianisation 49,459 ten years not assessed qldc qldc queenstown parking improvements, $48.0m queenstown parking improvements 47,994 not assessed qldc qldc public transport improvements stage 2: public transport hubs, $25.5m public transport improvements, stage 2, public transport hubs 25,450 not assessed qldc qldc wakatipu walking and cycling improvements, $26.0m wakatipu walking and cycling improvements 26,002 ten years not assessed qldc qldc travel management queenstown, $5.5m travel management queenstown 5,522 ten years not assessed qldc qldc water taxi/ferry network infrastructure, $6.1m water taxi/ferry network infrastructure 6,114 ten years not assessed qldc qldc ladies mile development roading (housing infrastructure fund), $6.3m ladies mile development (housing infrastructure fund) 6,295 ten years not assessed qldc qldc wānaka active transport networks, $3.7m, subject to business cases and nzta funding not assessed qldc qldc mt aspiring road widening: $0.1m allowed, $4.9m deferred until the business case is updated $4.9m deferred until the business case is updated deferred not assessed qldc qldc explore a frankton-queenstown mass rapid transit solution other options being explored through the mass rapid transport solution not assessed main document pdf part 2 pdf part 3 pdf",
    "sortDate": "2018-06-28",
    "cover": {
      "src": "/covers/QTS-014.webp",
      "srcset": "/covers/QTS-014.webp 400w, /covers/QTS-014-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-014/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-014/QTS-014-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-014/QTS-014-F1-part2.pdf"
      },
      {
        "label": "Part 3",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-014/QTS-014-F1-part3.pdf"
      }
    ]
  },
  {
    "id": "qts-015",
    "code": "QTS-015",
    "title": "Annual Report 2017/18",
    "shortTitle": "Annual Report 2017/18",
    "summary": "QLDC's 2017/18 Annual Report records council capital expenditure $13.6m below estimate (p.7). The final stage of Hawthorne Drive (Eastern Access Road) opened on 21 December 2017 (p.3), listed at $25.2m in total (p.11). The Chief Executive notes 'the long-awaited $2 Orbus public transport service introduced by Otago Regional Council' (pp.3-4). The report describes the Town Centre Masterplan as 'The 35 year, $385 million programme' (p.30), records Queenstown parking charges raised to encourage mode shift (p.66) and a $1.26m airport park-and-ride capital contribution partly offset by Queenstown Airport income (p.67). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2018,
    "publishedDate": "2018-10-25",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Report 2017/18 (2018).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/pjepbt2l/qldc-annual-report-2017-2018.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-015 annual report 2017/18 annual report 2017/18 qldc's 2017/18 annual report records council capital expenditure $13.6m below estimate (p.7). the final stage of hawthorne drive (eastern access road) opened on 21 december 2017 (p.3), listed at $25.2m in total (p.11). the chief executive notes 'the long-awaited $2 orbus public transport service introduced by otago regional council' (pp.3-4). the report describes the town centre masterplan as 'the 35 year, $385 million programme' (p.30), records queenstown parking charges raised to encourage mode shift (p.66) and a $1.26m airport park-and-ride capital contribution partly offset by queenstown airport income (p.67). no mass rapid transit reference was found. context and purpose. the annual report covers the final year of the 2015-2025 plan's early period before the 2018-2028 ten year plan, signed 25 october 2018 (p.22). transport. council capital expenditure was $13.6m below estimate (p.7). transport capital in the funding impact statement was $15.0m against a budget of about $11.2m (p.67). the final stage of hawthorne drive opened on 21 december 2017 (p.3), and the capital works table lists the eastern access road (hawthorne drive) project at $25,193,153 (p.11). the chief executive refers to 'the long-awaited $2 orbus public transport service introduced by otago regional council' and the queenstown integrated transport strategy (pp.3-4). the town centre masterplan is described as 'the 35 year, $385 million programme' (p.30). queenstown parking charges were reviewed and raised to encourage mode shift (p.66). an airport park-and-ride capital contribution of $1.26m was partly offset by $0.63m of queenstown airport income (p.67). performance. sealed road maintenance $173.75/km and unsealed $141.05/km, both above target; fatal and serious crashes 11 (target <15); smooth travel 94% (pp.68-70). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report annual report 2017/18 (2018). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $13.6m below estimate (p.7) eastern access road (hawthorne drive) $25,193,153 (p.11) town centre masterplan '35 year, $385 million programme' (p.30) airport park-and-ride contribution $1.26m, offset $0.63m qac income (p.67) transport capital $15.0m vs ~$11.2m budget (p.67) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2018 bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc deliver the 35-year, $385m queenstown town centre masterplan programme the 35 year, $385 million programme 35 years not assessed qldc qldc raise queenstown parking charges to encourage mode shift parking charges were reviewed and raised 2017/18 not assessed qldc qldc promote transport projects for the regional land transport plan transport projects promoted for the regional land transport plan not assessed qldc qldc main document pdf",
    "sortDate": "2018-10-25",
    "cover": {
      "src": "/covers/QTS-015.webp",
      "srcset": "/covers/QTS-015.webp 400w, /covers/QTS-015-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-015/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-015/QTS-015-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-018",
    "code": "QTS-018",
    "title": "Smarter journeys, together. Community Engagement Summary",
    "shortTitle": "Smarter journeys, together. Community Engagement",
    "summary": "A 12-page summary of the first Wakatipu Way to Go community engagement campaign (1-22 April 2019), run by QLDC, the NZ Transport Agency (Waka Kotahi) and Otago Regional Council. The campaign presented the partnership's projects: Frankton to Queenstown Town Centre business cases, the Wakatipu Active Travel Network, the Frankton Masterplan and Integrated Transport PBC, Grant Road to Kawarau Falls Bridge, and the Wakatipu ferry business case. Responses included 246 online surveys, 374 post-it ideas and conversations with over 700 people; 97% of those surveyed were local. Results: 71% usually travel by private car and 75% said subsidised or free transport would encourage change. On high capacity public transport, 58% preferred the existing Frankton Road route and 42% preferred mass rapid transit along Queenstown Hill from Frankton to Queenstown over the other options proposed. 48% rated high frequency as most important. 68% do not use the ferry. The summary also gives results on parking, trails and priorities for Frankton, plus selected comments.",
    "documentType": "Engagement report",
    "documentForm": "Community engagement summary",
    "year": 2019,
    "publishedDate": "2019-05",
    "documentStatus": "Not stated",
    "geographicScope": "Wakatipu Basin; Frankton; Queenstown Town Centre; Frankton Road",
    "owner": "Way to Go",
    "citation": "Smarter journeys, together. Community Engagement Summary (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/ohme2whu/qldc-way-to-go-engagement-summary-may19.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ohme2whu/qldc-way-to-go-engagement-summary-may19.pdf"
    ],
    "documentTypeCode": "engagement-report",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-018 smarter journeys, together. community engagement summary smarter journeys, together. community engagement a 12-page summary of the first wakatipu way to go community engagement campaign (1-22 april 2019), run by qldc, the nz transport agency (waka kotahi) and otago regional council. the campaign presented the partnership's projects: frankton to queenstown town centre business cases, the wakatipu active travel network, the frankton masterplan and integrated transport pbc, grant road to kawarau falls bridge, and the wakatipu ferry business case. responses included 246 online surveys, 374 post-it ideas and conversations with over 700 people; 97% of those surveyed were local. results: 71% usually travel by private car and 75% said subsidised or free transport would encourage change. on high capacity public transport, 58% preferred the existing frankton road route and 42% preferred mass rapid transit along queenstown hill from frankton to queenstown over the other options proposed. 48% rated high frequency as most important. 68% do not use the ferry. the summary also gives results on parking, trails and priorities for frankton, plus selected comments. context and purpose: the wakatipu way to go group (qldc, nz transport agency (waka kotahi) and otago regional council) ran its first community engagement campaign from 1 to 22 april 2019. it asked people to help plan safe, accessible and connected transport (p.2). the partners' leaders sign a foreword: mayor jim boult, jim harland (nzta) and chairman stephen woodhead (orc) (p.3). scope: the engagement presented the frankton to queenstown town centre work (the queenstown town centre dbc and the frankton to queenstown ssbc), the wakatipu active travel network ssbc, the frankton masterplan and integrated transport pbc, the grant road to kawarau falls bridge ssbc and the wakatipu ferry dbc. it also covered transport modelling, pt demand and capacity analysis and the parking strategy (p.4). method and reach: 246 online surveys, 374 post-it ideas, 969 webpage views, a facebook reach of 33,239, and conversations with over 700 people at presentations, stalls, by phone and face to face. 97% of those surveyed were local and 3% were nz visitors (p.5). findings: 71% usually travel in a personal car (p.5). 75% said subsidised or free transport would encourage them to change; 59% supported reducing on-street parking on shotover street to widen footpaths; 55% supported traffic signals on shotover street; 51% would pay more for parking if it meant fewer cars in the town centre; 68% use trails daily or weekly; 83% use trails for fitness or fun and 36% also to get to school or work (p.6). on public transport, 58% preferred the existing frankton road route for a future high capacity link and 42% preferred mass rapid transit along queenstown hill; 48% rated high frequency most important; 68% do not use the ferry and 3% use it to commute (p.7). the top ferry improvements were lower fares, a more convenient stop and a travel card valid on any public transport. the top frankton priorities were walking and cycling routes, better parks and reserves, and high-frequency local pt (p.7). pages 8-10 give selected comments. mass rapid transit: the summary reports a direct public preference question on the route for a future high capacity public transport link between frankton and queenstown. 58% preferred the existing frankton road route and 42% preferred 'a gondola along queenstown hill from frankton to queenstown' (p.7). it does not give the question wording, the options presented or the number of respondents to this question. the summary draws no conclusions or recommendations from the result. community engagement summary smarter journeys, together. community engagement summary (2019). wakatipu basin; frankton; queenstown town centre; frankton road not stated reports public preference on a future high-capacity public transport link: 58% the frankton road route, 42% mass rapid transit over queenstown hill; no recommendation. page 7 ('getting around by public transport') reports the only quantified public preference data on mass rapid transit in the way to go material. '58% prefer the existing route along frankton road for a future high capacity public transport link' and '42% prefer mass rapid transit along queenstown hill from frankton to queenstown to other options proposed' (p.7). the same page reports that '48% said high frequency (i.e low wait times) had the most importance for a future high capacity public transport system' (p.7). the summary does not set out the question wording, the information on each option given to respondents, the other options proposed, or the number of respondents (the campaign total was 246 online surveys, p.5). it draws no conclusion from the result. \"58% prefer the existing route along frankton road for a future high capacity public transport link\" (p.7) | \"42% prefer a gondola along queenstown hill from frankton to queenstown to other options proposed\" (p.7) | \"48% said high frequency (i.e low wait times) had the most importance for a future high capacity public transport system\" (p.7) 246 online surveys; 374 post-it ideas; 969 webpage views; 33,239 facebook reach; spoke to over 700 people (p.5) 97% of those surveyed were local (p.5) 71% usually travel by personal car (p.5) 75% said subsidised or free transport would incentivise change (p.6) 58% prefer frankton road route for high capacity pt; 42% prefer gondola along queenstown hill (p.7) 48% rated high frequency most important for high capacity pt (p.7) 68% do not use the ferry; 3% commute by ferry (p.7) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/ohme2whu/qldc-way-to-go-engagement-summary-may19.pdf way to go substantive engagement report not stated 2019 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared orc orc prepared qldc qldc prepared way to go way to go prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner jim boult signatory qldc qldc jim harland signatory nzta waka kotahi nzta stephen woodhead signatory orc orc main document pdf",
    "sortDate": "2019-05-01",
    "cover": {
      "src": "/covers/QTS-018.webp",
      "srcset": "/covers/QTS-018.webp 400w, /covers/QTS-018-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-018/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-018/QTS-018-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-019",
    "code": "QTS-019",
    "title": "Annual Plan 1 July 2019 - 30 June 2020",
    "shortTitle": "Annual Plan 1 July 2019 - 30 June 2020",
    "summary": "QLDC's Annual Plan for 2019/20, adopted 27 June 2019, updates year two of the 2018-2028 Ten Year Plan. Total capital expenditure is $163.4m, about $14m (7.8%) below the Ten Year Plan, 'due primarily to the time required to work through NZTA process for some transport-related projects', naming the Town Centre Masterplan arterial roads and parking buildings (p.13). Transport capital is $59.37m against $76.20m in the Ten Year Plan, a $16.83m reduction; parking facilities fall from $11.97m to $1.60m, noted as 'Deferral of capex for Queenstown parking' (p.31). No mass rapid transit reference was found.",
    "documentType": "Statutory plan",
    "documentForm": "Annual Plan",
    "year": 2019,
    "publishedDate": "2019-06-27",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Plan 1 July 2019 - 30 June 2020 (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/axufcqqu/qldc-annual-plan-2019-2020-combined-13jun-v10-final.pdf",
      "https://www.qldc.govt.nz/media/wvdjzw3r/5-annual-plan-201920-adoption-covering-report.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "nzta"
    ],
    "searchText": "qts-019 annual plan 1 july 2019 - 30 june 2020 annual plan 1 july 2019 - 30 june 2020 qldc's annual plan for 2019/20, adopted 27 june 2019, updates year two of the 2018-2028 ten year plan. total capital expenditure is $163.4m, about $14m (7.8%) below the ten year plan, 'due primarily to the time required to work through nzta process for some transport-related projects', naming the town centre masterplan arterial roads and parking buildings (p.13). transport capital is $59.37m against $76.20m in the ten year plan, a $16.83m reduction; parking facilities fall from $11.97m to $1.60m, noted as 'deferral of capex for queenstown parking' (p.31). no mass rapid transit reference was found. context and purpose. the 2019/20 annual plan sets the budget for the second year of the 2018-2028 ten year plan and explains variances from it. it was adopted on 27 june 2019 (p.15). transport. the plan reports total 2019/20 capital expenditure of $163.4m, about $14m (7.8%) below the ten year plan, 'due primarily to the time required to work through nzta process for some transport-related projects', citing the queenstown town centre masterplan arterial roads and parking buildings (p.13). in the funding impact tables, transport capital is $59.37m against $76.20m in the ten year plan, a variance of $(16.83)m, and parking facilities capital is $1.60m against $11.97m, a variance of $(10.37)m with the note 'deferral of capex for queenstown parking' (p.31). a transport improvement fund holds 'funds set aside to subsidise public transport and the development of public transport infrastructure' (p.36). active travel and park-and-ride are not mentioned in the portion read. correction to background. on the live document, the $16.83m reduction is 22.1% of the ten year plan figure (28.3% is relative to the annual plan figure), and $163.4m is the district's total capital expenditure for the year. mass rapid transit: no reference to mass rapid transit was found in the pages read (to p.45). annual plan annual plan 1 july 2019 - 30 june 2020 (2019). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read total capital expenditure 2019/20 $163.4m, about $14m (7.8%) below the ten year plan (p.13) transport capital $59.37m vs $76.20m ten year plan, variance $(16.83)m (p.31) parking facilities capital $1.60m vs $11.97m, variance $(10.37)m, 'deferral of capex for queenstown parking' (p.31) not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2019 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc reduce 2019/20 transport capital to $59.37m (from $76.20m) while nzta processes for major transport projects are worked through time required to work through nzta process 2019/20 not assessed qldc qldc defer queenstown parking capital: parking facilities $1.60m (from $11.97m) deferral of capex for queenstown parking 2019/20 not assessed qldc qldc progress town centre masterplan arterial roads and parking buildings through the nzta process queenstown town centre masterplan arterial roads and parking buildings 2019/20 not assessed nzta waka kotahi nzta main document pdf part 2 pdf",
    "sortDate": "2019-06-27",
    "cover": {
      "src": "/covers/QTS-019.webp",
      "srcset": "/covers/QTS-019.webp 400w, /covers/QTS-019-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-019/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-019/QTS-019-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-019/QTS-019-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-020",
    "code": "QTS-020",
    "title": "Te Kirikiri / Frankton Draft Masterplan (2048) - consultation summary (Scuttlebutt, Issue 132)",
    "shortTitle": "Te Kirikiri / Frankton Draft Masterplan (2048)",
    "summary": "A four-page consultation summary of the draft Te Kirikiri / Frankton Masterplan, published in QLDC's Scuttlebutt newsletter (Issue 132, June/July 2019), with feedback closing 18 July. It explains that the Wakatipu Way to Go partnership (QLDC, NZTA, ORC) developed the Frankton Masterplan and Integrated Transport Programme Business Case, building on 2018 and April 2019 engagement and agreed outcomes. It lists ten key actions to be staged over 30 years to 2048. These include an Airport-Lake Wakatipu Link, upgrading SH6 into a 50 km/h urban arterial, completing the active travel network and a high-frequency, high-capacity orbital public transport loop, and matching intensive land use to high capacity PT corridors. Others are integrating the airport into the PT network and investigating hospital relocation, a new transport interchange and Emergency Precinct at the Frankton Golf Course site, urban parks, a Shotover Delta reserve, relocating rural infrastructure, and expressing cultural heritage. A draft 2048 map and two artist's impressions are included.",
    "documentType": "Engagement report",
    "documentForm": "Consultation summary (council newsletter pages)",
    "year": 2019,
    "publishedDate": "2019-07",
    "documentStatus": "Draft",
    "geographicScope": "Te Kirikiri / Frankton; Frankton Flats; SH6 Frankton-Ladies Mile; Frankton Arm",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Te Kirikiri / Frankton Draft Masterplan (2048) - consultation summary (Scuttlebutt, Issue 132) (2019). Scuttlebutt Issue 132.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/omvow53w/frankon-draft-masterplan-summary-document-july-2019.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/omvow53w/frankon-draft-masterplan-summary-document-july-2019.pdf"
    ],
    "documentTypeCode": "engagement-report",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-020 te kirikiri / frankton draft masterplan (2048) - consultation summary (scuttlebutt, issue 132) te kirikiri / frankton draft masterplan (2048) a four-page consultation summary of the draft te kirikiri / frankton masterplan, published in qldc's scuttlebutt newsletter (issue 132, june/july 2019), with feedback closing 18 july. it explains that the wakatipu way to go partnership (qldc, nzta, orc) developed the frankton masterplan and integrated transport programme business case, building on 2018 and april 2019 engagement and agreed outcomes. it lists ten key actions to be staged over 30 years to 2048. these include an airport-lake wakatipu link, upgrading sh6 into a 50 km/h urban arterial, completing the active travel network and a high-frequency, high-capacity orbital public transport loop, and matching intensive land use to high capacity pt corridors. others are integrating the airport into the pt network and investigating hospital relocation, a new transport interchange and emergency precinct at the frankton golf course site, urban parks, a shotover delta reserve, relocating rural infrastructure, and expressing cultural heritage. a draft 2048 map and two artist's impressions are included. context and purpose: published in qldc's scuttlebutt newsletter (june/july 2019), this summary invites feedback on the draft te kirikiri / frankton masterplan by 18 july (p.1). in late 2018 wakatipu way to go, a qldc-nzta-orc partnership, decided to consider frankton as a whole. building on the september 2018 'your place, your plan' engagement, it began the frankton masterplan and integrated transport programme business case (p.1). the goals were liveability, integration of plans and investor confidence. outcomes were agreed with kāi tahu and stakeholders and tested with the community in april 2019 (p.1). content: the vision is 'te kirikiri frankton, where our pathways, the lake and the rivers meet' (p.2). ten key actions are listed, to be staged over 30 years with the way to go partners (p.2): 1. improved arrival experiences, including an airport-wakatipu lake link. 2. upgrading sh6 to a 50 km/h urban arterial. 3. a range of transport options, including the active travel network and a 'high frequency, high capacity public transport operating on an orbital loop'. 4. stronger links between high capacity pt corridors and intensive land use, such as northern glenda drive. 5. integrating the airport into the pt network and investigating lakes district hospital relocation. 6. a new transport interchange and emergency precinct at the frankton golf course site. 7. urban parks and 'frankton gardens'. 8. a shotover delta district reserve. 9. moving rural infrastructure to the edge. 10. expressing cultural heritage, including an arranmore / mcbride farm heritage precinct. the draft 2048 map (p.3) shows pt routes (separated lanes or priority), an orbital bus route, 'gondola lines / base station (private)', ferry routes, a pt interchange, park and ride sites and a regional coach hub. next steps: feedback will inform the final masterplan and business case for endorsement by the way to go partners (p.2). mass rapid transit: the summary refers to high capacity public transport on an orbital loop around frankton and to high capacity pt corridors (p.2). it does not discuss a frankton-queenstown town centre mrt link. the only mass rapid transit reference is the map legend 'gondola lines / base station (private)' (p.3), which is not described in the text. consultation summary (council newsletter pages) way to go partnership, nzta (waka kotahi), qldc, orc. te kirikiri / frankton draft masterplan (2048) - consultation summary (scuttlebutt, issue 132) (2019). scuttlebutt issue 132. te kirikiri / frankton; frankton flats; sh6 frankton-ladies mile; frankton arm draft (consultation) proposes high-capacity orbital public transport within frankton; reproduced maps show private mass rapid transit lines; silent on frankton-town centre mass rapid transit. key action 3 proposes 'linking several local and district centres together through a high frequency, high capacity public transport operating on an orbital loop' (p.2). key action 4 seeks to strengthen 'the relationship between high capacity public transport corridors and more intensive land use activities' (p.2). the draft 2048 map legend includes 'gondola lines / base station (private)' and 'bridge crossing (active travel and / or public transport)', and notes 'dashed routes subject to further investigation' (p.3). the text does not describe mass rapid transit lines and does not address a mass transit link between frankton and queenstown town centre. \"linking several local and district centres together through a high frequency, high capacity public transport operating on an orbital loop\" (p.2) | \"strengthening the relationship between high capacity public transport corridors and more intensive land use activities and built form\" (p.2) | \"gondola lines / base station (private)\" (p.3) ten key actions staged over a 30-year timeframe to 2048 (p.2) feedback closed 18 july 2019 (p.1) sh6 upgrade to a 50 km/h urban arterial (p.2) costed with the parent document. https://www.qldc.govt.nz/media/omvow53w/frankon-draft-masterplan-summary-document-july-2019.pdf way to go passing engagement report draft 2019 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead qldc qldc prepared way to go way to go prepared qldc qldc published improve arrival experiences via airport, state highway and trails, including a new airport-wakatipu lake link and recognising wāhi tūpuna at river crossings. improving the arrival experiences into queenstown staged over a 30-year timeframe (to 2048) not assessed way to go way to go upgrade sh6 into a high amenity 50 km/h urban arterial, improving intersections to reduce severance and improve active travel safety. upgrading state highway 6 into a high amenity, 50 km/hr urban arterial staged over a 30-year timeframe (to 2048) not assessed way to go way to go complete the active travel network and link centres with high frequency, high capacity public transport on an orbital loop. high frequency, high capacity public transport operating on an orbital loop staged over a 30-year timeframe (to 2048) not assessed way to go way to go strengthen the relationship between high capacity pt corridors and intensive land use, e.g. redeveloping northern glenda drive industrial area for residential. relationship between high capacity public transport corridors and more intensive land use staged over a 30-year timeframe (to 2048) not assessed way to go way to go integrate the airport terminal and landside operations into the pt network; investigate long-term relocation of lakes district hospital outside noise contours. integrating the airport terminal... into the public transport network staged over a 30-year timeframe (to 2048) not assessed way to go way to go enhance queenstown event centre facilities alongside a new transport interchange and emergency precinct on the frankton golf course site. staged over a 30-year timeframe (to 2048) not assessed way to go way to go provide more urban parks and greener streets, with links to lake wakatipu and a 'frankton gardens'. providing more urban parks and greener streets staged over a 30-year timeframe (to 2048) not assessed way to go way to go redevelop shotover delta into a district-wide reserve for informal recreation, mahinga kai and potentially a relocated golf course. redeveloping shotover delta into a district-wide reserve staged over a 30-year timeframe (to 2048) not assessed way to go way to go shift rural infrastructure (e.g. transmission line corridors) towards the edge of frankton to accommodate urban development. shifting current rural infrastructure towards the edge of frankton staged over a 30-year timeframe (to 2048) not assessed way to go way to go express cultural values and heritage, including creating the arranmore / mcbride farm heritage precinct. expressing cultural values, narratives and heritage of frankton staged over a 30-year timeframe (to 2048) not assessed way to go way to go use feedback to complete the masterplan and business case for endorsement by the way to go partners for the next business case stage. finalised and endorsed by the wakatipu way to go partners after feedback closes 18 july 2019 not assessed way to go way to go main document pdf",
    "sortDate": "2019-07-01",
    "cover": {
      "src": "/covers/QTS-020.webp",
      "srcset": "/covers/QTS-020.webp 400w, /covers/QTS-020-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-020/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-020/QTS-020-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-023",
    "code": "QTS-023",
    "title": "Wakatipu Active Travel Network Single Stage Business Case",
    "shortTitle": "Wakatipu Active Travel Network Single Stage",
    "summary": "Beca's Single Stage Business Case for the Wakatipu Active Travel Network (WATN), prepared on behalf of the Way to Go partnership (QLDC, NZ Transport Agency and ORC) with Queenstown Trails Trust, makes the case for a connected walking, cycling and e-mobility network across the Wakatipu Basin, building on the existing recreational trails. It was identified as an activity in the Queenstown Integrated Transport Programme Business Case. Three problem statements (safety barriers, incomplete trails, and car dependence causing congestion) led to investment objectives that were applied through multi-criteria assessment to 12 routes, giving a preferred network. It proposes a Package 1 of about $40m over five years for about 32km of facilities, with benefits of about $98m. Package 1 has a BCR of about 2.6 (Stage 1 2018-2021: 1.8; Stage 2 2021-2024: 3.2), with Queenstown to Frankton (Frankton Track) the highest-value component (BCR 5.9). Package 1 capital cost is $39.64m (QLDC $10.54m, NZTA $27.87m, third parties $1m) at a 51% funding assistance rate; Package 2 (2024-2030) is estimated at $93.78m and is subject to reassessment. Cycling trips across the network are forecast to grow from 3,122 (2016) to 15,055 (2046). The management case proposes a partner steering group and single-organisation maintenance. The case does not assess mass rapid transit; it notes only that the parallel Frankton to Queenstown business case included MRT options in its scope.",
    "documentType": "Single-stage business case",
    "documentForm": "Single stage business case (active travel network), with appendices",
    "year": 2019,
    "publishedDate": "2019-08-29",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton; Frankton Track (Frankton-Queenstown); Jacks Point; Kelvin Heights; Lake Hayes Estate; Arthurs Point; Fernhill; Arrowtown",
    "owner": "Way to Go",
    "citation": "QLDC, Way to Go partnership, NZTA (Waka Kotahi), ORC. Wakatipu Active Travel Network Single Stage Business Case (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/whakatipu-active-travel-network",
    "publicSourceConfidence": "landing page",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/whakatipu-active-travel-network"
    ],
    "documentTypeCode": "single-stage-business-case",
    "topics": [
      "active-travel",
      "ferry",
      "park-and-ride"
    ],
    "organisationIds": [
      "qldc",
      "nzta",
      "orc",
      "way-to-go-partnership",
      "beca",
      "ghd",
      "queenstown-trails-trust"
    ],
    "searchText": "qts-023 wakatipu active travel network single stage business case wakatipu active travel network single stage beca's single stage business case for the wakatipu active travel network (watn), prepared on behalf of the way to go partnership (qldc, nz transport agency and orc) with queenstown trails trust, makes the case for a connected walking, cycling and e-mobility network across the wakatipu basin, building on the existing recreational trails. it was identified as an activity in the queenstown integrated transport programme business case. three problem statements (safety barriers, incomplete trails, and car dependence causing congestion) led to investment objectives that were applied through multi-criteria assessment to 12 routes, giving a preferred network. it proposes a package 1 of about $40m over five years for about 32km of facilities, with benefits of about $98m. package 1 has a bcr of about 2.6 (stage 1 2018-2021: 1.8; stage 2 2021-2024: 3.2), with queenstown to frankton (frankton track) the highest-value component (bcr 5.9). package 1 capital cost is $39.64m (qldc $10.54m, nzta $27.87m, third parties $1m) at a 51% funding assistance rate; package 2 (2024-2030) is estimated at $93.78m and is subject to reassessment. cycling trips across the network are forecast to grow from 3,122 (2016) to 15,055 (2046). the management case proposes a partner steering group and single-organisation maintenance. the case does not assess mass rapid transit; it notes only that the parallel frankton to queenstown business case included mrt options in its scope. context and purpose: the ssbc sets out the case for an integrated, legible, attractive and safe walking and cycling network across the wakatipu basin (p.16). beca prepared it on behalf of way to go (p.16), on the specific instructions of qldc (pdf p.2). it was endorsed on 29 august 2019 by qldc's general manager, property and infrastructure and the nz transport agency's team leader - partnerships & investment (pdf p.2). it is an activity identified in the nzta-endorsed queenstown integrated transport programme business case (qitpbc) (p.16), whose recommended programme targets 30% alternative mode share by 2045, up from 15% (p.28). page references are printed page numbers for the main volume; appendices are cited by file. problems and objectives: ilm workshops identified three problems: lack of appropriate infrastructure creating safety barriers (40%); informal and incomplete trails leading to low usage (40%); and limited alternatives reinforcing congestion and poor health (20%) (p.34). trips into the town centre between 7am and 11am were 77% car occupants, 13% public transport, 9% pedestrians and 1% cyclists (p.56). the existing trails carry about 330,000 trips a year, expected to grow 5-10% annually (p.9). options and preferred network: twelve routes linking queenstown and frankton with jacks point, kelvin heights, lake hayes estate, arthurs point, fernhill and arrowtown were assessed through mca, with sensitivity tests (pp.67-127). the preferred network includes the utilities corridor from jacks point to frankton, the existing lakeside frankton track between frankton and queenstown, gorge road/robins road to arthurs point, and town centre routes from the queenstown town centre masterplan (pp.128-130). economic case: using the wsp-opus pt demand model to estimate cycle demand (p.155), and assuming existing cycling mode shares double by 2045 (p.156), package 1 has a present value cost of $36.9m and benefits of $97.6m, a bcr of 2.6 and first year rate of return of 13% (p.158). stage 1 (2018-2021) has a bcr of 1.8 and stage 2 (2021-2024) 3.2 (p.158). route bcrs range from 0.6 (park street) to 5.9 (queenstown to frankton, b3) (p.160). total cycling trips are forecast to grow from 3,122 (2016) to 8,828 (2029) and 15,055 (2046) (pp.160-161). with no growth in commute share the bcr falls to 1.0 (p.161). the proposal is rated 'high' for results alignment with priority order 5 (pp.162-163). financial, commercial and management cases: package 1 is estimated at $39.64m in 2019 dollars (stage 1 $13.63m; stage 2 $26.01m), excluding inflation, with +/-30% contingency (pp.166-169). package 2 (2024-2030) is estimated at $93.78m and the nz transport agency envisages reassessing it (p.169). funding is sought from the nltf at a 51% far plus qldc ltp contributions; nzta indicated about $15m for 2018-2021 and a $35m placeholder for 2021-2024 (p.170). the table 48 split totals $39.41m: qldc $10.54m, nzta $27.87m and third parties $1m (p.171). package 1 affects about 60 properties (p.169). recommended procurement is a price quality method for professional services and traditional staged construction procurement (pp.176-179). governance is through a watn steering group, with maintenance by one organisation under an mou (pp.189-191). next steps were qldc and nzta approval later in 2019 and stage 1 implementation from mid-2020 (p.196). the appendices include engagement, mca, cost estimate, risk, property and consenting reports, and a ghd peer review for qldc (appendix u). mass rapid transit: the ssbc does not assess mass rapid transit, offline public transport or mass rapid transit between frankton and the town centre. appendix b notes that the parallel frankton to queenstown ssbc's scope included 'the identification of potential high capacity water transport and mass rapid transit (mrt) options' so that sh6a interventions are appropriately sized (app a-g file p.24). other references are to the skyline gondola as a town centre destination (e.g. the rees street 'gardens to gondola' route, p.153) and a meeting with porter group about its proposed mass rapid transit and trails alongside the kawarau river (app c). single stage business case (active travel network), with appendices qldc, way to go partnership, nzta (waka kotahi), orc. wakatipu active travel network single stage business case (2019). wakatipu basin; queenstown town centre; frankton; frankton track (frankton-queenstown); jacks point; kelvin heights; lake hayes estate; arthurs point; fernhill; arrowtown final (revision 3, 'final issued' 29/08/2019) not assessed; notes the parallel frankton-queenstown ssbc scope includes mrt options to size sh6a interventions the business case is limited to active travel and does not assess mass rapid transit. its only mrt reference is in appendix b (strategic context), describing the parallel frankton to queenstown single stage business case for sh6a: 'also, within the scope of the business case is the identification of potential high capacity water transport and mass rapid transit (mrt) options. this is to ensure that the sh6a interventions are appropriately sized and whether the long-term solution for the corridor is to provide either of these solutions' (app a-g file p.24). the equivalent main-volume table of parallel projects (p.19) lists sh6a capacity, widening, bus priority and intersection options without the mrt sentence. references elsewhere concern the skyline gondola as a town centre trip attractor, the rees street 'gardens to gondola' route (c1, p.153) and the use of skyline ticket data as a pedestrian demand proxy (appendix r), and a stakeholder meeting with porter group 'regarding the proposed gondola and trails alongside kawarau river' (app c, app a-g file p.35). none of these relate to a frankton-town centre mrt. \"also, within the scope of the business case is the identification of potential high capacity water transport and mass rapid transit (mrt) options. this is to ensure that the sh6a interventions are appropriately sized and whether the long-term solution for the corridor is to provide either of these solutions.\" (p.appendix b (app a-g file p.24)) package 1 investment about $40m over five years for about 32km of facilities; benefits about $98m (p.9) package 1 bcr about 2.6; stage 1 (2018-2021) bcr 1.8; stage 2 (2021-2024) bcr 3.2; fyrr 13% (p.158) pv cost $36.9m; pv benefits $97.6m, of which walking and cycling benefits $83.0m and travel time savings $14.6m (pp.158-159) route b3 queenstown to frankton: pv benefits $36.1m, pv costs $6.1m, bcr 5.9 (p.160) package 1 capital cost $39.64m (stage 1 $13.63m; stage 2 $26.01m), 2019 dollars, no inflation (p.168) funding split (table 48): qldc $10.54m, nzta $27.87m, third party $1m; total $39.41m; 51% far (pp.170-171) package 2 (2024-2030) estimated capital cost $93.78m (p.169) cycling trips 3,122 (2016), 8,828 (2029), 15,055 (2046) across the network (p.161) town centre am trips (7-11am): car occupants 77%, pt 13%, pedestrians 9%, cyclists 1% (p.56) about 330,000 trips per year on existing trails, growing 5-10% a year (p.9) qitpbc target: 30% alternative mode share by 2045, up from 15% (p.28) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/services/transport-and-parking/way-to-go/whakatipu-active-travel-network way to go passing single-stage business case final 2019 walking and cycling walking, cycling, trails and other active travel. ferry ferry and water transport. park and ride park-and-ride sites and services. qldc qldc commissioned nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead beca beca prepared ghd ghd prepared nzta waka kotahi nzta partner queenstown trails trust queenstown trails trust partner d. mallett author ghd ghd robyn shephard author greg edwards prepared by beca beca nicolle vincent prepared by beca beca tom beedles prepared by beca beca alex mills reviewed by beca beca david aldridge reviewed by beca beca fiona blight reviewed by beca beca jonathan pimlott reviewed by beca beca kristina mead reviewed by beca beca mike todd reviewed by a. whaley approved by ghd ghd robbie noble approved by beca beca erik teekman client representative nzta waka kotahi nzta gabrielle tabron client representative qldc qldc mark williams client representative queenstown trails trust queenstown trails trust matthew roberts client representative qldc qldc stephen patience client representative orc orc tony pickard client representative qldc qldc tony sizemore client representative nzta waka kotahi nzta chad barker signatory nzta waka kotahi nzta peter hansby signatory qldc qldc deliver component a2 shotover bridge to state highway 6 (capital cost $2.59m, table 48). a2 shotover bridge to state highway 6 - partner lead nzta 2018-2021 (package 1 stage 1) not assessed nzta waka kotahi nzta deliver component a3/a4 sh6 to frankton track including marina safety improvements (capital cost $1.2m, table 48). a3/a4 sh6 to frankton track including marina safety improvements - partner lead nzta 2018-2021 (package 1 stage 1) not assessed nzta waka kotahi nzta deliver component a5/a7 jack's point to frankton including frankton connection south upgrade (capital cost $9.59m, table 48). a5/a7 jack's point to frankton including frankton connection south upgrade - partner lead nzta 2018-2021 (package 1 stage 1) not assessed nzta waka kotahi nzta deliver component a8 lake hayes estate to frankton (south) - design (capital cost $250k, table 48). a8 lake hayes estate to frankton - partner lead qldc 2018-2021 (package 1 stage 1) not assessed qldc qldc deliver component b2 fernhill to queenstown (capital cost $4.2m, table 48). b2 fernhill to queenstown - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver component b3 frankton track level of service improvements including park street greenway (capital cost $6.6m, table 48). b3 frankton track level of service improvements including park street greenway - partner lead nzta 2021-2024 (package 1 stage 2) not assessed nzta waka kotahi nzta deliver component c2 brecon street - design (capital cost $685k, table 48). c2 brecon street - design - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver component c3 park street upgrade - design (capital cost $620k, table 48). c3 park street upgrade - design - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver component c5 arthurs point to queenstown level of service improvements (capital cost $8.3m, table 48). c5 arthurs point to queenstown level of service improvements - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver component c7 lake hayes estate to shotover bridge (capital cost $1.6m, table 48). c7 lake hayes estate to shotover bridge - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver component a8 lake hayes estate to frankton (south) - physical works (capital cost $4m, table 48). a8 lake hayes estate to frankton - partner lead qldc 2021-2024 (package 1 stage 2) not assessed qldc qldc deliver package 2 component c1 rees street 'gardens to gondola' (town centre route), subject to later reassessment of economics and affordability. 2024-2030 package 2 c1 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component c2 brecon street - physical works, subject to later reassessment of economics and affordability. 2024-2030 package 2 c2 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component c3 park street upgrade - physical works, subject to later reassessment of economics and affordability. 2024-2030 package 2 c3 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component c4 upper and lower beach street, subject to later reassessment of economics and affordability. 2024-2030 package 2 c4 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component c6 arthurs point to tuckers beach, subject to later reassessment of economics and affordability. 2024-2030 package 2 c6 - partner lead qldc/qtt 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component d1 kelvin heights to frankton, subject to later reassessment of economics and affordability. 2024-2030 package 2 d1 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component d2 tuckers beach to frankton, subject to later reassessment of economics and affordability. 2024-2030 package 2 d2 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component d3 arrowtown to lake hayes track, subject to later reassessment of economics and affordability. 2024-2030 package 2 d3 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component d4 lake hayes north to shotover bridge, subject to later reassessment of economics and affordability. 2024-2030 package 2 d4 - partner lead nzta 2024-2030 (package 2) not assessed nzta waka kotahi nzta deliver package 2 component e1 arrowtown to arthurs point, subject to later reassessment of economics and affordability. 2024-2030 package 2 e1 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc deliver package 2 component f1 jack's point to kelvin heights, subject to later reassessment of economics and affordability. 2024-2030 package 2 f1 - partner lead qldc 2024-2030 (package 2) not assessed qldc qldc seek nltf funding at a 51% funding assistance rate with qldc long term plan contributions, using agreed partner funding splits (package 1: qldc $10.54m, nzta $27.87m, third party $1m). this business case seeks to secure funding for the active travel network through the national land transport fund (nltf) and local contributions from the long term plan pre-implementation approval 2019/20; construction 2020/21-2023/24 not assessed way to go way to go reassess package 2 routes (post-2024) for financials, economic viability and demand before funding. the nz transport agency has indicated that they envisage subsequent routes targeting delivery post-2024 to be subject to reassessment post-2024 not assessed nzta waka kotahi nzta pursue potential third-party contributions of about $0.5m each from remarkables park ltd / remarkables ski field (route a8 bridge) and utility providers (route a7 bridge). there is potential for a financial contribution to be made by remarkables park ltd pre-implementation not assessed procure professional services for each partner's work packages using an nzta-approved price quality method with a high weighting on quality; engage a single consultant for stage 1 detailed design. it is recommended that qldc and the nz transport agency procures its professional services provider pre-implementation not assessed nzta waka kotahi nzta use a traditional staged procurement approach for stage 1 (2018-2021) construction to start construction as early as possible. the recommended approach for qldc and nzta is to use a traditional staged approach to the procurement of construction services 2018-2021 not assessed nzta waka kotahi nzta engage early with affected landowners once land requirements are finalised at detailed design (about 60 properties affected by package 1). the property strategy strongly recommends early engagement with these affected landowners detailed design phase not assessed establish a watn steering group of project partners for pre-implementation; partners deliver construction separately; one organisation maintains the network under an mou. maintenance and ongoing operation is delivered by one organisation, delivered under an mou package 1 up to 2024 not assessed way to go way to go incorporate marketing of the watn into existing school travel planning activities after construction. it is advisable that qldc incorporates the marketing of watn post-construction into their existing school travel planning activities post-construction not assessed qldc qldc integrate the watn with park and ride, cycle parking, ferry and public transport improvements in parallel business cases. it will be important ensure integration of any public transport improvements whist implementing the active travel network not assessed way to go way to go monitor growth in e-scooters and other micromobility during and after implementation, consider restrictions, and reflect it in design and safety in design. it would also be prudent for way to go to consider, if implemented, the future use of the watn and whether additional restrictions may need to be introduced implementation and post-implementation not assessed way to go way to go operate a change control and issues register alongside the risk register. it is recommended that a change control and issues register shall operate as an addition to the risk register project life cycle not assessed hold a safety in design workshop at 50% design stage and prepare route-specific sid registers. a sid workshop will be held at the 50% design stage during pre-implementation pre-implementation (50% design) not assessed complete internal reviews and approvals of the ssbc, tender and appoint a detailed design consultant, and begin package 1 stage 1 implementation. this ssbc will be subject to internal reviews and approvals by qldc and nzta, which are targeting approval later in 2019 approval later 2019; consultant late 2019/early 2020; implementation mid-2020 not assessed nzta waka kotahi nzta carry out post-implementation monitoring (qtt user surveys, eco-counter counts, los surveys) against kpis such as 15% increases in daily cyclist and pedestrian flows on primary routes. increase the daily average cyclist flows on watn primary routes by 15% from baseline by 2029 not assessed nzta waka kotahi nzta pages 1-16 pdf part a the case for investment (pages 17-67 pdf part b option development and assessment (pages 68-167 pdf part c implementing the preferred network (pages 168-200 pdf appendices a-g pdf appendix h - town centre extent of works pdf appendix j - cost estimate report pdf appendices m-u pdf",
    "sortDate": "2019-08-29",
    "cover": {
      "src": "/covers/QTS-023.webp",
      "srcset": "/covers/QTS-023.webp 400w, /covers/QTS-023-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-023/",
    "files": [
      {
        "label": "Pages 1-16",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F1.pdf"
      },
      {
        "label": "Part A The Case for Investment (Pages 17-67",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F2.pdf"
      },
      {
        "label": "Part B Option Development and Assessment (Pages 68-167",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F3.pdf"
      },
      {
        "label": "Part C Implementing the Preferred Network (Pages 168-200",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F4.pdf"
      },
      {
        "label": "Appendices A-G",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F5.pdf"
      },
      {
        "label": "Appendix H - Town Centre Extent of Works",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F6.pdf"
      },
      {
        "label": "Appendix J - Cost Estimate Report",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F7.pdf"
      },
      {
        "label": "Appendices M-U",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-023/QTS-023-F8.pdf"
      }
    ]
  },
  {
    "id": "qts-024",
    "code": "QTS-024",
    "title": "2018/19 Annual Report (Rīpoata ā-tau)",
    "shortTitle": "2018/19 Annual Report (Rīpoata ā-tau)",
    "summary": "QLDC's 2018/19 Annual Report, year one of the 2018-2028 Ten Year Plan, records capital expenditure 'below estimate by $28.7m' (p.7) and some $53m short of the original Ten Year Plan budget (p.10), citing 'delay in the NZTA approval process for major transport improvements in Queenstown'. Carry-forwards of $47.1m were approved (p.13). Town Centre pedestrianisation spent $1.13m of a $2.50m budget (p.7). A capital works KPI of 52% missed the >80% target (p.54). The Wakatipu Way to Go partnership (QLDC, ORC, NZTA) launched in January 2019 (p.3). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2019,
    "publishedDate": "2019-10-10",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2018/19 Annual Report (Rīpoata ā-tau) (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/bs2omdk4/qldc-annual-report-2018-2019.pdf",
      "https://www.qldc.govt.nz/media/m04fthom/1-adopt-annual-report-2019-council-oct19.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-024 2018/19 annual report (rīpoata ā-tau) 2018/19 annual report (rīpoata ā-tau) qldc's 2018/19 annual report, year one of the 2018-2028 ten year plan, records capital expenditure 'below estimate by $28.7m' (p.7) and some $53m short of the original ten year plan budget (p.10), citing 'delay in the nzta approval process for major transport improvements in queenstown'. carry-forwards of $47.1m were approved (p.13). town centre pedestrianisation spent $1.13m of a $2.50m budget (p.7). a capital works kpi of 52% missed the >80% target (p.54). the wakatipu way to go partnership (qldc, orc, nzta) launched in january 2019 (p.3). no mass rapid transit reference was found. context and purpose. the first annual report under the 2018-2028 ten year plan, signed 10 october 2019 (p.23). transport. capital expenditure was 'below estimate by $28.7m for the year ended 30 june 2019' (p.7) and 'some $53m short of the original 2018 ten year plan budget' (p.10), attributed to 'delay in the nzta approval process for major transport improvements in queenstown' (p.10). carry-forward projects totalling $47.1m were approved in august 2019 (p.13). queenstown town centre pedestrianisation spent $1.13m against $2.50m, being 'dependent on nzta funding' and scheduled for 2019-2026 (p.7). year-end costs for the town centre arterials were $632,818 and queenstown parking improvements $910,111 (p.13). the water taxi/ferry network cost $3,168,172 (p.12). the wakatipu way to go partnership of qldc, orc and nzta, launched january 2019, aims for 'an enduring, affordable, safe transport system with a range of choices' (p.3). performance. the capital works kpi was 52% against a target above 80%, not met, attributed to deferred budgets and dependence on developer agreements, joint ventures and 'nzta funding approvals' (p.54). roading requests resolved on time: 78% (p.54). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report 2018/19 annual report (rīpoata ā-tau) (2019). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $28.7m below estimate (p.7); ~$53m short of ten year plan (p.10) carry-forwards $47.1m (p.13) capital works kpi 52% vs >80% target (p.54) qtc pedestrianisation $1.13m vs $2.50m budget (p.7) town centre arterials $632,818; parking improvements $910,111 at year end (p.13) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2019 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc carry forward $47.1m of capital projects to 2019/20, including town centre arterial, pedestrianisation and parking work carry-forward projects totalling $47.1m 2019/20 not assessed qldc qldc deliver queenstown town centre pedestrianisation, dependent on nzta funding 2019-2026 not assessed qldc qldc deliver the wakatipu way to go transport programme partnership between qldc, otago regional council and nzta from january 2019 not assessed way to go way to go main document pdf part 2 pdf",
    "sortDate": "2019-10-10",
    "cover": {
      "src": "/covers/QTS-024.webp",
      "srcset": "/covers/QTS-024.webp 400w, /covers/QTS-024-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-024/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-024/QTS-024-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-024/QTS-024-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-025",
    "code": "QTS-025",
    "title": "Official Information Act request - Treasury reference 20190632 (market ready roading projects and the Infrastructure Pipeline)",
    "shortTitle": "Official Information Act request - Treasury",
    "summary": "Treasury response of 20 November 2019 to an OIA request about its 8 April 2019 advice 'Treasury Report T2019/862: Publication of Infrastructure Pipeline' and the 12 large roading projects described as 'market ready'. Treasury defines 'market ready' as ready to engage the market with intent to procure through competitive tender, distinguishing it from 'shovel ready', and lists the 12 NZTA projects re-evaluated against the 2018 Government Policy Statement, none in Queenstown. It releases six documents in part (withholding officials' contact details under s9(2)(a) and s9(2)(k)): an Expert Review Panel paper, emails between the Infrastructure Transactions Unit, NZTA and consultant Advisian, a February 2019 slide pack for Ministers, and draft pipeline text. NZTA's February 2019 pipeline data includes four Queenstown/Otago items: SH6A Corridor Improvements ($5-25m, business case complete, construction start 1 March 2021), Stanley St Corridor Improvements ($50-100m, business case underway, joint with QLDC, includes the town centre public transport hub), Grant Rd Kawarau Falls Bridge Corridor Improvements Stage 2 ($25-50m) and the Otago Visiting Driver Signature Project (<$5m). No Queenstown mass rapid transit corridor appears in the released pipeline data.",
    "documentType": "Official information release",
    "documentForm": "OIA response letter with released emails, briefing paper, slides and pipeline data (OIA binder)",
    "year": 2019,
    "publishedDate": "2019-11-20",
    "documentStatus": "Final",
    "geographicScope": "New Zealand (national); Queenstown entries: SH6A corridor, Stanley Street, Grant Road to Kawarau Falls Bridge, Otago visiting driver routes",
    "owner": "Crown",
    "citation": "Official Information Act request - Treasury reference 20190632 (market ready roading projects and the Infrastructure Pipeline) (2019). 20190632.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (Treasury reference 20190632)",
    "sourceUrls": [],
    "documentTypeCode": "official-information",
    "topics": [
      "rapid-transit",
      "roads"
    ],
    "organisationIds": [
      "advisian",
      "nzta",
      "the-treasury",
      "sapere-research-group"
    ],
    "searchText": "qts-025 official information act request - treasury reference 20190632 (market ready roading projects and the infrastructure pipeline) official information act request - treasury treasury response of 20 november 2019 to an oia request about its 8 april 2019 advice 'treasury report t2019/862: publication of infrastructure pipeline' and the 12 large roading projects described as 'market ready'. treasury defines 'market ready' as ready to engage the market with intent to procure through competitive tender, distinguishing it from 'shovel ready', and lists the 12 nzta projects re-evaluated against the 2018 government policy statement, none in queenstown. it releases six documents in part (withholding officials' contact details under s9(2)(a) and s9(2)(k)): an expert review panel paper, emails between the infrastructure transactions unit, nzta and consultant advisian, a february 2019 slide pack for ministers, and draft pipeline text. nzta's february 2019 pipeline data includes four queenstown/otago items: sh6a corridor improvements ($5-25m, business case complete, construction start 1 march 2021), stanley st corridor improvements ($50-100m, business case underway, joint with qldc, includes the town centre public transport hub), grant rd kawarau falls bridge corridor improvements stage 2 ($25-50m) and the otago visiting driver signature project (<$5m). no queenstown mass rapid transit corridor appears in the released pipeline data. context and purpose. a requester asked treasury for its definition of 'market ready', the 12 large roading projects it called market ready, and related correspondence with nzta, the ministry of transport and private consultants (p.1). treasury clarified that the request related to its 8 april 2019 advice 'treasury report t2019/862: publication of infrastructure pipeline', prepared by the infrastructure transactions unit (itu), since moved to the new zealand infrastructure commission, and limited the response to substantive communications from 1 february to 8 april 2019 (pp.1-2). key content. the pipeline is described as an industry-facing list of relatively certain and committed government projects due to come to market (p.2). 'market ready' means ready to engage the market with intent to procure via competitive tender, and may mean a business case approved or near approval, consents obtained and land acquisition commenced; 48% of first-iteration projects were in business case development (p.2). based on nzta data, 41 transport projects were identified for the first iteration; 12 major roading projects under re-evaluation were excluded or reduced in scope (p.2). a table lists the 12 with their status (p.3): none are in otago. treasury identified no substantive communications with the ministry of transport, which was not a contributor (p.3). released documents (p.4). (1) a 4 february 2019 itu paper to the expert review panel by karen mitchell and adam wood on the pipeline approach, noting only projects with a current business case or funded for procurement would be included, and that most large projects were excluded because they were being re-evaluated (pp.8-11). (2-3) emails of 13 february 2019 in which nzta (tara macmillan) returned its pipeline data, noting projects would only progress through funding stage gates and re-evaluated projects had been removed, with advisian's feedback (pp.12-21). (4) a february 2019 slide pack for a ministers' meeting with minister jones comparing the 2015 and 2018 gps, including the shift of about $3.5 billion from state highway improvements and a new rapid transit activity class (pp.22-31). (5) a march 2019 email listing the re-evaluated projects (pp.32-34). (6) draft pipeline web text, largely deleted as out of scope (pp.35-40). queenstown projects in the pipeline data. nzta's data input table (doc 2) includes: 'sh6a corridor improvements' - corridor improvements to relieve congestion and ease access from side roads; business case/investment case development, business case complete, procurement 1 october 2020 to 1 february 2021, construction start 1 march 2021, value range $5-25 million (p.17); 'stanley st corridor improvements' - a new town centre arterial to improve access, particularly for public transport, and access to a new town centre public transport hub and plan change 50 area, a joint activity with qldc; business case underway, dates to be confirmed, $50-100 million (p.17); 'grant rd kawarau falls bridge corridor improvements (stage 2)' - including glenda drive, frankton bp roundabout and bp roundabout to kawarau falls bridge improvements; business case underway with completion 30 june 2019, project completion 2021, $25-50 million (p.17); and the 'visiting driver signature project otago' - tourist driver safety improvements on queenstown-milford, queenstown-west coast and queenstown-christchurch routes, in procurement, under $5 million (p.16). all are marked 'publish value range only (estimated value sensitive)'. mass rapid transit: the release says nothing about mass rapid transit in queenstown. no frankton-town centre mrt corridor appears in the nzta pipeline data; the queenstown entries are road corridor and hub projects. rapid transit is mentioned only as a national gps 2018 activity class (p.30) and through the auckland city centre to mangere light rail project (pp.17, 39). oia response letter with released emails, briefing paper, slides and pipeline data (oia binder) official information act request - treasury reference 20190632 (market ready roading projects and the infrastructure pipeline) (2019). 20190632. new zealand (national); queenstown entries: sh6a corridor, stanley street, grant road to kawarau falls bridge, otago visiting driver routes final (signed oia response with released documents) no queenstown mass rapid transit reference; queenstown pipeline entries are sh6a, stanley st, grant rd-kawarau falls bridge and visiting driver projects. 41 nzta transport projects identified for the first infrastructure pipeline iteration (p.2) 12 major roading projects under re-evaluation excluded or reduced in scope; none in otago (pp.2-3) 48% of first-iteration pipeline projects in business case development (p.2) sh6a corridor improvements: value range $5-25m; construction start 1 march 2021 (p.17) stanley st corridor improvements (town centre arterial and pt hub, joint with qldc): $50-100m; business case underway (p.17) grant rd kawarau falls bridge corridor improvements stage 2: $25-50m; completion 2021 (p.17) visiting driver signature project otago: under $5m; in procurement (p.16) gps 2018 vs 2015: state highway improvements down $3,550m; rapid transit class $1,620m (p.30) not separately commissioned. this is an internal or corporate document. released under oia 1982 (treasury reference 20190632) crown none official information release final 2019 rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. advisian advisian prepared nzta waka kotahi nzta prepared the treasury the treasury prepared the treasury the treasury published adam wood author the treasury the treasury karen mitchell author the treasury the treasury david taylor signatory sapere research group sapere research group brendan herder contributor the treasury the treasury tara macmillan contributor nzta waka kotahi nzta lyn holland recipient the treasury the treasury main document pdf",
    "sortDate": "2019-11-20",
    "cover": {
      "src": "/covers/QTS-025.webp",
      "srcset": "/covers/QTS-025.webp 400w, /covers/QTS-025-2x.webp 800w",
      "width": 400,
      "height": 567
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-025/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-025/QTS-025-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-026",
    "code": "QTS-026",
    "title": "Te Kirikiri Frankton Integrated Transport Programme Business Case",
    "shortTitle": "Te Kirikiri Frankton Integrated Transport",
    "summary": "GHD's Programme Business Case for Te Kirikiri Frankton, prepared for QLDC with partners NZ Transport Agency and ORC under the Way to Go partnership, was developed alongside Boffa Miskell's Te Kirikiri Frankton Masterplan (Appendix A) and sets a 30-year integrated transport programme for Frankton. Two problems were identified: a transport system favouring private vehicles that causes severance (60%), and land use, infrastructure constraints and growth causing congestion (40%). Seven long-list programmes were narrowed to three: Do Minimum, Programme 3 (bus priority then a trackless tram on SH6/SH6A within 10 years) and Programme 4 (a mass rapid transit linking Lake Hayes Estate, Frankton and Queenstown Town Centre within 10 years). Both 3 and 4 met the investment objectives, so the recommended programme is their common elements plus either a ground-based mass transit system or mass rapid transit, with the choice left to further work. It recommends short-term bus priority, an orbital bus trial, active mode links and parking policy; medium-term high capacity public transport, bus hubs, park and ride and new links; and long-term network expansion. Programme 3 is costed at about $295m (range $207m-$383m), Programme 4 at about $366m. Using trackless tram costs and benefits for Frankton only, the BCR is 0.3-0.6, rated low for benefit-cost appraisal but very high for results alignment. Indicative cost shares are NZTA $182.4m, QLDC $83.04m and ORC $28.8m.",
    "documentType": "Programme business case",
    "documentForm": "Programme business case with appendices (incl. Te Kirikiri Frankton Masterplan and Network Operating Framework)",
    "year": 2019,
    "publishedDate": "2019-12-20",
    "documentStatus": "Draft",
    "geographicScope": "Te Kirikiri Frankton (Frankton Flats, Remarkables Park, Five Mile, Quail Rise, Queenstown Airport); SH6 and SH6A; Queenstown Town Centre; Lake Hayes Estate; Jacks Point; Wakatipu Basin",
    "owner": "Way to Go",
    "citation": "QLDC, Way to Go partnership. Te Kirikiri Frankton Integrated Transport Programme Business Case (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/sfhfyskk/5b-8-oct-2020-att-b-frankton-int-trans-prog.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/sfhfyskk/5b-8-oct-2020-att-b-frankton-int-trans-prog.pdf"
    ],
    "documentTypeCode": "programme-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "freight"
    ],
    "organisationIds": [
      "qldc",
      "way-to-go-partnership",
      "boffa-miskell",
      "ghd",
      "nzta",
      "orc"
    ],
    "searchText": "qts-026 te kirikiri frankton integrated transport programme business case te kirikiri frankton integrated transport ghd's programme business case for te kirikiri frankton, prepared for qldc with partners nz transport agency and orc under the way to go partnership, was developed alongside boffa miskell's te kirikiri frankton masterplan (appendix a) and sets a 30-year integrated transport programme for frankton. two problems were identified: a transport system favouring private vehicles that causes severance (60%), and land use, infrastructure constraints and growth causing congestion (40%). seven long-list programmes were narrowed to three: do minimum, programme 3 (bus priority then a trackless tram on sh6/sh6a within 10 years) and programme 4 (a mass rapid transit linking lake hayes estate, frankton and queenstown town centre within 10 years). both 3 and 4 met the investment objectives, so the recommended programme is their common elements plus either a ground-based mass transit system or mass rapid transit, with the choice left to further work. it recommends short-term bus priority, an orbital bus trial, active mode links and parking policy; medium-term high capacity public transport, bus hubs, park and ride and new links; and long-term network expansion. programme 3 is costed at about $295m (range $207m-$383m), programme 4 at about $366m. using trackless tram costs and benefits for frankton only, the bcr is 0.3-0.6, rated low for benefit-cost appraisal but very high for results alignment. indicative cost shares are nzta $182.4m, qldc $83.04m and orc $28.8m. context and purpose: qldc and its partners nz transport agency and orc engaged ghd and boffa miskell to develop a masterplan and integrated transport programme business case for te kirikiri frankton, as part of the way to go initiative (p.9). both have a 30-year vision (p.9). frankton is reached by road only via the kawarau falls bridge, the shotover bridge and sh6/sh6a from the town centre; sh6a carries about 25,600 vehicles per day (p.9). the wakatipu ward population is forecast to grow by 17,260 (61%) by 2038, and the airport forecast over three million passengers by 2025 and six million by 2035 (p.10). the cover is marked 'attachment b' (p.1). problems and objectives: workshops in november 2018 identified two problems: the transport system favours private vehicles, causing severance (60%); and land use, infrastructure constraints and growth cause congestion (40%) (p.11). five investment objectives cover severance and liveability, multi-modal access, safety, active mode connectivity, and reliability (p.11). options: more than 150 interventions informed seven long-list programmes, from do minimum to do maximum (pp.61-68). programme 5 (mass transit in 20-25 years) was favoured for its mass transit elements but was judged not to meet pt needs within ten years (p.70). the short list was do minimum (about $10m), programme 3 (bus priority, then a trackless tram on a designated corridor alongside sh6 and sh6a within 10 years; about $295m) and programme 4 (a mass rapid transit linking lake hayes estate, frankton and queenstown town centre within 10 years, a travellator from qec to the airport, and ferry upgrades; about $366m) (pp.71-79). both met the investment objectives; programme 3 scored marginally better on pt share and travel times, and programme 4 had greater landscape and visual effects but likely greater air quality and visitor benefits (p.80). recommended programme: the common elements of programmes 3 and 4, plus either a ground-based mass transit system or mass rapid transit (p.81). short-term (2019-2024) measures include a trial orbital bus, bus priority on sh6/sh6a, orbus improvements, a new ferry terminal, a 50 km/h sh6 speed limit, safe crossings, a jack's point shared path and kawarau river active bridge, and parking policy (p.82). medium-term (2024-2028) measures include high capacity pt, more bus priority, the humphrey street link, park and ride near boyd road, a regional bus hub, the lake link, robertson street upgrades, intensification around mass transit stations and reduced parking requirements (pp.84-85). long-term (2029-2050) measures include potential pt bridges over the shotover and kawarau rivers and network expansion (p.87). further residential development above modelled levels, as transit-oriented development, is recommended (p.81). economics and finance: using programme 3 (trackless tram) costs and benefits within the frankton study area only, the bcr is 0.3-0.6 at 6% (0.2-0.7 across sensitivities). npv benefits are $89.4m against npv costs of $141.5m-$262.1m (p.16). costs outweigh benefits mainly because benefits start only in 2028 (p.92). the iaf rating is very high for results alignment and low for benefit-cost appraisal (p.94). programme 3 is estimated at $294.24m including escalation and contingency, of which public transport is $180m (p.98). interventions to 2024 total $19.84m (p.99); common elements to 2028 total $115.2m (p.101); trackless tram elements total $159.2m (p.101); and items without a current business case total $54.72m (p.102). indicative cost shares are nzta $182.4m, qldc $83.04m and orc $28.8m (p.104). the appendix j economics note carries a draft disclaimer (pp.254-263). management: delivery is through the way to go partnership, with specialist procurement for high capacity pt (p.103). risks include insufficient density for mass transit, high mass transit pricing and an unclear funding stream (p.96). mass rapid transit: substantive. a mass rapid transit was one of two shortlisted high capacity pt options (programme 4), linking lake hayes estate, frankton and queenstown town centre within 10 years (pp.13, 76). both mass transit options were deemed to meet the investment objectives, and the choice was deferred pending further work on costs and benefits (pp.13, 80). the economic case modelled only the trackless tram (pp.16, 257). the report records that a separate mass transit assessment 'has confirmed a need for a high capacity public transport solution for the wakatipu basin within the next ten years' (p.81). programme business case with appendices (incl. te kirikiri frankton masterplan and network operating framework) qldc, way to go partnership. te kirikiri frankton integrated transport programme business case (2019). te kirikiri frankton (frankton flats, remarkables park, five mile, quail rise, queenstown airport); sh6 and sh6a; queenstown town centre; lake hayes estate; jacks point; wakatipu basin final (document status table: draft a 10/10/2019; final 20/12/2019) shortlists mass rapid transit from lake hayes estate to frankton and the town centre, and a trackless tram; recommends one high-capacity public transport system within 10 years, with the choice deferred. high capacity pt is central to the pbc. programme 4 is 'mass transit (gondola) within 10 years and active modes focus', mass rapid transit 'linking lake hayes estate, frankton and the queenstown town centre that could be extended into growth areas' (p.13), with a qec-airport travellator and complementary ferries (p.76). programme 3 uses a trackless tram alongside sh6 and sh6a (p.74). both 'meet the investment objectives and contribute towards the kpis' (p.80). the trackless tram scored marginally better on pt share and travel times because it has more stops, while mass rapid transit would have greater landscape and visual effects but 'could become a significant attraction for visitors' (p.80). programme 4 was costed at about $366m against $295m for programme 3 (p.79). because 'the relative costs and benefits of the two mass transit solutions requires further investigation', the recommended programme is the common elements plus 'either a ground based mass transit system, or a gondola' (pp.80-81). it states that a separate mass transit assessment 'has confirmed a need for a high capacity public transport solution for the wakatipu basin within the next ten years' (p.81) and assumes operation from 2028 (p.13). the economic evaluation used only trackless tram costs and benefits for frankton (bcr 0.3-0.6) (p.16). the report notes a privately funded mass rapid transit being investigated between remarkables park and the remarkables ski field (p.84). \"programme option 4: mass transit (gondola) within 10 years and active modes focus... specifically a gondola service linking lake hayes estate, frankton and the queenstown town centre that could be extended into growth areas if demand supports this in the long-term.\" (p.13) | \"the recommended programme is the common elements of programme option 3 (trackless trams and bus network) and programme option 4 (gondola and bus network) with a high capacity public transport system.\" (p.13) | \"the relative costs and benefits of the two mass transit solutions requires further investigation before a decision can be made on the recommended solution.\" (p.80) | \"an assessment of the mass transit options is being is being undertaken at the time of issuing this report and has confirmed a need for a high capacity public transport solution for the wakatipu basin within the next ten years.\" (p.81) | \"the gondola would likely deliver greater air quality benefits and could become a significant attraction for visitors.\" (p.80) sh6a frankton road carries about 25,600 vehicles per day (p.9) wakatipu ward population +17,260 (61%) by 2038; airport forecast >3 million passengers by 2025 and 6 million by 2035 (p.10) short-list capex: do minimum about $10m; programme 3 (trackless tram) $295m; programme 4 (gondola) $366m (p.79) recommended programme (programme 3 basis) $294.24m incl. escalation and contingency; range $206.9m-$383.4m; public transport $180m (pp.16-17, 98) bcr 0.3-0.6 at 6% discount rate (sensitivities 0.2-0.7); npv benefits $89.4m vs npv costs $141.5m-$262.1m at 6% (p.16) trackless tram elements by 2028: $128m tram services, $24m superstop, $7.2m stops; total $159.2m (p.101) interventions to end 2024 total $19.84m; common elements to 2028 total $115.2m; items without a current business case $54.72m (pp.99-102) indicative cost allocation: nzta $182.4m, qldc $83.04m, orc $28.8m (p.104) iaf: very high results alignment; low benefit-cost appraisal (p.15) pt mode share frankton: 3.48% (2018); 10-15% (2028) and 15-25% (2048) under programmes 3 and 4 (p.230) 79% of journey to work trips by frankton residents are by private vehicle (p.94) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/sfhfyskk/5b-8-oct-2020-att-b-frankton-int-trans-prog.pdf way to go substantive programme business case draft 2019 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. freight freight and loading. qldc qldc commissioned way to go way to go lead boffa miskell boffa miskell prepared ghd ghd prepared nzta waka kotahi nzta partner orc orc partner a metge author ghd ghd j strijbis author ghd ghd t. hankinson author ghd ghd tim church prepared by boffa miskell boffa miskell dhanesh amerasingam reviewed by boffa miskell boffa miskell t. eldridge approved by ghd ghd introduce a trial orbital bus service in frankton linking five mile, frankton village, queenstown events centre, the airport, kawarau falls, remarkables park and shotover delta. orbital bus service introduced in frankton to link the key activity precincts short term (2019-2024); bus-only lanes medium term not assessed orc orc implement bus prioritisation along sh6 and sh6a. bus prioritisation along sh6 and sh6a short term (2019-2024) not assessed nzta waka kotahi nzta increase marketing of the orbus network and make operational improvements for more direct and frequent services and connections. increased marketing of the orbus network; operational improvements to orbus short term (2019-2024) not assessed orc orc improve information for commuters through real-time information apps. improved information provision for commuters through apps providing real time information short term (2019-2024) not assessed construct a new ferry terminal and new or upgraded wharf to support upgraded ferry services from frankton. a new ferry terminal and new or upgraded wharf is constructed short term (2019-2024) not assessed improve bus stop comfort and accessibility (seating, covered stops, lighting, shade trees). provide facilities to improve comfort and accessibility for pedestrians and public transport users short term (2019-2024) not assessed qldc qldc optimise the local road network to better accommodate buses. road network optimisation completed to better accommodate buses on the local network short term (2019-2024) not assessed qldc qldc reduce the sh6 speed limit between kawarau falls bridge and quail rise south (grant road) to 50 km/h (indicative cost $320,000). reduce speed limits on state highway 6 between the kawarau falls bridge and quail rise south to 50 km/h short term (2019-2024) not assessed increase safe crossings on and adjacent to arterial roads near public transport stops (e.g. sh6 near qec and five mile) ($1.92m). increased number of safe crossings on and adjacent to arterial roads near public transport stops short term (2019-2024) not assessed nzta waka kotahi nzta improve the active mode connection between quail rise and frankton flats through the quail rise south development, and upgrade the pedestrian network in growth areas. improve active mode connection between quail rise and frankton flats through quail rise south development short term (2019-2024) not assessed build a shared path to jack's point including a new active mode bridge over the kawarau river ($11.84m). new active mode bridge constructed over the kawarau river and track to jack's point short term (2019-2024) not assessed build new active travel routes a2 shotover bridge to sh6 ($3.2m) and a3/a4 sh6 to frankton track ($1.6m), and connected separated active mode paths within frankton. new active travel route - a2 shotover bridge to sh6; a3/a4 - sh6 to frankton track short term (2019-2024) not assessed provide lighting on key active mode routes and wayfinding and signage at visitor entry points and roundabouts. wayfinding and signage improvements are made at key visitor entry points short term (2019-2024) not assessed run safety promotion and education campaigns, including safe walking and cycling routes to frankton schools ($160,000). safety promotion and education campaigns in the community short term (2019-2024) not assessed qldc qldc promote high occupancy vehicles and run workplace and school travel planning initiatives. high occupancy vehicle promotion; workplace and school travel planning initiatives short term (2019-2024) not assessed implement parking policy ($320,000). parking policy implemented - bau qldc short term (2019-2024) not assessed qldc qldc provide additional active travel connections ($480,000). additional active travel connections - qldc/nzta low cost low risk programme short term (2019-2024) not assessed nzta waka kotahi nzta extend bus prioritisation throughout the study area, including signal pre-emption and priority lanes on sh6/kawarau road and hawthorne drive ($14.4m). additional bus prioritisation (public transport priority lanes)- i.e. sh6 / kawarau road and hawthorn drive medium term (2024-2028) not assessed nzta waka kotahi nzta invest in public transport technology (apps, real-time travel information) and provide pt facilities and express services in frankton. there is increased investment in public transport technology medium term (2024-2028) not assessed build the new humphrey street link with pt priority to remarkables park and the airport ($24m). new humphrey st alignment and connection to airport and remarkables park medium term (2024-2028) not assessed provide public transport priority and a new link between queenstown events centre and queenstown airport. public transport priority and new link between queenstown events centre and queenstown airport medium term (2024-2028) not assessed develop park & ride near boyd road, south of the kawarau river, with the active mode bridge. development of park & ride facilities near boyd road, south of kawarau river medium term (2024-2028) not assessed relocate the commuter hub and establish a regional bus hub, with stop and connections to a regional coach facility near remarkables park and the airport ($4.8m). the public transport commuter hub is relocated and a regional bus hub established medium term (2024-2028) not assessed build bus-only lanes and infrastructure for the orbital bus route ($1.6m). orbital bus route and bus lanes infrastructure throughout the study area medium term (2024-2028) not assessed nzta waka kotahi nzta high capacity pt option 1: trackless tram services on sh6 and sh6a completed within 10 years ($128m), with a superstop near sh6/sh6a/qec ($24m) and new stops to shotover river ($7.2m). option 1: trackless tram (ground base mass transit) services on key routes state highway 6 and state highway 6a completed within 10-years medium term (2024-2028); operation assumed 2028 not assessed nzta waka kotahi nzta high capacity pt option 2 (alternative): mass rapid transit linking frankton and queenstown town centre and potentially lake hayes estate, with a travellator between qec and airport stations. option 2: a gondola service linking frankton and queenstown town centre and frankton potentially to lake hayes estate medium term (2024-2028) not assessed signalise the sh6 / hawthorne drive intersection to provide safe controlled pedestrian crossings ($3.2m). signalise the state highway 6 and hawthorne drive intersection medium term (2024-2028) not assessed nzta waka kotahi nzta build new road connections to the airport, including lucas place realignment ($16m), dependent on the masterplan and hospital/st john relocation or realignment. new road connections to the airport including intersection upgrades / close the lucas place connector medium term (2024-2028) not assessed relocate or realign the hospital and st john ambulance site to enable the lake link ($24m). relocation (or realignment) of hospital and st john ambulance to enable lake link medium term (2024-2028) not assessed build the lake link active travel connection between remarkables park, the airport, remarkables primary school and lake wakatipu, including a bridge over sh6 ($16m). lake link - new active travel connection between remarkables park, the airport medium term (2024-2028) not assessed upgrade and prioritise robertson street for active modes, with the humphrey street realignment ($3.2m). robertson street is upgraded and prioritised for active modes medium term (2024-2028) not assessed qldc qldc complete the frankton cycling network ($1.92m) and build high quality cycleway connections parallel to sh6 ($4m). frankton cycling network is completed; new high quality cycleway connections within frankton parallel to sh6 medium term (2024-2028) not assessed nzta waka kotahi nzta upgrade walking networks and routes around pt interchanges ($800k) and streets with covered bus stops and bike racks ($800k). walking routes to public transport facilities continue to be upgraded medium term (2024-2028) not assessed nzta waka kotahi nzta intensify land use around proposed mass transit stations and promote transit-oriented development along key pt routes. increased land use intensification around proposed mass transit stations medium term (2024-2028) not assessed qldc qldc minimise parking requirements for new developments, require developments to provide accessible pt facilities, and provide freight loading zones. minimise new development parking requirements (planning and policy) medium term (2024-2028) not assessed qldc qldc build new pt interchanges along key arterials and upgrade services, routes and frequency, including services to new intensification areas. new transport interchanges are built along key arterials long term (2029-2050) not assessed orc orc provide a potential new one-way public transport bridge (with active mode connections) over the shotover river, dependent on 2030-50 pt demand. provide a new potential new public transport bridge (with active mode connections) over the shotover river (one way) long term (2029-2050) not assessed nzta waka kotahi nzta provide a potential dedicated public transport bridge over the kawarau river, dependent on longer-term pt demand. potential dedicated public transport bridge over the kawarau river long term (2029-2050) not assessed nzta waka kotahi nzta expand the high capacity pt network into growth areas based on demand (ground-based option, or mass rapid transit option - not included in cost estimates). option 1: ground based high capacity public transport is expanded... or option 2: gondola service can be expanded into new growth areas long term (2029-2050) not assessed continue upgrading walking routes to pt and develop the district pedestrian network connecting with frankton. walking routes to public transport facilities continue to be upgraded and amenity improved long term (2029-2050) not assessed qldc qldc confirm the financial and economic viability and implementation timing of the preferred high capacity pt system (trackless tram or mass rapid transit). further work is required to confirm the financial and economic viability of the preferred system as well as the timing not stated (operation assumed 2028) not assessed way to go way to go assess high capacity pt network costs and benefits across the whole wakatipu basin, which may justify investment. the high capacity public transport system options are currently being assessed to identify the network costs and benefits that occur across the whole wakatipu basin not assessed enable residential development in the study area above modelled levels, as transit-oriented development, to support mass transit uptake. it is recommended that increased residential development occurs within the study area over and above what is currently modelled not assessed qldc qldc investigate mass transit pricing models, finalise mass transit cost estimates and establish a funding stream for capital and operating costs. undertake further investigations into mass transit solutions and potential pricing models not assessed confirm business cases or planning activities for interventions without a current business case ($54.72m) through the regional land transport plan. business cases or transport planning activities for these interventions will need to be confirmed through the regional land transport plan process next rltp not assessed way to go way to go continue risk assessment (risk identification, mitigation actions and owners) in future detailed business cases. it is recommended that ongoing risk assessment... continue to be undertaken during future detailed business cases future business case stages not assessed review the masterplan at regular intervals (e.g. every 3 years) and amend it to keep transport and masterplan outcomes achievable. the masterplan will need to be reviewed at regular intervals (i.e. every 3 years) every 3 years not assessed procure specialised skills and capabilities for the high capacity public transport elements. specialised skills and capabilities will need to be procured for the high capacity public transport elements not assessed way to go way to go develop an ongoing benefit realisation plan through the way to go partnership. an ongoing benefit realisation plan is to be developed as part of the way to go partnership not assessed way to go way to go share programme costs between partners, indicatively nzta $182.4m, qldc $83.04m and orc $28.8m (for discussion). table 30 indicative recommended programme cost allocations not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2019-12-20",
    "cover": {
      "src": "/covers/QTS-026.webp",
      "srcset": "/covers/QTS-026.webp 400w, /covers/QTS-026-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-026/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-026/QTS-026-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-027",
    "code": "QTS-027",
    "title": "Te Kirikiri / Frankton Masterplan",
    "shortTitle": "Te Kirikiri / Frankton Masterplan",
    "summary": "Boffa Miskell's Te Kirikiri / Frankton Masterplan for QLDC (Revision 3, 31 January 2020) sets a 30-year vision and spatial framework to 2048 for Frankton. It was developed by the Way to Go partnership (QLDC, NZ Transport Agency (Waka Kotahi), ORC) alongside the Frankton Integrated Transport Programme Business Case, with two rounds of public engagement. It defines six Masterplan outcomes and eleven key features. These include a Frankton Flats-Lake Link, an SH6 50 km/h urban arterial, an orbital public transport service, transport-oriented development around high capacity PT, a PT interchange and Emergency Precinct at the Frankton Golf Centre site, and a Shotover Delta eco park and district park. Precinct plans cover Quail Rise, Five Mile, Remarkables Park, Frankton Village/QEC, Kimiākau/Shotover Delta and the Airport/Ōterotu. Phasing is 0-5, 5-15 and 15-30 years, and an action plan schedule assigns about 59 actions to Way to Go, QLDC units, QAC, private parties and others. It states that high-capacity PT options including trackless trams, double decker buses and mass rapid transit were being investigated, without choosing a mode.",
    "documentType": "Masterplan",
    "documentForm": "Masterplan with action plan schedule",
    "year": 2020,
    "publishedDate": "2020-01-31",
    "documentStatus": "Final",
    "geographicScope": "Te Kirikiri / Frankton; Frankton Flats; Five Mile; Remarkables Park; Quail Rise; Kimiākau / Shotover Delta; SH6 and SH6A; Queenstown Airport",
    "owner": "QLDC",
    "citation": "QLDC. Te Kirikiri / Frankton Masterplan (2020). Boffa Miskell file ref C18141_009.",
    "featured": true,
    "featuredOrder": 1,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/33wkqu1f/5a-8-oct-2020-att-a-frankton-masterplan.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/33wkqu1f/5a-8-oct-2020-att-a-frankton-masterplan.pdf"
    ],
    "documentTypeCode": "masterplan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "roads",
      "coach"
    ],
    "organisationIds": [
      "qldc",
      "boffa-miskell",
      "nzta",
      "orc",
      "way-to-go-partnership",
      "central-government-ministers",
      "queenstown-airport-corporation"
    ],
    "searchText": "qts-027 te kirikiri / frankton masterplan te kirikiri / frankton masterplan boffa miskell's te kirikiri / frankton masterplan for qldc (revision 3, 31 january 2020) sets a 30-year vision and spatial framework to 2048 for frankton. it was developed by the way to go partnership (qldc, nz transport agency (waka kotahi), orc) alongside the frankton integrated transport programme business case, with two rounds of public engagement. it defines six masterplan outcomes and eleven key features. these include a frankton flats-lake link, an sh6 50 km/h urban arterial, an orbital public transport service, transport-oriented development around high capacity pt, a pt interchange and emergency precinct at the frankton golf centre site, and a shotover delta eco park and district park. precinct plans cover quail rise, five mile, remarkables park, frankton village/qec, kimiākau/shotover delta and the airport/ōterotu. phasing is 0-5, 5-15 and 15-30 years, and an action plan schedule assigns about 59 actions to way to go, qldc units, qac, private parties and others. it states that high-capacity pt options including trackless trams, double decker buses and mass rapid transit were being investigated, without choosing a mode. context and purpose: the masterplan was prepared by boffa miskell for qldc (rev 3, 31 january 2020; cover marked 'attachment a') (p.1-2). in late 2018 the way to go partnership of qldc, nzta and orc decided to plan frankton as a whole. building on the september 2018 'your place, your plan' engagement, it began the masterplan and the integrated transport programme business case (itpbc) as an integrated process (p.4-5). engagement included april 2019 q&a sessions, market stalls and an online survey, and two rounds of public engagement (p.4). framework: the vision is 'te kirikiri/frankton, where our pathways, the lake and the rivers meet' (p.3). the document sets design and planning principles (p.6) and six outcomes: water's edge, gateway, local network, integrated urban centres, harmony with nature and inclusive neighbourhoods (p.7). eleven key features follow (p.8). they include a frankton flats-wakatipu lake link and an sh6 50 km/h urban arterial. they also include a high-frequency orbital pt loop, matching high capacity pt corridors with intensive land use such as northern glenda drive, and integrating the airport with pt while investigating relocation of lakes district hospital. further features are a transport interchange and emergency precinct at frankton golf centre, a frankton gardens legacy project, a kimiākau zero waste community eco park, and relocation of rural infrastructure (p.8). transport: the itpbc objectives include mode shift to walking and cycling, safety, reduced severance and congestion, and better pt coverage and frequency (p.44). proposed interventions include a separated active travel network, sh6 crossings, an orbital public transport service, pt river crossings if demand warrants, a freight route and a pt, regional and tourist coach hub near the airport (p.44). no park and ride is proposed with the interchange (p.45). precincts and implementation: precinct sections cover quail rise, five mile, remarkables park, frankton village/qec, kimiākau/shotover delta and queenstown airport/ōterotu (p.46-59). phasing groups actions into 0-5, 5-15 and 15-30 years, with orbital bus, coach hub and active mode bridges brought forward to the short term (p.60-61). the action plan schedule (p.62-66) lists about 59 actions with timeframes and responsibilities. way to go, qldc units, queenstown airport corporation, remarkables park ltd, aurora, the ministry of education and southern dhb are among the parties. an appendix summarises engagement themes and qldc responses. it also lists assumptions, including that the airport remains and that the crosswind runway might be removed (p.67-68). mass rapid transit: the masterplan states that 'high-capacity public transport options are currently being investigated and include, but are not limited to, trackless trams, double decker buses and gondolas' to improve access within frankton, 'to queenstown and across the wakatipu basin' (p.44). it says the form of transport-oriented development depends on the chosen pt solution and 'needs to be identified early' (p.44). it also notes 'several public transport modes are being considered including high capacity buses, trackless trams and gondolas' (p.45). no mode is selected; detail is deferred to the itpbc and other business cases (p.44). separately, maps and the remarkables park actions show private 'gondola lines / base station', including connections to the remarkables ski area (p.56, p.63-64). masterplan with action plan schedule qldc. te kirikiri / frankton masterplan (2020). boffa miskell file ref c18141_009. te kirikiri / frankton; frankton flats; five mile; remarkables park; quail rise; kimiākau / shotover delta; sh6 and sh6a; queenstown airport revision 3 (cover: 'attachment a', january 2020) high-capacity public transport is under investigation, including mass rapid transit, with the mode choice deferred to business cases. double-decker buses in the same list are not mass rapid transit. a private ski-field cableway is mapped and is not a mass rapid transit proposal. the masterplan identifies high capacity public transport as needed to support growth but does not select a mode. key interventions include: 'high-capacity public transport options are currently being investigated and include, but are not limited to, trackless trams, double decker buses and gondolas to improve access within te kirikiri/frankton, to queenstown and across the wakatipu basin' (p.44). on land use it notes that 'a higher capacity and/or more rapid transport solution may have fewer / distant stops and thus a more nodal-based development. the chosen approach needs to be identified early' (p.44). the hcpt section states that 'several public transport modes are being considered including high capacity buses, trackless trams and gondolas', with a business case to determine the preferred mode (p.45). it also says 'a diversified approach to high capacity public transport could be provided using both land and water-based services' (p.45). detailed transport information is deferred to the frankton itpbc (p.44). separate references to 'gondola lines / base station (private)' and remarkables park actions concern a private mass rapid transit to destinations including the remarkables ski area (p.56, p.63-64). \"high-capacity public transport options are currently being investigated and include, but are not limited to, trackless trams, double decker buses and gondolas to improve access within te kirikiri/frankton, to queenstown and across the wakatipu basin.\" (p.44) | \"a higher capacity and/or more rapid transport solution may have fewer / distant stops and thus a more nodal-based development. the chosen approach needs to be identified early\" (p.44) | \"currently, several public transport modes are being considered including high capacity buses, trackless trams and gondolas.\" (p.45) | \"a diversified approach to high capacity public transport could be provided using both land and water-based services.\" (p.45) 30-year horizon to 2048; phases 0-5, 5-15 and 15-30 years (p.60) six masterplan outcomes (mpo1-mpo6) (p.7); eleven key features (p.8) about 59 actions in the action plan schedule (p.62-66) queenstown airport: over 60 businesses and 700 people; more than a third of arrivals to queenstown (p.68) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/33wkqu1f/5a-8-oct-2020-att-a-frankton-masterplan.pdf qldc passing masterplan final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. coach coach and visitor shuttle services. qldc qldc commissioned boffa miskell boffa miskell prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner tim church prepared by boffa miskell boffa miskell dhanesh amerasingam reviewed by boffa miskell boffa miskell structure plan: enable masterplan and precinct plans, covering infrastructure networks, community facilities, land use demand, open space, transport infrastructure and natural hazards. development of a structure plan to enable the implementation of the masterplan high priority / short term (0-5 yrs) not assessed qldc qldc complete detailed business cases for grant rd-kawarau falls, sh6 frankton-ladies mile to shotover bridge, frankton flats active travel and the wakatipu basin pt network. completion of the detailed business cases... pt network across the wakatipu basin high priority / short term (0-5 yrs) not assessed way to go way to go orbital bus route linking urban centres and key destinations around the masterplan area, with a short-term trial. orbital bus enabling accessible and efficient movement high priority / short term (0-5 yrs) not assessed way to go way to go kāi tahu design strategy applying kāi tahu values and narrative to design and implementation of masterplan actions. develop a strategy to apply kāi tahu values high priority / short term (0-5 yrs) not assessed qldc qldc prepare and implement parks and reserves development and management plans to create an open space network. preparation and implementation of development and management plans for parks and reserves high priority / short term (0-5 yrs) not assessed qldc qldc develop a monitoring strategy and review processes for masterplan implementation. development of a monitoring strategy short term (0-5 yrs) not assessed way to go way to go develop frankton-specific residential design guidelines. development of frankton specific design guidelines short term (0-5 yrs) not assessed qldc qldc sustainable movement options: step-change to public transport and active travel, advanced transport infrastructure for intensifying land uses, and micro transport. step-change towards greater use of public transport and active travel short term (0-5 yrs) not assessed active travel network: walking and cycling trails with bridge crossings and controlled intersections. walking and cycling trails on and off road short term (0-5 yrs) not assessed way to go way to go native revegetation along esplanade reserves and strips of rivers and lake. removing weed species and carrying out native revegetation short term (0-5 yrs) not assessed qldc qldc transitional provision for local material sourcing and storage to reduce freight movements. transitional provision for local contractors to source and store local materials short term (0-5 yrs) not assessed qldc qldc infrastructure innovation, efficiency and intensification review, including smart technology and alternative energy, with infrastructure providers. investigating the potential for the integration of smart technology short term (0-5 yrs) not assessed qldc qldc integrate water sensitive design best practice into infrastructure codes. review of infrastructure code of compliance short term (0-5 yrs) not assessed qldc qldc transmission line relocation from frankton flats to increase development potential near high capacity pt routes. greater development potential closer to high capactiy public transport routes medium term (5-15 yrs) not assessed strategic land purchase review of sites for acquisition to enable key moves. review of potential sites for acquisition high priority / short term (0-5 yrs) not assessed way to go way to go sustainability and resilience strategy and programme of work. development of a strategy and programme of work short term (0-5 yrs) not assessed qldc qldc develop public realm design guidelines for streets and spaces. development of public realm design guidelines short term (0-5 yrs) not assessed qldc qldc placemaking strategy delivering transitional and demonstration projects and events. development of a programme that focuses on creating a unique sense of place short term (0-5 yrs) not assessed qldc qldc quail rise precinct plan: gateway, active travel bridge and routes, infrastructure cluster, wetlands and medium density infill. a plan developed with key stakeholders that further investigates a higher amenity short term (0-5 yrs) not assessed qldc qldc quail rise infill housing: medium density infill on larger sites near the five mile urban corridor. opportunity for medium density infill housing long term (15-30 yrs) not assessed qldc qldc wakatipu high school buildings expansion, supported by high capacity pt and the active travel network; consider a second high school outside the area. supported by high capacity public transport and active travel network short term (0-5 yrs) not assessed central government / ministers central government / ministers remarkables place: extend market street corridor towards quayside; hotels, conference centre and private gondola connections to destinations incl. remarkables ski area. gondola connections to destinations beyond the masterplan area, including the remarkables ski area short term (0-5 yrs) not assessed remarkables park masterplan: align proposed mass rapid transit and quayside jet boat ferry with wider network; active travel bridge keeping potential for a segregated pt bridge. aligning the proposed gondola and quayside jet boat ferry services with the wider transport network short term (0-5 yrs) not assessed redevelop the zoological gardens into te kirikiri/frankton gardens. redevelop the zoological gardens into a high amenity frankton gardens medium term (5-15 yrs) not assessed qldc qldc future residential infill south of frankton urban area west of remarkables park. increasing density in the existing neighbourhood long term (15-30 yrs) not assessed qldc qldc five mile corridor precinct plan: slower speeds, crossings, pt and tods at key nodes, retail, substation/transmission relocation, glenda drive north regeneration, freight link. urban form relationships, including tods at key nodes high priority / short term (0-5 yrs) not assessed way to go way to go hawthorne drive commercial developments supporting centres and public transport. commercial developments lining hawthorne drive short term (0-5 yrs) not assessed five mile shopping centre and queenstown central eastern extension into sh6 setback. extend small to medium retail and mixed use development short term (0-5 yrs) not assessed consolidate industrial activities within the airport noise contours, segregated from intensive uses. industrial activities to be consolidated within the airport noise contours short term (0-5 yrs) not assessed qldc qldc five mile urban corridor: slower speed urban arterial on frankton-ladies mile sh6 (depends on high capacity pt). changing to a slower speed urban arterial along the frankton-ladies mile stretch of sh6 short term (0-5 yrs) not assessed way to go way to go relocate the glenda drive resource recovery centre to the kimiākau community eco park. decommission of the current resource recovery centre on glenda drive short term (0-5 yrs) not assessed qldc qldc mixed use transition zone between industrial and commercial/residential areas. a band of mixed-use land manage the interface medium term (5-15 yrs) not assessed qldc qldc glenda drive north regeneration for residential living near high capacity pt corridors. strengthening the relationship between high capacity public transport corridors and more intensive land use long term (15-30 yrs) not assessed qldc qldc qec masterplan and implementation: expand recreational and community facilities with frankton golf course relocation. expand and intensify recreational and community facilities high priority / short term (0-5 yrs) not assessed qldc qldc frankton beach / domain enhancement as a high-quality informal recreation destination. enhancement of frankton beach and domain short term (0-5 yrs) not assessed qldc qldc community hub building with co-working space for not-for-profits; investigate entertainment venue. community facilities building in a central and easily accessible location short term (0-5 yrs) not assessed qldc qldc frankton campground redevelopment and stewart st extension for an active travel link. redevelopment of the frankton campground short term (0-5 yrs) not assessed qldc qldc frankton village precinct plan: golf course relocation, transport interchange with civic space and tod, qec, emergency precinct, lake links. provision of a transport interchange with associate civic space; tod short term (0-5 yrs) not assessed way to go way to go arranmore/mcbride farm heritage precinct through adaptive reuse of heritage buildings. adaptive reuse of heritage buildings short term (0-5 yrs) not assessed qldc qldc public transport interchange within/adjacent to the qec masterplan area (depends on high capacity pt). dependencies:... high capacity public transport short term (0-5 yrs) not assessed way to go way to go potential arrow water race trail to frankton marina with signalised sh6 crossing. active travel route linking existing trails medium term (5-15 yrs) not assessed way to go way to go emergency precinct relocating emergency services adjacent to qac and masterplan area. relocating emergency services medium term (5-15 yrs) not assessed way to go way to go frankton village redevelopment and extension to support community, transport interchange and frankton beach. redeveloping and extending frankton village medium term (5-15 yrs) not assessed qldc qldc kimiākau / shotover delta precinct plan: gateway, district park, wetlands, active travel, potential golf course relocation. a plan developed with key stakeholders that further investigates the enhancement of the natural gateway high priority / short term (0-5 yrs) not assessed qldc qldc kimiākau community eco park (learning park, re-sell store, resource recovery, recycling, waste transfer). the zero waste eco park will comprise high priority / short term (0-5 yrs) not assessed qldc qldc frankton golf centre relocation adjacent to the kawarau river. potential relocation of golf course high priority / short term (0-5 yrs) not assessed qldc qldc decommission oxidation ponds and repurpose them as revegetated wetlands. repurpose remaining oxidation ponds short term (0-5 yrs) not assessed qldc qldc wastewater treatment plant expansion (continuation of project pure). continuation of project pure medium term (5-15 yrs) not assessed qldc qldc kimiākau / shotover delta district park for informal recreation. creation of a new district park medium term (5-15 yrs) not assessed qldc qldc ngā rauemi (resource harvesting) wetlands within the remediated delta. provision of wetlands for ngā rauemi medium term (5-15 yrs) not assessed crosswind runway removal to reduce noise contours and enable intensive land use. removal of the cross wind runway high priority / short term (0-5 yrs) not assessed qldc qldc qac masterplan and redevelopment: coordinate multi-modal connections to improve access to higher capacity pt. improve access to higher capacity public transport connections short term (0-5 yrs) not assessed qldc qldc ōterotu / kawarau falls heritage waterfront esplanade enhancement. enhance the esplanade reserve along ōterotu / kawarau falls short term (0-5 yrs) not assessed qldc qldc investigate long-term relocation options for lakes district hospital outside airport noise contours. investigate potential long term relocation options for lakes district hospital short term (0-5 yrs) not assessed ferry facilities at a proposed jetty at ōterotu / kawarau falls and quayside. facilities to support potential ferry services short term (0-5 yrs) not assessed way to go way to go regional coach and tourist hub near queenstown airport. a hub proposed within the vicinity of queenstown airport short term (0-5 yrs) not assessed qldc qldc queenstown airport and ōterotu / kawarau falls precinct plan: lake link, terminal connections, pt interchange, ferry, coach hub, hospital relocation. a plan developed with key stakeholders that further investigates the potential design integration short term (0-5 yrs) not assessed queenstown airport corporation qac lake link active travel bridge over sh6 (kawarau road) between frankton flats and lake wakatipu. an active travel bridge over sh6 medium term (5-15 yrs) not assessed way to go way to go humphreys road extension linking kawarau road and hawthorne drive via humphrey st. strengthen road connections between kawarau road and hawthorne drive medium term (5-15 yrs) not assessed way to go way to go main document pdf",
    "sortDate": "2020-01-31",
    "cover": {
      "src": "/covers/QTS-027.webp",
      "srcset": "/covers/QTS-027.webp 400w, /covers/QTS-027-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-027/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-027/QTS-027-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-028",
    "code": "QTS-028",
    "title": "Appendix B23 Technical Note 19: Scope Extension Beyond SH6/6A Intersection (with Appendix B24 Technical Note 40: Ladies Mile, Appendix B25 Queenstown Public Transport Network Options Multi Criteria Analysis, and Appendix B26 Technical Note 43: Frankton Pedestrian Crossings)",
    "shortTitle": "Appendix B23 Technical Note 19: Scope Extension",
    "summary": "This bundle contains four appendices to the 2020 NZUP Queenstown Detailed Business Case. TN19 (Final, 4 February 2020) recommends extending the Frankton to Queenstown SSBC scope to absorb the Grant Road to Kawarau Falls Bridge project for SH6 between the Kawarau Falls and Shotover bridges, with an extension to Ladies Mile. The reason given is that SH6A PT reliability depends on the Frankton Flats network, and PT must carry up to 60% of SH6A person trips by 2048. One scope item for the Frankton Bus Hub is to 'Determine options to incorporate future potential gondola station'. TN40 models SH6 Ladies Mile and Stalker Road bus lanes. TN43 assesses pedestrian and cycle crossing options at 11 SH6 Frankton locations. B25, 'Evidence for Queenstown PT Network Options MCA', is undated and unattributed. It sets out scoring scales and evidence for each criterion across Do Min, Bus Max, Trackless Tram, Trackless Tram Max, Mass rapid transit and the ferry option option networks. This includes modelled mode shares (mass rapid transit 10% at 2028, 15% at 2048) and mass rapid transit capex 'Information from Doppelmayr' ($134.83m Queenstown to Frankton). Mass rapid transit opex is $4.9m p.a. for Frankton to Queenstown. The pages state that mass rapid transit and the ferry option 'B options' were not yet modelled. No option scores appear on these pages.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical notes and MCA evidence tables",
    "year": 2020,
    "publishedDate": "2020-02-04",
    "documentStatus": "Final",
    "geographicScope": "Frankton Flats SH6 (Kawarau Falls Bridge to Shotover Bridge); Ladies Mile; SH6A Frankton Road; Frankton to Queenstown Town Centre",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B23 Technical Note 19: Scope Extension Beyond SH6/6A Intersection (with Appendix B24 Technical Note 40: Ladies Mile, Appendix B25 Queenstown Public Transport Network Options Multi Criteria Analysis, and Appendix B26 Technical Note 43: Frankton Pedestrian Crossings) (2020). NZTA Contract 2018235 - F2Q SSBC & QTC DBC; Technical Notes #19, #40, #43.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-028 appendix b23 technical note 19: scope extension beyond sh6/6a intersection (with appendix b24 technical note 40: ladies mile, appendix b25 queenstown public transport network options multi criteria analysis, and appendix b26 technical note 43: frankton pedestrian crossings) appendix b23 technical note 19: scope extension this bundle contains four appendices to the 2020 nzup queenstown detailed business case. tn19 (final, 4 february 2020) recommends extending the frankton to queenstown ssbc scope to absorb the grant road to kawarau falls bridge project for sh6 between the kawarau falls and shotover bridges, with an extension to ladies mile. the reason given is that sh6a pt reliability depends on the frankton flats network, and pt must carry up to 60% of sh6a person trips by 2048. one scope item for the frankton bus hub is to 'determine options to incorporate future potential gondola station'. tn40 models sh6 ladies mile and stalker road bus lanes. tn43 assesses pedestrian and cycle crossing options at 11 sh6 frankton locations. b25, 'evidence for queenstown pt network options mca', is undated and unattributed. it sets out scoring scales and evidence for each criterion across do min, bus max, trackless tram, trackless tram max, mass rapid transit and the ferry option option networks. this includes modelled mode shares (mass rapid transit 10% at 2028, 15% at 2048) and mass rapid transit capex 'information from doppelmayr' ($134.83m queenstown to frankton). mass rapid transit opex is $4.9m p.a. for frankton to queenstown. the pages state that mass rapid transit and the ferry option 'b options' were not yet modelled. no option scores appear on these pages. context and purpose: this pdf bundles appendices b23 to b26 of the queenstown transport business case (nzta contract 2018235). author names are redacted under s 9(2)(a). sign-off roles are project manager, principal transportation engineer and project design/integration manager (p.8). b23 tn19 (pp.2-8) updates a 5 november 2019 draft. combined f2q and qtc work indicated that 'a high proportion of person trips along sh6a must be by public transport in future years (up to 60% by 2048)' (p.2). pt level of service on sh6a depends on the sh6 links in frankton flats (pp.3-4). tn19 therefore recommends absorbing the grant road to kawarau falls bridge (gr2kfb) dbc elements for sh6 between the two bridges, plus ladies mile westbound, into the f2q ssbc (p.8). a scope table (pp.5-7) flags items as in, part, extend or out. for the frankton bus hub the extend items include location, capacity, private coaches and 'determine options to incorporate future potential gondola station' (p.5). tn19 notes the nzup $90m queenstown package (sh6a corridor, ladies mile, frankton bus hub, sh6 grant road to kawarau falls). it records that workshop 5 (18 march 2020) is a hold point and that nzup elements may be split out for early delivery (pp.7-8). b24 tn40 (pp.10-26, final 14 october 2020) uses vissim modelling of a westbound sh6 ladies mile bus lane and a stalker road bus lane. significant am inbound savings are reported, for example alec robins road to shotover bridge bus time at 2028 am falls from 2069s to 925s (p.26). the stalker road lane has little benefit but should be monitored. further inbound bus lanes may be needed by 2048 (p.26). b25 pt network options mca evidence (pp.27-36) sets low/medium/high scales and evidence for each criterion. the criteria are mode shift, fit for future, resilience (network events, natural hazards), reliability, journey time, vision zero, modal integration, operational flexibility, resident/visitor experience, capex, opex, urban design, environmental, access, construction impacts and masterplan alignment. modelled am-peak westbound sh6a pt mode shares are: do-min 18% (2028) and 27% (2048); bus max 32%/47%; trackless tram 31%/44%; trackless tram max 33%/51%; mass rapid transit 10%/15%, plus bus 21%/28%; ferry option 8%/10%, plus bus 18%/30% (p.28). capex evidence: bus max $110m excluding vehicles; trackless tram $212.3m (do min) and $312.3m (do max); mass rapid transit doppelmayr information $134.83m (q-f), plus $122.48m (f-ladies mile), 'totalling $257.31 + $2 million for travellator'; 'gondola b = $134.83 million f2q + $10 million for airport trench'; 'gondola a = $284.6 million'; ferry a $51m (p.33). opex: bus max $12.8m p.a.; trackless tram $11.6m; mass rapid transit $18.8m including $10.2m connecting bus; ferry $36.2m (p.34). mass rapid transit journey time is 22 minutes at 18 km/h versus 16 for car (p.31). the page shows no option scores. b26 tn43 (pp.38-50, final 30 september 2020) recommends a crossing type at each of 11 sh6 locations for option a (roundabouts) and option b (conventional intersections). examples are a zebra at ross street, an underpass east of sh6/6a and an overpass at hardware lane (option a). mass rapid transit: tn19 scopes options to incorporate a 'future potential gondola station' at the frankton bus hub (p.5). b25 assesses a mass rapid transit network option across all mca criteria. its points include: mass rapid transit unaffected by road congestion; less susceptible to low-probability, high-impact natural hazards (p.30); among the options 'most likely to provide close to 100% reliable travel times' (p.31); 'ppp potential – best option for private sector participation' (p.33); 'unparalleled town centre arrival experience' (p.36). against this, it has the slowest journey time (p.31), worst connections pending 'b options' (p.31), visual and onl impacts (pp.32, 35), and low modelled mode share. the evidence pages caution that 'b options for gondola & ferry not yet modelled' and 'models tend to underpredict connective networks' (p.28). the mass rapid transit capex figures are sourced only to 'information from doppelmayr', and the $257.31m + $2m and $284.6m totals are not reconciled. technical notes and mca evidence tables nzta (waka kotahi). appendix b23 technical note 19: scope extension beyond sh6/6a intersection (with appendix b24 technical note 40: ladies mile, appendix b25 queenstown public transport network options multi criteria analysis, and appendix b26 technical note 43: frankton pedestrian crossings) (2020). nzta contract 2018235 - f2q ssbc & qtc dbc; technical notes #19, #40, #43. frankton flats sh6 (kawarau falls bridge to shotover bridge); ladies mile; sh6a frankton road; frankton to queenstown town centre tn19 final (4 february 2020); tn40 final (14 october 2020); tn43 final (30 september 2020); b25 undated, no status assesses a mass rapid transit network as a multi-criteria option, with supplier-sourced costs; notes some variants were unmodelled; scopes a future mass rapid transit station at the frankton hub. the ferry option in the same assessment is not mass rapid transit. tn19 lists, under the frankton bus hub, the extended-scope task 'determine options to incorporate future potential gondola station' (p.5). b25 'evidence for queenstown pt network options mca' covers mass rapid transit alongside bus, trackless tram and ferry networks. modelled mass rapid transit mode share is 10% at 2028 and 15% at 2048, with a larger bus share. the document cautions: 'b options for gondola & ferry not yet modelled. models tend to underpredict connective networks & favour one-seat ride networks' (p.28). the mass rapid transit is 'unimpacted by road congestion' and 'less susceptible' to slips, flooding and seismic events (pp.29-30). mass rapid transit and trackless tram max are 'most likely to provide close to 100% reliable travel times' (p.31). the mass rapid transit is the 'slowest option at 22 minutes, due to its 18km/h speed' (p.31). capex: 'information from doppelmayr has costs of $134.83 million for queenstown to frankton and an additional $122.48 m for frankton to ladies mile'; 'gondola a = $284.6 million' (p.33). opex: $4.9m p.a. frankton to queenstown, $18.8m p.a. in total with the connecting bus network (p.34). the mass rapid transit 'has ppp potential – best option for private sector participation' (p.33) and 'creates an unparalleled town centre arrival experience' (p.36). negatives recorded are privacy, breaking the queenstown hill onl, and visual impact (pp.32, 35). \"note: b options for gondola & ferry not yet modelled. models tend to underpredict connective networks & favour one-seat ride networks (cf. panmure in auckland).\" (p.28) | \"gondola & trackless tram max the options most likely to provide close to 100% reliable travel times.\" (p.31) | \"ferry and gondola have high terminal and landside infrastructure construction costs, but gondola has ppp potential – best option for private sector participation.\" (p.33) | \"gondola: information from doppelmayr has costs of $134.83 million for queenstown to frankton and an additional $122.48 m for frankton to ladies mile, totalling $257.31 + $2 million for travellator.\" (p.33) | \"gondola creates an unparalleled town centre arrival experience and reduces the number of buses needed in the town centre but significant mode shift needed to maximise these benefits through reducing traffic.\" (p.36) | \"determine options to incorporate future potential gondola station\" (p.5) pt share of sh6a person trips needed up to 60% by 2048 (p.2) nzup queenstown package $90m (p.7) modelled pt mode share 2028/2048: do-min 18%/27%; bus max 32%/47%; trackless tram 31%/44%; trackless tram max 33%/51%; gondola 10%/15%; mrt ferry 8%/10% (p.28) gondola capex $134.83m queenstown-frankton + $122.48m frankton-ladies mile = $257.31m + $2m travellator, 'information from doppelmayr' (p.33) gondola b = $134.83m + $10m airport trench; gondola a = $284.6m (p.33) bus max capex $110m excl. vehicles; 44 double-decker e-buses $35.2m (p.33) trackless tram total $212.3m (do min) / $312.3m (do max) (p.33) ferry a $51m capex (p.33); ferry opex $36.2m p.a. (p.34) opex p.a.: bus max $12.8m; trackless tram $11.6m; gondola $4.9m f2q + $3.7m wider + $10.2m bus = $18.8m (p.34) end-to-end time bp roundabout to town centre: gondola 22 min (18 km/h) vs car 16 min (p.31) 2028 am bus time alec robins rd to shotover bridge 2069s dm vs 925s nzup (p.26) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner marie verschuer contributor expand f2q ssbc scope to incorporate gr2kfb elements for sh6 between the kawarau falls and shotover bridges, with an extension to ladies mile. this technical note recommends and expansion to the f2q ssbc scope within programme to draft business case 26 june 2020 not assessed nzta waka kotahi nzta re-assess frankton bus hub location, capacity, use, access, internal layout and private coach needs. re-assess location... re-assess capacity... consider requirements for private coaches extend not assessed determine options to incorporate a future potential mass rapid transit station at the frankton bus hub. determine options to incorporate future potential gondola station extend not assessed develop sh6 intersection layouts and bus priority options at grant road and hawthorne drive, and determine the sh6 corridor layout to shotover bridge (bus v hov lanes). develop intersection design layouts... consider bus v hov lanes extend not assessed prepare a higher-level network control strategy for the frankton network. provide higher level network control strategy not assessed integrate ladies mile hif and rti designs, future-proof for ladies mile park and ride and howards drive, and analyse how to achieve and monitor ladies mile mode share targets. analysis of ladies mile hif mode share targets as determined by the nzta board august 2018 not assessed if needed for nzup, split assessment and reporting of nzup elements for early delivery after the workshop 5 hold point. it may be necessary to split the further assessment and reporting of the nzup elements after workshop 5 (18 march 2020) not assessed monitor the need for a stalker road northbound bus lane as frankton network demand grows. the need for such a scheme should be monitored towards 2028 and beyond not assessed consider extending sh6 inbound bus lanes to prevent buses being delayed by queues in the 2048 pm peak. extension of sh6 inbound bus lanes may be required by 2048 not assessed adopt recommended pedestrian/cycle crossing types at 11 sh6 frankton locations, e.g. ross st zebra, underpass east of sh6/6a, hardware lane overpass (option a). recommended solution for this option not assessed main document pdf",
    "sortDate": "2020-02-04",
    "cover": {
      "src": "/covers/QTS-028.webp",
      "srcset": "/covers/QTS-028.webp 400w, /covers/QTS-028-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-028/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-028/QTS-028-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-029",
    "code": "QTS-029",
    "title": "Appendix C10 Technical Note 22: Travel Demand Management (Update: Queenstown Travel Demand Management Scoping), with Technical Note 11 and the Queenstown TDM Scoping Study",
    "shortTitle": "Appendix C10 Technical Note 22: Travel Demand",
    "summary": "Appendix C10 of the NZUP Queenstown Transport Business Case bundles three documents. The first is Technical Note 22 (20 February 2020), a memo to the Way to Go Board. The second is Technical Note 11 (18 September 2019), which summarises the TDM programme. The third is the WSP Opus Queenstown Travel Demand Management Scoping Study (Final, 29 August 2019), commissioned by NZTA (Waka Kotahi) in June 2019 under the Way to Go banner. The study recommends a TDM programme with four areas: policy; travel planning and behaviour change; wayfinding; and setting up a Transport Management Association (TMA). It costs the programme at about $1.3M-$1.9M in year one, excluding infrastructure. TN11 links the programme to the mode share the business cases need: 40% alternative mode share by 2028 and 60% by 2048, against 4-5% in 2018. TN22 records that the study 'has not progressed' for three reasons. The anticipated NZ Transport Agency TDM Contestable Fund 'did not eventuate'. A councillor had raised concerns before the October 2019 elections. And the Way to Go approval process had not been followed, so the report could not be released. TN22 proposes Board engagement, confirmation of owners and funding, a check against 'Keeping Cities Moving', and an update to the Chamber of Commerce, which was pressing ahead with a TMA.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical note bundle with scoping study",
    "year": 2020,
    "publishedDate": "2020-02-20",
    "documentStatus": "Final",
    "geographicScope": "Queenstown; Wakatipu Basin; Frankton to Queenstown (SH6A); Queenstown Town Centre",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C10 Technical Note 22: Travel Demand Management (Update: Queenstown Travel Demand Management Scoping), with Technical Note 11 and the Queenstown TDM Scoping Study (2020). NZTA Contract 2018235 - F2Q SSBC & QTC DBC, Technical Note #22; Technical Note #11; WSP Opus ref 1-C1960.00.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "park-and-ride",
      "parking",
      "demand-management",
      "freight"
    ],
    "organisationIds": [
      "nzta",
      "stantec",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "chamber-of-commerce",
      "dunedin-city-council",
      "destination-queenstown",
      "central-government-ministers"
    ],
    "searchText": "qts-029 appendix c10 technical note 22: travel demand management (update: queenstown travel demand management scoping), with technical note 11 and the queenstown tdm scoping study appendix c10 technical note 22: travel demand appendix c10 of the nzup queenstown transport business case bundles three documents. the first is technical note 22 (20 february 2020), a memo to the way to go board. the second is technical note 11 (18 september 2019), which summarises the tdm programme. the third is the wsp opus queenstown travel demand management scoping study (final, 29 august 2019), commissioned by nzta (waka kotahi) in june 2019 under the way to go banner. the study recommends a tdm programme with four areas: policy; travel planning and behaviour change; wayfinding; and setting up a transport management association (tma). it costs the programme at about $1.3m-$1.9m in year one, excluding infrastructure. tn11 links the programme to the mode share the business cases need: 40% alternative mode share by 2028 and 60% by 2048, against 4-5% in 2018. tn22 records that the study 'has not progressed' for three reasons. the anticipated nz transport agency tdm contestable fund 'did not eventuate'. a councillor had raised concerns before the october 2019 elections. and the way to go approval process had not been followed, so the report could not be released. tn22 proposes board engagement, confirmation of owners and funding, a check against 'keeping cities moving', and an update to the chamber of commerce, which was pressing ahead with a tma. context and purpose: tn22 (pp.2-3) is a memo to the way to go board from the nzta contract 2018235 team (f2q ssbc and qtc dbc). the preparer, a wsp technical director (transport) and tdm specialist, is redacted. it updates the board on the queenstown tdm scoping study, which nzta commissioned in june 2019 as one of a series of 'rapid targeted interventions' complementing the f2q and qtc business cases (p.2). attached are the study's executive summary (pp.4-8), tn11 with the tdm programme table (pp.9-15) and the full study (pp.16-154). status of the study: tn22 says the study was finalised in august 2019 'but it has not progressed for three main reasons'. first, 'the anticipated nz transport agency tdm contestable fund did not eventuate and so the way to go team were not able to pitch for funding for the proposed programme' (p.2). second, a councillor had raised concerns with the agency before the october 2019 elections. third, the board advised that the correct way to go approval process had not been followed, so the report could not be released (p.3). tn22 calls tdm 'critical to the success' of the two business cases (p.3). in the august 2019 workshop minutes, the agency's own next steps were to 'establish the tdm contestable fund (pending)' and 'complete mode shift plan for queenstown' (p.104). tn11: tn11 sets out the gap the tdm programme is meant to close. business case modelling requires a significant alternative mode share in the peak (40% by 2028, 60% by 2048), against 4-5% in 2018. the future pt model predicts pt mode share of 30% by 2028 and 42% by 2048, 'which still leaves a gap' (p.9). it states that 70% of frankton-queenstown trips are through traffic, and that sh6a is expected to exceed its theoretical capacity of 28,500 vehicles per day 'as early as 2020' (p.10). it notes 'road pricing may also be considered in the long term' (p.10). scoping study method: a review of related projects and the local context, structured interviews with 15 stakeholders, two stakeholder workshops (4 july and 6 august 2019; pp.85-105), and international resort-town case studies such as zermatt, breckenridge and park city (appendix e). the programme (table 7-1; appendix a pp.12-15) has four parts: - policy: sustainable transport vision, car-free tourism, mobility co-ops, car-share policy, park and ride study, travel plan and development requirements, parking charges, freight management, car-free town centre, airport access study, self-drive permit study. - travel planning and behaviour change: school and community travel plans, cycle training, awards and gamification. - wayfinding: an audit and design guide, and accessible routes. - a tma (a member-controlled not-for-profit incorporated society): set-up, business and funding plans, programmes such as guaranteed ride home, luggage logistics, a journey planning app, bike share and ridesharing, data gap work, information, and advocacy. most items are assigned to qldc or the tma, with roles for nzta, orc, dq, mbie and others. costs: $1.3m-$1.9m in year one (the table prints '$1.2k $1.9k'), $539k-$813k in year two and $434k-$589k in year three, excluding infrastructure (p.62). tma running costs are $327k-$403k a year, plus $200k-$250k for the business and funding plans (p.62). the funding section expected nzta to establish 'a multi-million contestable fund for tdm' that the tma should qualify for (p.66). it also lists other potential sources: the provincial growth fund, eeca, a bed tax or the international visitor conservation and tourism levy, ringfenced parking revenue, membership fees and grants (pp.66-67). next steps: gain way to go partner approval, secure funding, assign ownership and establish an interim tma working group (p.68). interim working group members are listed (p.113). mass rapid transit: the bundle contains nothing on mrt or offline pt between frankton and the town centre. 'the gondola' appears only as a tourist destination (the existing skyline gondola) for which travel plans should be advocated (wbs 1.13.1, p.12). technical note bundle with scoping study nzta (waka kotahi). appendix c10 technical note 22: travel demand management (update: queenstown travel demand management scoping), with technical note 11 and the queenstown tdm scoping study (2020). nzta contract 2018235 - f2q ssbc & qtc dbc, technical note #22; technical note #11; wsp opus ref 1-c1960.00. queenstown; wakatipu basin; frankton to queenstown (sh6a); queenstown town centre tn22 memo (20 feb 2020); tn11 (18 sep 2019); tdm scoping study final (rev 7, 29 aug 2019) no mrt content; tdm programme presented as complementary to the on-road business cases tdm programme indicative cost $1.3m-$1.9m year 1; $539k-$813k year 2; $434k-$589k year 3, excluding infrastructure (p.62) tma operating cost $327k-$403k per year; business plan and funding plan $200k-$250k (p.62) required alternative mode share 40% by 2028 and 60% by 2048; 2018 alternative mode share 4-5%; modelled pt mode share 30% (2028) and 42% (2048) (p.9) 70% of frankton-queenstown trips are through traffic; sh6a theoretical capacity 28,500 vpd expected to be exceeded as early as 2020 (p.10) peak season ratio 34:1 visitors to residents (p.5) 15 stakeholders interviewed (p.2) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. travel demand travel demand management, pricing and time-of-use charging. freight freight and loading. nzta waka kotahi nzta commissioned nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta recipient orc orc recipient qldc qldc recipient way to go way to go recipient alix newman contributor andrew wilson contributor orc orc gabrielle tabron contributor qldc qldc james llewellyn contributor nzta waka kotahi nzta jo brown contributor chamber of commerce chamber of commerce julian philips contributor orc orc lorraine houston contributor nzta waka kotahi nzta nick sargent contributor dunedin city council dunedin city council peter harris contributor qldc qldc tony park contributor qldc qldc tony pickard contributor qldc qldc tony sizemore contributor nzta waka kotahi nzta tdm programme item 1.1.1: develop a sustainable transport vision for queenstown wbs 1.1.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.1.2: car-free tourism policy initiative wbs 1.1.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 1.1.3: research and blueprint for mobility co-operatives in outlying areas (e.g. arrowtown, lake hayes) wbs 1.1.3, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 1.1.4: car-share policy wbs 1.1.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.2: park and ride study wbs 1.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.3: require travel plans for new developments, large employers and significant trip generators wbs 1.3, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.4: require new developments to provide infrastructure that supports sustainable transport wbs 1.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.5: require travel plans for events as part of consent / traffic impact assessments wbs 1.5, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.6: charge for parking that is currently free or cheap wbs 1.6, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.7: prepare a freight management plan wbs 1.7, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.8: tdm for emergencies (weather, crashes, natural disasters) wbs 1.8, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 1.9: car-free town centre and residential areas wbs 1.9, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.10: promote queenstown as a sustainable tourism destination (as options become available) wbs 1.10, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed destination queenstown destination queenstown tdm programme item 1.11: queenstown airport access study and travel plan wbs 1.11, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.12: understand current levels of service for walking and cycling wbs 1.12, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 1.13.1: advocate for travel plans for tourist destinations, e.g. routeburn track, milford sound, arrowtown, wanaka, ski resorts, the gondola wbs 1.13.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 1.13.2: self-drive permit study (to protect sensitive areas) wbs 1.13.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 2.1: continue and enhance the school travel plan programme wbs 2.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 2.2: cycle/scooter training for adults and children wbs 2.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 2.3: community travel plans (e.g. lake hayes, shotover, jacks point) wbs 2.3, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 2.4: awards / rating scheme for mode shift (e.g. cycle-friendly employer or destination) wbs 2.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 2.5: gamify mode shift within travel plans for residents and tourists wbs 2.5, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 3.1: wayfinding and information provision audit and design guide (pt, destinations, facilities, routes, parking) wbs 3.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed nzta waka kotahi nzta tdm programme item 3.2: map smooth walking/wheeling routes and ccs disability action links wbs 3.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 4.1: set up the tma: establish mission, values, brand, incorporated society and board; write business plan and funding plan; set membership fees; establish revenue sources; recruit staff wbs 4.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.2: tma action plan: communication plan, website and promotional material, fund raising, coordinated submissions on projects and policies wbs 4.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.1: guaranteed ride home scheme wbs 4.3.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.2: luggage logistics action plan wbs 4.3.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.3: journey planning app / travel amalgamator wbs 4.3.3, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.4: set up bike share / e-bike share connecting key destinations and hotels wbs 4.3.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed qldc qldc tdm programme item 4.3.5: dynamic ridesharing / carpooling wbs 4.3.5, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.6: mobility lab (based on arlington, virginia) wbs 4.3.6, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.3.7: identify sustainable transport workforce deficits and establish training programmes (e.g. bicycle technicians, bus driver workforce planning) wbs 4.3.7, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.4: document data gaps: data sharing with members, inventory of bus and shuttle services, events register, data gap analysis, register of transport jobs wbs 4.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.5: better information provision: car-free travel information on tma website; marketing of car-free holidays wbs 4.5, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed destination queenstown destination queenstown tdm programme item 4.6.1: advocate for enhanced public transport service to the airport wbs 4.6.1, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.2: advocate for bus timetable/route changes to meet user needs wbs 4.6.2, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.3: gain commitment from businesses to develop travel plans through the tma wbs 4.6.3, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.4: advocate for high-quality branded (iconic) bus stops wbs 4.6.4, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.5: advocate for bike technicians and others in the immigration nz skills shortage visa category wbs 4.6.5, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.6: gain commitment from the tourism industry to deliver the plan (dq, travel agents, tour providers) wbs 4.6.6, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed central government / ministers central government / ministers tdm programme item 4.6.7: advocate for improved access to bus/ferry ticketing wbs 4.6.7, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed orc orc tdm programme item 4.6.8: advocate for pt supplier contracts to include quality-of-service metrics wbs 4.6.8, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed orc orc tdm programme item 4.6.9: advocate for queenstown to adopt the sustainable travel town vision wbs 4.6.9, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed tdm programme item 4.6.10: advocate for queenstown to become a blue zone wbs 4.6.10, appendix a tdm programme for queenstown years 1-3 of tdm programme (subject to approval and funding) not assessed present the tdm scoping study to the way to go board: origins, stakeholders, approach and key recommendations present to the way to go board to provide an overview not assessed nzta waka kotahi nzta confirm what process(es) the tdm scoping study should go through and complete outstanding actions confirm what process(es) the queenstown tdm scoping study should go through not assessed way to go way to go confirm which recommendations are taken forward and who owns each element; explore funding for items not meeting nltf criteria who owns the individual elements (qldc, orc, waka kotahi/nzta, other) not assessed way to go way to go meet mayor jim boult and other councillors to understand concerns raised about the tdm programme we propose meeting with mayor jim boult and other councillors not assessed nzta waka kotahi nzta write a technical note checking alignment of the tdm scoping study with nzta's 'keeping cities moving' write a technical note that checks the alignment not assessed nzta waka kotahi nzta provide an update to the chamber of commerce (which is setting up a tma) provide an update to the chamber of commerce. not assessed nzta waka kotahi nzta gain way to go partner approval, secure funding, gain ownership for each initiative and establish an interim working group for the tma gaining approval from the wakatipu way to go partners not assessed way to go way to go establish the tdm contestable fund (recorded as pending; tn22 later records it did not eventuate) establish the tdm contestable fund (pending) not stated (agency next steps, aug 2019) not assessed nzta waka kotahi nzta complete a mode shift plan for queenstown complete mode shift plan for queenstown not stated (agency next steps, aug 2019) not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-02-20",
    "cover": {
      "src": "/covers/QTS-029.webp",
      "srcset": "/covers/QTS-029.webp 400w, /covers/QTS-029-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-029/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-029/QTS-029-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-030",
    "code": "QTS-030",
    "title": "Appendix B16 Technical Note 24: Arterials Discussion Note (with B17 Technical Note 10: Parking Management; B18 Technical Note 9: Movement and Place Framework)",
    "shortTitle": "Appendix B16 Technical Note 24: Arterials",
    "summary": "Three technical notes supporting the 2020 NZUP Queenstown Transport Detailed Business Case for NZTA (Waka Kotahi). TN24 (23 April 2020) assesses the Queenstown Town Centre arterials. Stage 1 (Melbourne-Henry) would make Stanley Street bus-only, and Stages 2 and 3 run to Man/Camp and the One Mile Roundabout. The note finds benefits in amenity and congestion relief but costs that overshadow them. About $30 million of benefits had been identified against more than $140 million for Stages 1 and 2 and a further $52 million for Stage 3, giving an indicative BCR of 0.2-0.4. No development was found to be contingent on the arterials. The note recommends investigating alternative funding before further design and proposes Stages 1 and 2 for COVID-19 stimulus consideration. It says the 10-year priority should be NZUP SH6A, public transport, parking, active travel and TDM interventions. TN10 (September 2020) aligns the DBC with QLDC's parking strategy, reducing town centre core on-street parking from 472 to 147 spaces and managing parking to 85% occupancy. TN9 (November 2020) sets a three-tier movement and place hierarchy that prioritises active modes and public transport in the town centre.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical notes (arterials discussion; parking management; movement and place framework)",
    "year": 2020,
    "publishedDate": "2020-04-23",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre (Stanley, Shotover, Camp Streets, Lake Esplanade, Man Street, Thompson Street); Town Centre Arterials Stages 1-3; SH6A",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B16 Technical Note 24: Arterials Discussion Note (with B17 Technical Note 10: Parking Management; B18 Technical Note 9: Movement and Place Framework) (2020). NZTA Contract 2018235.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-030 appendix b16 technical note 24: arterials discussion note (with b17 technical note 10: parking management; b18 technical note 9: movement and place framework) appendix b16 technical note 24: arterials three technical notes supporting the 2020 nzup queenstown transport detailed business case for nzta (waka kotahi). tn24 (23 april 2020) assesses the queenstown town centre arterials. stage 1 (melbourne-henry) would make stanley street bus-only, and stages 2 and 3 run to man/camp and the one mile roundabout. the note finds benefits in amenity and congestion relief but costs that overshadow them. about $30 million of benefits had been identified against more than $140 million for stages 1 and 2 and a further $52 million for stage 3, giving an indicative bcr of 0.2-0.4. no development was found to be contingent on the arterials. the note recommends investigating alternative funding before further design and proposes stages 1 and 2 for covid-19 stimulus consideration. it says the 10-year priority should be nzup sh6a, public transport, parking, active travel and tdm interventions. tn10 (september 2020) aligns the dbc with qldc's parking strategy, reducing town centre core on-street parking from 472 to 147 spaces and managing parking to 85% occupancy. tn9 (november 2020) sets a three-tier movement and place hierarchy that prioritises active modes and public transport in the town centre. context and purpose: appendices b16-b18 of the queenstown transport business case (nzta contract 2018235; stantec-led consortium) for nzta (waka kotahi), prepared for the client team of qldc, nzta and orc (pp3-4). all author and reviewer names are redacted under s 9(2)(a). b16 tn24 (23 april 2020) explains how the town centre arterials have been considered. they have been planned for about 20 years, since the 2005 future links study (p3). the note lists the benefits as congestion relief, amenity, pt operations (stage 1 enabling a bus-only stanley street) and town centre expansion (p2). it sets them against costs. the emerging programme is indicatively $400-500m (p6). the arterials yield about $30m of identified benefits against more than $140m for stages 1-2 and $52m for stage 3, giving a bcr of 0.2-0.4 (p6). no development was found to be contingent on the arterials, and the pt benefits can be realised with or without them (p6). the challenge session found the economic case not established, with a risk to stakeholder acceptance if the arterials were excluded (p7). recommendations: investigate alternative funding before further design, submit stages 1-2 for covid-19 stimulus consideration, and prioritise nzup sh6a, pt, parking, active travel and tdm (pp7-8). appendices give problem statements, investment objective alignment, the emerging programme (p13) and pedestrian wellbeing benefits. the pedestrian benefits are estimated at $73-79m for urban realm and $28-34m for the arterials (p16). b17 tn10 (7 september 2020) aligns the dbc with qldc's parking strategy in support of the 40%/60% mode share targets (p19). core on-street parking falls from 472 to 147 spaces (p24), with active kerbside management to 85% occupancy (p25). appendices give parking inventories and performance. b18 tn9 (19 november 2020) sets out the movement and place framework. it notes that covid-19 adds uncertainty but is not expected to be significant over 20 years (p34). it defines a three-typology hierarchy with target speeds of under 30, 30-40 and under 50 km/h, notes the june 2020 funding of arterial stage 1, and gives street-by-street design requirements (pp44-46, 55-67). mass rapid transit: passing. the emerging programme lists 'high capacity mass transit', including 'off-line high capacity services', as a hard intervention, without detail (p13). references in tn9 relate to the skyline gondola on brecon street (pp60-63), which is not mass rapid transit. technical notes (arterials discussion; parking management; movement and place framework) nzta (waka kotahi). appendix b16 technical note 24: arterials discussion note (with b17 technical note 10: parking management; b18 technical note 9: movement and place framework) (2020). nzta contract 2018235. queenstown town centre (stanley, shotover, camp streets, lake esplanade, man street, thompson street); town centre arterials stages 1-3; sh6a final (tn24 'status: final 23 april 2020' (p2); tn10 final 7 sep 2020 (p19); tn9 final 19 nov 2020 (p34)) lists 'high capacity mass transit', including 'off-line high capacity services', as a hard intervention in the emerging dbc programme; no detail tn24's appendix 4 'dbc emerging programme' lists under hard interventions 'high capacity mass transit', described as 'step change service provision such as large scale fleet expansion and/or off-line high capacity services' (p13). no further detail, alignment, cost or timing is given. the tn9 design tables refer to the existing skyline gondola and the 'gardens to gondola' brecon street corridor (pp60-63), which concern access to the tourist cableway rather than mass rapid transit. \"high capacity mass transit: this includes step change service provision such as large scale fleet expansion and/or off-line high capacity services.\" (p.13) emerging programme indicatively costed at $400-500 million including the arterials (tn24, p6) arterials: about $30 million of urban realm and traffic reduction benefits vs indicative cost over $140 million (stages 1 & 2) plus $52 million (stage 3); indicative bcr 0.2-0.4 (tn24, p6) nz upgrade programme potentially up to $90 million for other interventions (tn24, p6) required alternative mode share 40% by 2028 and 60% by 2048 (tn24, p4) pedestrian benefits: urban realm improvements $73-79 million; arterials $28-34 million, up to $53 million (pv, 4%) (tn24 appendix 6, p16) town centre core on-street parking: 472 existing (2019), masterplan reduction -247, additional dbc reduction -78, proposed 147 (tn10, p24) parking to be managed to 85% occupancy (tn10, p25) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner investigate alternative funding streams for the town centre arterials before any further design development. the project team is recommending that alternative funding streams are investigated prior to any further design development work on the arterials before further design not assessed submit arterial stages 1 and 2 for consideration as a covid-19 infrastructure stimulus investment. it is therefore proposed that stage 1 & 2 of the arterials are submitted for consideration as an infrastructure investment. 2020 not assessed prioritise nz upgrade programme sh6a interventions with public transport, parking management, active travel and tdm over the arterials in the 10-year programme. the priority for this time period should on be the implementation of the nz upgrade programme interventions for sh6a 10-year land transport programme not assessed complete modelling and economic analysis of the arterials and assess available funding sources in more detail. the next steps on the assessment of the arterials will include a completion of the modelling and economic analysis not stated (2020) not assessed seek wider community feedback on the arterials before final recommendations. prior to any final recommendations being made, it is essential that feedback from the wider community is sought. april/may 2020 not assessed include high capacity mass transit (large-scale fleet expansion and/or off-line high capacity services) in the emerging dbc programme. high capacity mass transit this includes step change service provision not assessed reduce town centre core on-street parking to 147 spaces and use active kerbside management (variable time limits and pricing, vms, sensors) to achieve 85% occupancy. there are many options that can be used by qldc to achieve an 85% occupancy rate not assessed qldc qldc apply the revised three-typology movement and place hierarchy (primary active-mode, secondary pt, tertiary through traffic) to town centre streets. a three-typology approach was defined 2028 and 2048 design years not assessed introduce smart parking technologies and variable messaging signage to manage the kerb and reduce circulating traffic in the town centre. smart parking technologies such as vehicle detection sensors or smart cctv monitoring not assessed main document pdf",
    "sortDate": "2020-04-23",
    "cover": {
      "src": "/covers/QTS-030.webp",
      "srcset": "/covers/QTS-030.webp 400w, /covers/QTS-030-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-030/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-030/QTS-030-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-031",
    "code": "QTS-031",
    "title": "Appendix B8 Technical Note 42: SH6A Bus Signal and Virtual Priority (with B9 Technical Note 11: Queenstown Traffic Demand Management Programme; B10 Bus Lane Interventions; B11 Technical Note 39: SH6 Frankton Southern Corridor Operation and Future Performance; B12 Technical Note 41: South West Frankton; B13 Technical Note 35: SH6/SH6A Operation and Future Performance)",
    "shortTitle": "Appendix B8 Technical Note 42: SH6A Bus Signal",
    "summary": "This bundle of technical notes supports the 2020 NZUP Queenstown Transport Detailed Business Case for NZTA (Waka Kotahi). TN42 (3 May 2020) models SH6A Frankton Road bus priority at 2028 under Do Minimum, Managed Demand, Virtual Priority (both directions and eastbound only) and Full Priority scenarios. It finds that full bus lanes save relatively modest time for their cost. It recommends managed demand (holding traffic in Frankton) plus bus signal priority concentrated eastbound. TN11 (September 2019) summarises a Travel Demand Management programme with policy, travel planning, wayfinding and a Transport Management Association (TMA), and lists responsible agencies. B10 lists six proposed SH6A and town centre bus lanes. TN39 (September 2020) assesses signalising SH6 Kawarau Road intersections and recommends considering a northbound Lucas Place bus lane, subject to a PT Services DBC. TN41 (November 2020) supports a Humphrey Street link and signalised intersections at Lucas Place. TN35 (August 2020) compares a signalised roundabout ('Guavabout') with a conventional signalised intersection at SH6/SH6A and recommends the Guavabout.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical note bundle (traffic modelling, intersection design and TDM programme)",
    "year": 2020,
    "publishedDate": "2020-05-03",
    "documentStatus": "Final",
    "geographicScope": "SH6A Frankton Road; SH6/SH6A (BP Roundabout); SH6 Kawarau Road (Frankton southern corridor); south-west Frankton (Lucas Place, Humphrey Street); Queenstown Town Centre; Wakatipu Basin",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B8 Technical Note 42: SH6A Bus Signal and Virtual Priority (with B9 Technical Note 11: Queenstown Traffic Demand Management Programme; B10 Bus Lane Interventions; B11 Technical Note 39: SH6 Frankton Southern Corridor Operation and Future Performance; B12 Technical Note 41: South West Frankton; B13 Technical Note 35: SH6/SH6A Operation and Future Performance) (2020). NZTA Contract 2018235.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "way-to-go-partnership",
      "qldc"
    ],
    "searchText": "qts-031 appendix b8 technical note 42: sh6a bus signal and virtual priority (with b9 technical note 11: queenstown traffic demand management programme; b10 bus lane interventions; b11 technical note 39: sh6 frankton southern corridor operation and future performance; b12 technical note 41: south west frankton; b13 technical note 35: sh6/sh6a operation and future performance) appendix b8 technical note 42: sh6a bus signal this bundle of technical notes supports the 2020 nzup queenstown transport detailed business case for nzta (waka kotahi). tn42 (3 may 2020) models sh6a frankton road bus priority at 2028 under do minimum, managed demand, virtual priority (both directions and eastbound only) and full priority scenarios. it finds that full bus lanes save relatively modest time for their cost. it recommends managed demand (holding traffic in frankton) plus bus signal priority concentrated eastbound. tn11 (september 2019) summarises a travel demand management programme with policy, travel planning, wayfinding and a transport management association (tma), and lists responsible agencies. b10 lists six proposed sh6a and town centre bus lanes. tn39 (september 2020) assesses signalising sh6 kawarau road intersections and recommends considering a northbound lucas place bus lane, subject to a pt services dbc. tn41 (november 2020) supports a humphrey street link and signalised intersections at lucas place. tn35 (august 2020) compares a signalised roundabout ('guavabout') with a conventional signalised intersection at sh6/sh6a and recommends the guavabout. context and purpose: appendices b8-b13 of the queenstown transport business case (nzta contract 2018235; stantec-led consortium) for nzta (waka kotahi), bundled in one pdf. all author and reviewer names are redacted under s 9(2)(a). b8 tn42 (3 may 2020) uses paramics to test sh6a at 2028 demand. managed demand gates westbound traffic at an upgraded sh6/sh6a intersection to around 80-85% v/c, with bus lanes on the frankton approaches (p2). virtual priority adds bus signal priority (phase extension, bus phase, early termination) (p4). full priority has bus lanes for the full length (p4). two-way signal priority performed worse than managed because of conflicting calls at 20 buses per hour per direction (p10). eastbound-only priority improved eastbound times (pp10-11). full priority savings (pm: about 150 s westbound, 230 s eastbound) were 'still modest for the infrastructure works required' (p11). the note recommends managed plus signal priority concentrated eastbound (p12). a later tn42 version is apx_b27. b9 tn11 (18 september 2019) summarises a tdm programme to close the gap between the predicted pt share (30% in 2028, 42% in 2048) and the required 40%/60% alternative mode share (p14). it covers policy, travel planning, wayfinding and a tma, and its appendix a assigns responsible organisations by year (pp17-20). b10 (p22) lists six bus lanes. b11 tn39 (28 september 2020) assesses signalising sh6 kawarau road. operation is satisfactory but approaching capacity by 2028, and the pinch point is shotover bridge, sh6/sh6a and sh6a (p24). b12 tn41 (4 november 2020) supports the humphrey street link and signalised t-intersections on lucas place, and notes interdependencies with any airport access link (pp43, 59). b13 tn35 (13 august 2020) compares the guavabout with a conventional signalised intersection at sh6/sh6a. the guavabout has higher capacity and better pt travel times but more land take from the golf course (pp61, 74). the note records that 'some stakeholders' prefer a conventional layout, and recommends the guavabout (pp74-75). mass rapid transit: none. these notes address bus priority, intersections and tdm only. the only cableway mention is advocating travel plans for tourist destinations including 'the gondola' in the tdm programme (p17), which refers to a tourist attraction rather than mrt. technical note bundle (traffic modelling, intersection design and tdm programme) nzta (waka kotahi). appendix b8 technical note 42: sh6a bus signal and virtual priority (with b9 technical note 11: queenstown traffic demand management programme; b10 bus lane interventions; b11 technical note 39: sh6 frankton southern corridor operation and future performance; b12 technical note 41: south west frankton; b13 technical note 35: sh6/sh6a operation and future performance) (2020). nzta contract 2018235. sh6a frankton road; sh6/sh6a (bp roundabout); sh6 kawarau road (frankton southern corridor); south-west frankton (lucas place, humphrey street); queenstown town centre; wakatipu basin final (tn42 'status: final 3 may 2020' (p2); tn11 final 18 sep 2019 (p14); tn39 final 28 sep 2020 (p24); tn41 final 4 nov 2020 (p43); tn35 final 13 aug 2020 (p61)) does not address mass rapid transit between frankton and queenstown. 2028 am peak frankton road bus travel time (s): westbound do-min 706, virtual eb-only 711, full priority 660; eastbound do-min 893, virtual eb-only 861, full priority 738 (tn42, p10) 2028 pm peak bus travel time (s): westbound do-min 767, full priority 617; eastbound do-min 928, virtual eb-only 846, full priority 695 (tn42, p11) virtual eb-only achieves 45% (westbound) and 35% (eastbound) of full priority travel time savings over do minimum, pm peak (tn42, p11) managed demand releases traffic into sh6a at around 80-85% volume to capacity (tn42, p2) required alternative mode share 40% (2028) and 60% (2048); 2018 alternative mode share 4-5%; pt model predicts 30% (2028) and 42% (2048) (tn11, p14) sh6a theoretical capacity 28,500 vehicles per day, expected to be exceeded as early as 2020; 70% of frankton-queenstown trips are through traffic (tn11, p15) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner take forward managed demand plus bus signal priority on sh6a as the preferred option, with physical and signal priority concentrated eastbound. it is recommended that a managed plus signal priority concept is taken forward as the preferred option 2028 design year not assessed design sh6a bus stops close to signalised intersections with free-flow egress, and add economically justified eastbound bus lanes between sh6/sh6a and goldfield heights. where possible this should include: bus stop positions close to signalised intersections not assessed provide six new bus lanes: towne place-mcbride st, perkins rd-marina dr, larch hill-goldfield heights, suburb st-dublin st, coronation drive, and beetham st eastbound. table 1: sh6a proposed new bus lanes not assessed gain approval of the tdm programme from the wakatipu way to go partners, secure funding, assign ownership of initiatives and establish an interim tma working group. gain approval from the wakatipu way to go partners; secure funding for the programme not assessed way to go way to go develop a sustainable transport vision, car-share policy, park and ride study, travel plan requirements and charging for currently free or cheap parking. 1.1.1 develop a sustainable transport vision... qldc; 1.2 park and ride study qldc; 1.6 charging for parking years 1-3 not assessed qldc qldc promote car-free tourism. 1.1.2 car-free tourism mbie, dq, qldc, nzta years 1-3 not assessed nzta waka kotahi nzta undertake a queenstown airport access study and travel plan. 1.11 queenstown airport access study and travel plan airport, qldc years 1-3 not assessed qldc qldc undertake a self-drive permit study to protect sensitive areas. 1.13.2 self-drive permit study (to protect sensitive areas) mbie, nzta, mot years 1-3 not assessed nzta waka kotahi nzta carry out a wayfinding and information provision audit and design guide. 3.1 wayfinding and information provision audit and design guide years 1-3 not assessed nzta waka kotahi nzta establish a transport management association with business plan, membership, staff and programmes (guaranteed ride home, luggage logistics, journey planning app, ridesharing). 4.1.1 establish itself (mission, values, brand, set up incorporated society years 1-3 not assessed signalise sh6 kawarau road intersections at sh6/sh6a, gray street (with bus gate), pt hub, lucas place and humphrey street. the preferred scenario layout concepts, which consist of the following changes 2028 design year not assessed consider a northbound bus lane along lucas place in the longer term, subject to a pt services dbc confirming future bus routes. in the longer term it is recommended that the implementation of a northbound bus lane along lucas place be considered beyond 2028 not assessed build the humphrey street link with signalised t-intersections at lucas place/humphrey street and lucas place/hawthorne drive. a signalised t-intersection provides benefits in terms of pedestrian provision 2028 design year not assessed adopt the signalised roundabout ('guavabout') as the preferred upgrade of the sh6/sh6a junction. it is the recommendation of the project team that the guavabout option is the preferred option not assessed main document pdf",
    "sortDate": "2020-05-03",
    "cover": {
      "src": "/covers/QTS-031.webp",
      "srcset": "/covers/QTS-031.webp 400w, /covers/QTS-031-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-031/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-031/QTS-031-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-033",
    "code": "QTS-033",
    "title": "Annual Plan 1 July 2020 - 30 June 2021 (Mahere ā-tau)",
    "shortTitle": "Annual Plan 1 July 2020 - 30 June 2021",
    "summary": "QLDC's 2020/21 Annual Plan, adopted 25 June 2020, is a COVID-19 revised budget that cut the average rates rise from 6.76% to 1.59% (pp.4, 10). Transport capital is $48.7m against $111.4m in the Ten Year Plan, and parking facilities fall from $24.4m to $3.0m ('Deferral of capex for Queenstown parking') (p.34). Town centre capital is $35.1m, 'approximately $76.6M less than the programme originally outlined', with deferrals tied to NZTA work on the arterial design, Queenstown parking improvements and public transport (p.13). A shovel-ready funding bid to central government was pending (p.8). No mass rapid transit reference was found.",
    "documentType": "Statutory plan",
    "documentForm": "Annual Plan",
    "year": 2020,
    "publishedDate": "2020-06-25",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Plan 1 July 2020 - 30 June 2021 (Mahere ā-tau) (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/drdlnmg4/qldc_annual-plan_2020-2021_combined_30jun20-final-2.pdf",
      "https://www.qldc.govt.nz/media/elrpnlk2/1a-qldc_annual-plan_2020-2021_combined_03mar20-v7.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "nzta"
    ],
    "searchText": "qts-033 annual plan 1 july 2020 - 30 june 2021 (mahere ā-tau) annual plan 1 july 2020 - 30 june 2021 qldc's 2020/21 annual plan, adopted 25 june 2020, is a covid-19 revised budget that cut the average rates rise from 6.76% to 1.59% (pp.4, 10). transport capital is $48.7m against $111.4m in the ten year plan, and parking facilities fall from $24.4m to $3.0m ('deferral of capex for queenstown parking') (p.34). town centre capital is $35.1m, 'approximately $76.6m less than the programme originally outlined', with deferrals tied to nzta work on the arterial design, queenstown parking improvements and public transport (p.13). a shovel-ready funding bid to central government was pending (p.8). no mass rapid transit reference was found. context and purpose. the 2020/21 annual plan covers year three of the 2018-2028 ten year plan. the draft of 12 march 2020 signalled a 6.76% average rates rise; after covid-19 the council 'urgently set itself the target of a revised budget', reducing the rise to 1.59% (pp.4, 10), assuming tourism-related revenue would fall by at least 50%, removing the $5.8m queenstown airport dividend and cutting staff and contractor costs (pp.4-7). transport. transport capital is $48.7m against $111.4m in the ten year plan, and parking facilities capital is $3.0m against $24.4m, again noted as 'deferral of capex for queenstown parking' (p.34). town centre capital is $35.1m in 2020/21, 'approximately $76.6m less than the programme originally outlined'; deferrals relate to work with nzta on 'pre-implementation and detailed design for the proposed arterial road', and to queenstown parking improvements and public transport (p.13). the council had bid to central government for 'shovel ready projects', with a decision due mid-june 2020 (p.8); the $85m crown infrastructure partners contribution itself is not recorded in this plan. active travel and park-and-ride are not mentioned in the portion read. mass rapid transit: no reference to mass rapid transit was found in the pages read (to p.48). annual plan annual plan 1 july 2020 - 30 june 2021 (mahere ā-tau) (2020). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read transport capital $48.7m vs $111.4m ten year plan (p.34) parking facilities capital $3.0m vs $24.4m (p.34) town centre capital $35.1m, approximately $76.6m less than originally outlined (p.13) average rates rise reduced from 6.76% to 1.59% (pp.4, 10) not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc reduce 2020/21 transport capital to $48.7m (from $111.4m in the ten year plan) transport capex $48.7m 2020/21 not assessed qldc qldc defer queenstown parking capital: parking facilities $3.0m (from $24.4m) deferral of capex for queenstown parking 2020/21 not assessed qldc qldc continue pre-implementation and detailed design of the proposed arterial road with nzta pre-implementation and detailed design for the proposed arterial road 2020/21 not assessed nzta waka kotahi nzta seek central government shovel-ready funding for projects shovel ready projects decision mid-june 2020 not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2020-06-25",
    "cover": {
      "src": "/covers/QTS-033.webp",
      "srcset": "/covers/QTS-033.webp 400w, /covers/QTS-033-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-033/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-033/QTS-033-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-033/QTS-033-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-034",
    "code": "QTS-034",
    "title": "Appendix C11 Technical Note 36: Intelligent Transport Systems (Application of ITS in Queenstown), with Appendix C12 Technical Note 30: High Capacity Public Transport and Appendix C13 Consenting Strategy",
    "shortTitle": "Appendix C11 Technical Note 36: Intelligent",
    "summary": "This bundle is Appendices C11-C13 of the NZUP Queenstown Transport Business Case, prepared for NZTA (Waka Kotahi) under Contract 2018235. TN36 (30 August 2020) recommends five ITS measures: a Network Operating Plan; continued use of the Wellington Transport Operations Centre; SCATS Priority Engine for bus virtual priority ($30-50k set-up); at least six permanent variable message signs on SH6/SH6A ($90-120k each); and town centre parking and kerbside management ($300-500k). TN30, High Capacity Public Transport (13 July 2020, final November 2020), sets out the staged 'Bus Max' network. It grows from about 360 seats per hour on SH6A today to 2,500 passengers per hour of capacity by 2051 (modelled 2051 demand 2,322) using double-decker, articulated and then bi-articulated buses or trackless trams, with gross opex rising from $13.2m (2024) to $39.1m (2051). TN30 states that on-road PT 'can meet the expected demand until around 2051'. It acknowledges mass rapid transit's 'hyper-frequency', capacity and customer experience, but says it 'does not fit well into the current legislative and public transport procurement processes'. It asks the Board to approve that 'off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028'. TN30 also records that the mass-transit ferry was ruled out by MCA on 2 August 2019. Appendix C13 contains WSP preliminary consenting strategies for the town centre and for the 37 Frankton/Ladies Mile/SH6A locations listed in Table 1-1.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical notes and consenting strategy",
    "year": 2020,
    "publishedDate": "2020-08-30",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6A Frankton to Queenstown; SH6 Ladies Mile and Frankton; Frankton Hub; Queenstown Town Centre",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C11 Technical Note 36: Intelligent Transport Systems (Application of ITS in Queenstown), with Appendix C12 Technical Note 30: High Capacity Public Transport and Appendix C13 Consenting Strategy (2020). NZTA Contract 2018235 - Technical Note #36; Technical Note #30; WSP project no. 310201227.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "stantec",
      "wsp",
      "way-to-go-partnership",
      "qldc",
      "orc"
    ],
    "searchText": "qts-034 appendix c11 technical note 36: intelligent transport systems (application of its in queenstown), with appendix c12 technical note 30: high capacity public transport and appendix c13 consenting strategy appendix c11 technical note 36: intelligent this bundle is appendices c11-c13 of the nzup queenstown transport business case, prepared for nzta (waka kotahi) under contract 2018235. tn36 (30 august 2020) recommends five its measures: a network operating plan; continued use of the wellington transport operations centre; scats priority engine for bus virtual priority ($30-50k set-up); at least six permanent variable message signs on sh6/sh6a ($90-120k each); and town centre parking and kerbside management ($300-500k). tn30, high capacity public transport (13 july 2020, final november 2020), sets out the staged 'bus max' network. it grows from about 360 seats per hour on sh6a today to 2,500 passengers per hour of capacity by 2051 (modelled 2051 demand 2,322) using double-decker, articulated and then bi-articulated buses or trackless trams, with gross opex rising from $13.2m (2024) to $39.1m (2051). tn30 states that on-road pt 'can meet the expected demand until around 2051'. it acknowledges mass rapid transit's 'hyper-frequency', capacity and customer experience, but says it 'does not fit well into the current legislative and public transport procurement processes'. it asks the board to approve that 'off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028'. tn30 also records that the mass-transit ferry was ruled out by mca on 2 august 2019. appendix c13 contains wsp preliminary consenting strategies for the town centre and for the 37 frankton/ladies mile/sh6a locations listed in table 1-1. context: the pdf combines three appendices to the nzup queenstown transport business case. all preparer and reviewer names are redacted under s 9(2)(a). tn36, intelligent transport systems (pp.2-9, 30 august 2020). it reviews its technologies deployable by waka kotahi, orc or qldc (table 1, p.4) and the role of transport operations centres. deloitte (2017) bcrs for nz tocs were 5.11 (auckland), 3.53 (wellington) and 8.3 (christchurch) (p.5). because a dedicated local toc would cost over $400,000 a year in staff alone, it recommends the wellington toc continue to run queenstown signals (p.5). scats priority engine is 'considered essential' for sh6a pt priority, and the 'virtual' priority was included in the business case modelling (p.6). recommendations and costs are set out at pp.8-9. tn30, high capacity public transport (pp.10-24). it is written at ibc level (p.11). it describes the post-2017 orbus network, where patronage tripled from about 500,000 to 1.5 million a year (p.11). it notes nzup's $90 million infrastructure does not include bus services, fleet or depot (p.13), and that the pt contract expires in 2027 (p.13). figure 3 shows the forecast mode shift. tn30 warns 'if this mode shift does not occur, all networks will fail', and calls the mode shift 'a level of mode shift never before attempted in new zealand' (p.14). it cites aspen's 67.8% non-car commuter mode share (p.16). the mass-transit ferry (frankton beach-steamer wharf) was discounted for high opex (about $900 per hour per ferry), limited capacity (about 800 passengers per hour) and transfer penalties. it was ruled out at an mca workshop on 2 august 2019 (p.16). the bus max network has five bus routes and one ferry route, with a 3-4 minute peak on sh6a (p.17). it is staged: - 2020-24: 360 seats per hour, 22 buses, $4.38m opex. - 2024: 873 per hour, 27 buses, $13.18m. - 2027: 1,176-1,411 per hour, 35 buses, $23.84m. - 2030: 1,393-1,671 per hour, 39 buses, $25.39m. - 2039-2051: bi-articulated buses or trackless trams, 1,802-2,500 per hour, 34-50 vehicles, $26.56m-$39.06m. these are gross uninflated 2020 dollars (pp.18-19, 23). bus performance 'starts to significantly degrade beyond around 18-20 vehicles per hour' (p.19). the bus max fleet in 2030 is estimated at $46 million (p.22). implementation issues include institutional responsibilities, fleet ownership, the roughly equal ratepayer and nltf funding shares, crown ownership of the frankton hub and depot land (pp.22-23). appendix 2 is the hcpt options mca, scoring do min, bus max, trackless tram and trackless tram max, plus a mass rapid transit option and a ferry option, against 17 criteria. a ferry is not mass rapid transit (pp.23-24). appendix c13, consenting strategy (pp.25-94). wsp preliminary rma screens cover queenstown town centre non-arterials (approved 18/06/2020), the town centre arterials (pp.33-40), and the frankton to queenstown ssbc with frankton and ladies mile (final, july 2020). the ssbc strategy covers '46 discrete locations' (p.49) and a traffic-light table of 37 references. most are outline plan waivers. alterations to designation are needed at several intersections, new designations at the sh6/6a intersection and frankton hub (where an existing qldc designation has priority), and a notice of requirement for the humphrey street link (pp.49-50). mass rapid transit: tn30 is the key deferral document. it states that 'on-road public transport can meet the expected demand until around 2051'. it says mass rapid transit 'provides a number of attractive features such as hyper-frequency (<30 seconds between gondola cabins); capacity and a great visitor/ customer experience', but that on-road options fit current frameworks and best maximise the $90 million nzup investment (p.20). it suggests 'consideration of an off-line system be put on hold and reviewed in 2028'. it notes mass rapid transit 'could be delivered by the private sector for its tourism benefits', in which case public investment in its pt benefit could be considered (p.20). the decision sought is 'board to approve that off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028' (p.23). in the mca, mass rapid transit scores 3 on sustainably managing growth, network-event resilience, reliability, vision zero, construction impacts and masterplan alignment, and -2 on capex affordability (pp.23-24). the note does not state an overall mca result. tn36 and c13 contain no mrt content. technical notes and consenting strategy nzta (waka kotahi). appendix c11 technical note 36: intelligent transport systems (application of its in queenstown), with appendix c12 technical note 30: high capacity public transport and appendix c13 consenting strategy (2020). nzta contract 2018235 - technical note #36; technical note #30; wsp project no. 310201227. wakatipu basin; sh6a frankton to queenstown; sh6 ladies mile and frankton; frankton hub; queenstown town centre tn36 30 aug 2020; tn30 dated 13 july 2020, footer 'status - final, november 2020'; consenting strategies final (june-july 2020) recommends offline mass rapid transit be parked and reviewed in 2028; judges on-road bus services sufficient to about 2051. those bus services are not mass rapid transit. tn30 (appendix c12) is where the business case formally defers offline pt. it states: 'the business case work to date has identified that on-road public transport can meet the expected demand until around 2051' (p.20). it acknowledges mass rapid transit's 'hyper-frequency (<30 seconds between gondola cabins); capacity and a great visitor/ customer experience'. it prefers on-road options because they 'can feasibly be implemented under current public transport operational and procurement frameworks and are the best option to maximise the value from the $90 million nzup investment' (p.20). it suggests offline consideration 'be put on hold and reviewed in 2028 based on updated forecasts'. it adds that mass rapid transit 'does not fit well into the current legislative and public transport procurement processes but could be delivered by the private sector for its tourism benefits', and that public investment in its pt benefit could then be considered (p.20). the board decision sought is 'off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028' (p.23). the appended mca (pp.23-24) scores mass rapid transit against do min, bus max, trackless tram, trackless tram max and ferry. mass rapid transit rates highly on reliability, resilience, construction impacts and masterplan alignment, and lower on capex affordability (-2) and modal integration (1). the note states no overall ranking. the on-road path itself relies on 'bi-articulated buses or trackless trams' from about 2039 (p.19). \"board to approve that off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028.\" (p.23) | \"the business case work to date has identified that on-road public transport can meet the expected demand until around 2051.\" (p.20) | \"while the gondola option provides a number of attractive features such as hyper-frequency (<30 seconds between gondola cabins); capacity and a great visitor/ customer experience, on-road public transport options can feasibly be implemented under current public transport operational and procurement frameworks\" (p.20) | \"another challenge with the gondola is that it does not fit well into the current legislative and public transport procurement processes but could be delivered by the private sector for its tourism benefits.\" (p.20) | \"a key constraint of bus-based options is that performance starts to significantly degrade beyond around 18-20 vehicles per hour.\" (p.19) pt patronage tripled from about 500,000 to about 1,500,000 a year after the november 2017 network (p.11) bus max gross opex: $13,177,351 (2024); $23,840,986 (2027); $25,391,506 (2030); $26,563,421 (2039); $39,063,855 (2051), uninflated 2020 $ (p.23) sh6a capacity: 360 seats/hr now; 873 (2024); 1,176-1,411 (2027); 1,393-1,671 (2030); 1,802-2,500 (2039-2051) (pp.18-19) bus max fleet for full 2030 rollout estimated at $46 million (p.22) ferry mass transit option: about $900 per hour per ferry, vessels up to $4 million, about 800 passengers per hour; ruled out 2 august 2019 (p.16) aspen non-car commuter mode share 67.8% vs 60% target in this business case (p.16) scats priority engine $30-50k set-up; vms $90-120k per sign (at least 6); parking/kerbside system $300-500k (p.8) nz toc bcrs: auckland 5.11, wellington 3.53, christchurch 8.3 (p.5) f2q/frankton/ladies mile business case covers 46 discrete locations (p.49) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta commissioned abley abley prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go recipient prepare a network operating plan for queenstown to inform network management and modal priority a network operating plan should be produced not assessed keep the wellington transport operations centre (wtoc) providing toc services to queenstown rather than a dedicated local toc that the wellington transport operations centre continues to provide toc services not assessed nzta waka kotahi nzta introduce scats priority engine software and supporting infrastructure for virtual priority at signalised intersections serving pt scats priority engine software and supporting infrastructure is introduced not assessed nzta waka kotahi nzta install permanent variable message signs at key inbound and outbound locations on sh6 and sh6a (at least six) permanent virtual message signs are installed at key inbound and outbound locations not assessed introduce a dynamic parking and kerbside management system for the town centre, scoped with the council's parking strategy dynamic parking and kerbside management system is introduced not assessed qldc qldc note tn30 as an input to a proposed detailed business case on public transport services and infrastructure to move hcpt towards implementation board to note context of this paper is an input to a proposed detailed business case not assessed way to go way to go approve that off-line pt to sh6a (e.g. mass rapid transit) is parked and reviewed in 2028 board to approve that off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028. review in 2028 not assessed advise how to progress pt operational aspects, including a pt service operation dbc, and whether this should sit under way to go board to advise how to progress pt operational aspects to the next level of detail not assessed way to go way to go decide between double-decker and articulated bus operation before subsequent dbc work, as it drives frankton hub design this is a key project decision that needs to be made in advance of any subsequent dbc work in advance of any subsequent dbc not assessed investigate extending the jacks point bus service to queenstown town centre from 2024 in a dbc one response, worthy of inclusion in a dbc investigation, would be extending jacks point service 2024-2027 not assessed step up bus services from 2024: route 1 to 10-minute frequency with enhanced capacity buses (opex about $13.2m) there would need to be a bump in service from 2024 2024-2027 not assessed orc orc introduce the first bus max stage with the new pt contract: new double-decker or articulated fleet, three core routes every 15 minutes to midnight, frequent kelvin peninsula ferry, frankton loop the timing of a new public transport contract for the wakatipu basin would provide for a step change 2027-2030 not assessed orc orc secure a large flat depot site and plan fleet acquisition and electric bus charging well ahead of 2027 requires work to get underway very soon before 2027 ('get underway very soon') not assessed upgrade core services to 10-minute frequency (18 buses per hour on sh6a) from 2030 a further step change in capacity is required in 2030 2030-2039 not assessed move to bi-articulated buses or trackless trams from about 2039 to provide 1,802-2,500 passengers per hour to 2051 at this point bi-articulated buses would be required 2039-2051 not assessed address implementation issues in a dbc: institutional responsibilities, fleet and infrastructure ownership, funding alignment with visitor benefits, crown ownership of frankton hub, depot and charging some key implementation considerations and issues for consideration as part of a detailed business case not assessed obtain alterations to designations, new designations (sh6/6a intersection, frankton hub), outline plans or waivers and a notice of requirement for the humphrey street link in each location the waka kotahi nz transport agency (waka kotahi), as a requiring authority, has a designation not assessed nzta waka kotahi nzta obtain alteration of designation, outline plans and potential nescs consent and archaeological authority for the queenstown town centre non-arterial works identified the following resource management act approvals are required not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-08-30",
    "cover": {
      "src": "/covers/QTS-034.webp",
      "srcset": "/covers/QTS-034.webp 400w, /covers/QTS-034-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-034/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-034/QTS-034-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-035",
    "code": "QTS-035",
    "title": "Appendix C8 Safety in Design Register (with Appendix C9 Safe Systems Assessments)",
    "shortTitle": "Appendix C8 Safety in Design Register",
    "summary": "This appendix to the NZUP Queenstown Transport Business Case contains two sets of WSP safety material for NZTA (Waka Kotahi). The first is the Safety in Design (SiD) registers (Simplified Procedure), reviewed 4 September 2020 (pp.2-21). They cover five project elements: Ladies Mile (80 km/h), Frankton Bridge to Bridge (60 km/h), the Queenstown Town Centre SH6A and town centre works, the Queenstown Town Centre arterial route, and SH6A Frankton to Queenstown. Each register lists construction, operation and maintenance hazards with risk ratings, mitigations and risk owners (Designer, Contractor or Client). A risk matrix follows (p.21). The second set, headed Appendix C9, is three Safe System Assessments (Final, 18 November 2020). They cover Queenstown Town Centre (pp.22-58), SH6A Frankton to Queenstown (pp.59-82) and Frankton and Ladies Mile (pp.83-129). Each scores the preliminary design against the Safe System matrix and proposes improvements. For SH6A the score falls from 348/704 to 154/704 with improvements, and the SH6A assessment prefers a permanent 60 km/h speed limit. All personal names are redacted. There is no MRT content.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Safety in Design register and Safe System Assessments",
    "year": 2020,
    "publishedDate": "2020-09",
    "documentStatus": "Final",
    "geographicScope": "Ladies Mile; Frankton (Kawarau Bridge to Shotover Bridge); SH6A Frankton to Queenstown; Queenstown Town Centre SH6A and arterial route",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C8 Safety in Design Register (with Appendix C9 Safe Systems Assessments) (2020). WSP project numbers 6-XT014.00, 6-XT014.40, 6-XT014.50, 6-XT014.64, 6-XT014.65, 310201227.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-035 appendix c8 safety in design register (with appendix c9 safe systems assessments) appendix c8 safety in design register this appendix to the nzup queenstown transport business case contains two sets of wsp safety material for nzta (waka kotahi). the first is the safety in design (sid) registers (simplified procedure), reviewed 4 september 2020 (pp.2-21). they cover five project elements: ladies mile (80 km/h), frankton bridge to bridge (60 km/h), the queenstown town centre sh6a and town centre works, the queenstown town centre arterial route, and sh6a frankton to queenstown. each register lists construction, operation and maintenance hazards with risk ratings, mitigations and risk owners (designer, contractor or client). a risk matrix follows (p.21). the second set, headed appendix c9, is three safe system assessments (final, 18 november 2020). they cover queenstown town centre (pp.22-58), sh6a frankton to queenstown (pp.59-82) and frankton and ladies mile (pp.83-129). each scores the preliminary design against the safe system matrix and proposes improvements. for sh6a the score falls from 348/704 to 154/704 with improvements, and the sh6a assessment prefers a permanent 60 km/h speed limit. all personal names are redacted. there is no mrt content. context: this appendix supports the preferred option design in the nzup queenstown transport business case. although titled appendix c8, the pdf also contains appendix c9 safe systems assessments (divider p.22). wsp (dunedin office) prepared both for waka kotahi. names of preparers, reviewers, project managers and workshop attendees are redacted under s 9(2)(a). only first names appear in the narrative ('matthew, holly and esther', p.30; 'reece and esther', p.92). safety in design registers (pp.2-21): these are simplified procedure sid records, at business case stage, for ladies mile 80 km/h (6-xt014.65, pp.2-4), frankton bridge to bridge 60 km/h (6-xt014.64, pp.5-7), queenstown town centre sh6a and town centre (6-xt014.50, pp.8-10), queenstown town centre arterial route (6-xt014.50, pp.11-14) and frankton to queenstown sh6a (6-xt014.40, pp.15-20). hazards are grouped as construction (e.g. live traffic, public vs plant, contamination and asbestos pipe, services strikes, the mcdowell drive underpass, ice and snow, summer peak events), operation (e.g. pedestrian crossings, over-dimension loads, visitors unfamiliar with nz roads, lighting, inconsistent bus lane provision, cyclists, speed) and maintenance. each hazard is rated before and after mitigation and allocated to designer, contractor or client. a wsp risk assessment matrix follows (p.21). safe system assessments (appendix c9): - queenstown town centre, sh6a and arterials stages 1-3 (final 18/11/20, p.24). scores, existing design vs suggested improvements: sh6a south-north 218 to 156/704; sh6a west-east 226 to 164/768; arterial stage 1 216 to 152/576; stage 2 144 to 88/320; stage 3 288 to 192/704 (p.27). the design speed is mostly 40 km/h. suggested improvements include raised safety platforms at intersections, visibility around the bus hub, lilo restrictions, grade-separated pedestrian crossings, cyclist wayfinding and skid resistance (pp.27, 45). - frankton to queenstown sh6a (final 18/11/20, p.61). the score is 348/704 for the existing design and 154/704 with improvements. the highest-risk elements are signalised intersections (48/64), pedestrian refuge crossings (48/64) and on-road cycle lanes (36/64) (p.64). the ssa team's preference is 'a permanent speed reduction of sh6a to 60km/h'. it notes that significant speed reductions 'can conflict with the function of a state highway' (p.78). - frankton and ladies mile (final 18/11/20, p.85). frankton scores 684 to 600/1216 and ladies mile 244 to 188/448. improvements include raised zebra platforms at 30 km/h, signalised pedestrian crossings at signalised roundabouts, cyclist provision and traffic calming (p.89). preliminary design drawings follow (pp.114-128). method: the assessments were done by ms teams workshop (7 april 2020 and later meetings) during the covid-19 level 4 lockdown, without site visits (pp.30, 67, 92). mass rapid transit: nothing on mrt, offline pt or a frankton-town centre mass rapid transit. the only 'gondola' mentions refer to existing pedestrian and vehicle access to mass rapid transit near brecon street in the town centre arterial safe system assessment (pp.34, 57). safety in design register and safe system assessments nzta (waka kotahi). appendix c8 safety in design register (with appendix c9 safe systems assessments) (2020). wsp project numbers 6-xt014.00, 6-xt014.40, 6-xt014.50, 6-xt014.64, 6-xt014.65, 310201227. ladies mile; frankton (kawarau bridge to shotover bridge); sh6a frankton to queenstown; queenstown town centre sh6a and arterial route sid registers reviewed 04/09/2020; safe system assessments 'final' (18/11/20) no mrt or offline pt content; safety assessment of on-road preferred option only sh6a frankton to queenstown safe system score 348/704 existing design, 154/704 with suggested improvements (p.64) queenstown town centre sh6a south-north 218/704 to 156/704; arterial stage 3 288/704 to 192/704 (p.27) frankton 684/1216 to 600/1216; ladies mile 244/448 to 188/448 (p.89) five sid registers reviewed 04/09/2020 (pp.2-21) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned wsp (including opus) wsp prepared way to go way to go partner consider a permanent speed reduction on sh6a (frankton to queenstown) to 60 km/h, with raised tables or enforcement to bring intersection speeds to 50 km/h or below treatment preference includes a permanent speed reduction of sh6a to 60km/h not assessed provide safer pedestrian crossings on sh6a, such as underpasses or raised crossings, with minimum lighting standards alternatives were given to increase pedestrian safety such as pedestrian underpasses not assessed install raised safety platforms at queenstown town centre intersections and assess pedestrian visibility around the stanley street bus hub raised safety platforms (designed to 30km/hr operating speed) at every intersection not assessed install raised zebra crossing platforms (30 km/h) and signalised pedestrian crossings at signalised roundabouts in frankton and on ladies mile; improve provision for cyclists install signalised pedestrian crossings at signalised roundabouts not assessed improve skid resistance, apply de-icing agent as part of maintenance, and provide warning signage on steep downgrades part of maintenance programme - deicing agent applied not assessed manage construction hazards (live traffic, services strikes, contamination, temporary works) through design choices and the contractor's methodology and traffic management contractor to have temporary traffic control design and construction not assessed main document pdf",
    "sortDate": "2020-09-01",
    "cover": {
      "src": "/covers/QTS-035.webp",
      "srcset": "/covers/QTS-035.webp 400w, /covers/QTS-035-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-035/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-035/QTS-035-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-036",
    "code": "QTS-036",
    "title": "Appendix C1 Queenstown Town Centre Renders (Queenstown Centre DBC rendered plan sheets)",
    "shortTitle": "Appendix C1 Queenstown Town Centre Renders",
    "summary": "This is a set of rendered colour concept plans by Jasmax for the Queenstown Centre DBC, dated 2 September 2020 and marked 'Prepared for: NZTA / QLDC'. They form Appendix C1 of the 2020 NZUP Queenstown Detailed Business Case. After a divider and a key plan, plan sheets SK-0001 to SK-0043 (including SK-0019A and a Brecon Street design integration overlay) show proposed street designs across the town centre at 1:250. Sheet 1 shows the Stanley Street public transport hub with bus bays and a passenger lounge, together with Athol, Ballarat, Shotover and Camp Streets. Later sheets cover Marine Parade, Rees, Beach, Shotover and Camp Streets, Lake Esplanade, Stanley, Melbourne and Hallenstein Streets, Brecon and Man Streets, and outer streets. The renders show paving, planting, crossings, bus and parking arrangements. No mass rapid transit, MRT terminal or corridor protection is shown.",
    "documentType": "Design and engineering report",
    "documentForm": "Rendered concept plans",
    "year": 2020,
    "publishedDate": "2020-09-02",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre streets (Stanley St hub, Shotover, Camp, Beach, Rees, Lake Esplanade, Brecon, Man, Memorial and others)",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi), QLDC. Appendix C1 Queenstown Town Centre Renders (Queenstown Centre DBC rendered plan sheets) (2020). Jasmax Job No. 218146; drawings SK-0001 to SK-0043.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc",
      "jasmax",
      "way-to-go-partnership"
    ],
    "searchText": "qts-036 appendix c1 queenstown town centre renders (queenstown centre dbc rendered plan sheets) appendix c1 queenstown town centre renders this is a set of rendered colour concept plans by jasmax for the queenstown centre dbc, dated 2 september 2020 and marked 'prepared for: nzta / qldc'. they form appendix c1 of the 2020 nzup queenstown detailed business case. after a divider and a key plan, plan sheets sk-0001 to sk-0043 (including sk-0019a and a brecon street design integration overlay) show proposed street designs across the town centre at 1:250. sheet 1 shows the stanley street public transport hub with bus bays and a passenger lounge, together with athol, ballarat, shotover and camp streets. later sheets cover marine parade, rees, beach, shotover and camp streets, lake esplanade, stanley, melbourne and hallenstein streets, brecon and man streets, and outer streets. the renders show paving, planting, crossings, bus and parking arrangements. no mass rapid transit, mrt terminal or corridor protection is shown. context: rendered plans prepared by jasmax (job no. 218146) for the queenstown centre dbc, part of the queenstown transport business case. sheets state 'prepared for: nzta / qldc'. content: page 1 is the divider and page 2 a key plan indexing sheets. pages 3-46 are plan sheets 1-43 (sk-0001 to sk-0043, rev a, scale 1:250 at a1), plus sheet 19a and a 'brecon st – design integration overlay' (p.26). sheet 1 (p.3) shows the stanley street pt hub with bus bays, a passenger lounge, plaza, planting and crossings. mass rapid transit: no mass rapid transit terminal or corridor protection is shown. rendered concept plans nzta (waka kotahi), qldc. appendix c1 queenstown town centre renders (queenstown centre dbc rendered plan sheets) (2020). jasmax job no. 218146; drawings sk-0001 to sk-0043. queenstown town centre streets (stanley st hub, shotover, camp, beach, rees, lake esplanade, brecon, man, memorial and others) rev a renders show no mass rapid transit terminal or corridor protection. 43 plan sheets sk-0001 to sk-0043 plus sk-0019a and brecon st overlay, 1:250 @a1 (pp.3-46) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none design and engineering report final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned qldc qldc commissioned jasmax jasmax prepared way to go way to go partner main document pdf",
    "sortDate": "2020-09-02",
    "cover": {
      "src": "/covers/QTS-036.webp",
      "srcset": "/covers/QTS-036.webp 400w, /covers/QTS-036-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-036/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-036/QTS-036-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-037",
    "code": "QTS-037",
    "title": "Appendix B19 Technical Note 25: VURT Analysis (with Appendix B20 Proposed Speed Limits, B21 Way to Go Engagement Booklet and B22 Engagement Report)",
    "shortTitle": "Appendix B19 Technical Note 25: VURT Analysis",
    "summary": "A bundle of four appendices to the 2020 NZUP Queenstown Detailed Business Case. Technical Note 25 (B19) estimates pedestrian wellbeing benefits of Queenstown Town Centre street upgrades and the town centre arterials using the Valuing the Urban Realm Tool (VURT), with VURT values multiplied by four to align with emerging Waka Kotahi research. It estimates street-improvement benefits of about $76 million PV and arterial benefits of $28-34 million PV (up to $53 million), with illustrative retail spending (+$30-45m p.a.) and property value (+~$50m) responses not claimed as additional benefits. B20 is a one-page speed limit map. B21 is the August 2020 Way to Go engagement booklet on the emerging programme (Stanley Street hub, bus priority, arterials). B22 is the Engagement Report (April 2019 to September 2020), summarising workshops, stakeholder meetings, the April 2019 'Way to Go' engagement and online survey, the August 2020 engagement, written submissions and an engagement register. The April 2019 survey found 58% preferred a high-capacity PT link on SH6A and 42% mass rapid transit along Queenstown Hill. The register records landowner meetings on mass rapid transit alignment and terminals, and an agreed-in-principle 'gondola proof of concept' with QAC.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical note bundle with engagement booklet and engagement report",
    "year": 2020,
    "publishedDate": "2020-09-07",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre; SH6A Frankton Road; Frankton; Wakatipu Basin",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B19 Technical Note 25: VURT Analysis (with Appendix B20 Proposed Speed Limits, B21 Way to Go Engagement Booklet and B22 Engagement Report) (2020). NZTA Contract 2018235; Stantec Project No. 310201227.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-037 appendix b19 technical note 25: vurt analysis (with appendix b20 proposed speed limits, b21 way to go engagement booklet and b22 engagement report) appendix b19 technical note 25: vurt analysis a bundle of four appendices to the 2020 nzup queenstown detailed business case. technical note 25 (b19) estimates pedestrian wellbeing benefits of queenstown town centre street upgrades and the town centre arterials using the valuing the urban realm tool (vurt), with vurt values multiplied by four to align with emerging waka kotahi research. it estimates street-improvement benefits of about $76 million pv and arterial benefits of $28-34 million pv (up to $53 million), with illustrative retail spending (+$30-45m p.a.) and property value (+~$50m) responses not claimed as additional benefits. b20 is a one-page speed limit map. b21 is the august 2020 way to go engagement booklet on the emerging programme (stanley street hub, bus priority, arterials). b22 is the engagement report (april 2019 to september 2020), summarising workshops, stakeholder meetings, the april 2019 'way to go' engagement and online survey, the august 2020 engagement, written submissions and an engagement register. the april 2019 survey found 58% preferred a high-capacity pt link on sh6a and 42% mass rapid transit along queenstown hill. the register records landowner meetings on mass rapid transit alignment and terminals, and an agreed-in-principle 'gondola proof of concept' with qac. context and purpose: this pdf bundles appendices b19 to b22 of the queenstown transport business case prepared under nzta contract 2018235 for nzta (waka kotahi). all author names are redacted under s 9(2)(a). b19 technical note 25 (7 september 2020) explains how pedestrian wellbeing benefits were applied in the town centre business case, partitioned by phase (p.2), and attaches the 18 march 2020 note. the method scored 17 pers street attributes before and after improvements, converted the changes to dollars using vurt, and multiplied the results by four after calibration against emerging waka kotahi research (nunns and dodge 2019) (pp.3, 7). pedestrian time is valued at nz$12/hour (p.8). street design benefits total $76.1m pv, made up of $32.1m for the inner town centre and $44.0m for the outer town centre (p.8). arterials 1+2 give $15.3m and arterial 3 gives $15.5m at 4%/60 years, or $8.2m and $8.8m at 6%/40 years (p.13). sensitivity results range from $13.1m to $52.9m (p.14). illustrative responses are retail spending up 10-15% ($30-45m p.a.) on a base of about $300m, and property value uplift of about 5-6% (~$50m), both explicitly not claimed as additional benefits (p.4). international visitors are estimated at 30-40% of beneficiaries (p.11). the traffic modelling assumes bus max plus parking measures deliver 40% alternative mode share at 2028 and 60% at 2048 (p.12). there is a footer inconsistency: page 2 is footed 'final 7 november 2020'. b20 (p.16) is an image-only speed limit map. b21 (pp.18-28) is the august 2020 engagement booklet. it describes a stanley street transport hub, arterials stage 1, bus priority, and nzup funding of $35m (town centre), $50m (arterials stage 1) and $90m (sh6/6a pt and active travel) (p.19). feedback closed 31 august 2020. b22 engagement report (september 2020, final, project no. 310201227) covers workshops (december 2018, february 2019, may 2020) and stakeholder meetings (p.32), the april 2019 way to go engagement and survey (pp.34-60, 82-141), the 3-31 august 2020 online engagement via social pinpoint (pp.61-81), written submissions (pp.142-160) and an engagement register (pp.161-176). the report concludes that concerns centred on traffic signals along sh6a and frankton and on town centre parking, and that positive comments related to pt, active travel and town centre upgrades (p.80). mass rapid transit: the engagement report records substantive public and stakeholder input on mass rapid transit. stakeholder meetings were held with remarkables park ('integrating with the gondola') and the airport ('the gondola site') (p.32). at the april 2019 market events there was 'good support and recognition that one of these options [gondola, light rail or trackless tram] would be required in the medium term' (p.44), along with mixed post-it comments on mass rapid transit (pp.47, 49). in the online survey (q19), 58.33% (84) preferred a high-capacity pt link on sh6a and 41.67% (60) mass rapid transit along queenstown hill (pp.52, 105). in q26, 70.67% supported mass rapid transit terminals at regular intervals (p.114). qac's submission asked what future-proofing was being done for mass rapid or high-frequency transit (p.148), and another submitter supported the mass rapid transit proposal, urging early planning (p.159). the engagement register lists 'landowners affected by gondola alignment' and 'gondola terminal' sites, notes a reserve where a corridor should 'ideally' be protected for the future (pp.168-169), and records qac's agreement in principle to a 'gondola proof of concept to connect through airport to remarkables park' (p.174). the august 2020 booklet (b21) does not mention mass rapid transit. tn25 does not address mrt. technical note bundle with engagement booklet and engagement report nzta (waka kotahi). appendix b19 technical note 25: vurt analysis (with appendix b20 proposed speed limits, b21 way to go engagement booklet and b22 engagement report) (2020). nzta contract 2018235; stantec project no. 310201227. queenstown town centre; sh6a frankton road; frankton; wakatipu basin final (tn25 'status: final 7 september 2020'; engagement report 'status: final' september 2020) records community and stakeholder interest in frankton-queenstown mass rapid transit, including alignment and a proof of concept with the airport; makes no recommendation. the b22 engagement report is the substantive mrt content. in april 2019, 'frankton 2 queenstown – mass transit' was one of three projects displayed, and there was 'good support and recognition that one of these options would be required in the medium term' (p.44). online survey q19 asked about 'a future high capacity public transport link between frankton and queenstown': 58.33% chose the sh6a route, which 'would require significant road widening', and 41.67% chose 'a gondola along queenstown hill' (pp.52, 105). in q26, 70.67% supported mass rapid transit terminals at regular intervals (p.114). stakeholder meetings covered integration with mass rapid transit (remarkables park) and mass rapid transit site (airport) (p.32). qac's submission asked about future-proofing for 'mass rapid or high frequency transit options' (p.148). the engagement register lists landowners affected by mass rapid transit alignment over queenstown hill and candidate mass rapid transit terminals. for qldc reserve land the register says 'ideally would look to protect corridor for the future' (p.169). it also records qac agreement in principle to 'gondola proof of concept to connect through airport to remarkables park' (p.174) and remarkables park support (p.175). the august 2020 public booklet (b21) does not mention mass rapid transit. \"there was good support and recognition that one of these options would be required in the medium term.\" (p.44) | \"most respondents preferred using the existing route along sh6a (frankton road) for a high capacity public transport system – 58% of respondents, over a gondola along queenstown hill. – 42% of respondents.\" (p.52) | \"c) qac would like to understand what future proofing is being undertaken to accommodate longer-term solutions (such as mass rapid or high frequency transit options) from queenstown town centre to frankton and/or queenstown airport.\" (p.148) | \"gondola and property not discussed with qldc property team as this option not favoured. ideally would look to protect corridor for the future.\" (p.169) | \"pt connections close to the terminal door, including gondola proof of concept to connect through airport to remarkables park.\" (p.174) street design pedestrian wellbeing benefits $76.1m pv (inner $32.1m, outer $44.0m) at 4%, 30 years (p.8) arterials pedestrian benefits $30.9m pv at 4%/60yr; $17.0m at 6%/40yr (p.13) arterial benefit sensitivity range $13.1m-$52.9m pv (p.14) illustrative retail spending uplift 10-15% ($30-45m p.a.) on ~$300m base; property value uplift ~$50m, not claimed as benefits (p.4) modelled alternative mode share 40% at 2028 and 60% at 2048 under bus max plus parking measures (p.12) nzup funding cited: $35m town centre upgrades (qldc contribution $22m), $50m arterials stage 1, $90m pt/active travel on sh6/6a (p.19) april 2019 survey q19: sh6a route 58.33% (84) vs gondola along queenstown hill 41.67% (60), n=144 (p.105) april 2019 survey q26: 70.67% (106) support gondola terminals at regular intervals, n=150 (p.114) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta published orc orc published qldc qldc published way to go way to go published iain govan contributor nzta waka kotahi nzta tony pickard contributor qldc qldc tony sizemore contributor nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-09-07",
    "cover": {
      "src": "/covers/QTS-037.webp",
      "srcset": "/covers/QTS-037.webp 400w, /covers/QTS-037-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-037/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-037/QTS-037-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-038",
    "code": "QTS-038",
    "title": "Investment and Delivery Committee Paper: Queenstown Transport Programme Procurement",
    "shortTitle": "Investment and Delivery Committee Paper",
    "summary": "Waka Kotahi NZ Transport Agency paper to the Investment and Delivery Committee (meeting 17 September 2020) seeking approval of the Queenstown Transport Programme Procurement Strategy and Plan. The Programme combines two Crown Infrastructure Partners-funded shovel-ready projects (Queenstown Town Centre Street Upgrades and Arterials Stage 1), NZ Upgrade Programme (NZUP) public transport and walking and cycling upgrades on SH6 and SH6A, and Wakatipu Active Travel Network Stage 1, valued at circa $230M. After comparing traditional, panel and collaborative models, and competitive, hybrid and pure alliances, it recommends a Pure Alliance procured jointly with Queenstown Lakes District Council (QLDC), with a Memorandum of Understanding between the client partners. Reasons include coordinated delivery to limit disruption, broader outcomes and economic stimulus during COVID-19 suppressed demand. Projects would sit under individual Target Outturn Costs. Future projects (later Active Travel stages, Lakeview, Public Transport Interchange) could be allocated on a 'yours to lose' basis. Attachment 1 shows the NZUP element with a cost cap of $90M.",
    "documentType": "Board or committee paper",
    "documentForm": "Board committee decision paper (procurement strategy)",
    "year": 2020,
    "publishedDate": "2020-09-09",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre; Frankton; SH6 and SH6A; Wakatipu",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Investment and Delivery Committee Paper: Queenstown Transport Programme Procurement (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc"
    ],
    "searchText": "qts-038 investment and delivery committee paper: queenstown transport programme procurement investment and delivery committee paper waka kotahi nz transport agency paper to the investment and delivery committee (meeting 17 september 2020) seeking approval of the queenstown transport programme procurement strategy and plan. the programme combines two crown infrastructure partners-funded shovel-ready projects (queenstown town centre street upgrades and arterials stage 1), nz upgrade programme (nzup) public transport and walking and cycling upgrades on sh6 and sh6a, and wakatipu active travel network stage 1, valued at circa $230m. after comparing traditional, panel and collaborative models, and competitive, hybrid and pure alliances, it recommends a pure alliance procured jointly with queenstown lakes district council (qldc), with a memorandum of understanding between the client partners. reasons include coordinated delivery to limit disruption, broader outcomes and economic stimulus during covid-19 suppressed demand. projects would sit under individual target outturn costs. future projects (later active travel stages, lakeview, public transport interchange) could be allocated on a 'yours to lose' basis. attachment 1 shows the nzup element with a cost cap of $90m. context and purpose: this investment and delivery committee paper (dated 9 september 2020; meeting 17 september 2020; final version) asks the committee to recommend that the waka kotahi board approve the queenstown transport programme procurement strategy and plan, using a pure alliance procured jointly with qldc (p1). elt sponsors are brett gliddon and matthew walker; it was prepared by kesh keshaboina and legally reviewed by lucy riddiford (p1). programme: the programme comprises the crown infrastructure partners (cip) funded queenstown town centre street upgrades and arterials stage 1 (balance funded by qldc), nzup-funded public transport and walking and cycling upgrades on sh6 and sh6a, and wakatipu active travel network stage 1 funded through the nltp, to be delivered over four years (p2). its scale is put at circa $230m (p1). attachment 1 (p7, image) gives indicative caps: town centre street upgrades ($60m, cip cap $35m), arterials stage 1 ($65m, cip cap $50m; pt hub potential inclusion unfunded $27m), active travel stage 1 ($16m) and stage 2 ($23m funding application), and nzup ($90m, nzup cap $90m, completion 2024, then in business case phase). options: traditional, panel (qldc three waters panel) and collaborative (alliance) models were ranked, with the alliance first (p3). competitive, hybrid and pure alliances were then compared; competitive and hybrid were judged to lack time given cip and nzup deadlines, so a pure alliance was preferred (p4). expected efficiencies include single programme governance, consistent design and construction, coordinated resources, early works packages and a more attractive market proposition (p4). the alliance scope would cover design and construction; business case, property and consenting would sit outside it (p4). market: the local horizontal infrastructure market was mainly projects under $10m; qldc's three waters programme runs at about $70m a year; nzup contains $6.8bn of transport projects ($5.4bn roading) (p5). risks are the accelerated procurement timeframe, client partner alignment and commercial complexity with multiple funding sources (pp5-6). individual target outturn costs (tocs) are recommended for each project, and further projects may be allocated on a 'yours to lose' basis (p6). mass rapid transit: the paper says nothing about mass rapid transit. it mentions a future public transport interchange as a possible alliance project (p6). board committee decision paper (procurement strategy) nzta (waka kotahi). investment and delivery committee paper: queenstown transport programme procurement (2020). queenstown town centre; frankton; sh6 and sh6a; wakatipu final does not mention mass rapid transit. programme circa $230m (p1) nzup element indicative cost $90m, nzup cap $90m (attachment 1, p7) town centre street upgrades $60m, cip cap $35m (p7) arterials stage 1 $65m, cip cap $50m; pt hub potential inclusion unfunded $27m (p7) active travel stage 1 $16m; stage 2 funding application $23m (p7) nz upgrade programme $6.8bn of transport projects ($5.4bn roading) (p5) qldc 3 waters programme in the order of $70m per annum (p5) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared qldc qldc partner nzta waka kotahi nzta recipient kesh keshaboina prepared by nzta waka kotahi nzta lucy riddiford reviewed by nzta waka kotahi nzta brett gliddon approved by nzta waka kotahi nzta matthew walker approved by nzta waka kotahi nzta board to approve the queenstown transport programme procurement strategy and plan. approves the queenstown transport programme procurement strategy and plan meeting 17 september 2020 not assessed nzta waka kotahi nzta board to approve a pure alliance delivery model procured jointly with queenstown lakes district council. approves the use of a pure alliance delivery model procured jointly with queenstown lakes district council meeting 17 september 2020 not assessed nzta waka kotahi nzta board to note that waka kotahi and qldc will enter a memorandum of understanding setting the basis for the partnership, including commercial principles. notes that a memorandum of understanding will be entered into not assessed nzta waka kotahi nzta establish projects within the programme under individual target outturn costs (tocs). projects within the programme be established under individual target outturn costs not assessed nzta waka kotahi nzta allow additional future projects (later active travel stages, lakeview, public transport interchange) to be allocated to the alliance on a 'yours to lose' basis. may be allocated to the alliance on a strictly 'yours to lose' basis not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-09-09",
    "cover": {
      "src": "/covers/QTS-038.webp",
      "srcset": "/covers/QTS-038.webp 400w, /covers/QTS-038-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-038/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-038/QTS-038-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-039",
    "code": "QTS-039",
    "title": "Frankton Design Report (Appendix C7, Queenstown Transport Business Case)",
    "shortTitle": "Frankton Design Report",
    "summary": "Jasmax's Frankton Design Report (Rev D, 14 September 2020) is Appendix C7 of the NZUP Queenstown Transport Business Case, prepared for NZTA (Waka Kotahi). It is a graphic urban design report in four sections: site and context, transport corridors, the SH6/SH6A intersection, and the Frankton hub. The context section reproduces 'information provided' from other processes: the draft Frankton masterplan, the draft Wakatipu spatial plan option and the Queenstown Events Centre masterplan. The corridor section shows general movement, PT, pedestrian and cycle networks along SH6 Frankton-Ladies Mile Highway and SH6 Kawarau Road. It includes axonometric mid-block crossing diagrams for short-term, long-term and 'Long term MRT' scenarios. The intersection section shows roundabout and signalised sketch options considered in the MCA. The preferred option is a signalised intersection with a village shared space and the golf course marked as a 'Future PT/TOD site'. The hub section sets out a staged design for the Frankton bus hub: an interim layout and a future layout with a PT hub building, concourse and retail units. The report has no costs and no recommendations beyond the layouts shown.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Urban design report (design appendix)",
    "year": 2020,
    "publishedDate": "2020-09-14",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6 Frankton-Ladies Mile Highway; SH6 Kawarau Road; SH6/SH6A intersection; Frankton bus hub",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Frankton Design Report (Appendix C7, Queenstown Transport Business Case) (2020). F2Q SSBC.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "coach"
    ],
    "organisationIds": [
      "nzta",
      "jasmax",
      "way-to-go-partnership"
    ],
    "searchText": "qts-039 frankton design report (appendix c7, queenstown transport business case) frankton design report jasmax's frankton design report (rev d, 14 september 2020) is appendix c7 of the nzup queenstown transport business case, prepared for nzta (waka kotahi). it is a graphic urban design report in four sections: site and context, transport corridors, the sh6/sh6a intersection, and the frankton hub. the context section reproduces 'information provided' from other processes: the draft frankton masterplan, the draft wakatipu spatial plan option and the queenstown events centre masterplan. the corridor section shows general movement, pt, pedestrian and cycle networks along sh6 frankton-ladies mile highway and sh6 kawarau road. it includes axonometric mid-block crossing diagrams for short-term, long-term and 'long term mrt' scenarios. the intersection section shows roundabout and signalised sketch options considered in the mca. the preferred option is a signalised intersection with a village shared space and the golf course marked as a 'future pt/tod site'. the hub section sets out a staged design for the frankton bus hub: an interim layout and a future layout with a pt hub building, concourse and retail units. the report has no costs and no recommendations beyond the layouts shown. context and purpose: this is appendix c7 of the 2020 nzup queenstown transport business case (footer 'f2q ssbc'). jasmax prepared it for waka kotahi nzta (p.2). the names in the revision table (drawn, checked, approved) are redacted under s 9(2)(a) (p.3). the report is mostly plans, maps and renders with short captions. section 1, site and context (pp.4-13): existing state highway network; land use and key features; active transport network (based on active transport business case 12b) (p.7); the frankton masterplan, marked 'information provided' and '[draft]' (p.8); the draft preferred spatial option for wakatipu, marked 'draft in-confidence - not qldc or government policy' (p.10); an indicative pt network 'based on bus max network' (p.11); and the queenstown events centre masterplan with a 'possible future transport hub' (pp.12-13). section 2, transport corridors (pp.14-25): (a) sh6 frankton-ladies mile highway and (b) sh6 kawarau road. network diagrams show general movement, pt, pedestrian and cycle movement. they include bus stop and interchange locations, signalised intersections, a grade-separated pedestrian crossing and potential future bus routes (fern hill-lake hayes, arthurs point-arrowtown, kelvin heights-quail rise, the frankton connector and queenstown-jacks point) (p.16). axonometric diagrams show a 'short term' mid-block crossing (p.18), a 'long term' mid-block crossing (p.19) and a 'long term mrt' mid-block crossing (p.20). section 3, sh6/sh6a intersection (pp.26-32): the existing aerial; 'initial sketch options considered in mca', a roundabout option and an intersection option (p.27); and the signalised intersection layout. that layout includes a 'golf course / future pt/tod site', a village shared space, a slow street with parking, signalised pedestrian crossings and a link to the events centre (pp.28-30). a 'future potential' layout shows tod development (p.31). section 4, frankton hub (pp.33-43): the existing layout on kawarau road (p.33) and design principles. these include 'a staged approach to infrastructure meeting the required demand and patronage over time', separation of public transport from private coach waiting, and 'minimise abortive work for future stage works. interim as stepped provision to future hub' (p.34). there are interim layouts (plan, pedestrian/cycle, pt bus hub, private coaches) (pp.35-38). future layouts add a pt hub building, entrance, concourse, retail units and secure cycle parking (pp.39-42). no costs, patronage figures or bcrs are given. mass rapid transit: the report has two items. first, the reproduced draft frankton masterplan legend includes 'gondola lines/base station (private)' under movement networks (p.8). this is third-party 'information provided', not a proposal in this report. the mass rapid transit route shown on that map could not be clearly identified at the resolution inspected. second, the corridor section includes an axonometric diagram titled 'long term mrt _ mid-block crossing' for sh6 frankton-ladies mile highway (p.20). it shows articulated rail-type or tram-type vehicles running at street level in a central corridor beside the general traffic lanes. the report gives no text describing the mrt mode, timing or route. it shows no mass rapid transit base station at the frankton hub and says nothing about an mrt link between frankton and the town centre. urban design report (design appendix) nzta (waka kotahi). frankton design report (appendix c7, queenstown transport business case) (2020). f2q ssbc. frankton; sh6 frankton-ladies mile highway; sh6 kawarau road; sh6/sh6a intersection; frankton bus hub rev d (bc update) shows a long-term at-grade mass rapid transit crossing on sh6 ladies mile; reproduces a masterplan legend that includes private mass rapid transit lines and a base station; no mass rapid transit proposal in the text. two references, both graphic. (1) the draft frankton masterplan, reproduced as 'information provided', includes the legend item 'gondola lines/base station (private)' among its movement networks (p.8). (2) an axonometric diagram titled 'long term mrt _ mid-block crossing' for '(a) sh6 frankton - ladies mile highway' shows street-running rail-type vehicles in a central corridor beside the traffic lanes, with a signalised pedestrian crossing (p.20). the report has no accompanying text on mrt mode, route, timing or cost. its frankton hub layouts (pp.33-43) are bus and coach facilities and show no mass rapid transit base station or mrt interface. \"long term mrt _ mid-block crossing\" (p.20) | \"gondola lines/base station (private)\" (p.8) | \"minimise abortive work for future stage works. interim as stepped provision to future hub.\" (p.34) 43 pages; four sections: site and context, transport corridors, sh6/sh6a intersection, frankton hub (p.3) revision history rev a to rev d, 2-14 september 2020 (p.3) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. coach coach and visitor shuttle services. nzta waka kotahi nzta commissioned jasmax jasmax prepared way to go way to go partner main document pdf",
    "sortDate": "2020-09-14",
    "cover": {
      "src": "/covers/QTS-039.webp",
      "srcset": "/covers/QTS-039.webp 400w, /covers/QTS-039-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-039/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-039/QTS-039-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-040",
    "code": "QTS-040",
    "title": "Appendix B14 Technical Note 38: SH6 Frankton East Corridor Operation and Future Performance (with B15 Technical Note 32: Arterial Permeability)",
    "shortTitle": "Appendix B14 Technical Note 38: SH6 Frankton East",
    "summary": "Two technical notes supporting the 2020 NZUP Queenstown Transport Detailed Business Case for NZTA (Waka Kotahi). TN38 (28 September 2020) assesses intersection forms on SH6 Frankton-Ladies Mile Highway between SH6/SH6A and Shotover Bridge at 2028 'NZUP Bus Max' demand. Option 1 signalises the Grant Road and Hawthorne Drive roundabouts. Option 2 converts them to conventional signalised intersections. Both signalise Joe O'Connell Drive and a realigned Hansen Road. The two options give similar capacity and bus and general traffic travel times, and both are compatible with the preferred SH6/SH6A layout. Conventional intersections give better at-grade pedestrian provision but need extra lanes and land. Signalised roundabouts need less land and retain U-turns. A separate MCA showed little overall difference, and the note leaves the choice to the relative weight of trade-offs. TN32 (31 July 2020) assesses pedestrian permeability across Arterial Stage 1. It concludes that signalised crossings at Henry/Gorge and Melbourne/Sydney and a recommended overbridge at Ballarat Street maintain key desire lines.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical notes (corridor intersection operation; arterial pedestrian permeability)",
    "year": 2020,
    "publishedDate": "2020-09-28",
    "documentStatus": "Final",
    "geographicScope": "SH6 Frankton-Ladies Mile Highway (SH6/SH6A to Shotover Bridge); Queenstown Town Centre Arterial Stage 1 (Melbourne Street-Henry Street)",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B14 Technical Note 38: SH6 Frankton East Corridor Operation and Future Performance (with B15 Technical Note 32: Arterial Permeability) (2020). NZTA Contract 2018235.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-040 appendix b14 technical note 38: sh6 frankton east corridor operation and future performance (with b15 technical note 32: arterial permeability) appendix b14 technical note 38: sh6 frankton east two technical notes supporting the 2020 nzup queenstown transport detailed business case for nzta (waka kotahi). tn38 (28 september 2020) assesses intersection forms on sh6 frankton-ladies mile highway between sh6/sh6a and shotover bridge at 2028 'nzup bus max' demand. option 1 signalises the grant road and hawthorne drive roundabouts. option 2 converts them to conventional signalised intersections. both signalise joe o'connell drive and a realigned hansen road. the two options give similar capacity and bus and general traffic travel times, and both are compatible with the preferred sh6/sh6a layout. conventional intersections give better at-grade pedestrian provision but need extra lanes and land. signalised roundabouts need less land and retain u-turns. a separate mca showed little overall difference, and the note leaves the choice to the relative weight of trade-offs. tn32 (31 july 2020) assesses pedestrian permeability across arterial stage 1. it concludes that signalised crossings at henry/gorge and melbourne/sydney and a recommended overbridge at ballarat street maintain key desire lines. context and purpose: appendices b14-b15 of the queenstown transport business case (nzta contract 2018235; stantec-led consortium) for nzta (waka kotahi). b14 tn38 (28 september 2020) assesses the sh6 frankton-ladies mile highway, a regional state highway serving growing mixed-use development on both sides (pp3-4). it builds on the 2018 grant road to kawarau falls bridge ssbc (p3). two options were modelled in linsig and s-paramics at 2028 'nzup bus max' demand (p4). option 1 signalises the grant road and hawthorne drive roundabouts. option 2 converts them to conventional signalised intersections. both signalise joe o'connell drive and a realigned hansen road (p4). bus lanes cover most of the corridor and through-bus delay is about 20 s (pp8, 29). pt and general traffic travel time differences are about a minute or less and are attributed to signal offsets (pp29-30). conventional layouts need extra approach and exit lanes. they give better at-grade crossings, though the east side of hawthorne drive still cannot have a crossing and some crossings must be staggered. a grade-separated crossing would be needed at grant road in the roundabout option (pp2, 31). a separate mca (not included) scored the roundabout higher for land take, masterplan alignment and safety, and the conventional option higher for pedestrians and land use (p31). b15 tn32 (31 july 2020) assesses pedestrian movement across arterial stage 1 (melbourne street-henry street). it recommends signalised crossings at henry/gorge and melbourne/sydney and an overbridge at ballarat street; no median barrier is proposed (pp33, 40). mass rapid transit: none. neither note discusses mrt, off-line public transport or mass rapid transit. technical notes (corridor intersection operation; arterial pedestrian permeability) nzta (waka kotahi). appendix b14 technical note 38: sh6 frankton east corridor operation and future performance (with b15 technical note 32: arterial permeability) (2020). nzta contract 2018235. sh6 frankton-ladies mile highway (sh6/sh6a to shotover bridge); queenstown town centre arterial stage 1 (melbourne street-henry street) final (tn38 'status: final 28 september 2020' (p2); tn32 'status: final 31 july 2020' (p33)) does not address mass rapid transit between frankton and queenstown. 2028 pt journey time sh6 corridor westbound total: am 6.1 min (both options); interpeak 6.3 (roundabout) vs 7.2 (conventional); pm 6.1 vs 6.9 (tn38, p29) 2028 general traffic westbound total: am 4.9 (roundabout) vs 4.4 min (conventional) (tn38, p29) network cycle time 120 seconds assumed; roundabout option uses 60 s at grant road and sh6/sh6a (tn38, p30) bus delay for through movements along sh6 around 20 seconds in all peaks (tn38, p8) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner alix newman reviewed by signalise sh6/joe o'connell drive as a t-intersection and realign hansen road to a new signalised t-intersection (common to both options). signalise the existing intersection as a t-intersection at joe o'connell drive; re-align hansen road 2028 design year not assessed choose between signalising the grant road and hawthorne drive roundabouts and converting them to conventional signalised intersections, weighing land take, pedestrian provision and other objectives. the decision being a choice between the relative importance of the various trade-offs not assessed provide signalised crossings at henry/gorge and melbourne/sydney and an overbridge at ballarat street across arterial stage 1. as well as the recommended overbridge at ballarat street not assessed main document pdf",
    "sortDate": "2020-09-28",
    "cover": {
      "src": "/covers/QTS-040.webp",
      "srcset": "/covers/QTS-040.webp 400w, /covers/QTS-040-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-040/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-040/QTS-040-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-041",
    "code": "QTS-041",
    "title": "Appendix B27 Technical Note 42: SH6A Bus Signal and Virtual Priority (with Appendix B28 Queenstown Arterial Stages 1 and 2 – Intersection Optioneering)",
    "shortTitle": "Appendix B27 Technical Note 42: SH6A Bus Signal",
    "summary": "Two technical notes appended to the 2020 NZUP Queenstown Detailed Business Case. TN42 (Final, 6 October 2020) uses SIDRA to test signalising the SH6A Frankton Road/Marina Drive/Sugar Lane intersection. Option 1 is a short-term layout with fully protected crossings on all arms. Option 2 is a longer-term layout with a new Frankton Marina access to the west, the eastbound right turn banned, and a staggered crossing. Signalisation gives near-capacity operation even at 2018 volumes. Option 1 becomes over capacity once SH6A crossing call rates exceed about 25%. TN42 recommends Option 1 only short term, with pedestrian volumes monitored, and Option 2 with the new Marina access towards 2028. It notes the F2Q SSBC strategy of capping SH6A traffic at about 2018 levels through signalised intersections and gating at Frankton. TN44 (Final, 27 October 2020) reviews November 2019 optioneering for the Shotover Street/Gorge Road/Henry Street intersection on Arterial Stages 1 and 2, updated with August 2020 modelling. It recommends a 'double-T' arrangement of two 3-arm intersections over a 4-arm intersection.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical notes (intersection traffic modelling)",
    "year": 2020,
    "publishedDate": "2020-10-06",
    "documentStatus": "Final",
    "geographicScope": "SH6A Frankton Road at Marina Drive/Sugar Lane; Queenstown Town Centre Shotover Street/Gorge Road/Henry Street",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B27 Technical Note 42: SH6A Bus Signal and Virtual Priority (with Appendix B28 Queenstown Arterial Stages 1 and 2 – Intersection Optioneering) (2020). NZTA Contract 2018235 - F2Q SSBC & QTC DBC; Technical Notes #42 and #44.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-041 appendix b27 technical note 42: sh6a bus signal and virtual priority (with appendix b28 queenstown arterial stages 1 and 2 – intersection optioneering) appendix b27 technical note 42: sh6a bus signal two technical notes appended to the 2020 nzup queenstown detailed business case. tn42 (final, 6 october 2020) uses sidra to test signalising the sh6a frankton road/marina drive/sugar lane intersection. option 1 is a short-term layout with fully protected crossings on all arms. option 2 is a longer-term layout with a new frankton marina access to the west, the eastbound right turn banned, and a staggered crossing. signalisation gives near-capacity operation even at 2018 volumes. option 1 becomes over capacity once sh6a crossing call rates exceed about 25%. tn42 recommends option 1 only short term, with pedestrian volumes monitored, and option 2 with the new marina access towards 2028. it notes the f2q ssbc strategy of capping sh6a traffic at about 2018 levels through signalised intersections and gating at frankton. tn44 (final, 27 october 2020) reviews november 2019 optioneering for the shotover street/gorge road/henry street intersection on arterial stages 1 and 2, updated with august 2020 modelling. it recommends a 'double-t' arrangement of two 3-arm intersections over a 4-arm intersection. context and purpose: appendices b27 and b28 of the queenstown transport business case (nzta contract 2018235). author names are redacted (s 9(2)(a)). sign-off roles are principal transportation engineer, project design/integration manager and project team leader (pp.11, 22). tn42 (pp.2-11): existing priority-controlled operation of sh6a/marina drive/sugar lane is poor, with side-road los f and drivers accepting very short gaps. this 'suggests a road safety issue' (p.4). protected right turns and fully protected crossings were assumed in discussion with the transport agency (p.4). at 2028 pm peak, sh6a westbound v/c ranges from 0.99 (0% calls) to 1.46 (100%) under option 1, and from 0.95 to 1.17 under option 2 (p.9). holding westbound v/c at 85% at a 50% call rate would need demand cut by 419 v/h (option 1) or 256 v/h (option 2) (p.10). the f2q ssbc 'is likely to recommend the installation of a number of signalised intersections along frankton road', capping sh6a traffic near 2018 demand so that pt mode share must rise (pp.10-11). bus lanes shown in option 2 are 'still under investigation' (p.4). tn44 (pp.13-22): the town centre masterplan identified options 4, 4.1 and 5 for the gorge road/shotover/henry street intersection (p.13). with fully protected, single-phase pedestrian crossings, the 4-arm layout operates at los f at 2028 interpeak (p.16). an expanded 4-arm layout reaches los e but needs extra land, and the masterplan advisory group was concerned about intersection size (p.17). the double-t operates at los c-d (p.20). august 2020 volumes (arterial stage 1 only; total +7.5%) worsen all options, with the 4-arm worst movement at 142% (p.21). the note recommends the double-t as preferred (p.22). it also records that the 'shovel ready' funding announced 26 june 2020 was for stage 1 only (p.13). mass rapid transit: neither note mentions mass rapid transit or offline public transport. tn42 does set out the corridor strategy of capping sh6a traffic volumes near existing levels, which requires future growth to be carried by public transport (pp.10-11). technical notes (intersection traffic modelling) nzta (waka kotahi). appendix b27 technical note 42: sh6a bus signal and virtual priority (with appendix b28 queenstown arterial stages 1 and 2 – intersection optioneering) (2020). nzta contract 2018235 - f2q ssbc & qtc dbc; technical notes #42 and #44. sh6a frankton road at marina drive/sugar lane; queenstown town centre shotover street/gorge road/henry street tn42 final (6 october 2020); tn44 final (27 october 2020) no mass rapid transit reference; notes sh6a traffic to be capped near 2018 levels with growth carried by public transport. 2028 pm sh6a westbound v/c at marina/sugar lane: option 1 0.99-1.46; option 2 0.95-1.17 across 0-100% pedestrian call rates (p.9) demand reduction to hold 85% v/c at 50% call rate: 419 v/h (option 1) vs 256 v/h (option 2) (p.10) gorge rd/shotover/henry 4-arm: los f 2028 interpeak; double-t los c-d (pp.16, 20) august 2020 update: total intersection volume +7.5% (2,025 to 2,175 veh/h); 4-arm worst movement 142% (p.21) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner implement option 1 signalised layout at sh6a/marina drive/sugar lane on a short-term basis only, monitoring pedestrian crossing volumes. option 1 can be implemented at the location, but only on a relatively short-term basis short term not assessed move to option 2 layout with an additional frankton marina access intersection to the west as demand grows towards 2028. option 2 provides a more suitable layout at this location, together with the installation of an additional frankton marina access towards 2028 not assessed take forward the double-t arrangement as the preferred shotover street/gorge road/henry street intersection for arterial stages 1 and 2. it is recommended that the double-t arrangement is taken forward as the preferred option not assessed carefully consider phase arrangement changes at stanley/shotover street to coordinate with the double-t and limit internal queuing. there will need to be careful consideration of any alterations to phase arrangement not assessed main document pdf",
    "sortDate": "2020-10-06",
    "cover": {
      "src": "/covers/QTS-041.webp",
      "srcset": "/covers/QTS-041.webp 400w, /covers/QTS-041-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-041/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-041/QTS-041-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-042",
    "code": "QTS-042",
    "title": "Appendix D Economic Case (D1 Economics Peer Review; D2 Technical Note 26: Unmet Demand; D3 Breakdown of EEM Benefits; D4 Cost Estimates)",
    "shortTitle": "Appendix D Economic Case",
    "summary": "Appendix D supports the Economic Case of the NZUP Queenstown Transport Business Case. D1 holds two peer reviews for NZTA (Waka Kotahi), both addressed to Tony Sizemore. In the first, EY (29 October 2020) concludes that the Wider Economic Benefit analysis is 'robust and defensible' and probably a lower bound. It flags a communications risk in using international tourism as a proxy for unmet demand, and queries the low agglomeration assumption. In the second, Flow Transportation Specialists (20 October 2020) finds 'some level of risk' in the fixed-trip-matrix evaluation and the treatment of NZUP in the Do Minimum. Flow cut travel time and vehicle operating cost benefits by 20% and 33% and removed double-counted farebox recovery. With those changes, BCRs fall to between 2.9 and 1.2 across the five cumulative scenarios but stay above 1.0. D2 is Technical Note 26 (Final, 7 September 2020). It estimates GDP effects of unmet SH6A travel demand using international tourism as a proxy. It states that after on-road capacity (about 55,900 person-trips per day) is reached in 25-30 years, 'another step-wise intervention, possibly an MRT system such as a gondola, will then be required'. It puts the NZ GDP benefit of capacity beyond 2051 at $187 million (PV). D3 tabulates EEM benefits by scenario. D4 contains about 330 pages of NZTA-format cost estimate forms: for example, the Frankton package is $68.7m expected ($83.5m 95th percentile) and SH6A Frankton-Queenstown $28.0m ($34.3m).",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Economic case appendix: peer reviews, technical note, benefit tables and cost estimates",
    "year": 2020,
    "publishedDate": "2020-10-29",
    "documentStatus": "Final",
    "geographicScope": "SH6A Frankton to Queenstown; Queenstown Town Centre; Frankton (SH6); Wakatipu Basin",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix D Economic Case (D1 Economics Peer Review; D2 Technical Note 26: Unmet Demand; D3 Breakdown of EEM Benefits; D4 Cost Estimates) (2020). NZTA Contract 2018235 - Technical Note #26; WSP/Stantec project no. 310201227.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "ey",
      "flow-transportation-specialists",
      "stantec",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-042 appendix d economic case (d1 economics peer review; d2 technical note 26: unmet demand; d3 breakdown of eem benefits; d4 cost estimates) appendix d economic case appendix d supports the economic case of the nzup queenstown transport business case. d1 holds two peer reviews for nzta (waka kotahi), both addressed to tony sizemore. in the first, ey (29 october 2020) concludes that the wider economic benefit analysis is 'robust and defensible' and probably a lower bound. it flags a communications risk in using international tourism as a proxy for unmet demand, and queries the low agglomeration assumption. in the second, flow transportation specialists (20 october 2020) finds 'some level of risk' in the fixed-trip-matrix evaluation and the treatment of nzup in the do minimum. flow cut travel time and vehicle operating cost benefits by 20% and 33% and removed double-counted farebox recovery. with those changes, bcrs fall to between 2.9 and 1.2 across the five cumulative scenarios but stay above 1.0. d2 is technical note 26 (final, 7 september 2020). it estimates gdp effects of unmet sh6a travel demand using international tourism as a proxy. it states that after on-road capacity (about 55,900 person-trips per day) is reached in 25-30 years, 'another step-wise intervention, possibly an mrt system such as a gondola, will then be required'. it puts the nz gdp benefit of capacity beyond 2051 at $187 million (pv). d3 tabulates eem benefits by scenario. d4 contains about 330 pages of nzta-format cost estimate forms: for example, the frankton package is $68.7m expected ($83.5m 95th percentile) and sh6a frankton-queenstown $28.0m ($34.3m). context: appendix d is the economic case appendix of the 2020 nzup queenstown transport business case (nzta contract 2018235). author and reviewer names are largely redacted under s 9(2)(a). d1, ey peer review of wider economic benefits (pp.2-11). ey was engaged under an ipa contract of 14 august 2020 and reviewed the october 2020 draft business case and stantec et al methodology papers. it did not review the wider models (p.7). it found the web analysis 'robust and defensible' and aligned with waka kotahi guidance, using a 4% discount rate and 60-year period. conservative assumptions mean estimates 'likely represent the lower-bound of benefits' (p.7). pedestrian amenity (pers/vurt, 4x multiplier) is judged robust (p.9). on unmet demand, ey notes waka kotahi guidance that 'tourism benefits must not be included in any bcr calculation'. it accepts that tourism is used as a proxy for travel demand rather than monetised, calls this 'a potential communications risk', and recommends the point be highlighted to treasury or idm assurance officials (pp.10-11). it also queries the low agglomeration judgement and the omission of non-co2 pollutants, and notes covid-19 forecast uncertainty (p.11). d1, flow transportation specialists review of monetised benefits (pp.12-20). flow reviewed the economic case report (7 october 2020), the economics spreadsheet, the abley tracks modelling report, the stantec fmor and wsp tn3b (p.13). its findings (p.14): - nzup was moved into the do minimum without a matching model scenario. - nzup may worsen general traffic performance. - a variable trip matrix assessment was needed but could not be done on the current platforms. a proxy cross-load test 'switch[ed] from a positive benefit stream, to a negative benefit stream for general traffic' (p.17). flow's sensitivity bcrs for the five cumulative scenarios are 3.9/3.6/2.5/2.1/1.6 (20% cut) and 3.4/3.2/2.2/1.9/1.4 (33% cut) (p.18). after also removing double-counted farebox recovery they are 2.9/2.8/1.9/1.7/1.3 and 2.6/2.5/1.7/1.5/1.2 (p.19). costs use expected estimates with a ±20% test rather than 95th percentile (p.19). flow concludes there is 'sufficient confidence... to progress to the next stage' and supports a new single modelling platform for the dbc (pp.14, 18). d2, tn26 effect of transport constraint on tourism (pp.21-56; final 7 september 2020). using sh6a daily flows decomposed into residents, domestic and international visitors, and a 38,000 vehicles per day capacity, it estimates: - unmet demand on 126 days in 2028 and 338 days in 2048, or 268,000 vehicle-trips in 2028 rising to 3.5 million in 2048 (p.28). - foregone queenstown direct gdp of about $1.1 billion pv, $748 million net of investment costs, and an nz effect of about $174 million (40 years at 6%), or $2.3 billion and $0.5 billion at 60 years and 4% (pp.24, 30-34). benefits applied in the business case: $61 million for 2,100 unmodelled person-trips per day attributed to nzup, and $187 million for capacity beyond 55,900 person-trips per day from 2051 (pp.22-23). the standard modelled user benefit is $407 million (p.23). behaviour change of 2% a year (18% by 2028) would eliminate the foregone gdp (pp.33-34). airport capacity of 5.1 million arrivals is a potential competing constraint within 18-43 years depending on the scenario (pp.32-33). d3, breakdown of eem benefits (pp.57-58): 2018/2028/2048 benefits by component for cumulative scenarios, e.g. about $37.4m in 2048 for dm + nzup + arterial stages 2-3 + bus hub (p.58). d4, cost estimates (pp.59-396): nzta estimate pro-formas for queenstown town centre items. examples are tc14c stanley street full hub $45.9m expected, and arterial stages 1 to 3 at $88.3m, $44.1m and $97.1m expected. the sh6 frankton ssbc summary is $68.7m expected and $83.5m 95th percentile, excluding the humphrey street link at $10.6m (p.311). the sh6a frankton to queenstown summary is $28.0m expected and $34.3m 95th percentile (p.341). mass rapid transit: tn26 treats an offline system as the expected next stage. it states that on-road capacity will reach a limit 'probably in 25-30 years', and that 'another step-wise intervention, possibly an mrt system such as a gondola, will then be required to meet the travel demand between frankton and queenstown central' (p.22). it values meeting demand above 55,900 person-trips per day from 2051 at $187 million of nz gdp (pv) (p.23). it describes staged interventions: 'initial interventions (i.e. more buses)' followed by 'a second intervention (e.g. gondola) enabling even higher travel demand to be met' (p.27). it also notes 'more buses now may avoid an initial capacity constraint for many years but eventually further changes (e.g. a gondola) will also be required' (p.34). it flags 'economies of scale around a gondola node' and property value gains 'near a gondola station' as possible additional benefits (pp.25, 32). the peer reviews do not discuss mrt. economic case appendix: peer reviews, technical note, benefit tables and cost estimates nzta (waka kotahi). appendix d economic case (d1 economics peer review; d2 technical note 26: unmet demand; d3 breakdown of eem benefits; d4 cost estimates) (2020). nzta contract 2018235 - technical note #26; wsp/stantec project no. 310201227. sh6a frankton to queenstown; queenstown town centre; frankton (sh6); wakatipu basin peer reviews final letters (oct 2020); tn26 status: final (7 sep 2020); cost estimates dated apr-oct 2020 expects mass rapid transit once on-road capacity is reached (about 25-30 years; from 2051). tn26 (appendix d2) sets out a staged capacity model for sh6a. vehicle capacity (cap 1) will soon be reached. higher occupancy through pt will reach a second limit 'probably in 25-30 years' (cap 2). then 'another step-wise intervention, possibly an mrt system such as a gondola, will then be required to meet the travel demand between frankton and queenstown central' (p.22). the modelling implies cap 2 equals 55,900 person-trips per day. providing capacity beyond it 'from 2051 would be expected to generate an extra $187 million gdp for new zealand' in pv terms, excluding welfare gains to the other 60% of users (p.23). it explains that mass rapid transit 'would leave the sh6a vehicle capacity... unchanged and instead would shift the unmet demand to an alternative route and mode'. it adds that 'a second intervention (e.g. gondola)' would capture area c benefits (p.27), and that 'eventually further changes (e.g. a gondola) will also be required to avoid a later capacity constraint' (p.34). possible additional benefits are 'economies of scale around a gondola node' (p.25) and property value gains 'near a gondola station' (p.32). it notes that the effectiveness of interventions is not assessed and 'this stage of work is ongoing' (p.28). the ey and flow reviews do not address mrt. \"another step-wise intervention, possibly an mrt system such as a gondola, will then be required to meet the travel demand between frankton and queenstown central.\" (p.22) | \"then providing extra capacity from 2051 would be expected to generate an extra $187 million gdp for new zealand, expressed in present value terms today\" (p.23) | \"it is likely that interventions will be staged, with initial interventions (i.e. more buses) meeting demand up to the point of the dashed black line, say, and a second intervention (e.g. gondola) enabling even higher travel demand to be met.\" (p.27) | \"more buses now may avoid an initial capacity constraint for many years but eventually further changes (e.g. a gondola) will also be required to avoid a later capacity constraint.\" (p.34) flow sensitivity bcrs (20% vot/voc cut, farebox removed): 2.9, 2.8, 1.9, 1.7, 1.3 across five cumulative scenarios; 33% cut: 2.6, 2.5, 1.7, 1.5, 1.2 (p.19) flow bcrs with 20% / 33% cut only: 3.9-1.6 / 3.4-1.4 (p.18) second capacity cap 55,900 person-trips/day; nz gdp benefit of capacity beyond it from 2051 $187m pv (p.23) unmodelled 2,100 person-trips/day benefit $61m applied to nzup; standard modelled user benefit $407m (p.23) foregone queenstown gdp ~$1.1b pv gross, $748m net; nz ~$174m (40yr/6%); $2.3b and $0.5b (60yr/4%) (pp.24, 34) sh6a capacity assumed 38,000 vpd; unmet demand on 126 days (2028) and 338 days (2048) (p.28) sh6 frankton ssbc estimate $68.7m expected / $83.5m 95th percentile, excl. humphrey st link $10.6m (p.311) sh6a frankton to queenstown estimate $28.0m expected / $34.3m 95th percentile (p.341) tc14c stanley street full hub $45.9m expected; arterial stage 1 $88.3m, stage 2 $44.1m, stage 3 $97.1m expected (pp.177, 277, 288, 309) evaluation: eem, 60 years at 4% discount; 40 years at 6% sensitivity (p.8) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned ey ey prepared flow transportation specialists flow transportation specialists prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner terry church reviewed by flow transportation specialists flow transportation specialists tony sizemore client representative nzta waka kotahi nzta anthony byett contributor ey ey invest in a new single transport modelling platform for general vehicle and pt demand, for use in the detailed business case we would support this investment and its use in the next phases of this project next phase (dbc) not assessed way to go way to go undertake a variable trip matrix assessment (at least between phase 1 and phase 2) to address the step change in demand between do minimum and options our preference would have been for the evaluation to be based on a vtm method between phase 1 and phase 2 next phase not assessed remove double-counted farebox recovery from the benefit stream (flow applied this correction in its sensitivity bcrs) farebox recovery had been double counted not assessed highlight that tourism is a proxy for travel demand, not a monetised benefit, if unmet demand results are presented to treasury or idm assurance officials we recommend that this point be highlighted if the programme team ever presents their results to treasury when presenting to treasury / assurance not assessed clarify the unmet demand and productivity wording in tn26 before presenting detailed analysis to external parties the programme team may wish to clarify this section of the technical note before external presentation not assessed reconsider agglomeration benefits, judged low by stantec, given the programme aims to enable higher density, higher amenity development we would appreciate an opportunity to better understand stantec's reasoning follow-up assessment not assessed stantec stantec consider non-monetised benefits and health impacts of non-co2 pollutants (nox, particulates) in follow-up assessment subsequent analysis may wish to take account of these eem / mbcm benefit categories. follow-up assessment not assessed assess the effectiveness of alternative interventions (e.g. more buses, mass rapid transit) in removing the sh6a constraint; tn26 estimates potential benefit only this report does not consider the effectiveness of alternative interventions... this stage of work is ongoing. 'this stage of work is ongoing' not assessed main document pdf",
    "sortDate": "2020-10-29",
    "cover": {
      "src": "/covers/QTS-042.webp",
      "srcset": "/covers/QTS-042.webp 400w, /covers/QTS-042-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-042/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-042/QTS-042-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-043",
    "code": "QTS-043",
    "title": "2019/20 Annual Report (Rīpoata ā-tau)",
    "shortTitle": "2019/20 Annual Report (Rīpoata ā-tau)",
    "summary": "QLDC's 2019/20 Annual Report records capital expenditure 'below estimate by $108.1m' (p.8), $16.2m of it transport timing. The delayed Queenstown Arterials project 'created an unfavourable variance of $20.2m' in grants and subsidies, linked to NZTA approval (pp.7, 10). $67.75m of carry-forwards were approved, including deferred Queenstown parking improvements ($1.31m) and park-and-ride services ($1.25m) (p.13). The three waters and roading capital works KPI was 66% against >80% (p.55). The Council secured $85m of Crown Infrastructure Partners funding for Queenstown streetscapes and arterial stage one (p.28). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2020,
    "publishedDate": "2020-10-29",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2019/20 Annual Report (Rīpoata ā-tau) (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ylepm2do/qldc_annual-report_2019-2020_combined-291020-adopted.pdf",
      "https://www.qldc.govt.nz/media/fvonijec/1-adopt-annual-report-2020.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-043 2019/20 annual report (rīpoata ā-tau) 2019/20 annual report (rīpoata ā-tau) qldc's 2019/20 annual report records capital expenditure 'below estimate by $108.1m' (p.8), $16.2m of it transport timing. the delayed queenstown arterials project 'created an unfavourable variance of $20.2m' in grants and subsidies, linked to nzta approval (pp.7, 10). $67.75m of carry-forwards were approved, including deferred queenstown parking improvements ($1.31m) and park-and-ride services ($1.25m) (p.13). the three waters and roading capital works kpi was 66% against >80% (p.55). the council secured $85m of crown infrastructure partners funding for queenstown streetscapes and arterial stage one (p.28). no mass rapid transit reference was found. context and purpose. annual report for 2019/20, the second year of the 2018-2028 plan and the first covid-19 year, signed 29 october 2020 (p.23). transport. capital expenditure was 'below estimate by $108.1m for the year ended 30 june 2020', of which transport accounted for $16.2m of timing differences (p.8). 'the delay associated with the queenstown arterials project created an unfavourable variance of $20.2m' in grant and subsidy revenue, attributed to the nzta approval process for major queenstown transport improvements (pp.7, 10). carry-forwards of $67.75m were approved in august 2020 (p.13), and queenstown parking improvements ($1,311,074) and park and ride transport services ($1,248,033) were deferred at year end (p.13). the council reports 'securing $85m in cip funding for the queenstown streetscapes and stage one of the arterials' (p.28); the chief executive puts combined government and council investment in the two projects at $125m with 320 expected jobs (p.4). performance. the capital works kpi for three waters and roading was 66% against a target above 80%, with $40.2m spent against a year-to-date budget of $61.2m (p.55). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report 2019/20 annual report (rīpoata ā-tau) (2020). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $108.1m below estimate; transport $16.2m of timing (p.8) queenstown arterials unfavourable grant/subsidy variance $20.2m (p.7) carry-forwards $67.75m (p.13) deferred: queenstown parking improvements $1,311,074; park and ride services $1,248,033 (p.13) capital works kpi (three waters and roading) 66% vs >80% (p.55) $85m cip funding for streetscapes and arterial stage one (p.28) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2020 bus scheduled bus and bus-priority public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc carry forward $67.75m of capital projects to 2020/21 $67.75m of carry-forward projects 2020/21 not assessed qldc qldc defer queenstown parking improvements ($1,311,074) and park and ride transport services ($1,248,033) deferred at year end deferred at year end 2019/20 not assessed qldc qldc deliver queenstown streetscapes and arterials stage one with $85m crown infrastructure partners funding securing $85m in cip funding from 2020/21 not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2020-10-29",
    "cover": {
      "src": "/covers/QTS-043.webp",
      "srcset": "/covers/QTS-043.webp 400w, /covers/QTS-043-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-043/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-043/QTS-043-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-043/QTS-043-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-044",
    "code": "QTS-044",
    "title": "Appendix A Strategic Case (A1 Technical Note 37: Frankton Land Use Integration; A2 Alignment to National and Local Standards; A3 Key Performance Indicator Details; A4 Community Engagement Analysis; A5 Workshop Notes)",
    "shortTitle": "Appendix A Strategic Case",
    "summary": "Appendix A to the 2020 NZUP Queenstown Transport Detailed Business Case for NZTA (Waka Kotahi) supports the strategic case. A1 is Technical Note 37 (13 November 2020), which describes Frankton's growth, congestion at the BP Roundabout and Frankton Hub conflicts. It proposes a short-term hub upgrade, a substantial upgrade around 2027, a signalised SH6/SH6A intersection and SH6 bus priority. A2 sets out alignment with national and local strategies (GPS 2021 draft, Road to Zero, Arataki, Keeping Cities Moving, Better Ways to Go, RLTP, RPTP). A3 defines key performance indicators. A4 is the March 2019 engagement report on a February 2019 online survey of 349 people. Its main themes were mode conflict, congestion, intersection and pedestrian upgrades and parking. A5 contains workshop notes and slides from September 2018 to April 2019, including draft MCA weightings. The April 2019 Workshop 4 memo concluded that public transport should include 'new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit)'. It also found that further work was needed to decide whether mass rapid transit or road-based solution delivers more benefits.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case appendix bundle (technical note, strategy alignment, KPI definitions, engagement report and workshop notes/slides)",
    "year": 2020,
    "publishedDate": "2020-11",
    "documentStatus": "Final",
    "geographicScope": "Frankton; BP Roundabout (SH6/SH6A); Frankton to Queenstown corridor (SH6A); Queenstown Town Centre",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix A Strategic Case (A1 Technical Note 37: Frankton Land Use Integration; A2 Alignment to National and Local Standards; A3 Key Performance Indicator Details; A4 Community Engagement Analysis; A5 Workshop Notes) (2020). NZTA Contract 2018235; Stantec Project No. 80510559 (TN37, workshop notes); 310201227 (Engagement Report); 310101227 (Workshop 4 memo, as printed).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-044 appendix a strategic case (a1 technical note 37: frankton land use integration; a2 alignment to national and local standards; a3 key performance indicator details; a4 community engagement analysis; a5 workshop notes) appendix a strategic case appendix a to the 2020 nzup queenstown transport detailed business case for nzta (waka kotahi) supports the strategic case. a1 is technical note 37 (13 november 2020), which describes frankton's growth, congestion at the bp roundabout and frankton hub conflicts. it proposes a short-term hub upgrade, a substantial upgrade around 2027, a signalised sh6/sh6a intersection and sh6 bus priority. a2 sets out alignment with national and local strategies (gps 2021 draft, road to zero, arataki, keeping cities moving, better ways to go, rltp, rptp). a3 defines key performance indicators. a4 is the march 2019 engagement report on a february 2019 online survey of 349 people. its main themes were mode conflict, congestion, intersection and pedestrian upgrades and parking. a5 contains workshop notes and slides from september 2018 to april 2019, including draft mca weightings. the april 2019 workshop 4 memo concluded that public transport should include 'new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit)'. it also found that further work was needed to decide whether mass rapid transit or road-based solution delivers more benefits. context and purpose: appendix a supports the strategic case of the queenstown transport business case (nzta contract 2018235; stantec-led consortium with wsp opus, abley and jasmax) for nzta (waka kotahi) and the way to go partners. consultant names are redacted under s 9(2)(a) throughout. a1, technical note 37 'frankton design' (divider title 'frankton land use integration'; 13 november 2020, pp3-9), describes frankton's growth since 2007, including the airport (about 2.2 million passengers in 2019, p4). it notes that pt commute mode share rose from 3.1% to 8.0% between 2013 and 2018, off a low base (p5), and describes car-oriented development and the bp roundabout as a pinch point (pp5-6). it sets out the conflicts at the frankton hub between urban, tourist, regional and other services (pp6-7). it proposes a short-term hub upgrade and a larger upgrade around 2027 (p7), a signalised sh6/sh6a intersection (p8), and sh6 east/south bus priority with signalised crossings and a set-back walking and cycling route (p8). a2 (pp11-16) sets out alignment with the draft gps 2021-31, road to zero, arataki, keeping cities moving, better ways to go (endorsed by orc on 26 august 2020, p15), the otago/southland rltp and the otago rptp, and lists other documents used (p16). a3 (pp18-24) defines kpis: amenity (vurt-based index), system occupancy, walking los, network catchment by mode, visitor experience, urban development potential and quality of life. a4 is the 'engagement report strategic case' (march 2019, pp26-61). it reports a february 2019 social pinpoint survey with 349 participants (p30). public transport attracted most interest overall, and was the main interest in the frankton to queenstown corridor (p58). the main themes were mode conflict, safety and congestion. the recommended improvements were intersection and side-road access upgrades, pedestrian facilities, an upgraded transport hub and town centre parking (pp28, 59-60). verbatim comments include suggestions for light rail, a tram on the frankton track and monorail/'above the road mrt' (pp42-44). a5 (pp62-153) contains workshop 1 notes (18-19 september 2018) and workshop 2 notes (9 october 2018), which cover project set-up, scope, governance and problem statements. it also contains workshop 3 slides for the f2q long list and mca criteria, which give draft weightings (pp90-91), and slides for a qtc options workshop (pp109-146). the workshop 4 'emerging packages' memo (april 2019) records that do-nothing and private-vehicle packages performed poorly, and that 'a step change in public transport is necessary' (p150). two packages emerged: package 1 (modest) and package 2 (ambitious), with the latter adding a further pt mode (p151). a6 overarching engagement strategy appears only as a divider page (p154). mass rapid transit: passing but significant. the workshop 4 memo (april 2019) lists 'new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit)' as a consensus theme (p150). it states that package 2 'delivers an additional public transport mode' and that 'further work is required to determine whether a gondola or road-based (light rail/bus rapid transit) solution delivers more benefits' (p151). the memo background says the step change 'is likely to increase the volume of mass transit' (p148). workshop 1 notes refer to 'the mrt part of the f2q ssbc' (p64), and the draft f2q criteria weight 'public transport (buses, ferries, mrt)' at 30% (p91). tn37 does not mention mass rapid transit or mrt. business case appendix bundle (technical note, strategy alignment, kpi definitions, engagement report and workshop notes/slides) nzta (waka kotahi). appendix a strategic case (a1 technical note 37: frankton land use integration; a2 alignment to national and local standards; a3 key performance indicator details; a4 community engagement analysis; a5 workshop notes) (2020). nzta contract 2018235; stantec project no. 80510559 (tn37, workshop notes); 310201227 (engagement report); 310101227 (workshop 4 memo, as printed). frankton; bp roundabout (sh6/sh6a); frankton to queenstown corridor (sh6a); queenstown town centre final (tn37 'status - final' (p3); engagement report strategic case 'status: final' march 2019 (p27); workshop 4 memo 'final' april 2019 (p147)) workshop 4 (april 2019) keeps a mass rapid transit corridor in the ambitious package; further work is needed to choose the technology. the workshop 4 'emerging packages' memo (april 2019) records a consensus theme that 'public transport should be multi-modal and include... new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit)' (p150). it describes package 2 (ambitious) as delivering 'an additional public transport mode (besides bus and ferry services)'. it adds that 'further work is required to determine whether a gondola or road-based (light rail/bus rapid transit) solution delivers more benefits' (p151). the memo's background states that 'a step change in capacity is necessary along the frankton to queenstown corridor' and 'is likely to increase the volume of mass transit' (p148). workshop 1 notes (september 2018) refer to 'the mrt part of the f2q ssbc' (p64). the draft f2q investment objective weightings give 'public transport (buses, ferries, mrt)' 30% (p91). public comments in the march 2019 engagement report include 'light rail investment in the corridor' (p42), 'tram line along frankton track' and 'above the road mrt' (pp42-44). tn37 (november 2020) and a2/a3 do not discuss mass rapid transit or mrt. \"public transport should be multi-modal and include a combination of bus service improvements, water-based public transport options and new public transport corridors facilitated by alternative modes (gondolas or light rail/bus rapid transit).\" (p.150) | \"package two delivers an additional public transport mode (besides bus and ferry services). further work is required to determine whether a gondola or road-based (light rail/bus rapid transit) solution delivers more benefits.\" (p.151) | \"this step change is likely to increase the volume of mass transit, which will have significant impacts in operation of the town centre.\" (p.148) | \"does the mrt part of the f2q ssbc need to consider the traffic coming east from shotover?\" (p.64) frankton public transport commute mode share 3.1% (2013) to 8.0% (2018) (tn37, p5) queenstown airport around 2.2 million passenger arrivals and departures in 2019 (tn37, p4) february 2019 engagement: 349 participants; 48 completed the demographic sub-survey; 89.4% locals (p30) frankton road theoretical capacity of 28,000 daily traffic, tipping point around 2019/2020 (workshop 2 notes, p71) draft f2q mca category weightings 20% each; draft investment objective weights incl. 'public transport (buses, ferries, mrt) 30%' within 55% throughput (pp90-91) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared nzta waka kotahi nzta prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner tony sizemore project manager nzta waka kotahi nzta gabrielle tabron contributor qldc qldc matthew roberts contributor qldc qldc peter hansby contributor qldc qldc stephen patience contributor orc orc tony pickard contributor qldc qldc upgrade the current frankton hub in the short term to separate urban from tourism and long-distance services and improve customer amenity. in the short-term, we propose to upgrade the current hub short term not assessed deliver a more substantial frankton hub upgrade timed around the planned 2027 step change in public transport service. longer-term, we call for a more substantial upgrade, at best timed around the planned step change around 2027 not assessed replace the bp roundabout with a signalised sh6/sh6a intersection with bus lanes, bus priority and safe pedestrian and cycle links. the preferred solution of a signalised intersection provides as best as possible for these conflicting functions not assessed provide extensive bus priority, bus stops, signalised crossings and a set-back walking and cycling route on sh6 east and south. what we call for in our plans for these sections of state highway 6 is a game changer. not assessed carry out further work to choose among mass rapid transit technologies for the ambitious package. further work is required to determine whether a gondola or road-based (light rail/bus rapid transit) solution delivers more benefits. before workshop 5 (2019) not assessed stantec stantec perform specific analysis on the different public transport modes and connections in queenstown town centre, and investigate short-term deliverable elements. specific analysis will be performed on the different public transport modes and connections before workshop 5 (2019) not assessed stantec stantec appoint an independent quality assurer (iqa) for the business cases. nzta to appoint an iqa for the business cases. tony sizemore to confirm. not stated (2018) not assessed nzta waka kotahi nzta arrange a property specialist for the project. arrange a property specialist for the project ts not stated (2018) not assessed nzta waka kotahi nzta draft problem statements, develop a preliminary long list and organise a long-listing workshop for 4 december 2018. develop a preliminary long list project team october-december 2018 not assessed undertake further engagement with people under 30, who were under-represented in the february 2019 survey. further engagement with the under 30s would be valuable not assessed main document pdf",
    "sortDate": "2020-11-01",
    "cover": {
      "src": "/covers/QTS-044.webp",
      "srcset": "/covers/QTS-044.webp 400w, /covers/QTS-044-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-044/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-044/QTS-044-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-045",
    "code": "QTS-045",
    "title": "Appendix B Options Assessment (B1 Options Development Process; B2 Longlist Options; B3 Modelling Reports; B4 Future Public Transport Model; B5 Technical Note 30: High Capacity Public Transport; B6 Technical Note 12: Queenstown Public Transport Development Story; B7 Technical Note 18: Queenstown Lakeview Bus Service Analysis)",
    "shortTitle": "Appendix B Options Assessment",
    "summary": "Appendix B of the 2020 NZUP Queenstown Transport Detailed Business Case for NZTA (Waka Kotahi) documents how options were developed and assessed. It contains the option development process (B1), the Frankton to Queenstown and town centre long lists (B2), which include Frankton Track, Queenstown Hill and Kelvin Peninsula mass rapid transit alignments, and traffic and economic modelling reports (B3). It also includes WSP's public transport demand and economic notes TN3b and TN3c (B4) and three Stantec technical notes. TN12 (February 2020) describes six public transport network options, including a mass rapid transit network, and an unweighted multi-criteria analysis (MCA). It finds a road-based 'Bus Max' network could serve demand until about 2038, after which mass rapid transit is considered 'the best option'. TN12 also lists four circumstances in which mass rapid transit could be advanced. TN30 (July 2020, footer November 2020) sets out a staged 'Bus Max' pathway to 2051 and asks the Board to approve that 'off-line PT to SH6A (e.g. a gondola) is parked and reviewed in 2028'. TN18 concludes that buses should not be routed into Lakeview. The modelling reports find the NZUP package keeps SH6A below capacity at 2028 with parking restraint, and that Frankton becomes severely congested by 2048.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case appendix bundle (options development, long list, modelling reports and public transport technical notes)",
    "year": 2020,
    "publishedDate": "2020-11",
    "documentStatus": "Final",
    "geographicScope": "Frankton to Queenstown (SH6A Frankton Road); Queenstown Town Centre; Frankton; Ladies Mile; Kelvin Peninsula; Wakatipu Basin",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix B Options Assessment (B1 Options Development Process; B2 Longlist Options; B3 Modelling Reports; B4 Future Public Transport Model; B5 Technical Note 30: High Capacity Public Transport; B6 Technical Note 12: Queenstown Public Transport Development Story; B7 Technical Note 18: Queenstown Lakeview Bus Service Analysis) (2020). NZTA Contract 2018235; Stantec Project No. 80510559 (TN30 footer, p193); FMOR Stantec Project No. 80510478 (p13); Abley Job NZTA-J116 (p76).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "qldc",
      "orc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-045 appendix b options assessment (b1 options development process; b2 longlist options; b3 modelling reports; b4 future public transport model; b5 technical note 30: high capacity public transport; b6 technical note 12: queenstown public transport development story; b7 technical note 18: queenstown lakeview bus service analysis) appendix b options assessment appendix b of the 2020 nzup queenstown transport detailed business case for nzta (waka kotahi) documents how options were developed and assessed. it contains the option development process (b1), the frankton to queenstown and town centre long lists (b2), which include frankton track, queenstown hill and kelvin peninsula mass rapid transit alignments, and traffic and economic modelling reports (b3). it also includes wsp's public transport demand and economic notes tn3b and tn3c (b4) and three stantec technical notes. tn12 (february 2020) describes six public transport network options, including a mass rapid transit network, and an unweighted multi-criteria analysis (mca). it finds a road-based 'bus max' network could serve demand until about 2038, after which mass rapid transit is considered 'the best option'. tn12 also lists four circumstances in which mass rapid transit could be advanced. tn30 (july 2020, footer november 2020) sets out a staged 'bus max' pathway to 2051 and asks the board to approve that 'off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028'. tn18 concludes that buses should not be routed into lakeview. the modelling reports find the nzup package keeps sh6a below capacity at 2028 with parking restraint, and that frankton becomes severely congested by 2048. context and purpose: appendix b of the queenstown transport business case (nzta contract 2018235; stantec-led consortium with wsp opus, abley and jasmax) for nzta (waka kotahi) and the way to go partners. it brings together the options development material and supporting modelling. all consultant author, reviewer and approver names are redacted under s 9(2)(a). b1 (pp3-5) explains that the frankton to queenstown work came straight from the qitpbc and 'morphed into a network-wide public transport response' (p3). b2 (pp7-10) is the long list. under '1.6 mass rapid transit' it lists bus rapid transit, light rail options, '1.6.5 frankton track gondola', '1.6.6 queenstown hill gondola', '1.6.7 north shore mrt' and '1.6.8 kelvin peninsula gondola' (p8). the town centre list includes 'frankton track for mrt' and 'gondola landing location' (p10). b3 contains the stantec/wsp/abley future modelling option report (16 september 2020). it models nzup scenarios with arterial stages and a stanley street closure. the do minimum scenarios 'locked up' in paramics (p17). the report recommends further northbound bus lanes beyond 2028 because frankton is severely congested by 2048 (pp50-51). b3 also contains abley's business case modelling report (17 november 2020), which gives annualised nzup benefits of about $34-35m in 2028/2048 (p83) and a 13% spatial plan uplift in npv benefits, from $382m to $431m (p84). b4 contains wsp tn3b and tn3c. they find the nzup option keeps sh6a at 82-86% v/c in 2028, with parking cost a 'major driver' of pt share (pp132-133, 142). they also record that 'gondola mrt' was tested earlier but 'omitted for implementability reasons' (p129). b6 tn12 (18 february 2020) describes six network options: rti, do minimum, bus max, trackless tram (base and max), mass rapid transit and a ferry option. a ferry is not mass rapid transit (pp212-217). it summarises the evidence base, including 2048 travel times and opex (p219). an mca was presented on 2 august 2019 and 'agreed to and adopted largely unaltered' (p220). the mca scores 17 criteria from -3 to +3. as printed, mass rapid transit scores 2, 3, 3, 1, 3, 2, 3, 1, 0, -2, 1, 1, 1, 2, 1, 3, 3, and bus max scores 2, 3, 1, 0, 3, 3, 2, 3, 2, -2, 2, 1, 3, 1, 3, -1, 1. no weights or totals are printed (pp220, 205-206). do minimum and ferry were dropped. the remaining options were then simplified to 'hcpt' (bus to trackless tram) and mass rapid transit (p221). tn12 concludes that bus max provides capacity for about 15-18 years and runs out 'by 2038 at the latest'. it considers mass rapid transit 'the best option at this point' and lists four circumstances for advancing it (pp224-225). the mass rapid transit capex estimate is $134.83m (p225). b5 tn30 (13 july 2020; 'november 2020' footers) sets out current pt issues, nzup's $90m pt infrastructure and a staged bus max pathway. opex rises from $13.2m (2024) to $39.1m (2051), and the fleet is estimated at $46m (pp200-205). it cites aspen's 67.8% non-car commute share (p198). it records the mass-transit ferry being ruled out by mca (p198) and appends the same mca as tn12 (pp205-206). b7 tn18 concludes buses should not enter lakeview (p228). mass rapid transit: substantive. the long list names three mass rapid transit alignments (p8). tn12 describes queenstown–frankton (and optionally ladies mile) mass rapid transit with a travellator to the airport and a possible extension to the airport and remarkables park (pp216, 221). in the unweighted mca, mass rapid transit scores at or near the top on growth, resilience, reliability, safety and masterplan alignment, and scores -2 on capex (p220). tn12 sees mass rapid transit as the next step change by 2038. tn30 instead says on-road pt can meet demand to about 2051. it gives two main grounds: on-road options can be implemented under current pt operational and procurement frameworks and best maximise value from the $90m nzup investment, and mass rapid transit 'does not fit well' with current legislative and procurement processes. it recommends the board approve that off-line pt 'is parked and reviewed in 2028' (pp202, 205). the four circumstances for advancing mass rapid transit appear in tn12 (p224), not tn30. business case appendix bundle (options development, long list, modelling reports and public transport technical notes) nzta (waka kotahi). appendix b options assessment (b1 options development process; b2 longlist options; b3 modelling reports; b4 future public transport model; b5 technical note 30: high capacity public transport; b6 technical note 12: queenstown public transport development story; b7 technical note 18: queenstown lakeview bus service analysis) (2020). nzta contract 2018235; stantec project no. 80510559 (tn30 footer, p193); fmor stantec project no. 80510478 (p13); abley job nzta-j116 (p76). frankton to queenstown (sh6a frankton road); queenstown town centre; frankton; ladies mile; kelvin peninsula; wakatipu basin final (component documents marked final: tn30 'status - final' (p193); tn12 'status - final' (p208); tn18 'status - final' (p227); fmor rev 1 final 16 sep 2020 (p13); abley modelling report final 17 nov 2020 (p76); tn3b and tn3c rev 2 final 17 nov 2020 (pp127, 177)) rates mass rapid transit strongly in the multi-criteria assessment and as the best post-2038 step change, but recommends off-line public transport be 'parked and reviewed in 2028'. the b2 long list includes 'frankton track gondola', 'queenstown hill gondola' and 'kelvin peninsula gondola' under mass rapid transit (p8). tn12 describes mass rapid transit from queenstown town centre to frankton hub (optionally ladies mile), with a cabin every 15 seconds, 10 passengers per cabin and 22 km/h (p216). it costs mass rapid transit at $134.83m capex and $4.9m opex per year (p225). the 2 august 2019 mca scores six options on 17 criteria from -3 to +3, with no weights or totals printed (p220; repeated in tn30, pp205-206). tn12 says bus max 'would run out of capacity... by 2038 at the latest' and that 'the gondola option is the best option at this point' (p224). it lists four circumstances for advancing mass rapid transit: insufficient bus priority on sh6/sh6a, bus max capex/opex 'not forthcoming', faster demand growth, and a ppp in which the public sector funds outcomes 'capped by the actual capacity of the gondola' (p224). tn30 states on-road pt can meet demand 'until around 2051'. it gives as grounds that on-road options fit current frameworks and maximise the $90m nzup investment, and that mass rapid transit 'does not fit well into the current legislative and public transport procurement processes' (p202). it asks the board to approve that off-line pt 'is parked and reviewed in 2028' (p205). tn3b records that a mass rapid transit scenario was 'omitted for implementability reasons' (p129). \"board to approve that off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028.\" (p.205) | \"given that the on-road public transport options are expected to have sufficient capacity for 30 years, then it is suggested that consideration of an off-line system be put on hold and reviewed in 2028 based on updated forecasts at the time and other factors at that time such as travel behavioural change and technology.\" (p.202) | \"another challenge with the gondola is that it does not fit well into the current legislative and public transport procurement processes but could be delivered by the private sector for its tourism benefits.\" (p.202) | \"we consider that the gondola option is the best option at this point, simply because it is completely independent of the road network on state highway 6a, provides hyper-frequency (every 30 seconds and possibly even less than this) and is fairly resilient to disruption, and provides for increased capacity.\" (p.224) | \"note that there might be a range of circumstances in which consideration should be given to advancing the gondola option.\" (p.224) | \"an additional scenario, gondola mrt, was tested under the previous round of demand sets but was omitted for implementability reasons before this update.\" (p.129) gondola option capex estimate $134.83 million for queenstown to frankton (tn12, p225) gondola annual opex estimate $4.9 million for queenstown to frankton; gondola-based network total opex $18,888,037 p.a. vs bus max $12,823,050 (tn12, pp219, 225) gondola network assumptions: cabin every 15 seconds, 10 passengers per cabin, 22 km/h (tn12, p216); service every 30 seconds in later frequency table (p222) 2048 am peak travel time to queenstown town centre from frankton: gondola 22 min, bus max 17 min, car 14-16 min, with footnote 'updated evidence of gondola having similar travel times to bus max and trackless tram max' (tn12, p219) 2048 mode share: bus max 47%, trackless tram 51%; frankton fast ferry 10% mode shift (tn12, p218) bus max ultimate capacity about 1,800 passengers/hour/direction, runs out of capacity 'by 2038 at the latest' (tn12, pp223-224); tn30 says on-road pt can meet demand 'until around 2051' using bi-articulated buses or trackless trams (p202) bus max fleet for full 2030 roll-out estimated at $46 million incl. 12% spares (tn30, p204; tn12, p225) pt network gross opex (uninflated 2020 $): $13,177,351 (2024) rising to $39,063,855 (2051) (tn30 appendix 1, p205) ferry mca option: operating cost about $900/hour per ferry, vessels up to $4 million, capacity about 800 passengers/hour (tn30, p198) patronage tripled from ≈500,000 to ≈1,500,000 p.a. after the november 2017 network change (tn30, p193) annualised transport benefits of nzup package with stanley st open: $34.0m (2028), $35.1m (2048), undiscounted (abley, p83) spatial plan sensitivity: npv benefits of nzup package rise from $382m to $431m (+13%) (abley, p84) nzup option sh6a v/c 82%-86% at 2028 (tn3b, p133) unmet pt demand on sh6a at 2048 without nzup: 196 (am), 93 (ip), 600 (pm) (tn3c, p184) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared stantec stantec prepared wsp (including opus) wsp prepared qldc qldc partner nzta waka kotahi nzta recipient orc orc recipient qldc qldc recipient way to go way to go recipient approve that off-line public transport to sh6a (e.g. mass rapid transit) is parked and reviewed in 2028. board to approve that off-line pt to sh6a (e.g. a gondola) is parked and reviewed in 2028. 2028 not assessed note tn30 as an input to a proposed detailed business case on public transport services and infrastructure, to move hcpt towards implementation. board to note context of this paper is an input to a proposed detailed business case on public transport services not assessed advise how to progress pt operational aspects, including a pt service operation dbc and whether it should sit under way to go, given w2g's mandate does not cover construction or operations. board to advise how to progress pt operational aspects to the next level of detail not assessed give consideration to advancing the mass rapid transit option if bus priority cannot be achieved, bus max funding is not forthcoming, demand grows faster than modelled, or a public-private partnership funds its transport benefits. there might be a range of circumstances in which consideration should be given to advancing the gondola option not stated (before 2038) not assessed if mass rapid transit is delivered by the private sector for tourism benefits, consider whether public investment in its public transport benefit has merit. it would be worth considering whether there was merit in public investment in any public transport benefit not assessed begin work very soon to secure funding, a bus depot site and fleet for the 2027 step change in bus max services under a new pt contract. requires work to get underway very soon 2027-2030 not assessed include in dbc investigation extending the jacks point bus service to queenstown town centre from about 2024. one response, worthy of inclusion in a dbc investigation, would be extending jacks point service to queenstown tc 2024-2027 not assessed decide between double-decker and articulated bus operation before subsequent dbc work, as it drives frankton hub design. this is a key project decision that needs to be made in advance of any subsequent dbc work in advance of any subsequent dbc not assessed investigate an on-demand public transport service model for queenstown hill. we recommend investigation of an on-demand service model for this area. not assessed consider a northbound bus lane on lucas place (riverside road roundabout to airport roundabout). it is recommended that a northbound bus lane on lucas place... is considered for implementation beyond 2028. beyond 2028 not assessed consider northbound bus priority lanes south of kawarau falls bridge, including to serve a park and ride near boyd road. it is recommended that northbound bus priority lanes (and complimentary measures) are considered for implementation south of the kawarau falls bridge beyond 2028. beyond 2028 not assessed design southern housing growth areas with public transport as a priority, to future-proof the transport system. the need to ensure housing areas to the south are designed with public transport as a priority not assessed keep the core bus network on stanley street, shotover street and lake esplanade rather than routing buses into lakeview. the core network... should continue to follow this route not assessed main document pdf",
    "sortDate": "2020-11-01",
    "cover": {
      "src": "/covers/QTS-045.webp",
      "srcset": "/covers/QTS-045.webp 400w, /covers/QTS-045-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-045/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-045/QTS-045-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-046",
    "code": "QTS-046",
    "title": "Appendix C15 Environmental and Social Responsibility (with Appendix C16 Preliminary Geotechnical Assessment Reports and Appendix C17 Road Transport Emissions Assessment)",
    "shortTitle": "Appendix C15 Environmental and Social",
    "summary": "This 149-page compilation bundles Appendices C15-C17 of the NZUP Queenstown Transport Business Case. C15 (pp.1-22) holds WSP Social and Environmental Responsibility screens (June 2020) for the Frankton to Queenstown and Frankton SSBC options, with completed NZTA (Waka Kotahi) screen forms. The F2Q screen lists five shortlisted options: Do Minimum, virtual priority, trackless tram, four-laning, and 'Mass Rapid Transit - see separate screen'. It describes the fifth as an 'offline' mass rapid transit. The source also names a ferry, which is not mass rapid transit option, but the separate MRT screen is not included. C16 (pp.23-146) holds WSP preliminary geotechnical assessments for the town centre arterials, SH6A Frankton to Queenstown, and Frankton/Ladies Mile, covering geology, landslides, liquefaction, contaminated sites and proposed investigations. One Frankton investigation plan (29 May 2020) shows a 'proposed gondola base station', 'gondola tower location', 'below ground gondola hangar' and 'gondola underpass at end of runway' on the golf course hub site. C17 (pp.147-149) is an Abley note for QLDC (12 November 2020). It forecasts district road transport emissions falling 15% between 2018 and 2048 despite an 89% rise in VKT.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Environmental and social screens, geotechnical reports and emissions note",
    "year": 2020,
    "publishedDate": "2020-11",
    "documentStatus": "Final",
    "geographicScope": "SH6A Frankton to Queenstown; Frankton (SH6/SH6A, golf course hub site); Ladies Mile; Queenstown Town Centre arterials; Queenstown Lakes District (emissions)",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi), QLDC. Appendix C15 Environmental and Social Responsibility (with Appendix C16 Preliminary Geotechnical Assessment Reports and Appendix C17 Road Transport Emissions Assessment) (2020). WSP project no. 310201227; WSP 6-XT014.64/375GX; Abley QLDC-J053.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc",
      "abley",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-046 appendix c15 environmental and social responsibility (with appendix c16 preliminary geotechnical assessment reports and appendix c17 road transport emissions assessment) appendix c15 environmental and social this 149-page compilation bundles appendices c15-c17 of the nzup queenstown transport business case. c15 (pp.1-22) holds wsp social and environmental responsibility screens (june 2020) for the frankton to queenstown and frankton ssbc options, with completed nzta (waka kotahi) screen forms. the f2q screen lists five shortlisted options: do minimum, virtual priority, trackless tram, four-laning, and 'mass rapid transit - see separate screen'. it describes the fifth as an 'offline' mass rapid transit. the source also names a ferry, which is not mass rapid transit option, but the separate mrt screen is not included. c16 (pp.23-146) holds wsp preliminary geotechnical assessments for the town centre arterials, sh6a frankton to queenstown, and frankton/ladies mile, covering geology, landslides, liquefaction, contaminated sites and proposed investigations. one frankton investigation plan (29 may 2020) shows a 'proposed gondola base station', 'gondola tower location', 'below ground gondola hangar' and 'gondola underpass at end of runway' on the golf course hub site. c17 (pp.147-149) is an abley note for qldc (12 november 2020). it forecasts district road transport emissions falling 15% between 2018 and 2048 despite an 89% rise in vkt. context: this file is a compilation of three appendices. preparer names are redacted under s 9(2)(a). c15, social and environmental responsibility screens (pp.1-22). the frankton to queenstown ssbc screen (wsp, 18/06/2020) reviews the shortlisted interventions: 'do minimum - no widening of sh6a', 'virtual/priority/queue jump', 'trackless tram - requires considerable widening of sh6a', '4-laning of frankton road', and 'mass rapid transit - see separate screen' (p.2). the planning context covers zones, qldc reserve designations and protected trees (pp.2-3). the broad-screen effects are lake reclamation, cultural values of lake wakatipu (ngāi tahu statutory acknowledgement), noise for residential neighbours, loss of recreation reserve and property purchase (p.4). technical assessments required include ecological, archaeological, arboricultural, noise, contamination, landscape and lighting (p.5). completed nzta screen forms follow (pp.7-10). the frankton ssbc screen (pp.11-22) lists the elements: mcbride street changes, an upgraded sh6/sh6a intersection, 'new public transport hub on the frankton golf course site', the lucas place intersection, kawarau road works, humphrey street (p.12). c16, preliminary geotechnical assessment reports (pp.23-146): - town centre arterials, stages 1-3 (final, 06/08/20). covers ground conditions, the cardrona-nevis fault about 13 km away, retaining walls and test pits (pp.24-55). - sh6a frankton to queenstown (final, july 2020). covers the frankton, oak tree and perkins road landslides, liquefaction, hail sites including leary's gully landfill, and retaining walls and boardwalks along the shared path (pp.56-119). - frankton and ladies mile (july 2020, revised 11/11/20 'intersection change'). covers the signalised sh6/sh6a intersection, the transport hub and the ladies mile underpasses (pp.120-146). each report has testing-schedule estimates. c17, road transport emissions (pp.147-149). abley prepared this for qldc (matt roberts), issued 12 november 2020. using the queenstown transport business case model run, annual vkt rises from 643.6 million (2018) to 1,217.7 million (2048), up 89%. emissions fall from 178,535 to 156,257 tonnes co2-e, down 15%, attributed to mode shift through nzup/qtbc and fleet electrification (electric share 0.33% in 2018 to 46.10% in 2048) (pp.148-149). mass rapid transit: there are three items. first, the f2q esr screen treats 'mass rapid transit' as a shortlisted fifth option, 'an 'offline' option involving mass rapid transit (gondola/ferries)', 'assessed separately' (p.2). it notes 'the gondola option could give rise to high levels of visual and landscape effects depending on alignment' (p.4) and that offline options would affect water zone and rural general zone land (p.3). the separate mrt screen is not in this compilation. second, the frankton ssbc screen notes that the lucas place intersection 'may need to shift south slightly to accommodate future mrt' (p.12). third, the wsp frankton preliminary geotechnical assessment and investigation plan (sheet c1 rev a, 'for information only', 29-05-2020) marks a 'proposed gondola tower location' near the sh6/sh6a intersection. it also marks a 'proposed gondola base station with underground storage' and a 'proposed below ground gondola hangar' on the golf course, next to 'proposed transit oriented buildings', and a 'proposed gondola underpass at end of runway'. borehole location 3 is for the 'gondola base and building' (pp.135, 142). the accompanying text describes only the intersection, transport hub and ladies mile works (p.130). environmental and social screens, geotechnical reports and emissions note nzta (waka kotahi), qldc. appendix c15 environmental and social responsibility (with appendix c16 preliminary geotechnical assessment reports and appendix c17 road transport emissions assessment) (2020). wsp project no. 310201227; wsp 6-xt014.64/375gx; abley qldc-j053. sh6a frankton to queenstown; frankton (sh6/sh6a, golf course hub site); ladies mile; queenstown town centre arterials; queenstown lakes district (emissions) esr screens 18/06/2020; geotechnical reports final (jul-nov 2020); emissions note issued 12 nov 2020 screens offline mass rapid transit as a separate shortlisted option. the source pairs it with ferries; a ferry is not mass rapid transit. a frankton geotechnical plan marks base station, tower and hangar sites. the frankton to queenstown esr screen (18/06/2020) lists 'mass rapid transit - see separate screen' among five shortlisted options and explains that 'the fifth option is an 'offline' option involving mass rapid transit (gondola/ferries) and hence is assessed separately' (p.2). it notes that land affected by offline options is additionally zoned water and rural general (p.3). it also notes that 'the gondola option could give rise to high levels of visual and landscape effects depending on alignment' (p.4). the separate mrt screen does not appear in this compilation. the frankton screen records that the lucas place intersection 'may need to shift south slightly to accommodate future mrt' (p.12). the wsp frankton preliminary geotechnical assessment and investigation plan (29-05-2020, 'for information only'; pp.135, 142) is the most specific. it annotates a 'proposed gondola tower location', a 'proposed gondola base station with underground storage', a 'proposed below ground gondola hangar' and a 'proposed gondola underpass at end of runway' around the frankton golf course hub site, and assigns borehole 3 to the 'gondola base and building'. the plan notes 'all proposed building locations indicative and subject to change'. \"the fifth option is an 'offline' option involving mass rapid transit (gondola/ferries) and hence is assessed separately.\" (p.2) | \"the gondola option could give rise to high levels of visual and landscape effects depending on alignment.\" (p.4) | \"lucas place - signalised t intersection with bus priority measures (may need to shift south slightly to accommodate future mrt).\" (p.12) | \"proposed gondola base station with underground storage\" (p.135) | \"proposed gondola underpass at end of runway\" (p.135) district road vkt 643,601,405 (2018) to 1,217,723,917 (2048), +89% (p.148) road transport emissions 178,535 t co2-e (2018) to 156,257 t (2048), -15% (p.149) electric vehicle share of vkt 0.33% (2018), 7.95% (2028), 46.10% (2048) (p.149) five shortlisted f2q options screened, including mrt as an offline option (p.2) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned qldc qldc commissioned abley abley prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner matt roberts client representative qldc qldc undertake technical assessments as the project advances: ecological, archaeological/heritage, arboricultural, cultural impact, noise, contaminated land, landscape/urban design, lighting and geotechnical the following technical assessments will be required as the project advances as the project advances not assessed carry out the proposed geotechnical investigations (boreholes and test pits) at the arterials, sh6a and frankton sites before design, including at the indicated mass rapid transit base location 3. gondola base and building (borehole location) pre-implementation design not assessed main document pdf",
    "sortDate": "2020-11-01",
    "cover": {
      "src": "/covers/QTS-046.webp",
      "srcset": "/covers/QTS-046.webp 400w, /covers/QTS-046-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-046/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-046/QTS-046-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-047",
    "code": "QTS-047",
    "title": "Appendix E Financial Case - Appendix E1 Funding Spreadsheet",
    "shortTitle": "Appendix E Financial Case - Appendix E1 Funding",
    "summary": "Appendix E1 is the funding spreadsheet for the Financial Case of the NZUP Queenstown Transport Business Case, published by NZTA (Waka Kotahi). It sets out a nine-year (2021-2029) cash flow by project, phase and funder. The element total is $600.76 million (p.7), with a further $12.46 million of items excluded from the charts. By funder (p.8): NZUP committed $107.48m; Crown Infrastructure Partners committed $119.70m (Crown and QLDC); Waka Kotahi $26.02m; QLDC $151.94m; ORC $269.50m; total $674.64m. This funder table does not account for the 50% QLDC-ORC cost share for the Stanley Street and Frankton hubs, which appear in both councils' totals. ORC's share is dominated by PT capex (new bus fleet $46m, depot $34m) and gross PT opex of $126.59m. Footnotes state that 'Offline PT Service Improvements' are 'under further investigation beyond 2030 ($262M)' and Arterial Stage 3 likewise ($61.2M). Neither is in the funded cash flow.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Funding spreadsheet (financial case appendix)",
    "year": 2020,
    "publishedDate": "2020-11",
    "documentStatus": "Not stated",
    "geographicScope": "SH6A Frankton to Queenstown; Frankton (SH6); Ladies Mile; Queenstown Town Centre; Wakatipu Basin PT network",
    "owner": "Way to Go",
    "citation": "Appendix E Financial Case - Appendix E1 Funding Spreadsheet (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers",
      "crown-infrastructure-partners",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-047 appendix e financial case - appendix e1 funding spreadsheet appendix e financial case - appendix e1 funding appendix e1 is the funding spreadsheet for the financial case of the nzup queenstown transport business case, published by nzta (waka kotahi). it sets out a nine-year (2021-2029) cash flow by project, phase and funder. the element total is $600.76 million (p.7), with a further $12.46 million of items excluded from the charts. by funder (p.8): nzup committed $107.48m; crown infrastructure partners committed $119.70m (crown and qldc); waka kotahi $26.02m; qldc $151.94m; orc $269.50m; total $674.64m. this funder table does not account for the 50% qldc-orc cost share for the stanley street and frankton hubs, which appear in both councils' totals. orc's share is dominated by pt capex (new bus fleet $46m, depot $34m) and gross pt opex of $126.59m. footnotes state that 'offline pt service improvements' are 'under further investigation beyond 2030 ($262m)' and arterial stage 3 likewise ($61.2m). neither is in the funded cash flow. context: appendix e1 is an eight-page spreadsheet print (pp.1-2 are dividers). funding is listed by funder: 1. nzup (committed), p.3: sh6a corridor improvements $26,739,506; grant road to kawarau falls bridge improvements $68,707,588, incl. interim frankton hub $12.8m and sh6/6a intersection; ladies mile stage 2 $11,258,124; its (scats priority engine $50k; vms $720k) $770,000. total $107,475,218, spread over 2021-2024. 2. cip (committed), 'includes crown and qldc', p.4: arterials stage 1 $59,701,969; town centre street upgrade stage 1 $60,000,000 (streetscapes 'to skyline gondola'). total $119,701,969. 3. waka kotahi, p.4: travel behaviour change ssbc $300,000; stanley/shotover street improvements $25,280,941; bus lane enforcement cameras $400,000; scats maintenance $40,000. total $26,020,941. 4. qldc, p.5: town centre improvements stage 2 $30,798,998; arterial stage 2 $48,796,021 (2027-2029); stanley street full hub $45,933,120 and frankton hub $15,485,483 (each '50% cost share with orc'); frankton local works incl. humphrey street link $10,924,928. total $151,938,550. footnote: ''arterial 3' is under further investigation beyond 2030 ($61.2m)'. 5. orc, p.6: stanley street and frankton hubs (50% share with qldc, shown at full value); pt services and infrastructure dbc $1,500,000; new bus fleet $46,000,000 and new bus depot $34,000,000 (2027-2029); pt services within the existing contract $55,062,426; the on-road pt service step change $71,522,958 (2027-2029). total $269,503,987. footnotes on p.6: ''offline pt service improvements' is under further investigation beyond 2030 ($262m)'; the existing contract cost for 2021-24 is not part of the business case; and the step change is a 'continuous programme beyond 2030 until 2051 ($5.5m average)'. cash flow by element (p.7): the total is $600,757,134. annual totals peak at $115.4m in 2028. excluded from the charts are the pt dbc, scats ongoing costs and the frankton local works, totalling $12,464,928. a note repeats that arterial 3 ($61.2m) and offline pt service improvements ($262m) are under further investigation beyond 2030. cash flow by organisation (p.8): $674,640,665 in total. the note says the table 'does not take into account the 50% cost share between qldc and orc' for the two hubs. mass rapid transit: the only mrt item is the footnote line ''offline pt service improvements' is under further investigation beyond 2030 ($262m)', placed in the orc section (p.6) and repeated in the cash flow note (p.7). it has no funder, phase or year, and it is outside the $600.76m funded cash flow. 'skyline gondola' appears only as the end-point of town centre streetscape upgrades (p.4). funding spreadsheet (financial case appendix) appendix e financial case - appendix e1 funding spreadsheet (2020). sh6a frankton to queenstown; frankton (sh6); ladies mile; queenstown town centre; wakatipu basin pt network not stated offline pt ($262m) listed only as under further investigation beyond 2030; not funded or allocated to any party the spreadsheet's only offline pt entry is a footnote in the orc section: ''offline pt service improvements' is under further investigation beyond 2030 ($262m)' (p.6). it is repeated in the element cash flow note: 'arterial 3 ($61.2m) and offline pt service improvements ($262m) are under further investigation beyond 2030' (p.7). the item has no cash flow, funder or phase and is excluded from the $600,757,134 nine-year total (p.7) and from the $674,640,665 funder summary (p.8). the funded pt programme is on-road: a new bus fleet ($46m), a depot ($34m) and gross pt opex ($126.59m) to 2029, with the step-change service continuing 'beyond 2030 until 2051' (p.6). \"'offline pt service improvements' is under further investigation beyond 2030 ($262m)\" (p.6) | \"arterial 3 ($61.2m) and offline pt service improvements ($262m) are under further investigation beyond 2030.\" (p.7) total cash flow by element 2021-2029: $600,757,134 (p.7) funding by party (p.8): nzup (committed) $107,475,218; cip (committed, crown and qldc) $119,701,969; waka kotahi $26,020,941; qldc $151,938,550; orc $269,503,987; total $674,640,665 (hub 50% shares not netted) offline pt service improvements $262m - further investigation beyond 2030 (p.6) arterial stage 3 $61.2m - further investigation beyond 2030 (p.5) orc pt capex: new bus fleet $46,000,000; new bus depot $34,000,000 (p.6) orc pt opex (gross) 2021-2029 $126,585,384, incl. on-road step change $23,840,986 a year from 2027 (p.6) stanley street full hub $45,933,120; frankton hub $15,485,483 (50% qldc / 50% orc) (pp.5-6) items excluded from charts: $12,464,928 (p.7) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go passing business case chapter or appendix not stated 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta prepared central government / ministers central government / ministers partner crown infrastructure partners cip partner nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner nzta waka kotahi nzta published deliver nzup sh6a corridor improvements (intersections, bus lanes, bus stops, shared path, supporting pt infrastructure): $26.74m total for nzup sh6a corridor improvements $ 26,739,506 2021-2024 not assessed nzta waka kotahi nzta deliver nzup grant road to kawarau falls bridge improvements incl. interim frankton hub and sh6/6a intersection: $68.71m total for nzup grant road to kf bridge improvements $ 68,707,588 2022-2024 not assessed nzta waka kotahi nzta deliver nzup sh6 ladies mile stage 2 (westbound bus lane, howards drive roundabout): $11.26m total for nzup sh6 ladies mile stage 2 $ 11,258,124 2022-2024 not assessed nzta waka kotahi nzta install its: scats priority engine software ($50k) and variable message signs ($720k) total for its $ 770,000 2021-2024 not assessed nzta waka kotahi nzta deliver arterials stage 1: $59.70m total for arterials - stage 1 $ 59,701,969 2021-2023 not assessed qldc qldc deliver town centre street upgrade stage 1 (full streetscape upgrades incl. park, camp, rees, beach, man/brecon streets to skyline gondola): $60m total for town centre street upgrade - stage 1 $ 60,000,000 2021-2023 not assessed qldc qldc prepare a travel behaviour change single stage business case ($300k) travel behaviour change ssbc single stage business case $ 300,000 2021 not assessed nzta waka kotahi nzta deliver stanley street and shotover street improvements (interim hub, pt improvements, shotover to arterial 1): $25.28m total for stanley street and shotover street improvements $ 25,280,941 2021-2026 not assessed nzta waka kotahi nzta install bus priority lane enforcement cameras ($400k) bus priority lane enforcement infrastructure (cameras) implementation $ 400,000 2024 not assessed nzta waka kotahi nzta deliver town centre improvements stage 2 (lake esplanade without bus lanes, ballarat, camp, church, earl, marine parade, ped crossings): $30.80m total for town centre improvements (stage 2) $ 30,798,998 2022-2027 not assessed qldc qldc deliver arterial stage 2 (gorge road to hay street link, brecon st steps, camp-man intersection): $48.80m total for arterial stage 2 $ -... $ 48,796,021 2027-2029 not assessed qldc qldc deliver stanley street full bus hub ($45.93m), 50% cost share between qldc and orc stanley street - full hub improvements (50% cost share with orc) 2028-2029 not assessed qldc qldc deliver frankton transport hub ($15.49m), 50% cost share between qldc and orc frankton hub (50% cost share with orc) 2028-2029 not assessed qldc qldc deliver frankton local works incl. humphrey st link (sh6 to lucas place): $10.92m (excluded from cash flow charts) total for frankton $... $ 10,924,928 2023-2027 not assessed qldc qldc prepare a pt services and infrastructure detailed business case ($1.5m) pt services and infrastructure dbc detailed business case $ 750,000 $ 750,000 2021-2022 not assessed orc orc procure a new bus fleet ($46m) and new bus depot ($34m) new bus fleet implementation... $ 46,000,000; new bus depot... $ 34,000,000 2027-2029 not assessed orc orc fund pt service improvements within the existing contract ($55.06m) and the on-road pt service step change from 2027 ($71.52m; continuing to 2051 at ~$5.5m average) on road pt service improvements (step change) 2021-2029 and beyond to 2051 not assessed orc orc further investigate offline pt service improvements ($262m) beyond 2030 'offline pt service improvements' is under further investigation beyond 2030 ($262m) beyond 2030 not assessed further investigate arterial stage 3 ($61.2m) beyond 2030 'arterial 3' is under further investigation beyond 2030 ($61.2m) beyond 2030 not assessed main document pdf",
    "sortDate": "2020-11-01",
    "cover": {
      "src": "/covers/QTS-047.webp",
      "srcset": "/covers/QTS-047.webp 400w, /covers/QTS-047-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-047/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-047/QTS-047-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-048",
    "code": "QTS-048",
    "title": "Appendix G Management Case",
    "shortTitle": "Appendix G Management Case",
    "summary": "A single divider page for Appendix G (Management Case) of the NZUP Queenstown Transport Business Case, published by NZTA (Waka Kotahi). It states: 'No appendices for the Management Case.' The management case content itself is in the main business case document.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Appendix divider page",
    "year": 2020,
    "publishedDate": "2020-11",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown",
    "owner": "Way to Go",
    "citation": "Appendix G Management Case (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on page)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [],
    "organisationIds": [
      "way-to-go-partnership",
      "nzta"
    ],
    "searchText": "qts-048 appendix g management case appendix g management case a single divider page for appendix g (management case) of the nzup queenstown transport business case, published by nzta (waka kotahi). it states: 'no appendices for the management case.' the management case content itself is in the main business case document. context: this one-page pdf is the appendix g divider from the redacted, oia-released nzup queenstown transport business case appendices. it carries the heading 'appendix g management case', the statement 'no appendices for the management case.', and the waka kotahi footer (p.1). there is no other content. mass rapid transit: the page says nothing about mrt, offline pt or mass rapid transit. appendix divider page appendix g management case (2020). queenstown not stated no content; divider page only a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on page) way to go none business case chapter or appendix not stated 2020 way to go way to go partner nzta waka kotahi nzta published main document pdf",
    "sortDate": "2020-11-01",
    "cover": {
      "src": "/covers/QTS-048.webp",
      "srcset": "/covers/QTS-048.webp 400w, /covers/QTS-048-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-048/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-048/QTS-048-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-049",
    "code": "QTS-049",
    "title": "Appendix F Commercial Case - F1 Risk Register (Queenstown Business Case Risk Management Plan) and F2 Property Strategy",
    "shortTitle": "Appendix F Commercial Case - F1 Risk Register",
    "summary": "Appendix F of the NZUP Queenstown Transport Business Case holds the Commercial Case supporting material. F1 is the business case Risk Management Plan (Final, 3/11 November 2020) for NZTA (Waka Kotahi) Contract 2018235, valued at $4.4M (Sep 2020). It describes an AS/NZS ISO 31000 process using Waka Kotahi standard Z/44 (general approach), with a High risk tolerance threshold. It records risk workshops in November 2018, at the February 2020 Challenge workshop and on 30 October 2020. Three registers follow: project (contract) risks, delivery risks for the next stages, and closed risks. The delivery register rates five risks Critical: slow or poor external decision making; funding not aligning with recommendations; misalignment between Waka Kotahi, QLDC and ORC across interdependent projects (almost certain, severe); loss of community support; and parking measures not strong enough to push mode shift. Named risk owners are Shaun Hubbard (W2G), Tony Sizemore (NZTA) and Tony Pickard (QLDC). Workshop notes record that the strategic model only stabilised with a four-laned SH6A and 3,000 town centre parks. F2 Property Strategy is a divider page only; its content is not in this file.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Risk management plan and risk registers",
    "year": 2020,
    "publishedDate": "2020-11-03",
    "documentStatus": "Final",
    "geographicScope": "Queenstown (F2Q SSBC and QTC DBC programme)",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix F Commercial Case - F1 Risk Register (Queenstown Business Case Risk Management Plan) and F2 Property Strategy (2020). NZTA Contract 2018235.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "stantec",
      "the-property-group",
      "wsp",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-049 appendix f commercial case - f1 risk register (queenstown business case risk management plan) and f2 property strategy appendix f commercial case - f1 risk register appendix f of the nzup queenstown transport business case holds the commercial case supporting material. f1 is the business case risk management plan (final, 3/11 november 2020) for nzta (waka kotahi) contract 2018235, valued at $4.4m (sep 2020). it describes an as/nzs iso 31000 process using waka kotahi standard z/44 (general approach), with a high risk tolerance threshold. it records risk workshops in november 2018, at the february 2020 challenge workshop and on 30 october 2020. three registers follow: project (contract) risks, delivery risks for the next stages, and closed risks. the delivery register rates five risks critical: slow or poor external decision making; funding not aligning with recommendations; misalignment between waka kotahi, qldc and orc across interdependent projects (almost certain, severe); loss of community support; and parking measures not strong enough to push mode shift. named risk owners are shaun hubbard (w2g), tony sizemore (nzta) and tony pickard (qldc). workshop notes record that the strategic model only stabilised with a four-laned sh6a and 3,000 town centre parks. f2 property strategy is a divider page only; its content is not in this file. context: f1 is the risk management plan for the queenstown business case (f2q ssbc and qtc dbc) under nzta contract 2018235. the contract value is '$4.4m - sep 2020', with tony sizemore as nzta lead and the supplier lead redacted (p.16). the plan was 'originally developed some period into the project's life' and updated at final delivery (p.7). revision initials are 'an' (prepared) and 'ak' (reviewed and approved) (p.4). method: as/nzs iso 31000:2018 is applied with waka kotahi standard z/44 'general' approach. the plan explains why it did not use the 'advanced' approach normally expected above $50m: no single element exceeds $50m, and 'pt operations... will require their own dbc' (p.10). the risk tolerance threshold is high; lower risks are 'live-parked' (pp.10-11). workshops were held on 16 november 2018, as part of the challenge workshop (25 february 2020), and informally on 30 october 2020 (p.11). no risk-adjusted programme is provided at closeout (p.12). the consequence criteria add a stakeholder measure for mode shift and pt delivery, at the challenge team's suggestion (pp.13, 15). project register (pp.16-17): critical risks are qbcs 009b, that external decision making is poor or slow (w2g, shaun hubbard), and qbcs 007, that the programme is extremely tight (stantec, owner redacted). by september 2020, qbcs 007 had 'forced modified delivery schedule, incomplete reporting' (p.17). delivery register (pp.20-23): critical risks are: - qbcs 009b, decision making (w2g, shaun hubbard). - qbcs 010, funding not aligning with recommendations; likely/severe; qldc, nzta and orc; shaun hubbard. the note records 'differences between known available funding and estimated project costs'. - qbcs 023, misalignment between waka kotahi, qldc and orc; almost certain/severe; w2g board; shaun hubbard. - qbcs 024, loss of community support; likely/severe; w2g communications; shaun hubbard. - qbcs 030, parking not a strong enough 'push' factor; likely/severe; qldc; tony pickard. the note records 'no parking implementation plan developed' and disagreement on who is responsible. high risks cover work programmes not working together, spatial plan inconsistency, property availability (nzta, tony sizemore), interface projects, detailed design changes and staff turnover (pp.20-21). treatments are listed with residual ratings (pp.22-23). closed risks (pp.25-28) include qbcs 021, 'that pt elements do not get implemented because team unable to talk with orc' (critical; orc). appendix d notes from the 16 november 2018 workshop record 'risk - no viable long term economic solutions' and 'noted that to stabilise strategic model that had to 4 lane sh6a and 3000 parks in town centre to get it to stabilise' (p.30). january 2019 notes record that the 'relationship between qldc and orc is a bit testy' (p.31). appendix e is the february 2020 challenge team risk presentation (pp.32-39). f2 property strategy (p.40): divider only. mass rapid transit: none. the risk registers do not mention mrt, offline pt or mass rapid transit. the challenge-team risk 'there is no long term viable, economic solutions' (rare/extreme, high) is the nearest long-term reference (p.37). risk management plan and risk registers nzta (waka kotahi). appendix f commercial case - f1 risk register (queenstown business case risk management plan) and f2 property strategy (2020). nzta contract 2018235. queenstown (f2q ssbc and qtc dbc programme) risk management plan final (v2 final, 11 nov 2020; cover dated 3 november 2020) no mass rapid transit risks recorded; registers address on-road programme delivery and agency alignment. contract nzta 2018235 value $4.4m (sep 2020) (p.16) delivery register: 5 critical risks (qbcs 009b, 010, 023, 024, 030) (p.20) qbcs 023 agency misalignment rated almost certain / severe = critical (p.20) strategic model stabilised only with 4-laned sh6a and 3,000 town centre parks (workshop notes, p.30) risk tolerance threshold: high and above (p.10) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go none business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared nzta waka kotahi nzta prepared stantec stantec prepared the property group the property group prepared wsp (including opus) wsp prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner tony sizemore project manager nzta waka kotahi nzta shaun hubbard contributor way to go way to go tony pickard contributor qldc qldc maintain contact with appropriate levels in nzta, orc and qldc and reinforce the need for timely implementation decisions (risk qbcs 009b) maintain contact with appropriate levels in nzta, orc and qldc. reinforcement of requirement for timely decisions. next and subsequent stages not assessed way to go way to go update cases to realistic cost/budget profiles; parties to signal funding priorities as early as possible (qbcs 010) parties to signal funding priorities as early as possible as early as possible not assessed nzta waka kotahi nzta secure consistent decisions across design, operations, approvals, funding, programme and implementation through frequent interaction between agencies (qbcs 023) consistent decisions are required across design, operations, approvals, funding, programme and implementation ongoing not assessed way to go way to go continue a comprehensive engagement strategy after business case completion to retain community support (qbcs 024) comprehensive engagement strategy on-going after business case completion after business case completion not assessed way to go way to go w2g to seek board direction to prompt qldc to develop a parking implementation plan that supports the business case (qbcs 030) recommended w2g seek board direction to prompt qldc to develop implementation plan not assessed way to go way to go clarify and keep connected the governance and management structures of interdependent work programmes (qbcs 028) w2g to emphasis understanding the connected projects management and governance structure over the life of the project not assessed way to go way to go run sensitivity tests on spatial plan options in pre-implementation to test consistency of land use assumptions (qbcs 029) pre-implementation work could do further sensitivity tests on sp options pre-implementation not assessed way to go way to go engage owners of properties required for the preferred option (qbcs 015) engage property owners. not assessed nzta waka kotahi nzta maintain observation of interface projects (arterial stages, manawa) with strong integrated governance and clear roles (qbcs 022) w2g maintain observation on interface projects ongoing not assessed way to go way to go appoint an informed backup team member in each organisation to reduce staff-turnover risk (qbcs 027) recommend a second (backup) team member who is appropriately informed and current. ongoing not assessed nzta waka kotahi nzta use sensitivity tests in subsequent business case work to address covid-19 growth uncertainty (qbcs 031) sensitivity tests, especially as part of subsequent business case work subsequent business case work not assessed way to go way to go develop new risk registers for each programme element taken forward, with their own budgets and approvals new risk registers will need to be developed for each element of the programme that is taken forward as elements progress not assessed pass parking pricing mechanism development to follow-up work under the parking strategy (qbcs 019) pass further development to follow up work. next stages not assessed stantec stantec main document pdf",
    "sortDate": "2020-11-03",
    "cover": {
      "src": "/covers/QTS-049.webp",
      "srcset": "/covers/QTS-049.webp 400w, /covers/QTS-049-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-049/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-049/QTS-049-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-050",
    "code": "QTS-050",
    "title": "Queenstown Business Case – Summary Report",
    "shortTitle": "Queenstown Business Case – Summary Report",
    "summary": "The Summary Report (Final, 12 November 2020, Alan Kerr) is the executive summary of the NZUP Queenstown Business Case. It was prepared for the Waka Kotahi, QLDC, ORC and Way to Go partners, who were seeking endorsement of the programme. It sets out the case for change: SH6A capacity was exceeded on 140 days in 2019, and non-car trips must rise from 16% to 40% by 2028 and 60% by 2048. It describes the 'three pillars' preferred programme of targeted infrastructure (NZUP $90m, CIP $85m), BRT-style public transport and travel behaviour change. Table 2 sequences 11 interventions with lead agencies, costs, BCRs and NLTP periods. The final element is 'Offline PT Service Improvements, including offline PT hubs' (Waka Kotahi/ORC, $262m, BCR 1.7, further investigation beyond 2030). The BCR is 2.3 for the first ten years and 1.5 for the full programme. For 2021-24 the activities include a Waka Kotahi travel behaviour change SSBC, an ORC PT services and infrastructure DBC, QLDC activities (about $1.7m plus Crown Infrastructure Partners obligations) and Waka Kotahi preliminary Stanley St/Shotover work (p.21).",
    "documentType": "Detailed business case",
    "documentForm": "Business case summary report (executive summary)",
    "year": 2020,
    "publishedDate": "2020-11-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Summary Report (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/jundqt0n/5ab-queenstown-business-case-summary-report.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/jundqt0n/5ab-queenstown-business-case-summary-report.pdf"
    ],
    "documentTypeCode": "detailed-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "parking",
      "roads",
      "demand-management",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-050 queenstown business case – summary report queenstown business case – summary report the summary report (final, 12 november 2020, alan kerr) is the executive summary of the nzup queenstown business case. it was prepared for the waka kotahi, qldc, orc and way to go partners, who were seeking endorsement of the programme. it sets out the case for change: sh6a capacity was exceeded on 140 days in 2019, and non-car trips must rise from 16% to 40% by 2028 and 60% by 2048. it describes the 'three pillars' preferred programme of targeted infrastructure (nzup $90m, cip $85m), brt-style public transport and travel behaviour change. table 2 sequences 11 interventions with lead agencies, costs, bcrs and nltp periods. the final element is 'offline pt service improvements, including offline pt hubs' (waka kotahi/orc, $262m, bcr 1.7, further investigation beyond 2030). the bcr is 2.3 for the first ten years and 1.5 for the full programme. for 2021-24 the activities include a waka kotahi travel behaviour change ssbc, an orc pt services and infrastructure dbc, qldc activities (about $1.7m plus crown infrastructure partners obligations) and waka kotahi preliminary stanley st/shotover work (p.21). context and purpose: this 24-page summary report is the first component of the queenstown business case (dbc). it is reproduced as pp.1-24 of the oia-released main volume, where the author name is redacted. the project partners sought endorsement. two business cases were to follow in 2021-24: tdm led by waka kotahi and pt services and infrastructure led by orc (p.6). the study area is the wakatipu basin: queenstown town centre, frankton to queenstown, frankton and ladies mile (p.6). assurance included a challenge team (february 2020), flow modelling and ey economics peer reviews, partner and aecom reviews, arup drawings review, commute and the waka kotahi iqa (pp.6-7). case for change: peak-day population is forecast to grow from about 120,000 (2018) to 200,000 (2048) (p.8). sh6a practical capacity was exceeded on 140 days in 2019. by 2028 lake hayes estate to queenstown trips may regularly exceed 60 minutes, and private cars make up 84% of sh6a trips (p.9). the non-car share needs to rise from 16% to 40% by 2028 and to 60% by 2048 (p.9). emissions rise from 178,535t to 227,939t by 2028 under the do-minimum (p.9). the estimated economic loss without investment is $670m-$1.2 billion over 40 years (p.9). options and programme: more than 300 ideas were distilled into nine packages, with public engagement in august 2020 (p.11). the preferred programme comprises committed cip town centre works, committed nzup sh6a, ladies mile and sh6 works with bus priority and a frankton hub upgrade, and unfunded items (pp.14-15). the unfunded items are town centre upgrades, stanley street hub, arterial stages 2 and 3, a frankton road shared path, brt services with fleet moving to bi-articulated vehicles, ferry services (orc), future offline pt, tdm, parking management and its. performance: the bcr is 2.3 for elements recommended over the next ten years and 1.5 for the full programme (p.16). the programme gives a more than 100% increase in sh6a people capacity by 2028 and more than 20% pt travel time improvement. it also yields $143m of amenity webs, a 15% emissions reduction by 2048 and safety benefits of $25m-$31m (pp.16-17). sequencing and funding: table 2 (p.19) lists nzup ($106m, waka kotahi) and cip ($120m, qldc) as committed. tdm ($1.8m), pt services, on-road pt ($80m plus opex), stanley/shotover ($24m), town centre stage 2 ($17m) and arterial stage 2 ($43m) are recommended. stanley street redevelopment ($46m), arterial stage 3 ($118m) and offline pt ($262m) follow later. cash flows for the next three nltp periods exclude arterial stage 3 and offline pt (p.20). next-period costs are waka kotahi $1,722,821, orc $1,500,000 and qldc $1,695,243 plus cip obligations (p.21). commercial and management: an alliance between waka kotahi and qldc was to secure a supplier in q4 2020. property is on the critical path, and one of 37 nzup consent locations is complex (p.22). key risks are funding misalignment, property availability, slow decisions, interface misalignment, loss of community support and design changes (p.22). mass rapid transit: the report does not use the word 'gondola'. it describes 'future offline public transport services that provide a further step change in capacity along with additional resilience and experiential benefits', requiring offline hubs in frankton and queenstown (p.15). it says a 'future offline corridor improves resilience of frankton to queenstown journey' (p.16) and gives the offline pt line in table 2 as $262m, bcr 1.7, 'other activities – for later re-evaluation', beyond 2030 (p.19). offline pt is excluded from the cash-flow graphs (p.20). business case summary report (executive summary) way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – summary report (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (v3, 11/11/20) lists offline pt ($262m, bcr 1.7 (economic case gives 1.6), waka kotahi/orc) as a later re-evaluation activity beyond 2030; not funded the summary does not name a mass rapid transit technology. among unfunded pt services it lists 'future offline public transport services that provide a further step change in capacity along with additional resilience and experiential benefits. this will require the development of offline public transport hubs in both frankton and queenstown' (p.15). under the resilience objective it states that a 'future offline corridor improves resilience of frankton to queenstown journey' (p.16). it adds that 'longer term, the provision of an offline public transport link between frankton and queenstown will deliver an alternative corridor that provides full separation from the road network' (p.17). table 2 records 'offline pt service improvements, including offline pt hubs' with lead waka kotahi/orc and dependency 'future proofed/protected corridor and terminal locations'. its trigger is 'demand trigger – once on road capacity is reached. anticipated beyond 2030'. it shows bcr 1.7, $262m, 'other activities – for later re-evaluation' and 'further investigation beyond 2030' (p.19). the cash-flow graphs exclude 'off line pt' (p.20). \"future offline public transport services that provide a further step change in capacity along with additional resilience and experiential benefits. this will require the development of offline public transport hubs in both frankton and queenstown.\" (p.15) | \"longer term, the provision of an offline public transport link between frankton and queenstown will deliver an alternative corridor that provides full separation from the road network.\" (p.17) | \"demand trigger – once on road capacity is reached. anticipated beyond 2030\" (p.19) nzup $90m (sh6a, ladies mile, gr2kfb); cip $50m arterials stage 1 + $35m streetscape (p.8) peak day population ~120,000 (2018) to 200,000 (2048) (p.8) sh6a practical capacity exceeded 140 days in 2019; car 84% of sh6a trips (p.9) non-car share 16% to 40% by 2028; 60% by 2048 (p.9) emissions 178,535t (2018) to 227,939t (2028) do-min (p.9) economic loss $670m-$1.2bn over 40 years without investment (p.9) bcr 2.3 (first ten years); 1.5 (full programme) (pp.16, 23) table 2: nzup $106m; cip $120m; tdm $1.8m; on-road pt $80m + opex; stanley/shotover $24m; tc stage 2 $17m; arterial 2 $43m; stanley st redevelopment $46m; arterial 3 $118m; offline pt $262m bcr 1.7 (p.19) opex ramps from $8m to $24m a year over next three periods (p.21) next nltp: waka kotahi $1,722,821; orc $1,500,000; qldc $1,695,243 + cip (p.21) costed with the parent document. https://www.qldc.govt.nz/media/jundqt0n/5ab-queenstown-business-case-summary-report.pdf way to go substantive detailed business case final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published alan kerr author deliver sh6a, sh6 grant road to kawarau falls bridge and ladies mile improvements (nzup); committed. sh6a improvements, gr2kfb improvements and ladies mile improvements | waka kotahi 21-24 not assessed nzta waka kotahi nzta deliver arterials stage 1 and town centre upgrade stage 1 (cip); committed. arterials – stage 1, town centre upgrade – stage 1 | qldc 21-24 not assessed qldc qldc travel demand management package ($1.8m, bcr 3.5). travel demand management package | qldc / orc / waka kotahi ongoing over multiple periods not assessed nzta waka kotahi nzta lead a tdm business case in the 2021-24 nltp period. the tdm business case will be led by waka kotahi 2021-24 not assessed nzta waka kotahi nzta lead a public transport services and infrastructure business case ($1.5m) in the 2021-24 nltp period. the pt business case will be led by the otago regional council (orc) 2021-24 not assessed orc orc travel behaviour change ssbc with preliminary work on stanley and shotover street improvements ($1,722,821). waka kotahi | travel behaviour change ssbc next nltp period not assessed nzta waka kotahi nzta cip obligations plus small-scale old frankton changes, preliminary wayfinding and travel behaviour change ($1,695,243). qldc | cip obligations plus small scale changes in old frankton next nltp period not assessed qldc qldc pt services improvements within existing contract (opex $8m to $11m a year). pt services improvements | orc 21-24 investigation; staged from 24-27 not assessed orc orc on-road pt service improvements incl. frankton hub ($80m plus opex rising to $24m a year by 2027). on road pt service improvements | orc staged from 27-30 not assessed orc orc stanley and shotover street improvements incl. stanley street bus hub stage 1 ($24m). stanley street and shotover street improvements | waka kotahi 24-27 not assessed nzta waka kotahi nzta town centre upgrade stage 2 ($17m). town centre upgrade – stage 2 | qldc 24-27 not assessed qldc qldc arterial stage 2 ($43m excl. memorial hall rebuild). arterial stage 2 | qldc investigation 24-27; implementation 27-30 not assessed qldc qldc stanley street redevelopment incl. bus hub stage 2 ($46m incl. $33m property). stanley street redevelopment | qldc / orc / developer further investigation 24-27 not assessed qldc qldc arterial stage 3 ($118m, bcr 0.2) for later re-evaluation. arterial stage 3 | qldc further investigation beyond 2030 not assessed qldc qldc offline pt service improvements incl. offline pt hubs ($262m, bcr 1.7); demand trigger once on-road capacity reached; requires protected corridor and terminals. offline pt service improvements, including offline pt hubs | waka kotahi/orc further investigation beyond 2030 not assessed nzta waka kotahi nzta develop town centre parking requirements and park-and-ride in greater detail. these are currently being developed to a greater detail by qldc not assessed qldc qldc let alliance tender for nzup/cip construction and secure preferred supplier. an alliance approach has been agreed between waka kotahi and qldc quarter 4 2020 not assessed nzta waka kotahi nzta council meeting-pack copy pdf standalone copy pdf",
    "sortDate": "2020-11-12",
    "cover": {
      "src": "/covers/QTS-050.webp",
      "srcset": "/covers/QTS-050.webp 400w, /covers/QTS-050-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-050/",
    "files": [
      {
        "label": "Council meeting-pack copy",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-050/QTS-050-F1.pdf"
      },
      {
        "label": "Standalone copy",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-050/QTS-050-F2.pdf"
      }
    ]
  },
  {
    "id": "qts-051",
    "code": "QTS-051",
    "title": "Appendix C Preferred Option – Appendix C1 Queenstown Town Centre Drawings and Renders: Drawings (NZTA F2Q QTC Business Cases, Queenstown Town Centre – Overall Layout Plan and General Layout Plan with Arterial Route)",
    "shortTitle": "Appendix C Preferred Option – Appendix C1",
    "summary": "These are concept drawings for the Queenstown Town Centre preferred option in the 2020 NZUP Queenstown Detailed Business Case. After two divider pages (Appendix C Preferred Option; Appendix C1 Town Centre Drawings), drawing C200 shows an overall layout plan of the town centre with the arterial route on aerial imagery. Drawings C201-C214 (14 sheets) give general layout plans with the arterial route, covering Melbourne and Henry Streets, Gorge Road, Man/Thompson Streets, Lake Esplanade and town centre streets. They show proposed street layouts, lanes, crossings, bus stops and proposed retaining walls. All sheets are marked 'Conceptual' and 'Not for Construction', dated 13.11.2020, and are to be read with the Preliminary Design Philosophy Statement (APX_C4). No mass rapid transit corridor or corridor protection is shown.",
    "documentType": "Design and engineering report",
    "documentForm": "Concept design drawings",
    "year": 2020,
    "publishedDate": "2020-11-13",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Town Centre; town centre arterial route (Melbourne St, Henry St, Gorge Rd, Man St, Thompson St, Lake Esplanade); Frankton Road (town end)",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C Preferred Option – Appendix C1 Queenstown Town Centre Drawings and Renders: Drawings (NZTA F2Q QTC Business Cases, Queenstown Town Centre – Overall Layout Plan and General Layout Plan with Arterial Route) (2020). Drawings 310201227-01-001-C200 to C214.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-051 appendix c preferred option – appendix c1 queenstown town centre drawings and renders: drawings (nzta f2q qtc business cases, queenstown town centre – overall layout plan and general layout plan with arterial route) appendix c preferred option – appendix c1 these are concept drawings for the queenstown town centre preferred option in the 2020 nzup queenstown detailed business case. after two divider pages (appendix c preferred option; appendix c1 town centre drawings), drawing c200 shows an overall layout plan of the town centre with the arterial route on aerial imagery. drawings c201-c214 (14 sheets) give general layout plans with the arterial route, covering melbourne and henry streets, gorge road, man/thompson streets, lake esplanade and town centre streets. they show proposed street layouts, lanes, crossings, bus stops and proposed retaining walls. all sheets are marked 'conceptual' and 'not for construction', dated 13.11.2020, and are to be read with the preliminary design philosophy statement (apx_c4). no mass rapid transit corridor or corridor protection is shown. context: appendix c of the queenstown transport business case (nzta contract 2018235). the drawings are by the stantec-led consortium, whose title blocks carry stantec, wsp, abley and waka kotahi logos. designer and checker names are redacted. content: page 1 is the appendix c 'preferred option' divider and page 2 the appendix c1 'queenstown town centre drawings and renders – drawings' divider. page 3 is drawing 310201227-01-001-c200, 'overall layout plan with arterial route' (nts), on aerial imagery. pages 4-17 are drawings c201-c214, 'general layout plan with arterial route', sheets 1-14. they show proposed street layouts along the arterial route and town centre streets, with proposed retaining walls and bus stops. notes state that no survey was undertaken, cadastral boundaries are indicative, and streetscape designs need to be revised to tie in (p.3). mass rapid transit: the drawings show no mass rapid transit alignment, terminal or corridor protection. concept design drawings nzta (waka kotahi). appendix c preferred option – appendix c1 queenstown town centre drawings and renders: drawings (nzta f2q qtc business cases, queenstown town centre – overall layout plan and general layout plan with arterial route) (2020). drawings 310201227-01-001-c200 to c214. queenstown town centre; town centre arterial route (melbourne st, henry st, gorge rd, man st, thompson st, lake esplanade); frankton road (town end) conceptual; not for construction; rev a drawings show no mass rapid transit alignment, terminal or corridor protection. 15 drawings: c200 overall layout plus c201-c214 general layout sheets 1-14 (pp.3-17) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none design and engineering report final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner main document pdf",
    "sortDate": "2020-11-13",
    "cover": {
      "src": "/covers/QTS-051.webp",
      "srcset": "/covers/QTS-051.webp 400w, /covers/QTS-051-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-051/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-051/QTS-051-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-052",
    "code": "QTS-052",
    "title": "Appendix C14 Land Requirement Plans (Town Centre Property Plans; Frankton to Queenstown, and Frankton and Ladies Mile Preliminary Land Plans)",
    "shortTitle": "Appendix C14 Land Requirement Plans",
    "summary": "Appendix C14 of the NZUP Queenstown Transport Business Case is a set of preliminary land requirement drawings for NZTA (Waka Kotahi). It has three parts: Town Centre property plans (8 sheets, Stantec/Abley, 13 November 2020); Frankton to Queenstown SH6A preliminary land plans (2 sheets, WSP); and Frankton and Ladies Mile preliminary land plans (WSP). Each sheet shows parcels needed on aerial imagery, with a schedule giving reference number, area in hectares, legal description and owner. Categories include land required for the arterial road, non-arterial roads, state highway, local road, the Frankton bus hub, future bus hub expansion and temporary occupation, plus local road proposed to be stopped for exchange. Owners include QLDC, the Department of Conservation, the Crown and private parties. The largest parcels are recreation reserve on the town centre arterial route (e.g. 1.3363 ha and 1.1734 ha) and DoC land at Frankton (0.840 ha and 0.534 ha). The WSP sheets are stamped 'Not approved' and 'Draft for review'. There is no MRT content.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Land requirement drawings",
    "year": 2020,
    "publishedDate": "2020-11-13",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Town Centre (arterial and non-arterial roads); SH6A Frankton to Queenstown; Frankton (SH6, bus hub); Ladies Mile",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C14 Land Requirement Plans (Town Centre Property Plans; Frankton to Queenstown, and Frankton and Ladies Mile Preliminary Land Plans) (2020). 310201227-01-001-C1200 to C1207; 6-XT014.40-WSP-01-ZZ-DR-C-1101 to 1102; 6-XT014.64-WSP-01-ZZ-DR-C-1101 to 1103.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "paterson-pitts-group",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-052 appendix c14 land requirement plans (town centre property plans; frankton to queenstown, and frankton and ladies mile preliminary land plans) appendix c14 land requirement plans appendix c14 of the nzup queenstown transport business case is a set of preliminary land requirement drawings for nzta (waka kotahi). it has three parts: town centre property plans (8 sheets, stantec/abley, 13 november 2020); frankton to queenstown sh6a preliminary land plans (2 sheets, wsp); and frankton and ladies mile preliminary land plans (wsp). each sheet shows parcels needed on aerial imagery, with a schedule giving reference number, area in hectares, legal description and owner. categories include land required for the arterial road, non-arterial roads, state highway, local road, the frankton bus hub, future bus hub expansion and temporary occupation, plus local road proposed to be stopped for exchange. owners include qldc, the department of conservation, the crown and private parties. the largest parcels are recreation reserve on the town centre arterial route (e.g. 1.3363 ha and 1.1734 ha) and doc land at frankton (0.840 ha and 0.534 ha). the wsp sheets are stamped 'not approved' and 'draft for review'. there is no mrt content. context: these are land requirement plans supporting the preferred option. all areas are approximate and subject to survey (pp.11-12). town centre property plans (pp.1-9): drawing set 310201227-01-001-c1200 to c1207, rev a 'preliminary land requirement plan', scale 1:500, 'not for construction'. survey information is from paterson pitts group (p.3). schedules list 'land required for arterial road' (references a1-a51) and 'land required for non arterial roads' (q references). parcels include qldc road and reserve land, the memorial hall and templeton way area, gorge road and stanley street properties, a crown parcel at 9-11 camp street, and recreation reserve at lake esplanade and thompson street. the largest are a29 (1.3363 ha) and a31 (1.1734 ha) (pp.8-9). frankton to queenstown (pp.10-12): drawings 6-xt014.40-wsp-01-zz-dr-c-1101 and 1102 for sh6a/frankton road. the schedule covers land required for local road, mostly small doc sections (f2q1-f2q3), and for state highway (e.g. f2q5, qldc land). the revision history runs from issued for workshop (04/2020) to issued for iqa review (02/10/2020). the waka kotahi approval stamp is unsigned and the sheet is marked 'not approved' (p.11). frankton and ladies mile (pp.13-18): drawings 6-xt014.64-wsp-01-zz-dr-c-1101 to 1103 and a 'frankton improvements' sheet. categories are land required for state highway, local road, bus hub (the sheet also lists doc parcels ff10 0.840 ha and ff11 0.534 ha, p.15), temporary occupation and future bus hub expansion. ladies mile parcels include queenstown country club village land (lm2 0.782 ha, p.16). no costs or recommendations are given. mass rapid transit: none. the plans show no land protection for an offline mrt corridor or mass rapid transit terminal. the only future provision shown is 'future bus hub expansion' at frankton. land requirement drawings nzta (waka kotahi). appendix c14 land requirement plans (town centre property plans; frankton to queenstown, and frankton and ladies mile preliminary land plans) (2020). 310201227-01-001-c1200 to c1207; 6-xt014.40-wsp-01-zz-dr-c-1101 to 1102; 6-xt014.64-wsp-01-zz-dr-c-1101 to 1103. queenstown town centre (arterial and non-arterial roads); sh6a frankton to queenstown; frankton (sh6, bus hub); ladies mile preliminary; town centre sheets rev a; wsp sheets 'draft for review' / 'not approved' (rev e-f, issued for iqa review) no mrt corridor or terminal land shown; only future bus hub expansion at frankton town centre arterial: recreation reserve parcels a29 1.3363 ha and a31 1.1734 ha (pp.8-9) frankton (sheet 2, with bus hub land): doc parcels ff10 0.840 ha and ff11 0.534 ha (p.15) ladies mile: lm2 0.782 ha (queenstown country club village ltd) (p.16) town centre set: 8 sheets c1200-c1207 rev a (pp.2-9) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on pages) way to go none business case chapter or appendix draft 2020 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared paterson pitts group paterson pitts group prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner colin mackay signatory nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-11-13",
    "cover": {
      "src": "/covers/QTS-052.webp",
      "srcset": "/covers/QTS-052.webp 400w, /covers/QTS-052-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-052/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-052/QTS-052-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-053",
    "code": "QTS-053",
    "title": "Appendix C4 Queenstown Town Centre Preliminary Design Philosophy Statement (with Appendix C5 Frankton Preliminary Design Philosophy Statement and Appendix C6 Preliminary Pavement Design Report)",
    "shortTitle": "Appendix C4 Queenstown Town Centre Preliminary",
    "summary": "This bundle contains three technical design appendices to the 2020 Queenstown Transport Business Case, prepared for NZTA (Waka Kotahi) by the Stantec-led consortium. C4 sets the concept design philosophy for 28 Queenstown Town Centre streets and the arterials. It covers street functions, cross sections, intersections, lighting, pavement, structures, utilities and landscaping, and lists further technical work for detailed design. C5 sets the design philosophy for SH6A Frankton Road and SH6 Frankton/Ladies Mile. Full-length bus lanes on Frankton Road were rejected because of topographical, geotechnical and property constraints (approx. $400M of impacts). The adopted approach is physical bus priority on SH6 in Frankton, the SH6/6A intersection used as a 'valve' to hold SH6A traffic at free-flow levels, and virtual and targeted priority along SH6A. C5 states that the overall response is to increase on-road PT capacity and 'then provide an off-line system (likely a gondola) once the SH6A corridor has reached capacity'. It also reproduces the TDM programme and sets construction sequencing around the SH6/6A intersection. C6 gives preliminary pavement designs, including a trackless tram pavement.",
    "documentType": "Design and engineering report",
    "documentForm": "Preliminary design philosophy statements and pavement design report",
    "year": 2020,
    "publishedDate": "2020-11-13",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Town Centre and arterials; SH6A Frankton Road; Frankton Flats SH6; Ladies Mile",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C4 Queenstown Town Centre Preliminary Design Philosophy Statement (with Appendix C5 Frankton Preliminary Design Philosophy Statement and Appendix C6 Preliminary Pavement Design Report) (2020). Stantec Project No. 310201227; NZTA Contract 2018235.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "jasmax",
      "stantec",
      "wsp",
      "way-to-go-partnership",
      "qldc"
    ],
    "searchText": "qts-053 appendix c4 queenstown town centre preliminary design philosophy statement (with appendix c5 frankton preliminary design philosophy statement and appendix c6 preliminary pavement design report) appendix c4 queenstown town centre preliminary this bundle contains three technical design appendices to the 2020 queenstown transport business case, prepared for nzta (waka kotahi) by the stantec-led consortium. c4 sets the concept design philosophy for 28 queenstown town centre streets and the arterials. it covers street functions, cross sections, intersections, lighting, pavement, structures, utilities and landscaping, and lists further technical work for detailed design. c5 sets the design philosophy for sh6a frankton road and sh6 frankton/ladies mile. full-length bus lanes on frankton road were rejected because of topographical, geotechnical and property constraints (approx. $400m of impacts). the adopted approach is physical bus priority on sh6 in frankton, the sh6/6a intersection used as a 'valve' to hold sh6a traffic at free-flow levels, and virtual and targeted priority along sh6a. c5 states that the overall response is to increase on-road pt capacity and 'then provide an off-line system (likely a gondola) once the sh6a corridor has reached capacity'. it also reproduces the tdm programme and sets construction sequencing around the sh6/6a intersection. c6 gives preliminary pavement designs, including a trackless tram pavement. context and purpose: these are supporting design documents for the queenstown town centre dbc and the frankton to queenstown and frankton ssbcs (nzta contract 2018235). named personnel are redacted under s 9(2)(a). c4 lists 'various authors' (p.3). c4 queenstown town centre pdps (pp.1-76): this records concept design for 28 town centre streets and the arterials (pp.11-13). designs are based on a movement and place framework, and the investment objectives are restated (p.14). the document gives typical cross sections (xa-xd), arterial cross sections by stage (pp.17-19), mid-block crossings and intersection designs including gorge road/shotover/henry street (pp.23-31), and street-by-street layouts (pp.32-58). brecon street references access to the existing skyline gondola, a tourism attraction, not a transit proposal (p.36). the remaining sections cover pavement, lighting, geotechnical (none undertaken; p.70), structures including an overpass (pp.71-72), stormwater, landscaping, and a note that construction methodology has not been considered in detail (p.76). c5 frankton and frankton to queenstown pdps (pp.77-103): the physical widening needed for bus lanes along all of frankton road would have 'significant social..., environmental, and financial (approx. $400m) impacts' (p.85). the philosophy is therefore physical bus lanes on sh6 in frankton, with the sh6/6a intersection as a 'valve' to cap sh6a traffic, and virtual and targeted bus priority on sh6a (p.85). figure 2-3, 'response to travel demand', shows people movements growing 6.1% p.a. to 2028 and 1.6% p.a. beyond. it shows bus spare capacity, then 'hcpt spare capacity' from about 2030, illustrated with trackless tram and mass rapid transit icons (p.86). c5 refers to technical note #30 high capacity public transport (p.87). it sets out walking and cycling philosophy, design standards and typical sections, environmental screening by option (do min, virtual priority, trackless tram, 4 laning) (pp.95-96), and the queenstown tdm programme (table 3-6) with responsible organisations (pp.96-100). it also covers maintenance (17 new signal sets; operation by wellington toc; p.100-101) and construction sequencing (pp.101-102). c6 preliminary pavement design (pp.104-138): this gives feasibility-level pavement designs for the arterials, bus lanes, sh6/6a and frankton bus hub (pp.109-114). it includes a trackless tram pavement for a 51-tonne three-car set, requiring about 200 mm structural asphalt over stabilised or granular layers, with information from crrc (p.115). modelling outputs follow (pp.118-137). mass rapid transit: c5 states that the design response to future demand is to grow on-road pt capacity 'and to then provide an off-line system (likely a gondola) once the sh6a corridor has reached capacity' (p.86). figure 2-3 depicts high-capacity pt capacity from about 2030 (p.86). c6 provides a preliminary trackless tram pavement design (p.115). neither c4 nor c5 includes design provisions or corridor protection for an offline mass rapid transit. c4's brecon street references are to the existing skyline gondola only. preliminary design philosophy statements and pavement design report nzta (waka kotahi). appendix c4 queenstown town centre preliminary design philosophy statement (with appendix c5 frankton preliminary design philosophy statement and appendix c6 preliminary pavement design report) (2020). stantec project no. 310201227; nzta contract 2018235. queenstown town centre and arterials; sh6a frankton road; frankton flats sh6; ladies mile c4 rev 3 final (13-11-20); c5 rev 2 final (4/10/20) though footer reads 'status: draft'; c6 rev 1 final (06/08/2020) on-road public transport first, then off-line mass rapid transit once sh6a reaches capacity; the drawings include no mass rapid transit design. the c5 frankton design philosophy statement explains that full-length bus lanes on sh6a were rejected because widening would have 'significant social (loss of housing and property), environmental, and financial (approx. $400m) impacts' (p.85). it then states: 'overall, the design response to increased travel and public transport demand in the future is to increase the capacity of on road public transport and to then provide an off-line system (likely a gondola) once the sh6a corridor has reached capacity' (p.86). figure 2-3 'response to travel demand' shows forecast people movements exceeding car plus bus capacity. the gap is labelled 'hcpt spare capacity' from about 2030 and illustrated with trackless tram and mass rapid transit images (p.86). the document cross-references technical note #30 high capacity public transport (p.87). c6 includes a preliminary pavement design for trackless trams (p.115). the town centre pdps (c4) mentions only the existing skyline gondola on brecon street (p.36). no design element, terminal or corridor protection for an offline mass rapid transit appears in these documents. \"the physical widening required to accommodate bus lanes over the full length of frankton road would result in significant social (loss of housing and property), environmental, and financial (approx. $400m) impacts.\" (p.85) | \"overall, the design response to increased travel and public transport demand in the future is to increase the capacity of on road public transport and to then provide an off-line system (likely a gondola) once the sh6a corridor has reached capacity.\" (p.86) full-length sh6a bus lane widening impacts approx. $400m (p.85) people movement growth 6.1% p.a. to 2028, 1.6% p.a. beyond 2028 (figure 2-3, p.86) 17 new sets of traffic signals for frankton and frankton to queenstown (p.100) trackless tram pavement: 51 t three-car set; ~200 mm structural ac (p.115) town centre scope: 28 streets (p.11) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go substantive design and engineering report draft 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared jasmax jasmax prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner complete the sh6/6a intersection before signalising sh6a frankton road, in particular the marina intersections. needs to be completed prior to the signalising of sh6a frankton road not assessed build the new sh6a marina west intersection before installing signals at sugar lane/marina heights. will need to be completed before the sh6a sugar lane/marina heights intersection signals can be installed not assessed prepare a thorough network operating plan for queenstown so the wellington traffic operations centre can operate and optimise the signals. it is essential that a thorough network operating plan (nop) is prepared not assessed discuss sustaining local traffic signal technical and maintenance skills with aspiring highways. this should be discussed further with aspiring highways not assessed undertake further technical assessments (ecological, heritage, noise, contamination, landscape, lighting, geotechnical) as the project advances. the following technical assessments will be required as the project advances as the project advances not assessed undertake detailed pavement design, test pits and materials testing in pre-implementation; confirm trackless tram parameters with manufacturers. detailed pavement design including pavement test pits... will be required during the pre-implementation phase pre-implementation not assessed establish a transport management association to deliver the tdm programme (set-up, business plan, programmes, advocacy). 4 transport management association (tma) 4.1 set up years 1-3 (per table 3-6) not assessed deliver qldc-led tdm measures including a park and ride study, travel plans for developments and events, parking charging, freight management plan and car-free areas. 1.2 park and ride study qldc... 1.6 charging for parking that is currently free or cheap years 1-3 (per table 3-6) not assessed qldc qldc carry out an airport access study and travel plan. 1.11 airport access study and travel plan queenstown airport, qldc per table 3-6 not assessed qldc qldc main document pdf",
    "sortDate": "2020-11-13",
    "cover": {
      "src": "/covers/QTS-053.webp",
      "srcset": "/covers/QTS-053.webp 400w, /covers/QTS-053-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-053/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-053/QTS-053-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-054",
    "code": "QTS-054",
    "title": "Appendix C2 Frankton to Queenstown Drawings (6-XT014.40 – SH6A/Frankton Rd, Frankton to Queenstown, Concept Design)",
    "shortTitle": "Appendix C2 Frankton to Queenstown Drawings",
    "summary": "These are WSP concept design drawings for SH6A Frankton Road between Frankton and Queenstown, forming Appendix C2 of the 2020 NZUP Queenstown Detailed Business Case. After a divider, an overview plan (C-5001) indexes eight plan sheets (C-5101 to C-5108) along the corridor. The sheets show the preferred virtual and targeted bus priority layout: new signalised intersections and crossings, new and future bus stops, a widened lakeside shared path, pedestrian refuge islands and access changes. All sheets are Rev E 'Final' and dated 16/11/2020. No mass rapid transit, MRT alignment or corridor protection is shown.",
    "documentType": "Design and engineering report",
    "documentForm": "Concept design drawings",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "SH6A Frankton Road, Frankton to Queenstown",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C2 Frankton to Queenstown Drawings (6-XT014.40 – SH6A/Frankton Rd, Frankton to Queenstown, Concept Design) (2020). 6-XT014.40-WSP-01-ZZ-DR-C-5001 and C-5101 to C-5108.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-054 appendix c2 frankton to queenstown drawings (6-xt014.40 – sh6a/frankton rd, frankton to queenstown, concept design) appendix c2 frankton to queenstown drawings these are wsp concept design drawings for sh6a frankton road between frankton and queenstown, forming appendix c2 of the 2020 nzup queenstown detailed business case. after a divider, an overview plan (c-5001) indexes eight plan sheets (c-5101 to c-5108) along the corridor. the sheets show the preferred virtual and targeted bus priority layout: new signalised intersections and crossings, new and future bus stops, a widened lakeside shared path, pedestrian refuge islands and access changes. all sheets are rev e 'final' and dated 16/11/2020. no mass rapid transit, mrt alignment or corridor protection is shown. context: appendix c2 of the queenstown transport business case. the drawing set is 6-xt014.40 (sh6a/frankton rd), with stantec, wsp, abley and waka kotahi logos. most designer and checker names are redacted. content: page 1 is the divider. page 2 is the overview plan c-5001 (1:5000) on aerial imagery, keying sheets 1-8. pages 3-10 are concept design plans c-5101 to c-5108. labels include 'new bus stop', 'future bus stop', 'new signalised' intersection or crossing, 'proposed shared path', 'new pedestrian refuge island' and 'retain access with cutdown'. the revision history runs from draft for comment, through issued for workshop (29/04/2020) and issued for iqa review (02/10/2020), to final (16/11/2020). mass rapid transit: no mass rapid transit, mrt alignment or corridor protection is shown on these sh6a drawings. concept design drawings nzta (waka kotahi). appendix c2 frankton to queenstown drawings (6-xt014.40 – sh6a/frankton rd, frankton to queenstown, concept design) (2020). 6-xt014.40-wsp-01-zz-dr-c-5001 and c-5101 to c-5108. sh6a frankton road, frankton to queenstown rev e final (status stamp 'final') drawings show no mass rapid transit alignment or corridor protection. 9 drawings: overview c-5001 plus plan sheets c-5101 to c-5108 (pp.2-10) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none design and engineering report final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner t. grant prepared by wsp (including opus) wsp main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-054.webp",
      "srcset": "/covers/QTS-054.webp 400w, /covers/QTS-054-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-054/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-054/QTS-054-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-055",
    "code": "QTS-055",
    "title": "Appendix C3 Frankton and Ladies Mile Drawings (Queenstown Business Case – Frankton Works / Frankton Improvements, Concept Design)",
    "shortTitle": "Appendix C3 Frankton and Ladies Mile Drawings",
    "summary": "These are WSP concept design drawings for the Frankton and Ladies Mile elements of the 2020 NZUP Queenstown Detailed Business Case (Appendix C3). An overview plan (C-5001) keys zones Z01-Z10 from Humphrey Street and Kawarau Road through the SH6/6A (BP) intersection and Frankton Flats to Ladies Mile. Zone sheets show Ladies Mile and Stalker Road bus improvements, the Hawthorne Drive intersection, Grant Road to Joe O'Connell Drive and the SH6 link to Hansen Road, the Grant Road intersection, the Frankton (SH6/6A) intersection, and the SH6/Kawarau Road bus hub (Option 1, with an outlined 'future bus hub expansion' area). Further sheets show SH6/Lucas Place and Humphrey Street. Sheets are marked Final, mostly dated 16/11/2020. No mass rapid transit station, MRT alignment or corridor protection is shown, including on the bus hub sheet.",
    "documentType": "Design and engineering report",
    "documentForm": "Concept design drawings",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Frankton Flats SH6 (Kawarau Falls Bridge to Shotover Bridge); SH6 Ladies Mile; Stalker Road; Humphrey Street",
    "owner": "Way to Go",
    "citation": "NZTA (Waka Kotahi). Appendix C3 Frankton and Ladies Mile Drawings (Queenstown Business Case – Frankton Works / Frankton Improvements, Concept Design) (2020). 6-XT014.64-WSP-01-ZZ-DR-C-5001 and zone sheets Z01-Z10 (C-5101 to C-5103).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "stantec",
      "wsp",
      "way-to-go-partnership"
    ],
    "searchText": "qts-055 appendix c3 frankton and ladies mile drawings (queenstown business case – frankton works / frankton improvements, concept design) appendix c3 frankton and ladies mile drawings these are wsp concept design drawings for the frankton and ladies mile elements of the 2020 nzup queenstown detailed business case (appendix c3). an overview plan (c-5001) keys zones z01-z10 from humphrey street and kawarau road through the sh6/6a (bp) intersection and frankton flats to ladies mile. zone sheets show ladies mile and stalker road bus improvements, the hawthorne drive intersection, grant road to joe o'connell drive and the sh6 link to hansen road, the grant road intersection, the frankton (sh6/6a) intersection, and the sh6/kawarau road bus hub (option 1, with an outlined 'future bus hub expansion' area). further sheets show sh6/lucas place and humphrey street. sheets are marked final, mostly dated 16/11/2020. no mass rapid transit station, mrt alignment or corridor protection is shown, including on the bus hub sheet. context: appendix c3 of the queenstown transport business case. the drawing set is 6-xt014.64 (frankton), with stantec, wsp, abley and waka kotahi logos. names are redacted. content: page 1 is the divider and page 2 the overview plan c-5001 (rev c final) keying zones z01-z10. pages 3-6 cover ladies mile highway and the stalker road/sh6 bus improvements (sheets 1-3). page 7 is the hawthorne drive intersection, pages 8-10 grant road to joe o'connell drive, the sh6 link between hansen road and grant road, and the sh6/grant road intersection. page 11 is the frankton (sh6/6a) intersection and page 12 the sh6/kawarau road bus hub (option 1), which shows an outlined 'future bus hub expansion' area. page 13 is sh6/lucas place and pages 14-15 humphrey street. the drawings show bus lanes, signalised and roundabout intersections and crossings. mass rapid transit: no mass rapid transit station, mrt alignment or corridor protection is shown. tn19 (apx_b23, p.5) had scoped 'options to incorporate future potential gondola station' at the frankton hub, but the bus hub sheet (p.12) shows only the bus facility and a future bus hub expansion area. concept design drawings nzta (waka kotahi). appendix c3 frankton and ladies mile drawings (queenstown business case – frankton works / frankton improvements, concept design) (2020). 6-xt014.64-wsp-01-zz-dr-c-5001 and zone sheets z01-z10 (c-5101 to c-5103). frankton flats sh6 (kawarau falls bridge to shotover bridge); sh6 ladies mile; stalker road; humphrey street final (rev c overview; rev d on most sheets) drawings show no mass rapid transit station or corridor protection; the frankton hub shows only future bus hub expansion. 14 drawings: overview c-5001 plus zone sheets z01-z10 (pp.2-15) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page) way to go none design and engineering report final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared stantec stantec prepared wsp (including opus) wsp prepared way to go way to go partner main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-055.webp",
      "srcset": "/covers/QTS-055.webp 400w, /covers/QTS-055-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-055/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-055/QTS-055-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-056",
    "code": "QTS-056",
    "title": "Queenstown Business Case – Commercial Case",
    "shortTitle": "Queenstown Business Case – Commercial Case",
    "summary": "The Commercial Case (Final, 16 November 2020; Stephen Carruthers) explains how the Queenstown Business Case preferred programme will be procured, consented and how property will be acquired. NZUP and CIP are to be delivered with Wakatipu Active Travel Network Stage 1 through the Wakatipu Transport Programme Alliance. Waka Kotahi and QLDC released the RfT on 2 October 2020, with award expected pre-Christmas 2020, four-year delivery and an estimated $200M budget. The unfunded remainder, including the Frankton offline transport hub and 'Offline PT infrastructure and service improvements', is to be procured traditionally as discrete, competitively tendered phases. Most risks are expected to stay with QLDC or Waka Kotahi. Six high-level risks are listed with Way to Go and Waka Kotahi owners. Property is on the critical path. Acquisition follows the Public Works Act and takes at least 18 months; costs include $17.997m for the Stanley Street hub and $82.3m for Arterials Stage 2. Of 37 Frankton to Queenstown consent locations, about half have challenges; the Frankton offline PT hub needs a new designation.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case chapter – commercial case",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Frankton to Queenstown (SH6A); Frankton and Ladies Mile (SH6); Queenstown Town Centre; arterial routes",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Commercial Case (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-056 queenstown business case – commercial case queenstown business case – commercial case the commercial case (final, 16 november 2020; stephen carruthers) explains how the queenstown business case preferred programme will be procured, consented and how property will be acquired. nzup and cip are to be delivered with wakatipu active travel network stage 1 through the wakatipu transport programme alliance. waka kotahi and qldc released the rft on 2 october 2020, with award expected pre-christmas 2020, four-year delivery and an estimated $200m budget. the unfunded remainder, including the frankton offline transport hub and 'offline pt infrastructure and service improvements', is to be procured traditionally as discrete, competitively tendered phases. most risks are expected to stay with qldc or waka kotahi. six high-level risks are listed with way to go and waka kotahi owners. property is on the critical path. acquisition follows the public works act and takes at least 18 months; costs include $17.997m for the stanley street hub and $82.3m for arterials stage 2. of 37 frankton to queenstown consent locations, about half have challenges; the frankton offline pt hub needs a new designation. context and purpose: the commercial case covers procurement, risk allocation, payment mechanisms, contract management, property and consenting (p.4). the programme has three parts: nzup (crown-funded), cip (crown-funded) and an unfunded remainder (p.4). alliance: 'waka kotahi and qldc released an rft for the wakatipu transport programme alliance on 2 october 2020'. it covers professional services and physical works for nzup, cip and stage 1 of the wakatipu active travel network, with award expected pre-christmas 2020, four-year delivery and an estimated budget of $200m (p.4). remainder: the remainder needs ltp and nltp approval. it comprises tdm, pt services, on-road pt, stanley/shotover with bus hub stage 1, town centre stage 2, arterials stages 2 and 3, stanley street bus hub stage 2, the frankton offline transport hub, and offline pt infrastructure and service improvements. it is to be procured through gets using price/quality (p.4). risk: most risks remain with qldc or waka kotahi under traditional procurement and are largely transferred under the alliance (pp.4-5). table 1 lists risks of funding misalignment, property, slow decisions, interface misalignment, partner misalignment, loss of community support and design changes. owners are shaun hubbard (way to go) and tony sizemore (waka kotahi) (p.5). standard payment mechanisms apply (pp.5-6), and contracts are managed under qldc and waka kotahi policies (p.6). property: the property group's strategy is in appendix f02. property is on the critical path, and acquisition takes '18 months but can take much longer'. negotiations are recommended to commence after approval (p.6). table 2 costs include the sh6/6a intersection ($4.51m), stanley street hub ($17.997m), arterials stage 1 ($32.27m) and arterials stage 2 ($82.35m) (pp.6-7). consenting: of 37 f2q locations, 'approximately half of the sites have some consenting challenges' (p.7). required approvals and assessments are listed for the town centre and arterials (pp.9-10). mass rapid transit: the report does not mention mass rapid transit. it lists 'frankton offline transport hub' and 'offline pt infrastructure and service improvements' in the unfunded remainder (p.4). item 13, the 'frankton offline pt hub', 'requires new designation'; the 'site subject of existing qldc designation, which has priority'; and it involves 'displacement of recreational land' (p.8). no procurement model specific to an offline system (for example ppp) is discussed. business case chapter – commercial case way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – commercial case (2020). frankton to queenstown (sh6a); frankton and ladies mile (sh6); queenstown town centre; arterial routes final (v3, 16/11/20) lists offline pt infrastructure and frankton offline hub in unfunded remainder; hub needs new designation the remainder of the preferred programme 'requires approval through the long term plan and national land transport programme before it will proceed'. its scope includes 'frankton offline transport hub' and 'offline pt infrastructure and service improvements' (p.4). these are to be procured like other items, 'as discrete pieces of work following the traditional approach' (p.4). the consenting table records for the 'frankton offline pt hub': 'requires new designation • site subject of existing qldc designation, which has priority • displacement of recreational land' (p.8). no mass rapid transit or alternative delivery model is discussed. \"offline pt infrastructure and service improvements.\" (p.4) | \"frankton offline pt hub • requires new designation • site subject of existing qldc designation, which has priority • displacement of recreational land\" (p.8) alliance rft released 2 october 2020; estimated alliance budget $200m; four-year delivery (p.4) property acquisition at least 18 months (p.6) property costs: sh6/6a intersection $4,507,250; stanley st pt hub $17,997,000; arterials stage 1 $32,274,063; arterials stage 2 $82,346,503 (pp.6-7) 37 f2q consenting locations; about half with challenges (p.7) costed with the parent document. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published stephen carruthers author shaun hubbard project director way to go way to go tony sizemore client representative nzta waka kotahi nzta deliver nzup, cip and wakatipu active travel network stage 1 through the wakatipu transport programme alliance (estimated budget $200m, ~4 years). waka kotahi and qldc released an rft for the wakatipu transport programme alliance on 2 october 2020 contract award pre-christmas 2020; four years not assessed nzta waka kotahi nzta procure the remainder of the programme (tdm, pt, stanley/shotover, town centre 2, arterials 2-3, hubs, offline pt) as discrete, competitively tendered phases via gets. the remainder of the preferred programme is procured and delivered as discrete pieces of work following the traditional approach subject to ltp/nltp approval not assessed each project to develop its own risk register for its next stage. requires that the individual projects develop their own risk registers next stage not assessed commence negotiations for all required property following business case approval (public works act). recommended that negotiations commence for all required property following the approval following business case approval not assessed develop more detailed consenting strategies in the next stage. more detailed strategies will be developed in the next stage of the project next stage not assessed obtain a new designation for the frankton offline pt hub (site has existing qldc designation; displaces recreational land). frankton offline pt hub • requires new designation not assessed main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-056.webp",
      "srcset": "/covers/QTS-056.webp 400w, /covers/QTS-056-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-056/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-056/QTS-056-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-057",
    "code": "QTS-057",
    "title": "Queenstown Business Case – Management Case",
    "shortTitle": "Queenstown Business Case – Management Case",
    "summary": "The Management Case (Final, 16 November 2020; Stephen Carruthers) defines governance, roles, interdependencies, next stages, assurance, change control, benefits realisation, risk, cost management and monitoring. It states the business case 'has been developed under Wakatipu Way to Go', a partnership of QLDC, ORC and Waka Kotahi, and names its governance and management members. NZUP ($90M approved, $16.2M shortfall) and CIP ($85M) are delivered through the Wakatipu Transport Programme Alliance. The unfunded remainder is led by QLDC (local assets), Waka Kotahi (state highways) and ORC (PT). Table 6 assigns next stages, including an ORC PT services DBC, a QLDC TDM SSBC, and an 'Offline PT corridor' business case update with route protection under ORC/QLDC 'Beyond 2030'. It identifies SH6A revocation, the Project Manawa land strip and Frankton hub land as critical issues. It recommends a data improvement plan and lists assurance reviewers, including the Challenge Team, Flow and EY.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case chapter – management case",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Management Case (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "mein-consulting-limited",
      "ey",
      "price-waterhouse-cooper",
      "flow-transportation-specialists"
    ],
    "searchText": "qts-057 queenstown business case – management case queenstown business case – management case the management case (final, 16 november 2020; stephen carruthers) defines governance, roles, interdependencies, next stages, assurance, change control, benefits realisation, risk, cost management and monitoring. it states the business case 'has been developed under wakatipu way to go', a partnership of qldc, orc and waka kotahi, and names its governance and management members. nzup ($90m approved, $16.2m shortfall) and cip ($85m) are delivered through the wakatipu transport programme alliance. the unfunded remainder is led by qldc (local assets), waka kotahi (state highways) and orc (pt). table 6 assigns next stages, including an orc pt services dbc, a qldc tdm ssbc, and an 'offline pt corridor' business case update with route protection under orc/qldc 'beyond 2030'. it identifies sh6a revocation, the project manawa land strip and frankton hub land as critical issues. it recommends a data improvement plan and lists assurance reviewers, including the challenge team, flow and ey. context and purpose: the case defines roles and responsibilities, management through to implementation, and how scope and risk will be managed (p.4). governance: way to go provides governance oversight. its governance members are peter hansby, kesh keshaboina and gavin palmer, and its management members tony pickard, tony sizemore and garry maloney. its staff are led by project director shaun hubbard (p.4). nzup is managed by waka kotahi ($90m approved; $16.2m shortfall to the nzup governance group) and cip by the qldc pmo ($85m), both through the wakatipu transport programme alliance (p.5). prospective alliance board members are peter hansby, geoff mayman, kesh keshaboina and peter spies (pp.5-6). the remainder is unfunded; leads are qldc (local assets), waka kotahi (state highways) and orc (pt), with most submissions to the 2024-27 nltp (p.6). tables 3-4 allocate asset and phase responsibilities (p.7). interdependencies and issues: these include the spatial plan, ladies mile masterplan, project manawa, lakeview, skyline's car parking expansion and the 3 waters programme (pp.8-9). critical issues are sh6a revocation from frankton road/dublin street to steamer wharf, which needs a joint waka kotahi/qldc project (pp.9-10); a 2.5m project manawa strip for the stanley street hub (p.10); and frankton hub stage 2 land on doc recreation reserve (golf course), needing at least 18 months (pp.10-11). pt services rise in 2024 and step up in 2027, aligned with ptom contract renewal (pp.11-12). next stages (table 6, pp.11-12): nzup (waka kotahi) and cip (qldc) are committed. tdm ssbc (qldc); pt services dbc (orc); on-road pt dbc (orc/waka kotahi); stanley/shotover pre-implementation (waka kotahi); town centre stage 2 (qldc, 2024-27); arterials stage 2 update (qldc); stanley street hub phase 2 and frankton transport hub within the pt dbc (qldc, 2024-27); arterials stage 3 (qldc) and offline pt corridor (orc/qldc) beyond 2030. assurance, benefits and risk: assurance is described on pp.15-17. the benefits framework (pp.17-20) targets 40% sustainable modes on f2q by 2028 and 60% by 2048, and a 15% emissions cut by 2048. key risks have owners (pp.21-22), including a critical parking risk owned by qldc's tony pickard. cost management, lessons learned and joint monitoring follow (pp.22-25). mass rapid transit: the scope of the remainder includes 'offline pt service improvements, including an offline frankton transport hub' (p.6). frankton hub stage two 'will only be required if stimulated through development, an off-line pt connection, or the desire to create a combined local/long distance/tourism facility' (p.10). table 6 assigns the 'offline pt corridor' to orc/qldc for a 'business case update for pre-implementation funding, route protection', 'beyond 2030' (p.12). table 7 defines its purpose as 'to identify a new public transport route outside of the road network... between frankton and queenstown town centre' (p.13). the only cableway mention is skyline's existing gondola site (p.9). business case chapter – management case way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – management case (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (v3, 16/11/20) assigns offline pt corridor business case update and route protection to orc/qldc, beyond 2030 the unfunded remainder includes 'offline pt service improvements, including an offline frankton transport hub' (p.6). the frankton hub stage two upgrade 'will only be required if stimulated through development, an off-line pt connection, or the desire to create a combined local/long distance/tourism facility'. it would require doc-owned recreation reserve land (golf course) 'beyond 2030' (p.10). in table 6, 'offline pt corridor' has next stage 'business case update for pre-implementation funding, route protection', responsibility 'orc/qldc', timing 'beyond 2030' and funding 'none' (p.12). a business case update 'is intended to review the case for the project without the need for a new business case' (p.12). table 7 gives its purpose as 'to identify a new public transport route outside of the road network', located 'between frankton and queenstown town centre', with outcome 'to provide additional capacity for the pt system and encourage higher pt patronage' (p.13). this differs from the sequencing table, which lists waka kotahi/orc as lead. \"offline pt corridor | business case update for pre-implementation funding, route protection | orc/qldc | beyond 2030 | none\" (p.12) | \"purpose: to identify a new public transport route outside of the road network. location: between frankton and queenstown town centre. outcome: to provide additional capacity for the pt system and encourage higher pt patronage.\" (p.13) | \"this will only be required if stimulated through development, an off-line pt connection, or the desire to create a combined local/long distance/tourism facility.\" (p.10) nzup $90m approved; $16.2m shortfall (p.5) cip $85m approved (p.5) property purchase at least 18 months (p.11) mode share targets f2q: 40% sustainable modes by 2028; 60% by 2048 (p.18) emissions baseline 178,535 t co2-e (2018); 2048 target 156,257 t (15% decrease) (p.20) residents within 400m of bus stop: 17,024 (62% of wakatipu ward); target 90% (p.18) costed with the parent document. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published stephen carruthers author shaun hubbard project director way to go way to go barry mein reviewed by mein consulting limited mein consulting limited chris money reviewed by ey ey geoff cooper reviewed by pwc (pricewaterhousecoopers) pwc ian clark reviewed by flow transportation specialists flow transportation specialists pete clark reviewed by nzta waka kotahi nzta garry maloney client representative orc orc gavin palmer client representative orc orc geoff mayman client representative qldc qldc kesh keshaboina client representative nzta waka kotahi nzta peter hansby client representative qldc qldc peter spies client representative nzta waka kotahi nzta tony pickard client representative qldc qldc tony sizemore client representative nzta waka kotahi nzta deliver nzup (sh6a, ladies mile, gr2kf) pre-implementation and implementation; $90m approved with $16.2m shortfall referred to nzup governance group. the transport programme is being managed by waka kotahi 2021-2024 not assessed nzta waka kotahi nzta deliver cip package (arterials stage 1, town centre upgrade stage 1). will be managed by the qldc project management office 2021-2024 not assessed qldc qldc travel demand management package: single stage business case. travel demand management package | single stage business case | qldc 2021-24 and beyond not assessed qldc qldc public transport services: detailed business case. public transport services | detailed business case | orc 2021-24 not assessed orc orc on-road pt service improvements: detailed business case. on-road pt service improvements | detailed business case | orc/waka kotahi 2021-24 not assessed nzta waka kotahi nzta stanley and shotover corridor improvements and stanley st bus hub phase 1: pre-implementation. stanley and shotover corridor improvements... pre-implementation | waka kotahi 2021-24 not assessed nzta waka kotahi nzta town centre upgrade stage 2: pre-implementation. town centre upgrade – stage 2 | pre-implementation | qldc 2024-27 not assessed qldc qldc arterials stage 2: business case update for pre-implementation funding. arterials stage 2 | business case update* for pre-implementation funding | qldc 2021-24 not assessed qldc qldc stanley street bus hub phase 2: include in pt services and infrastructure dbc. stanley street bus hub phase 2 | included in pt services and infrastructure dbc | qldc 2024-27 not assessed qldc qldc frankton transport hub (on golf course): include in pt services and infrastructure dbc. frankton transport hub (on golf course) | included in pt services and infrastructure dbc | qldc 2024-27 not assessed qldc qldc stage 3 arterials route: business case update for pre-implementation funding. stage 3 arterials route | business case update | qldc | beyond 2030 beyond 2030 not assessed qldc qldc offline pt corridor between frankton and queenstown town centre: business case update for pre-implementation funding and route protection. offline pt corridor | business case update for pre-implementation funding, route protection | orc/qldc | beyond 2030 beyond 2030 not assessed qldc qldc set up dedicated joint project to agree sh6a revocation and oversee physical works. a dedicated project is set up to form a revocation agreement as soon as possible not assessed nzta waka kotahi nzta agree the project manawa land strip/swap needed for the stanley street bus hub. it is critical for the bus hub that this agreement is made as soon as possible (critical path) not assessed initiate public works act purchase of frankton hub land once pt service and infrastructure dbc confirms the case. this is therefore a key process that needs to be initiated subject to the case for the investment being confirmed after pt dbc not assessed carry the engagement strategy into project-specific communication plans owned by the project director and governance group. it is recommended that the intent of the engagement strategy is carried through next stages not assessed way to go way to go establish change control registers for each project and across the programme. it is recommended that a change control register is established each project phase not assessed develop a data improvement plan to address baseline data gaps for benefits monitoring. a data improvement plan is developed between qldc, waka kotahi and orc not assessed nzta waka kotahi nzta seek w2g board direction prompting qldc to develop a parking implementation plan supporting the business case. recommended w2g seek board direction to prompt qldc to develop implementation plan not assessed way to go way to go each partner to deliver a project close-out report with lessons learned within two months of completion. it should be required by each of the partners to deliver a project close out report within two months of each project/phase not assessed nzta waka kotahi nzta jointly monitor post-implementation kpis per table 11. monitoring will be a joint responsibility of each of the partners ongoing not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-057.webp",
      "srcset": "/covers/QTS-057.webp 400w, /covers/QTS-057-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-057/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-057/QTS-057-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-058",
    "code": "QTS-058",
    "title": "Queenstown Business Case – Preferred Option Assessment",
    "shortTitle": "Queenstown Business Case – Preferred Option",
    "summary": "The Preferred Option Assessment (Final, 16 November 2020; Stacey Lloyd) describes the Queenstown Programme that emerged from optioneering and engagement. The programme has four elements: committed activities (NZUP $90m, CIP $85m), a recommended option, supporting activities and other activities. It sets an eight-phase roll-out from the 2024 Do Minimum to Phase 8, a 'future off-line gondola connection' timed '2050+'. It lists interventions by area (Ladies Mile, Frankton, SH6A, Town Centre) with phase numbers. It sets out wider strategies: a TDM programme with agency responsibilities, ITS (WTOC, VMS, parking technology), a road-based BRT network of five bus routes and one ferry route building on 'Bus Max', urban realm typologies and parking. The programme rates High for GPS results alignment, with a Low BCR bracket and priority order 5. It records social, environmental, planning and property impacts, noting the mass rapid transit option 'could give rise to high levels of visual and landscape effects'.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case chapter – preferred option/programme assessment",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Preferred Option Assessment (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "its",
      "coach"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-058 queenstown business case – preferred option assessment queenstown business case – preferred option the preferred option assessment (final, 16 november 2020; stacey lloyd) describes the queenstown programme that emerged from optioneering and engagement. the programme has four elements: committed activities (nzup $90m, cip $85m), a recommended option, supporting activities and other activities. it sets an eight-phase roll-out from the 2024 do minimum to phase 8, a 'future off-line gondola connection' timed '2050+'. it lists interventions by area (ladies mile, frankton, sh6a, town centre) with phase numbers. it sets out wider strategies: a tdm programme with agency responsibilities, its (wtoc, vms, parking technology), a road-based brt network of five bus routes and one ferry route building on 'bus max', urban realm typologies and parking. the programme rates high for gps results alignment, with a low bcr bracket and priority order 5. it records social, environmental, planning and property impacts, noting the mass rapid transit option 'could give rise to high levels of visual and landscape effects'. context and purpose: the report builds on the options assessment to define the preferred programme. it covers its alignment with customer needs and investment objectives, its gps/iaf assessment profile and its wider impacts (p.5). its four elements are committed activities, recommended option, supporting activities (re-evaluation in 24-27 or 27-30) and other activities (re-evaluation beyond 2030) (p.6). programme: table 1 (p.8) summarises interventions. they comprise a stanley street hub, arterials stage 1 and town centre upgrades; sh6a targeted bus lanes and signalised intersections; ladies mile bus lanes and the howards drive roundabout; and frankton hub and sh6 bus lanes. other measures are fleet upgrade towards bi-articulated 'trackless tram' style vehicles, tdm, technology and ferries. a 'future suite' covers arterials stages 2 and 3, further hub upgrades, connector services and a 'future offline public transport service, such as a gondola'. funding is cip $85m and nzup $90m (p.9). table 2 phases the roll-out as follows: phase 1 do minimum 2024; 2 pt services 2025; 3 stanley/shotover 2026; 4 town centre stage two 2027; 5 arterial stage two 2027; 6 hub upgrades 2029; 7 arterial stage three 2033+; 8 future offline pt 2050+ (p.10). tables 3-6 give intervention ids and phases (pp.12-17). the ff2 frankton bus hub (phase 6) is to cater 'for growing pt demand and operations including mrt' (p.13). wider strategies: the tdm programme has four areas: policy, travel planning, wayfinding and a transport management association. table 7 assigns organisations, mostly qldc (pp.18-22). its recommends continued wtoc operation and permanent vms (pp.23-24). the pt strategy is a road-based brt network building on bus max (hcpt tn, appendix c12), with five core routes and one ferry route. it is expected to make nzup benefits last 'a predicted 30 years' (pp.25-26). urban realm typologies and the parking strategy follow (pp.26-28). alignment: by 2028, 40% of trips are expected by alternative modes and 60% by 2048 (p.29). the assessment profile gives high results alignment (gps 2018), a low bcr bracket estimate and priority order 5. car mode share falls from 77% to 40% by 2048 (pp.40-41). impacts: the report covers social and environmental effects (pp.42-43), planning considerations and property via the public works act (pp.44-45), and further technical assessments (p.46). mass rapid transit: phase 8 'consists of a future off-line gondola connection', timed 2050+ (p.10). the pt strategy table states the road-based network 'will accommodate demand growth to around 2051. an offline corridor can provide an additional step-change in capacity on the core spine when needed' (p.37). it adds that 'the longer-term offline option removes crash risk from sh6a entirely' (p.37). hubs can accommodate additional long-term capacity 'through an offline gondola system' (p.38). the addition of mass rapid transit 'would deliver a unique experiential element to the pt network' (p.38). its potential visual and landscape effects are flagged (p.43). customers are told there is 'potential for an offline high capacity public transport option to be introduced in the long term' (p.29). business case chapter – preferred option/programme assessment way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – preferred option assessment (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (rev 3, 12/11/20) includes further off-line mass rapid transit as phase 8 (2050+), after road-based bus rapid transit capacity runs out around 2051. table 1 lists, under longer-term measures, a 'future offline public transport service, such as a gondola, that provides a further step change in capacity along with additional resilience and amenity benefits' (p.8). table 2 phase 8 states: 'road based public transport services will eventually reach capacity. therefore a \"future offline pt\" package has been included to demonstrate the benefits associated with providing additional capacity on the franklin [sic] to queenstown corridor. this consists of a future off-line gondola connection', timed '2050+' (p.10). the frankton bus hub (ff2, phase 6) is to cater for 'operations including mrt' (p.13). the road-based pt network 'will accommodate demand growth to around 2051. an offline corridor can provide an additional step-change in capacity on the core spine when needed' (p.37). when bus bunching becomes critical, capacity 'can be accommodated in the hubs through an offline gondola system' (p.38). table 22 notes 'the gondola option could give rise to high levels of visual and landscape effects depending on alignment' (p.43). \"road based public transport services will eventually reach capacity. therefore a \"future offline pt\" package has been included to demonstrate the benefits associated with providing additional capacity on the franklin [sic] to queenstown corridor. this consists of a future off-line gondola connection.\" (p.10) | \"will accommodate demand growth to around 2051. an offline corridor can provide an additional step-change in capacity on the core spine when needed.\" (p.37) | \"the addition of an offline corridor such as a gondola, in the future, would deliver a unique experiential element to the pt network.\" (p.38) | \"the gondola option could give rise to high levels of visual and landscape effects depending on alignment.\" (p.43) cip $85m (streetscape $35m, arterials stage one $50m); nzup $90m (p.9) phase timing: 1 do min 2024; 2 pt services 2025; 3 2026; 4 2027; 5 2027; 6 2029; 7 2033+; 8 offline gondola 2050+ (p.10) brt network: five core bus routes + one ferry route; nzup benefits to last a predicted 30 years (pp.25-26) mode share: 40% alternative modes by 2028, 60% by 2048 (p.29); car share 77% to 40% by 2048; active 2% to 5% (p.40) iaf profile: results alignment high; bcr bracket low; priority order 5 (p.41) road-based pt accommodates growth to around 2051 (p.37) costed with the parent document. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go substantive business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. coach coach and visitor shuttle services. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published stacey lloyd author phase 1 do minimum: arterial stage one (cip), its package, town centre upgrades stage one, tdm package and nzup-funded pt infrastructure. 1 do minimum includes:... 2024 2024 not assessed phase 2: nltf-funded pt service improvements – bus max core network, new bus fleet, new bus depot, bus lane enforcement. 2 nltf enabling public transport services... 2025 (and ongoing) 2025 (and ongoing) not assessed phase 3: targeted improvements to stanley and shotover streets, paving way for sh6a revocation and upgraded hub. 3 targeted improvements to stanley street and shotover street... 2026 2026 not assessed phase 4: town centre upgrade stage two (camp, earl, church streets, mall, cow lane, lake esplanade, ballarat st). 4 town centre upgrade – stage two... 2027 2027 not assessed phase 5: queenstown arterial stage two (gorge road to hay street) and brecon street steps. 5 queenstown arterial – stage two... 2027 2027 not assessed phase 6: final upgrades to queenstown (stanley st/athol st) and frankton bus hubs. 6 upgrades to the bus hubs in queenstown and frankton... 2029 2029 not assessed phase 7: queenstown arterial stage three, glasgow street to one mile roundabout. 7 queenstown arterial – stage three... 2033+ 2033+ not assessed phase 8: future offline pt package – a future off-line mass rapid transit connection adding capacity between frankton and queenstown. this consists of a future off-line gondola connection. 2050+ 2050+ not assessed develop a single stage business case for tdm with an implementation plan, as recommended in waka kotahi's mode shift plan. a recommendation has been made to develop a single stage business case for tdm not assessed introduce charging for parking that is currently free or cheap. 1.6 charging for parking that is currently free or cheap | qldc year 1-3 programme not assessed qldc qldc undertake a park and ride study. 1.2 park and ride study | qldc year 1-3 programme not assessed qldc qldc require travel plans for new developments, large employers and significant trip generators. 1.3 require travel plans for new developments... qldc year 1-3 programme not assessed qldc qldc advocate travel plans for tourist destinations including the gondola. advocate for travel plans for tourist destinations eg... the gondola | qldc, orc, waka kotahi year 1-3 programme not assessed nzta waka kotahi nzta establish a transport management association to coordinate tdm (business plan, membership, programmes). 4.1.1 establish itself (mission, values, brand, set up incorporated society year 1-3 programme not assessed continue wtoc oversight of queenstown traffic operations. it is recommended that the wtoc continues to oversee queenstown traffic operations not assessed nzta waka kotahi nzta introduce permanent fixed variable message signs at key network locations, scoped with the operating toc. it is recommended, permanent, fixed signs be introduced at appropriate locations not assessed deliver a brt network of five core bus routes and one ferry route, with staged fleet upgrade and new depot. the proposed brt network for queenstown is made up of five core bus routes and one ferry route over 30 years not assessed main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-058.webp",
      "srcset": "/covers/QTS-058.webp 400w, /covers/QTS-058-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-058/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-058/QTS-058-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-059",
    "code": "QTS-059",
    "title": "Queenstown Business Case – Strategic Context",
    "shortTitle": "Queenstown Business Case – Strategic Context",
    "summary": "The Strategic Context (Final, 16 November 2020; Chris Baker and Darren Davis) is Part A of the Queenstown Business Case, 'being delivered by Way to Go'. It re-confirms the strategic case set by the 2017 Queenstown Integrated Transport PBC. It documents rapid visitor and resident growth, car-oriented dispersed land use and a constrained network. SH6A practical capacity was exceeded on 140 days in 2019, and 40% of SH6A trips must be non-car by 2028, rising to 60% by 2048. It sets out problem statements for Frankton to Queenstown (efficiency, amenity, safety, resilience) and the Town Centre (efficiency, amenity, safety), agreed at a 9 October 2018 ILM workshop. Four investment objectives follow. It reviews COVID-19 impacts, related projects (NZUP, CIP, spatial plan, masterplans, ferry DBC) and stakeholder engagement. It concludes that investment in the 'three pillars' (PT services, supporting infrastructure and TDM) is needed and that the COVID-19 lull is the time to act. It records that the project began with Mass Rapid Transit, later called HCPT, to be investigated to IBC level.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case chapter – strategic case (Part A)",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Strategic Context (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "coach"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "wsp"
    ],
    "searchText": "qts-059 queenstown business case – strategic context queenstown business case – strategic context the strategic context (final, 16 november 2020; chris baker and darren davis) is part a of the queenstown business case, 'being delivered by way to go'. it re-confirms the strategic case set by the 2017 queenstown integrated transport pbc. it documents rapid visitor and resident growth, car-oriented dispersed land use and a constrained network. sh6a practical capacity was exceeded on 140 days in 2019, and 40% of sh6a trips must be non-car by 2028, rising to 60% by 2048. it sets out problem statements for frankton to queenstown (efficiency, amenity, safety, resilience) and the town centre (efficiency, amenity, safety), agreed at a 9 october 2018 ilm workshop. four investment objectives follow. it reviews covid-19 impacts, related projects (nzup, cip, spatial plan, masterplans, ferry dbc) and stakeholder engagement. it concludes that investment in the 'three pillars' (pt services, supporting infrastructure and tdm) is needed and that the covid-19 lull is the time to act. it records that the project began with mass rapid transit, later called hcpt, to be investigated to ibc level. context and purpose: the report 'is the first of seven in a suite of reports' (p.6). it aims to 'document and evidence the existing and anticipated problems' and 're-confirm the strategic case' established in the qit pbc (p.7). the project originally comprised the f2q ssbc and qtc dbc, 'with mass rapid transit (subsequently referred to as high capacity public transport, hcpt) to be investigated to an indicative business case (ibc) level'. frankton and ladies mile were added part-way through (pp.6, 10). background: the report traces growth since the 1980s, the paused grant road to kawarau falls ssbc (p.13), covid-19 impacts (pp.13-14) and new funding (nzup, cip $85m) (p.15). it covers the economic, transport and land use contexts including the spatial plan and masterplans (pp.16-28), and parallel projects (p.30). in the parallel projects table, the lake wakatipu ferry dbc found a subsidised frankton arm ferry would achieve a bcr of 0.97, 'suggesting ferries are unlikely to form the mass rapid transit option for this business case'. parking was found to be the 'single most sensitive parameter driving mode shift' (p.30). problems and objectives: an ilm workshop on 9 october 2018 with waka kotahi, qldc, orc and the project team set problem and benefit statements; the f2q ilm was reviewed in february 2020 (p.37). investment objectives cover efficient and reliable access, adaptability to change and disruption, liveability and the built and natural environment, and safety towards vision zero (pp.41-44). evidence: sh6a car capacity was 'all but reached by 2018'. the majority of growth can only be catered for 'by increasing road capacity over the entire network or by providing high capacity public transport'. 40% of sh6a trips must be non-car by 2028 and 60% by 2048 (p.56). resilience is treated as 'to some extent a secondary problem' (p.57). safety and amenity evidence and the implications of not investing follow (pp.60-67), then opportunities, constraints and resort-town case studies (pp.67-70). engagement: five workshops ran from september 2018 to march 2020 (p.71). community consultation gathered 349 online responses and discussions with more than 230 people (p.72). conclusion: a 'different pathway' through the three pillars is needed, and 'now is the time to address these challenges' (p.75). mass rapid transit: the report recalls that the qit pbc priority projects included 'a mass rapid transit (mrt) corridor between queenstown and frankton'. its figure 5 'indicates a gondola over queenstown hill as a mrt option, though bus rapid transit and light rail are also suggested' (p.11). it notes that the spatial plan recognises transport can drive land use change 'such as around a mass rapid transit route' (p.23), and that the frankton masterplan aims at 'enabling high frequency, high capacity public transport in the future' (p.27). it identifies hcpt as an opportunity to 'enable development and build density' (p.67). it does not assess mass rapid transit; that is done in the options assessment. business case chapter – strategic case (part a) way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – strategic context (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (rev 3, 16/11/20) records mass rapid transit, later called high-capacity public transport, at indicative business case level, including a corridor over queenstown hill; no assessment in this report. the report states the project began 'with mass rapid transit (subsequently referred to as high capacity public transport, hcpt) to be investigated to an indicative business case (ibc) level' (p.6). summarising the 2017 qit pbc, it lists 'a mass rapid transit (mrt) corridor between queenstown and frankton' among priority projects. it adds that 'figure 5 indicates a gondola over queenstown hill as a mrt option, though bus rapid transit and light rail are also suggested' (p.11). the ferry dbc result (bcr 0.97) is taken to suggest 'ferries are unlikely to form the mass rapid transit option for this business case' (p.30). growth beyond 2018 'can only be catered by increasing road capacity over the entire network or by providing high capacity public transport' (p.56). hcpt options 'provide the opportunity to enable development and build density around the transport network' (p.67). \"with mass rapid transit (subsequently referred to as high capacity public transport, hcpt) to be investigated to an indicative business case (ibc) level\" (p.6) | \"a mass rapid transit (mrt) corridor between queenstown and frankton (figure 5 indicates a gondola over queenstown hill as a mrt option, though bus rapid transit and light rail are also suggested).\" (p.11) | \"suggesting ferries are unlikely to form the mass rapid transit option for this business case.\" (p.30) queenstown population ~3,500 in 1980 (p.7) cip $85m: streetscape $35m, arterial stage one $50m (p.15) ferry: subsidised frankton arm service bcr 0.97 (p.30) non-car share of sh6a trips 40% by 2028, 60% by 2048 (pp.8, 56) sh6a practical capacity exceeded on 140 recorded days in 2019 (p.50) consultation: 349 online responses; 230+ people at events (p.72) costed with the parent document. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. coach coach and visitor shuttle services. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published chris baker author wsp (including opus) wsp darren davis author main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-059.webp",
      "srcset": "/covers/QTS-059.webp 400w, /covers/QTS-059-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-059/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-059/QTS-059-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-060",
    "code": "QTS-060",
    "title": "Preferred programme sequencing report",
    "shortTitle": "Preferred programme sequencing report",
    "summary": "This short report (Final, 16 November 2020; Stephen Carruthers) sets out the sequencing of the Queenstown Business Case preferred programme. Short-term PT service improvements pave the way for BRT services from 2027, matched by behaviour change measures. Table 1 lists 11 interventions. For each it gives lead organisation, dependencies, trigger points, activity class, IAF profile, capital cost, IAF priority, DBC status and NLTP period, keyed to two location maps. The committed elements are NZUP ($106M, Waka Kotahi) and CIP ($120M, QLDC). Six recommended elements require funding approval: TDM ($1.8M), PT services, on-road PT ($80m plus opex), Stanley/Shotover ($24M), Town Centre Stage 2 ($17M) and Arterial Stage 2 ($43M). Later items are Stanley Street redevelopment ($46m), Arterial Stage 3 ($118M, BCR 0.2) and offline PT improvements including offline PT hubs (Waka Kotahi/ORC, $262M, BCR 1.7, further investigation beyond 2030).",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case chapter – programme sequencing table",
    "year": 2020,
    "publishedDate": "2020-11-16",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Preferred programme sequencing report (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-060 preferred programme sequencing report preferred programme sequencing report this short report (final, 16 november 2020; stephen carruthers) sets out the sequencing of the queenstown business case preferred programme. short-term pt service improvements pave the way for brt services from 2027, matched by behaviour change measures. table 1 lists 11 interventions. for each it gives lead organisation, dependencies, trigger points, activity class, iaf profile, capital cost, iaf priority, dbc status and nltp period, keyed to two location maps. the committed elements are nzup ($106m, waka kotahi) and cip ($120m, qldc). six recommended elements require funding approval: tdm ($1.8m), pt services, on-road pt ($80m plus opex), stanley/shotover ($24m), town centre stage 2 ($17m) and arterial stage 2 ($43m). later items are stanley street redevelopment ($46m), arterial stage 3 ($118m, bcr 0.2) and offline pt improvements including offline pt hubs (waka kotahi/orc, $262m, bcr 1.7, further investigation beyond 2030). context and purpose: the report is one of the queenstown business case component documents. its sequencing 'maximises the benefits provided by the committed projects through short term improvements in pt services that pave the way for the implementation of brt services from 2027' (p.4). structure: 'the programme contains 11 sets of interventions. the first two intervention sets are committed activities with approved funding. the following six interventions seek approval through this business case... the remaining four projects require further investigation' (p.4). the table shows three such later items (stanley street redevelopment, arterial stage 3, offline pt), so the 'four' does not reconcile with the table. table 1 (p.5): committed: sh6a, gr2kfb and ladies mile improvements (waka kotahi, $106m, 21-24); arterials stage 1 and town centre upgrade stage 1 (qldc, $120m, 21-24). recommended, needing funding approval: tdm package (qldc/orc/waka kotahi, $1.8m, bcr 3.5*, ongoing); pt services improvements (orc, opex $8m to $11m, 21-24 investigation, staged from 24-27); on-road pt service improvements (orc, $80m plus gross opex rising from $11m to $24m per annum by 2027, staged from 27-30); stanley and shotover street improvements with bus hub stage 1 (waka kotahi, $24m, bcr 1.6, 24-27); town centre upgrade stage 2 (qldc, $17m, bcr 1.5, 24-27); arterial stage 2 (qldc, $43m, bcr 0.9 or 1.1 with qldc property discounted, 24-27/27-30). other: stanley street redevelopment with bus hub stage 2 (qldc/orc/developer, $46m incl. $33m property, 24-27, 'for endorsement'); arterial stage 3 (qldc, $118m, bcr 0.2, beyond 2030); offline pt improvements (waka kotahi/orc, $262m, bcr 1.7, beyond 2030). iaf priorities are 4 for tdm and pt, 5 for stanley/shotover and town centre stage 2, and 6 for arterial stage 2. maps: figures 1-2 show sh6a, gr2kfb and ladies mile works and town centre improvements (pp.6-7). mass rapid transit: the report does not name a technology. its last row (label partly missing in the text layer, reading 'improvements, including offline pt hubs') gives the following: lead waka kotahi/orc; dependency 'future proofed/protected corridor and terminal locations'; trigger 'demand trigger – once on road capacity is reached. anticipated beyond 2030'; activity class public transport improvements; bcr 1.7; capital cost $262m; iaf priority not required; status 'other activities – for later re-evaluation'; nltp period 'further investigation beyond 2030' (p.5). business case chapter – programme sequencing table way to go partnership, nzta (waka kotahi), qldc, orc. preferred programme sequencing report (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (v2, 16/11/20) offline pt ($262m, bcr 1.7, waka kotahi/orc) listed for later re-evaluation, further investigation beyond 2030 the only reference is the final row of table 1, '...improvements, including offline pt hubs' (the label 'offline pt service' appears in other copies of the table). the lead organisation is 'waka kotahi/orc' and the dependency is 'future proofed/protected corridor and terminal locations'. the trigger is 'demand trigger – once on road capacity is reached. anticipated beyond 2030', with activity class 'public transport improvements'. it shows bcr 1.7, capital cost $262m and iaf funding priority 'not required'. its status is 'other activities – for later re-evaluation', with nltp period 'further investigation beyond 2030' (p.5). no technology is named. \"future proofed/protected corridor and terminal locations\" (p.5) | \"demand trigger – once on road capacity is reached. anticipated beyond 2030\" (p.5) 11 sets of interventions: 2 committed, 6 recommended, remainder for further investigation (p.4) nzup $106m; cip $120m (p.5) tdm $1.8m bcr 3.5; stanley/shotover $24m bcr 1.6; town centre stage 2 $17m bcr 1.5; arterial stage 2 $43m bcr 0.9 (1.1) (p.5) on-road pt $80m + gross opex $11m rising to $24m p.a. by 2027 (p.5) stanley st redevelopment $46m incl. $33m property; arterial stage 3 $118m bcr 0.2; offline pt $262m bcr 1.7 (p.5) costed with the parent document. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead nzta waka kotahi nzta published stephen carruthers author sh6a improvements, gr2kfb improvements and ladies mile improvements (nzup) – committed, $106m. sh6a improvements gr2kfb improvements ladies mile improvements | waka kotahi 21-24 not assessed nzta waka kotahi nzta arterials stage 1 and town centre upgrade stage 1 (cip) – committed, $120m. arterials – stage 1, town centre upgrade – stage 1 | qldc 21-24 not assessed qldc qldc travel demand management package – $1.8m, bcr 3.5, funding approval required. travel demand management package | qldc/orc/ waka kotahi ongoing activity over multiple periods not assessed nzta waka kotahi nzta pt services improvements – opex from $8m to $11m, funding approval required. pt services improvements | orc 21-24 investigation; staged implementation from 24-27 not assessed orc orc on road pt service improvements incl. frankton hub – $80m plus opex ramping $11m to $24m a year by 2027. on road pt service improvements | orc staged implementation starting 27-30 not assessed orc orc stanley street and shotover street improvements incl. stanley street bus hub stage 1 – $24m, bcr 1.6. stanley street and shotover street improvements | waka kotahi 24-27 not assessed nzta waka kotahi nzta town centre upgrade stage 2 – $17m, bcr 1.5. town centre upgrade – stage 2 | qldc 24-27 not assessed qldc qldc arterial stage 2 – $43m (excl. memorial hall replacement), bcr 0.9 (1.1 with qldc property discounted). arterial stage 2 | qldc further investigation 24-27; pre-implementation and implementation 27-30 not assessed qldc qldc stanley street redevelopment incl. bus hub stage 2 – $46m incl. $33m property; for endorsement. stanley street redevelopment | qldc / orc / developer further investigation 24-27 not assessed qldc qldc arterial stage 3 – $118m, bcr 0.2; other activity for later re-evaluation. arterial stage 3 | qldc | low bcr – no trigger points have been identified further investigation beyond 2030 not assessed qldc qldc [offline pt service] improvements including offline pt hubs – $262m, bcr 1.7; demand trigger once on-road capacity reached; needs protected corridor and terminals. improvements, including offline pt hubs | waka kotahi/orc | future proofed/protected corridor further investigation beyond 2030 not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2020-11-16",
    "cover": {
      "src": "/covers/QTS-060.webp",
      "srcset": "/covers/QTS-060.webp 400w, /covers/QTS-060-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-060/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-060/QTS-060-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-061",
    "code": "QTS-061",
    "title": "Wakatipu Basin Future Public Transport Demand Analysis – Technical Note 3b – Future Scenarios Update (Sept 2020)",
    "shortTitle": "Wakatipu Basin Future Public Transport Demand",
    "summary": "WSP's Technical Note 3b sets out future-year public transport (PT) demand modelling for the Queenstown Town Centre, Frankton to Queenstown, and Frankton Transport Business Case, including outputs used in the business case economics and sensitivity tests for the Spatial Plan growth distribution and post-COVID-19 tourism. A bespoke logit-based spreadsheet PT model, fed by Abley's Tracks demand model, was run for 2018, 2028 and 2048 in three peak hours. Only two scenarios were tested with the updated demand: Do Minimum and the NZ Upgrade Programme (NZUP) package, which most closely represents the earlier 'Bus Max' option. The note records that a Mass rapid transit MRT scenario tested in the previous modelling round 'was omitted for implementability reasons', and that a Trackless Tram achieved the highest mode shift but was set aside for feasibility reasons. Results show NZUP keeps SH6A at 82-86% volume/capacity in 2028 while Do Minimum exceeds capacity; PT mode share on SH6A is around 45% at 2028 against around 20-25% at the Shotover and Kawarau Falls bridges. Demand is expected to approach or exceed capacity on SH6A by 2048 in all scenarios. The note concludes that parking control in the Town Centre is critical, that free parking in Frankton undermines PT, and that Ladies Mile land use and access do not sufficiently support PT. The Spatial Plan and COVID-19 sensitivity tests had limited impact on projected PT patronage.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Technical note (public transport demand modelling)",
    "year": 2020,
    "publishedDate": "2020-11-17",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6A Frankton Road (Frankton-Queenstown Town Centre); SH6 Shotover Bridge; SH6 Kawarau Falls Bridge; Ladies Mile; Southern Corridor / Jacks Point",
    "owner": "NZTA and QLDC",
    "citation": "Wakatipu Basin Future Public Transport Demand Analysis – Technical Note 3b – Future Scenarios Update (Sept 2020) (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "Public source URL not yet recorded.",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "wsp",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-061 wakatipu basin future public transport demand analysis – technical note 3b – future scenarios update (sept 2020) wakatipu basin future public transport demand wsp's technical note 3b sets out future-year public transport (pt) demand modelling for the queenstown town centre, frankton to queenstown, and frankton transport business case, including outputs used in the business case economics and sensitivity tests for the spatial plan growth distribution and post-covid-19 tourism. a bespoke logit-based spreadsheet pt model, fed by abley's tracks demand model, was run for 2018, 2028 and 2048 in three peak hours. only two scenarios were tested with the updated demand: do minimum and the nz upgrade programme (nzup) package, which most closely represents the earlier 'bus max' option. the note records that a mass rapid transit mrt scenario tested in the previous modelling round 'was omitted for implementability reasons', and that a trackless tram achieved the highest mode shift but was set aside for feasibility reasons. results show nzup keeps sh6a at 82-86% volume/capacity in 2028 while do minimum exceeds capacity; pt mode share on sh6a is around 45% at 2028 against around 20-25% at the shotover and kawarau falls bridges. demand is expected to approach or exceed capacity on sh6a by 2048 in all scenarios. the note concludes that parking control in the town centre is critical, that free parking in frankton undermines pt, and that ladies mile land use and access do not sufficiently support pt. the spatial plan and covid-19 sensitivity tests had limited impact on projected pt patronage. context and purpose: technical note 3b (final, rev 2, 17 november 2020; wsp new zealand) reports the methodology and results of future scenario modelling for the queenstown town centre, frankton to queenstown, and frankton transport business case, including the outputs used in its economic evaluation and later sensitivity tests (p.1). it follows technical note 3 (model build) and technical note 3a (shortlist option testing) (p.1). method: future demand comes from the tracks model maintained by abley transportation consultants on behalf of qldc and waka kotahi, using 2028 and 2048 scenarios (pp.1-2). two 2048 sensitivity sets were added: the preferred spatial plan growth distribution (more development near jacks point, 2,580 fewer jobs in the queenstown urban area) and a post-covid-19 set with reduced tourist activity (p.2). car trips in the am peak grow from 14,851 (2018) to 22,821 (2028) and 30,857 (2048) in the business case demand set (p.3). the spreadsheet model calculates mode share for each origin-destination pair and iterates with link travel times to convergence (p.3). key assumptions include bus fare $2 and ferry $4.90, a mode penalty of $5 for bus and $7 for ferry, 40-seat buses (bus max services double-decker or articulated, capacity 100), airport passengers of 3.2m (2028) and 5.1m (2048), and town centre parking costs rising from $3.66 (2018 am peak) to $13.78 (2028) and $20.66 (2048) (p.5). no active mode demand, peak spreading or tdm is modelled (pp.5-6). park and ride sites are assumed at sh6/howards drive and sh6/boyd road (p.6). the note states the parking cost increase is 'a major driver in the increased pt model share' for town centre trips (p.6). scenarios: with the latest demand sets only do minimum and the nzup scenario (closest to the earlier bus max option) were tested (p.3). nzup uses a 'one-seat-ride' bus network, an improved kelvin heights-town centre bus-ferry link, and 'virtual priority' for buses on sh6a, with physical priority through frankton flats and a westbound ladies mile bus lane and bus gate (pp.3-4). earlier option assessment had included bus min, bus max, trackless tram, mass rapid transit mrt and ferry option; bus max was preferred (p.4). results: on sh6a in 2028, nzup gives volume/capacity of 82-86% while do minimum exceeds capacity (p.7). for example, in the 2028 am peak westbound the business case nzup scenario carries 23% by bus and 13% by park and ride, against 15% by bus under do minimum (p.8). by 2048 demand 'is expected to reach close to, or exceed, capacity' on sh6a under all scenarios (p.7). pt mode share at the shotover bridge peaks at around 20% compared with around 45% on sh6a at 2028, attributed to dispersed frankton land use, transfers and lack of frankton parking control (p.10); at kawarau falls bridge it peaks at around 25% (p.13). spatial plan and covid-19 sensitivity sets had 'limited impact on projected public transport patronage' (p.16). at 75% of the assumed parking cost, the degree of saturation on frankton road approaches 100% (p.16). conclusions: nzup retains a high degree of mode shift over do minimum, particularly at 2048; 'sticks' such as parking control 'appear to be critical'; the land use and first/last mile access assumed on ladies mile does not sufficiently support pt; and southern housing areas should be designed with pt as a priority (p.16). appendices (pp.17-50) give the nzup pt network, hub passenger movements and origin-destination matrices by mode, including mrt columns that are zero throughout. mass rapid transit: the note records that 'an additional scenario, gondola mrt, was tested under the previous round of demand sets but was omitted for implementability reasons before this update' (p.3). it lists mass rapid transit mrt, ferry option and trackless tram among previously tested high capacity public transport scenarios, says the trackless tram 'achieved the highest mode shift' but feasibility issues led to bus max being preferred, and that only bus max (nzup) was tested with updated demand (p.4). it gives no mass rapid transit results and does not explain the implementability reasons. model output tables carry an mrt mode row with zero trips (pp.8-15, 21-50). technical note (public transport demand modelling) wakatipu basin future public transport demand analysis – technical note 3b – future scenarios update (sept 2020) (2020). wakatipu basin; sh6a frankton road (frankton-queenstown town centre); sh6 shotover bridge; sh6 kawarau falls bridge; ladies mile; southern corridor / jacks point final, revision 2 records a mass rapid transit scenario tested earlier but omitted for 'implementability reasons'; only the do minimum and the nzup bus package were modelled with updated demand. that bus package is not mass rapid transit. a ferry scenario in the earlier set is not mass rapid transit either. the note states that 'an additional scenario, gondola mrt, was tested under the previous round of demand sets but was omitted for implementability reasons before this update' (p.3). it lists the high capacity public transport scenarios from the business case option assessment as bus min, bus max, trackless tram (or similar road-based higher capacity rapid transit), mass rapid transit mrt and ferry option, and says earlier modelling 'helped to identify bus max as the preferred option' (p.4). it notes that the trackless tram 'achieved the highest mode shift because of a lower mode penalty' but that feasibility issues led to bus max being preferred, so 'only the bus max option (now the pt assumptions within the nzup package) was tested with the updated demand sets' (p.4). no mass rapid transit patronage or results are reported, and the implementability reasons are not set out. the mrt rows in the point summaries and appendix matrices show zero trips because no mrt mode was included in the scenarios tested (pp.8-15, 21-50). the note also finds sh6a demand close to or above capacity by 2048 in all tested scenarios (p.7). \"an additional scenario, gondola mrt, was tested under the previous round of demand sets but was omitted for implementability reasons before this update.\" (p.3) | \"the trackless tram option achieved the highest mode shift because of a lower 'mode penalty' but is largely interchangeable with the bus max option in terms of infrastructure. feasibility issues with the trackless tram option led to bus max being preferred.\" (p.4) | \"notably, demand is expected to reach close to, or exceed, capacity in 2048 under all scenarios, even with more stringent parking controls and improvements to public transport.\" (p.7) am peak car trips: 14,851 (2018), 22,821 (2028), 30,857 (2048) business case demand set (p.3) town centre parking cost (am inbound): $3.66 (2018), $13.78 (2028), $20.66 (2048) (p.5) bus fare $2, ferry $4.90; mode penalty $5 bus, $7 ferry (p.5) airport passengers assumed 3.2m (2028) and 5.1m (2048) (p.5) sh6a v/c under nzup 82%-86% in 2028; do minimum exceeds capacity (p.7) 2028 am peak westbound sh6a, business case nzup: bus 23%, park and ride 13%, car 62% (p.8) pt mode share around 45% on sh6a at 2028; max around 20% at shotover bridge and around 25% at kawarau falls bridge (pp.10, 13) 2048 do minimum demand exceeds sh6a capacity by up to 18% (interpeak eastbound) (p.7) at 75% of assumed parking cost, frankton road degree of saturation approaches 100% (p.16) a study cost has been requested under the official information act or lgoima. no figure has been received. public source url not yet recorded. nzta and qldc passing business case chapter or appendix final 2020 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. wsp (including opus) wsp prepared nzta waka kotahi nzta partner qldc qldc partner chris baker author wsp (including opus) wsp matt gatenby reviewed by wsp (including opus) wsp reece gibson approved by wsp (including opus) wsp apply parking control ('sticks') alongside pt improvements, including addressing unrestricted free parking in frankton, to achieve mode shift. \"sticks\" such as parking control appear to be critical not assessed design southern housing areas with public transport as a priority to future-proof the transport system serving the area. emphasises the need to ensure housing areas to the south are designed with public transport as a priority not assessed main document pdf",
    "sortDate": "2020-11-17",
    "cover": {
      "src": "/covers/QTS-061.webp",
      "srcset": "/covers/QTS-061.webp 400w, /covers/QTS-061-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-061/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-061/QTS-061-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-062",
    "code": "QTS-062",
    "title": "Queenstown Business Case (NZ Upgrade Programme Queenstown Transport Detailed Business Case) – main volume, redacted",
    "shortTitle": "Queenstown Business Case",
    "summary": "The NZUP Queenstown Business Case main volume compiles the Summary Report and the Strategic Context, Options Assessment, Preferred Option Assessment, Programme Sequencing, Economic, Financial, Commercial and Management cases, plus the Assurance Process with peer reviews. It was developed under the Wakatipu Way to Go partnership (Waka Kotahi, QLDC, ORC). It finds that SH6A is at capacity and that 40% of SH6A peak trips must be by non-car modes by 2028, rising to 60% by 2048. The preferred programme rests on three pillars: targeted infrastructure (NZUP $90m, CIP $85m), road-based Bus Rapid Transit services, and travel behaviour change. The sequencing table lists 11 elements with lead agencies. The BCR is 2.3 for the elements recommended in the next ten years and 1.5 for the full programme. Phase 8, 'Future offline public transport option (e.g. a gondola)', is costed at $262m with a BCR of 1.7. It is classed 'Other activities – for later re-evaluation', with 'Further investigation beyond 2030'. The Economic Case recommends the offline PT case be revisited after the 2024-27 NLTP. Commute found it fit for purpose; EY and Flow found the work adequate; AECOM, Arup and Waka Kotahi's IQA provided comments, with caveats on mode shift, parking and funding.",
    "documentType": "Detailed business case",
    "documentForm": "Detailed (programme) business case – compiled main volume of 11 component reports",
    "year": 2020,
    "publishedDate": "2020-11-25",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case (NZ Upgrade Programme Queenstown Transport Detailed Business Case) – main volume, redacted (2020). NZTA Contract 2018235 (cited in EY peer review footnote p.437); no OIA reference number printed.",
    "featured": true,
    "featuredOrder": 5,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; watermark on every page; no OIA reference printed)",
    "sourceUrls": [],
    "documentTypeCode": "detailed-business-case",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "abley",
      "ey",
      "stantec",
      "wsp",
      "mein-consulting-limited",
      "price-waterhouse-cooper"
    ],
    "searchText": "qts-062 queenstown business case (nz upgrade programme queenstown transport detailed business case) – main volume, redacted queenstown business case the nzup queenstown business case main volume compiles the summary report and the strategic context, options assessment, preferred option assessment, programme sequencing, economic, financial, commercial and management cases, plus the assurance process with peer reviews. it was developed under the wakatipu way to go partnership (waka kotahi, qldc, orc). it finds that sh6a is at capacity and that 40% of sh6a peak trips must be by non-car modes by 2028, rising to 60% by 2048. the preferred programme rests on three pillars: targeted infrastructure (nzup $90m, cip $85m), road-based bus rapid transit services, and travel behaviour change. the sequencing table lists 11 elements with lead agencies. the bcr is 2.3 for the elements recommended in the next ten years and 1.5 for the full programme. phase 8, 'future offline public transport option (e.g. a gondola)', is costed at $262m with a bcr of 1.7. it is classed 'other activities – for later re-evaluation', with 'further investigation beyond 2030'. the economic case recommends the offline pt case be revisited after the 2024-27 nltp. commute found it fit for purpose; ey and flow found the work adequate; aecom, arup and waka kotahi's iqa provided comments, with caveats on mode shift, parking and funding. context and purpose: this 467-page oia-released volume (author names redacted under s 9(2)(a)) is the main body of the queenstown business case. it is described as 'effectively a detailed programme business case' (p.34). it merged the frankton to queenstown ssbc and the queenstown town centre dbc, with hcpt taken to ibc level, and added frankton and ladies mile part-way through (pp.8, 111). its components are the summary report, 12 nov 2020 (pp.1-24), a programme poster (pp.25-28), strategic context (pp.29-103), options assessment (pp.104-184), preferred option assessment (pp.185-231), programme sequencing (pp.232-238), economic case (pp.239-252), financial case (pp.253-275), commercial case (pp.276-285), management case (pp.286-310) and assurance process with review appendices (pp.311-467). the last part includes an annotated 2 oct 2020 final draft summary (pp.445-467). case for change: peak-day population is forecast to rise from about 120,000 (2018) to 200,000 (2048). sh6a practical capacity was exceeded on 140 days in 2019, and cars make up 84% of sh6a trips (pp.8-9). without investment, the economic loss is estimated at $670m-$1.2b over 40 years (p.9). options: more than 300 ideas were distilled into nine packages (p.11). an mca workshop on 2 august 2019 took bus max, trackless tram and mass rapid transit forward and omitted ferry and do minimum (p.133). a road-based system was found to provide capacity to about 2051 (p.134). sh6a widening would cost about $200m in property and affect 169 properties (p.142); virtual priority was preferred. preferred programme: the three pillars are targeted infrastructure, brt-style pt services (fleet upgraded towards bi-articulated 'trackless tram' vehicles), and travel behaviour change including parking management (pp.12-15). committed works are nzup ($106m in the sequencing table, against $90m approved and a $16.2m shortfall, p.290) and cip ($120m including arterials stage 1). recommended items needing funding approval are tdm ($1.8m), pt services, on-road pt ($80m plus opex rising to $24m a year by 2027), stanley/shotover streets ($24m), town centre stage 2 ($17m) and arterial stage 2 ($43m). later items are stanley street redevelopment ($46m), arterial stage 3 ($118m; $61m in the financial case, p.268) and offline pt ($262m) (p.19). for 2021-24 the activities are a waka kotahi tdm ssbc ($1.72m), an orc pt services and infrastructure dbc ($1.5m) and qldc's cip obligations ($1.70m) (p.21). economics: the case uses 60-year npvs at a 4% discount rate (p.249). the pt services and infrastructure programme costs $162m against $374m of benefits (bcr 2.3). the full programme, excluding phase 8, costs $295m against $445m (bcr 1.5) (p.250). phase 2 (nzup-enabled pt services) has a bcr of 3.3 (p.249). sensitivity tests keep the bcr above 1.0 (p.251). benefits depend on mode shift through 'effective parking management and travel demand management' (p.251). delivery: the waka kotahi/qldc alliance was tendered on 2 october 2020 (p.279). leads for the remainder are qldc (local assets), waka kotahi (state highway) and orc (pt) (p.291). key risks include funding misalignment, property, slow decisions and interface misalignment (p.22). assurance: reviews came from an independent challenge team (pete clark, geoff cooper, barry mein), partner reviewers (tony sizemore, garry maloney, tony pickard), aecom, arup, matthew roberts (qldc), commute, flow and ey, and the waka kotahi iqa (pp.314-315, 404). commute found the case 'fit for purpose' (p.410). ey called the web analysis 'robust and defensible' (p.436). mass rapid transit: mrt was in scope from the start, renamed hcpt and assessed only to ibc level (pp.34, 111). the mass rapid transit passed the august 2019 mca (p.133). it was 'not taken forward to the preferred programme... as it falls well outside of the next few nltp periods' (p.134), but stays as phase 8 with waka kotahi/orc as lead (p.19). the management case instead lists orc/qldc for an offline pt corridor business case update and route protection beyond 2030 (p.297). phase 8 timing is given as '2050+' (p.194), with an assumed implementation date of 2051 in the economic case (p.248). the economic case gives phase 8 a 60-year npv cost of $114m, $187m of benefits (all unmet-demand webs) and a bcr of 1.6 (pp.247, 249); the sequencing table gives $262m and 1.7. possible co-funding of the off-line corridor with private investors is listed (p.270). tn30's recommendation to park offline pt and review it in 2028 sits in appendices b5/c12, not in this volume. detailed (programme) business case – compiled main volume of 11 component reports way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case (nz upgrade programme queenstown transport detailed business case) – main volume, redacted (2020). nzta contract 2018235 (cited in ey peer review footnote p.437); no oia reference number printed. wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (component reports v3 final/final, 11-16 nov 2020; assurance process final 25 nov 2020); redacted oia release mass rapid transit passed the multi-criteria assessment but was excluded from the funded programme; retained as phase 8 offline public transport ($262m, bcr 1.7 in the sequencing table; 1.6 in the economic case) for re-evaluation beyond 2030. the volume records that the project began with 'mass rapid transit (subsequently referred to as high capacity public transport, hcpt) to be investigated to an indicative business case (ibc) level' (p.34). at the 2 august 2019 mca, mass rapid transit was 'take forward for assessment', with a 'potential fatal flaw in consentability due to visual impacts' (p.133). the options assessment states that a road-based system 'could provide practical capacity through to 2051'. it adds that 'an off-road option (most likely gondola) would be required in the longer term' but was not taken forward 'as it falls well outside of the next few nltp periods' (p.134). the gorge road hub site was retained for potential mass rapid transit, and the frankton hub location chosen to be future-proofed (pp.137, 139). phase 8 is 'future offline public transport option (e.g. a gondola)' (p.242). it is timed '2050+' (p.194), with an assumed date of 2051 (p.248). the sequencing table lists it at $262m, bcr 1.7, lead waka kotahi/orc, 'further investigation beyond 2030' (p.19). the economic case recommends 'the case for offline pt is revisited after the 24-27 nltp period' (p.252). the iqa judged the offline pt solution ($262m) 'unlikely to be supportable at this stage' as 'too far in the future' (p.395). it also noted that a 'new offline solution is considered the only feasible option' once the network reaches severe over-capacity by 2048 (p.401). tn30's 'parked and reviewed in 2028' wording is in the appendices (apx_b, apx_c11). \"an off-road option (most likely gondola) would be required in the longer term to provide any additional step-change in capacity, but was not taken forward to the preferred programme in the queenstown business case as it falls well outside of the next few nltp periods.\" (p.134) | \"phase 8 – future offline public transport option (e.g. a gondola) – includes an offline frankton bus hub.\" (p.242) | \"although the assumed implementation date is pushed out to 2051, the benefits calculated are still significant indicating that an offline option will be worthy of further consideration at the appropriate time.\" (p.248) | \"similarly, although the analysis demonstrates that an offline pt corridor is not required at this moment in time, the long term benefits are significant. it is recommended that the case for offline pt is revisited after the 24-27 nltp period.\" (p.251-252) | \"arterials stage 3 ($61m) and offline pt solution ($262m) unlikely to be supportable at this stage – low bcr and too far in the future respectively.\" (p.395) | \"longer term, the provision of an offline public transport link between frankton and queenstown will deliver an alternative corridor that provides full separation from the road network.\" (p.17) | \"co-funding of the off-line pt corridor with private investors\" (p.270) nzup allocation $90m; cip $50m arterials stage 1 + $35m streetscape (p.8) peak day population ~120,000 (2018) to 200,000 (2048) (p.8) sh6a practical capacity exceeded on 140 days in 2019; private car 84% of sh6a trips (p.9) non-car share needed on sh6a peak: 16% to 40% by 2028; 60% by 2048 (p.9) economic loss without investment $670m-$1.2b over 40 years (p.9) bcr 2.3 for elements recommended in next ten years; 1.5 full programme (p.16) sequencing table: nzup $106m; cip $120m; tdm $1.8m (bcr 3.5); on-road pt $80m + opex to $24m/yr; stanley/shotover $24m (bcr 1.6); town centre stage 2 $17m (bcr 1.5); arterial stage 2 $43m (bcr 0.9); stanley st redevelopment $46m; arterial stage 3 $118m (bcr 0.2); offline pt $262m (bcr 1.7) (p.19) next nltp activities: waka kotahi $1,722,821; orc $1,500,000; qldc $1,695,243 plus cip (p.21) economic case 60-yr npv (4%): phase 2 cost $106m / benefit $350m bcr 3.3; phase 8 offline pt cost $114m / benefit $187m bcr 1.6 (p.249) pt services and infrastructure programme $162m/$374m bcr 2.3; full programme (excl. phase 8) $295m/$445m bcr 1.5 (p.250) road-based pt practical capacity to about 2051 (p.134) sh6a widening property cost ~$200m; 169 properties affected, 77 outright purchases (p.142) nzup funding shortfall $16.2m (p.290); alliance budget estimate $200m (p.279) pt opex ~$200m net of farebox over 60 years (p.270) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; watermark on every page; no oia reference printed) way to go substantive detailed business case final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta commissioned nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead abley abley prepared ey ey prepared stantec stantec prepared way to go way to go prepared wsp (including opus) wsp prepared orc orc partner qldc qldc partner alan kerr author alix newman author chris baker author wsp (including opus) wsp darren davis author stacey lloyd author stephen carruthers author shaun hubbard project director way to go way to go barry mein reviewed by mein consulting limited mein consulting limited brian waddell reviewed by nzta waka kotahi nzta chad barker reviewed by nzta waka kotahi nzta geoff cooper reviewed by pwc (pricewaterhousecoopers) pwc graeme belliss reviewed by nzta waka kotahi nzta matthew roberts reviewed by qldc qldc pete clark reviewed by nzta waka kotahi nzta rob woods reviewed by nzta waka kotahi nzta garry maloney client representative orc orc gavin palmer client representative orc orc geoff mayman client representative qldc qldc kesh keshaboina client representative nzta waka kotahi nzta peter hansby client representative qldc qldc peter spies client representative nzta waka kotahi nzta tony pickard client representative qldc qldc tony sizemore client representative nzta waka kotahi nzta anthony byett contributor ey ey deliver sh6a corridor, sh6 grant road to kawarau falls bridge and ladies mile improvements (nzup); committed, no further approvals. sh6a improvements, gr2kfb improvements and ladies mile improvements | waka kotahi 21-24 nltp not assessed nzta waka kotahi nzta deliver arterials stage 1 and town centre upgrade stage 1 (cip funded); committed activity. arterials – stage 1, town centre upgrade – stage 1 | qldc 21-24 nltp not assessed qldc qldc implement a travel demand management package ($1.8m, bcr 3.5) to support mode shift. travel demand management package | qldc / orc / waka kotahi ongoing over multiple periods not assessed nzta waka kotahi nzta prepare a travel behaviour change single stage business case with preliminary work on stanley and shotover street improvements ($1,722,821). waka kotahi | travel behaviour change ssbc along with preliminary work next nltp period (2021-24) not assessed nzta waka kotahi nzta prepare a public transport services and infrastructure detailed business case ($1.5m) to confirm brt services, fleet, stops, hubs and depot funding. orc (excluding opex) | pt services and infrastructure dbc | $1,500,000 next nltp period (2021-24) not assessed orc orc meet cip obligations plus small-scale changes in old frankton, preliminary wayfinding and travel behaviour change interventions ($1,695,243). qldc | cip obligations plus small scale changes in old frankton next nltp period (2021-24) not assessed qldc qldc improve pt services within the existing contract (gross opex rising from $8m to $11m a year). pt services improvements | orc 21-24 investigation; staged implementation from 24-27 not assessed orc orc implement on-road pt service improvements including the frankton hub ($80m plus opex ramping to $24m a year by 2027). on road pt service improvements | orc staged from 27-30 not assessed orc orc deliver stanley street and shotover street improvements including stanley street bus hub stage 1 ($24m, bcr 1.6). stanley street and shotover street improvements | waka kotahi 24-27 not assessed nzta waka kotahi nzta deliver town centre upgrade stage 2 ($17m, bcr 1.5). town centre upgrade – stage 2 | qldc 24-27 not assessed qldc qldc investigate and implement arterial stage 2, gorge road to hay street ($43m, bcr 0.9). arterial stage 2 | qldc investigation 24-27; implementation 27-30 not assessed qldc qldc investigate stanley street redevelopment including bus hub stage 2 ($46m incl. $33m property). stanley street redevelopment | qldc / orc / developer further investigation 24-27 not assessed qldc qldc re-evaluate arterial stage 3 to one mile roundabout ($118m, bcr 0.2); no trigger points identified. arterial stage 3 | qldc | low bcr – no trigger points further investigation beyond 2030 not assessed qldc qldc offline pt service improvements including offline pt hubs ($262m, bcr 1.7), triggered once on-road capacity is reached; needs protected corridor and terminal locations. offline pt service improvements, including offline pt hubs | waka kotahi/orc further investigation beyond 2030 not assessed nzta waka kotahi nzta revisit the case for offline pt after the 2024-27 nltp period. it is recommended that the case for offline pt is revisited after the 24-27 nltp period after 24-27 nltp not assessed revisit the case for offline hubs once the pt/brt concept of operations has been fully developed. recommended that the case for offline hubs is revisited once the pt/brt concept of operations not assessed revisit the case for arterial stages 2 and 3 after the 2024-27 nltp period. we recommend that the case for investment in stages 2 and 3 is revisited after the 24-27 nltp period after 24-27 nltp not assessed business case update for pre-implementation funding and route protection for an offline pt corridor between frankton and queenstown town centre. offline pt corridor | business case update for pre-implementation funding, route protection | orc/qldc beyond 2030 not assessed qldc qldc set up a dedicated joint project to agree sh6a revocation (frankton road/dublin st to steamer wharf) and oversee physical works. suggested that a dedicated project is set up to form a revocation agreement as soon as possible not assessed nzta waka kotahi nzta initiate public works act land acquisition for the frankton hub (golf course reserve land) once the pt services and infrastructure dbc confirms the case. it has not yet been agreed who would purchase the land for the bus hub after pt dbc not assessed commence negotiations for all required property following approval of the business case. recommended that negotiations commence for all required property following the approval following business case approval not assessed develop a data improvement plan to fill baseline gaps for benefits monitoring. recommended that a data improvement plan is developed between qldc, waka kotahi and orc not assessed nzta waka kotahi nzta deliver nzup and cip elements through the wakatipu transport programme alliance; let tender and secure preferred supplier. an alliance approach has been agreed between waka kotahi and qldc for construction quarter 4 2020 not assessed nzta waka kotahi nzta develop town centre parking requirements and park-and-ride in greater detail, as raised in engagement. these are currently being developed to a greater detail by qldc not assessed qldc qldc provide ferry services complementing bus services, detailed in a separate ferry business case. ferry services that complement the bus services... separate ferry business case (orc) not assessed orc orc tn30 (appendix b5/c12, not reproduced in this volume): board to approve that off-line pt to sh6a (e.g. mass rapid transit) is parked and reviewed in 2028. review in 2028 not assessed full volume pdf",
    "sortDate": "2020-11-25",
    "cover": {
      "src": "/covers/QTS-062.webp",
      "srcset": "/covers/QTS-062.webp 400w, /covers/QTS-062-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-062/",
    "files": [
      {
        "label": "Full volume",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-062/QTS-062-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-063",
    "code": "QTS-063",
    "title": "Queenstown Business Case – Assurance Process",
    "shortTitle": "Queenstown Business Case – Assurance Process",
    "summary": "This 157-page Assurance Process chapter (Final, 25 November 2020) records the quality assurance and peer review of the Queenstown Business Case, with reviews and project team responses appended. These comprise a Stantec internal review against the 16 IQA questions (App. A), QLDC feedback (B), an Arup drawings review (C), an AECOM review (D), Matthew Roberts' QLDC review (E), the Waka Kotahi IQA review (F) by Chad Barker, Rob Woods, Graeme Belliss and Brian Waddell, the Commute peer review (G), the Flow transport economics review (H), the EY wider-economic-benefits review (I) and Way to Go Board comments on the Summary (J). An Independent Challenge Team, including Pete Clark, reviewed the emerging programme in February 2020. Commute found the case fit for purpose, Flow found every sensitivity BCR stayed above 1.0, and EY found the WEB analysis robust and defensible. The IQA judged the $262m offline PT solution 'unlikely to be supportable at this stage' as 'too far in the future'. Reviewers asked whether mass rapid transit would proceed. The file is NZTA's copy released under OIA-23524, with individual names withheld under section 9(2)(a).",
    "documentType": "Assessment and assurance",
    "documentForm": "Business case assurance chapter with peer review reports and responses",
    "year": 2020,
    "publishedDate": "2020-11-25",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Business Case – Assurance Process (2020). Commute report J00886 (appended, p.98).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "assessment",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "aecom",
      "arup",
      "commute-transportation-consultants",
      "ey",
      "flow-transportation-specialists",
      "stantec"
    ],
    "searchText": "qts-063 queenstown business case – assurance process queenstown business case – assurance process this 157-page assurance process chapter (final, 25 november 2020) records the quality assurance and peer review of the queenstown business case, with reviews and project team responses appended. these comprise a stantec internal review against the 16 iqa questions (app. a), qldc feedback (b), an arup drawings review (c), an aecom review (d), matthew roberts' qldc review (e), the waka kotahi iqa review (f) by chad barker, rob woods, graeme belliss and brian waddell, the commute peer review (g), the flow transport economics review (h), the ey wider-economic-benefits review (i) and way to go board comments on the summary (j). an independent challenge team, including pete clark, reviewed the emerging programme in february 2020. commute found the case fit for purpose, flow found every sensitivity bcr stayed above 1.0, and ey found the web analysis robust and defensible. the iqa judged the $262m offline pt solution 'unlikely to be supportable at this stage' as 'too far in the future'. reviewers asked whether mass rapid transit would proceed. the file is nzta's copy released under oia-23524, with individual names withheld under section 9(2)(a). context and purpose: the chapter 'details the qa process... the responses to the business case iterations; and the peer reviews' (p.4). after the iqa, all documents were marked final. further updates might follow from the way to go board, qldc and/or orc 'prior to completion of the business case for waka kotahi board delivery' (p.4). as of 25 november, documents were resubmitted for council and committee support 'before presentation to the waka kotahi board in december'. a modelling peer review was still 'in process' (p.5). reviews: the independent challenge team (pete clark, waka kotahi, with colleagues from pwc and mein consulting) was briefed in february 2020; its issues went to the w2g board and are not appended (p.4). two senior stantec staff reviewed the 7 september draft against the 16 iqa questions (app. a, pp.6-15). client reviewers were tony sizemore, garry maloney and tony pickard. aecom and arup reviewed for qldc (pp.4-5), and matthew roberts of qldc reviewed late (app. e) (p.5). the iqa review began on 8 october 2020 (app. f, pp.81-94). commute found the case 'fit for purpose and able to allow investors to make an informed decision'. it recommended a total programme bcr, a clearer document structure and more sensitivity testing (pp.98-111). flow (20 october 2020) found 'sufficient confidence in the assessment to progress to the next stage'. it removed double-counted farebox benefits and cut vot/voc benefits by 20-33%; bcrs stayed above 1.0 (pp.115-122). ey (29 october 2020) called the web analysis 'robust and defensible' (p.126). way to go board members peter clark, peter hansby, kesh keshaboina and gavin palmer annotated the 2 october final draft summary (app. j, pp.134-157). iqa findings: the management case has gaps (governance links, roles, property strategy, spatial plan alignment) (pp.82-84). there is a risk to orc's ability to plan and co-fund the 2027-30 pt step change (p.84). the iqa recommends trigger-based timing (p.85). road-based pt with tdm and parking is 'likely to be the most cost-effective response' (p.91). it notes political risk in parking policy (p.92). mass rapid transit: the iqa states: 'arterials stage 3 ($61m) and offline pt solution ($262m) unlikely to be supportable at this stage – low bcr and too far in the future respectively' (p.85). it notes pt benefits 'gradually reduce as the network reaches severe over-capacity by 2048 and a new offline solution is considered the only feasible option from that point onwards' (p.91). it adds that the case for a full offline frankton facility 'has not been made with a clear evidence base' (p.82). the trigger for the frankton hub is 'the point at which offline transport infrastructure needed' (p.85). a qldc reviewer asked whether it was 'intentional to narrow focus on gondola solution' (p.17). aecom described tn30 as 'technically poor' and said 'it is not clear if the gondola will proceed' (p.47); it also asked to 'state which is the preferred option as offline pt service' (p.50). when matthew roberts asked for detail on co-funding offline pt, the response was that 'offline pt is too far in the future and too uncertain', and that 'some form of sponsorship agreement could be reached' (p.69). source: nzta's copy released under the official information act 1982 (oia-23524, 16 october 2026), with individual names withheld under section 9(2)(a). business case assurance chapter with peer review reports and responses way to go partnership, nzta (waka kotahi), qldc, orc. queenstown business case – assurance process (2020). commute report j00886 (appended, p.98). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final (cover; no document control table) the investment quality assurance judged the $262m offline public transport option unsupportable at this stage, as too far in the future, yet the only feasible option after about 2048; reviewers asked how the mass rapid transit option was being treated. the waka kotahi iqa recorded: 'arterials stage 3 ($61m) and offline pt solution ($262m) unlikely to be supportable at this stage – low bcr and too far in the future respectively' (p.85). it also said road-based pt 'ostensibly can accommodate projected growth for the next three decades', with benefits that 'gradually reduce as the network reaches severe over-capacity by 2048 and a new offline solution is considered the only feasible option from that point onwards' (p.91). on frankton, 'the case for a full offline facility has not been made with a clear evidence base' (p.82). the project team responded that 'the trigger for the frankton hub is essentially the point at which offline transport infrastructure needed' (p.85). a qldc reviewer asked: 'is it intentional to narrow focus on gondola solution?' (p.17). aecom said tn30 'is technically poor as it does not present enough evidence' and 'it is not clear if the gondola will proceed' (p.47). responding to matthew roberts on co-funding, the team said 'offline pt is too far in the future an[d] too uncertain', adding that 'some form of sponsorship agreement could be reached' (p.69). \"arterials stage 3 ($61m) and offline pt solution ($262m) unlikely to be supportable at this stage – low bcr and too far in the future respectively.\" (p.85) | \"these benefits gradually reduce as the network reaches severe over-capacity by 2048 and a new offline solution is considered the only feasible option from that point onwards.\" (p.91) | \"this document is technically poor as it does not present enough evidence on the assessment that has been conducted. in addition, it is not clear if the gondola will proceed.\" (p.47) | \"note that reference is made specifically to gondola (long term), rather than mrt. is it intentional to narrow focus on gondola solution?\" (p.17) | \"offline pt is too far in the future an too uncertain, at this stage, to seek this level of detail. in line with overseas examples, some form of sponsorship agreement could be reached\" (p.69) iqa submission 8 october 2020; documents resubmitted 25 november 2020 for waka kotahi board in december (pp.4-5) flow sensitivity bcrs after removing farebox and cutting vot/voc 20%: 2.9, 2.8, 1.9, 1.7, 1.3; 33%: 2.6, 2.5, 1.7, 1.5, 1.2 (p.121) iqa: arterials stage 3 $61m vs $118m discrepancy; offline pt $262m (p.85) pt step change from 360 to 873 people per hour in 2024-27 (iqa, p.85) virtual priority on sh6a gives 60% of benefits at 5% of cost of extra lanes (p.91) costed with the parent document. released under oia 1982 (nzta oia-23524, 16 oct 2026) way to go substantive assessment and assurance final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead aecom aecom prepared arup arup prepared commute transportation consultants commute transportation consultants prepared ey ey prepared flow transportation specialists flow transportation specialists prepared nzta waka kotahi nzta prepared qldc qldc prepared stantec stantec prepared nzta waka kotahi nzta published brian waddell reviewed by nzta waka kotahi nzta chad barker reviewed by nzta waka kotahi nzta garry maloney reviewed by orc orc gavin palmer reviewed by orc orc graeme belliss reviewed by nzta waka kotahi nzta kesh keshaboina reviewed by nzta waka kotahi nzta matthew roberts reviewed by qldc qldc pete clark reviewed by nzta waka kotahi nzta peter hansby reviewed by qldc qldc rob woods reviewed by nzta waka kotahi nzta tony pickard reviewed by qldc qldc tony sizemore reviewed by nzta waka kotahi nzta alan kerr contributor anthony byett contributor ey ey further review and update by way to go board, qldc and/or orc before completion for waka kotahi board delivery. there may be a further review and updates required from the way to go board, qldc and/or orc before waka kotahi board, december 2020 not assessed way to go way to go review matt roberts' (qldc) outstanding comments and respond where opportunity for further update arises. the project team will review matt's comments and respond where appropriate next update not assessed seek review and support of respective councils and committees before presentation to the waka kotahi board. require the review and support of the respective councils and committees, before presentation to the waka kotahi board in december december 2020 not assessed qldc qldc iqa: progress the pt services detailed business case urgently alongside nzup pre-implementation and the park and ride ssbc. should be progressed urgently alongside nzup projects pre-imp and the park and ride ssbc urgently not assessed iqa: clarify investment triggers (demand/patronage) in the management case instead of or as well as years. can we turn our responses into triggers (i.e. demand/patronage etc) instead of/as well as years? before completion not assessed iqa: frankton hub stage 2 land acquisition requires further justification via business case update in 2024-27 before any process begins. further justification is required before any land acquisition process can be made 2024-27 not assessed iqa/management case: allocate tdm ssbc lead (allocated to qldc in management case table 7 response). table 7 of management case allocates this to qldc as the lead 2021-24 not assessed qldc qldc add spatial plan integration to risk register and note sp preferred option modelled but not approved. add integration with spatial plan to risk register before completion not assessed main document pdf",
    "sortDate": "2020-11-25",
    "cover": {
      "src": "/covers/QTS-063.webp",
      "srcset": "/covers/QTS-063.webp 400w, /covers/QTS-063-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-063/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-063/QTS-063-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-064",
    "code": "QTS-064",
    "title": "Queenstown Transport Business Case – Appendices (combined volume, redacted)",
    "shortTitle": "Queenstown Transport Business Case – Appendices",
    "summary": "This is the combined appendices volume (final, 26 November 2020) to the NZUP Queenstown Transport Business Case, released under the OIA. Only its cover, copyright page and two-page contents were extracted; the appendices themselves are recorded separately (APX_* keys). The contents list seven groups. Appendix A (Strategic Case, A1-A6) covers land use integration, alignment, KPIs, engagement analysis, workshop notes and the engagement strategy. Appendix B (Options Assessment, B1-B28) includes modelling reports, the Future PT Model, B5 Technical Note 30 High Capacity Public Transport, B6 Technical Note 12 PT Development Story, B19 VURT analysis, B25 PT Network Options MCA and other technical notes. Appendix C (Preferred Option, C1-C17) includes drawings, design philosophy statements, TDM (TN22), ITS (TN36), C12 TN30 High Capacity Public Transport, consenting strategy, land requirement plans and environmental reports. Appendix D covers the Economic Case (peer review, TN26 Unmet Demand, EEM benefits, cost estimates), E the Financial Case (funding spreadsheet), F the Commercial Case (risk register, property strategy) and G the Management Case.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Compendium",
    "year": 2020,
    "publishedDate": "2020-11-26",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "Way to Go",
    "citation": "Way to Go partnership, NZTA (Waka Kotahi), QLDC, ORC. Queenstown Transport Business Case – Appendices (combined volume, redacted) (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA release; no OIA reference printed in extracted pages)",
    "sourceUrls": [],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "parking",
      "roads",
      "demand-management",
      "its"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "beca",
      "ey",
      "jasmax",
      "stantec",
      "wsp"
    ],
    "searchText": "qts-064 queenstown transport business case – appendices (combined volume, redacted) queenstown transport business case – appendices this is the combined appendices volume (final, 26 november 2020) to the nzup queenstown transport business case, released under the oia. only its cover, copyright page and two-page contents were extracted; the appendices themselves are recorded separately (apx_* keys). the contents list seven groups. appendix a (strategic case, a1-a6) covers land use integration, alignment, kpis, engagement analysis, workshop notes and the engagement strategy. appendix b (options assessment, b1-b28) includes modelling reports, the future pt model, b5 technical note 30 high capacity public transport, b6 technical note 12 pt development story, b19 vurt analysis, b25 pt network options mca and other technical notes. appendix c (preferred option, c1-c17) includes drawings, design philosophy statements, tdm (tn22), its (tn36), c12 tn30 high capacity public transport, consenting strategy, land requirement plans and environmental reports. appendix d covers the economic case (peer review, tn26 unmet demand, eem benefits, cost estimates), e the financial case (funding spreadsheet), f the commercial case (risk register, property strategy) and g the management case. context and purpose: the appendices volume supports the main queenstown business case (dbc). the extracted part (4 pages) is the cover ('queenstown transport business case – appendices, 26 november 2020, final', p.1), the nz transport agency copyright page (p.2) and the contents (pp.3-4). the full volume (336mb) was not extracted. each appendix group is summarised in its own record. contents (pp.3-4): appendix a strategic case: a1 tn37 frankton land use integration; a2 alignment to national and local standards; a3 kpi details; a4 community engagement analysis; a5 workshop notes; a6 overarching engagement strategy (record apx_a). appendix b options assessment: b1 options development process; b2 longlist options; b3 modelling reports; b4 future public transport model; b5 tn30 high capacity public transport; b6 tn12 queenstown public transport development story; b7 tn18 lakeview bus service analysis (apx_b); b8 tn42 sh6a bus signal and virtual priority; b9 tn11 tdm programme; b10 bus lane interventions; b11 tn39 sh6 frankton southern corridor; b12 tn41 south west frankton; b13 tn35 sh6/sh6a operation (apx_b8); b14 tn38 sh6 frankton east corridor; b15 tn32 arterial permeability (apx_b14); b16 tn24 arterials discussion note; b17 tn10 parking management; b18 tn9 movement and place framework (apx_b16); b19 tn25 vurt analysis; b20 proposed speed limits; b21 way to go engagement booklet; b22 engagement report (apx_b19); b23 tn19 scope extension; b24 tn40 ladies mile; b25 pt network options mca; b26 tn43 frankton pedestrian crossings (apx_b23); b27 tn42 sh6a bus signal and virtual priority; b28 tn44 arterial stages 1 and 2 intersection optioneering (apx_b27). appendix c preferred option: c1 town centre drawings and renders (apx_c, apx_c1r); c2 frankton to queenstown drawings (apx_c2); c3 frankton and ladies mile drawings (apx_c3); c4-c6 design philosophy statements and pavement design (apx_c4); c7 frankton design report (apx_c7); c8 safety in design register (apx_c8); c9 safe systems assessment; c10 tn22 travel demand management (apx_c10); c11 tn36 its, c12 tn30 hcpt, c13 consenting strategy (apx_c11); c14 land requirement plans (apx_c14); c15 environmental and social responsibility; c16 preliminary geotechnical reports; c17 road transport emissions assessment (apx_c15 for c15). appendix d economic case: d1 economics peer review; d2 tn26 unmet demand; d3 eem benefits; d4 cost estimates (apx_d). appendix e financial case: e1 funding spreadsheet (apx_e). appendix f commercial case: f1 risk register; f2 property strategy (apx_f). appendix g management case (apx_g). mass rapid transit: the contents list technical note 30 high capacity public transport twice (b5 and c12) and tn12 (b6) and the pt network options mca (b25). these are the appendices that assess mass rapid transit and record the recommendation to park offline pt and review it in 2028. their content is summarised in apx_b, apx_b23 and apx_c11; the cover and contents themselves contain no mrt discussion. compendium way to go partnership, nzta (waka kotahi), qldc, orc. queenstown transport business case – appendices (combined volume, redacted) (2020). wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) final contents only; lists tn30 high capacity public transport (b5 and c12) and pt network options mca (b25) the cover and contents contain no mrt discussion. the contents list 'appendix b5 technical note 30: high capacity public transport' (p.3) and 'appendix c12 technical note 30: high capacity public transport' (p.4). they also list 'appendix b6 technical note 12: queenstown public transport development story' and 'appendix b25 queenstown public transport network options multi criteria analysis' (p.3). these are where the mass rapid transit option and the recommendation that offline pt be parked and reviewed in 2028 appear (see apx_b, apx_b23, apx_c11). \"appendix b5 technical note 30: high capacity public transport\" (p.3) | \"appendix c12 technical note 30: high capacity public transport\" (p.4) seven appendix groups (a-g); appendix b has 28 items, appendix c 17 items (pp.3-4) a study cost has been requested under the official information act or lgoima. no figure has been received. released under oia 1982 (nzta release; no oia reference printed in extracted pages) way to go passing business case chapter or appendix final 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. nzta waka kotahi nzta lead orc orc lead qldc qldc lead way to go way to go lead beca beca prepared ey ey prepared jasmax jasmax prepared stantec stantec prepared wsp (including opus) wsp prepared nzta waka kotahi nzta published cover and contents pdf",
    "sortDate": "2020-11-26",
    "cover": {
      "src": "/covers/QTS-064.webp",
      "srcset": "/covers/QTS-064.webp 400w, /covers/QTS-064-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-064/",
    "files": [
      {
        "label": "Cover and contents",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-064/QTS-064-F2.pdf"
      }
    ]
  },
  {
    "id": "qts-065",
    "code": "QTS-065",
    "title": "Emissions Reduction Roadmap: Pathway to Science Based Targets – scenarios for Queenstown Lakes District",
    "shortTitle": "Emissions Reduction Roadmap: Pathway to Science",
    "summary": "Prepared by Sapere for Queenstown Lakes District Council (QLDC), with contributions from DETA Consulting and Maidstone Associates, this roadmap models pathways to net zero emissions by 2050 for the whole district and tests feasibility of Science Based Targets. It was a priority action of QLDC's March 2020 Climate Action Plan. Using the Tonkin & Taylor 2019 inventory (659,274 tCO2e gross, road transport 36.7%), it models Business as Usual, Modest Change and High Change scenarios, each with three population projections. Modest Change cuts 2050 emissions 44% against Business as Usual; High Change only just meets the combined well-below-2°C and biogenic methane target, and neither pathway meets the 1.5°C target. Gross emissions stay positive in 2050, so about 233 ktCO2e/year would need sequestration under High Change; a parallel study suggests planting around 17,320 ha could sequester over 400 ktCO2e/year. For road transport it assumes 60% (Modest) or 80% (High) mode shift to public transport and active travel by 2050 for journeys on SH6A between Frankton and Queenstown, but finds light-vehicle electrification gives the largest savings. Marginal abatement costs are estimated for vehicle electrification, biofuels, hydrogen, LPG switching, solar PV and waste. The report urges QLDC to aim for the High Change pathway and sets subsector next steps, including full transport network modelling. It does not mention mass rapid transit.",
    "documentType": "Feasibility or modelling study",
    "documentForm": "Emissions reduction roadmap / scenario modelling report",
    "year": 2020,
    "publishedDate": "2020-11-26",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Lakes District (whole district); SH6A Frankton-Queenstown for transport mode shift",
    "owner": "QLDC",
    "citation": "QLDC. Emissions Reduction Roadmap: Pathway to Science Based Targets – scenarios for Queenstown Lakes District (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/yytb3e5t/qldc-emissions-reduction-roadmap-final-report.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/yytb3e5t/qldc-emissions-reduction-roadmap-final-report.pdf"
    ],
    "documentTypeCode": "feasibility-study",
    "topics": [
      "active-travel",
      "roads",
      "freight",
      "aviation",
      "electric-vehicles"
    ],
    "organisationIds": [
      "qldc",
      "deta-consulting",
      "maidstone-associates",
      "sapere-research-group"
    ],
    "searchText": "qts-065 emissions reduction roadmap: pathway to science based targets – scenarios for queenstown lakes district emissions reduction roadmap: pathway to science prepared by sapere for queenstown lakes district council (qldc), with contributions from deta consulting and maidstone associates, this roadmap models pathways to net zero emissions by 2050 for the whole district and tests feasibility of science based targets. it was a priority action of qldc's march 2020 climate action plan. using the tonkin & taylor 2019 inventory (659,274 tco2e gross, road transport 36.7%), it models business as usual, modest change and high change scenarios, each with three population projections. modest change cuts 2050 emissions 44% against business as usual; high change only just meets the combined well-below-2°c and biogenic methane target, and neither pathway meets the 1.5°c target. gross emissions stay positive in 2050, so about 233 ktco2e/year would need sequestration under high change; a parallel study suggests planting around 17,320 ha could sequester over 400 ktco2e/year. for road transport it assumes 60% (modest) or 80% (high) mode shift to public transport and active travel by 2050 for journeys on sh6a between frankton and queenstown, but finds light-vehicle electrification gives the largest savings. marginal abatement costs are estimated for vehicle electrification, biofuels, hydrogen, lpg switching, solar pv and waste. the report urges qldc to aim for the high change pathway and sets subsector next steps, including full transport network modelling. it does not mention mass rapid transit. context and purpose: the report describes an emissions reduction roadmap, with associated costs, to inform qldc about pathways to net zero emissions by 2050 across the district and the feasibility of science based targets for 1.5°c and well-below-2°c (p.9). qldc adopted a climate action plan (cap) in march 2020, one priority action of which was this roadmap with a separate sequestration study (p.12). qldc engaged sapere to undertake both (p.12). page references are pdf pages; printed page numbers are 8 lower. baseline: using the tonkin & taylor ghg inventory for 2019, gross district emissions were 659,274 tco2e, of which road transport was 241,755 tco2e (36.7%), agriculture 171,923 (26.1%), victoria flats landfill 88,011 (13.3%), domestic transboundary aviation 64,670 (9.8%), electricity 45,822 (7.0%) and lpg 30,200 (4.6%) (p.14). method: three scenarios (business as usual, modest change, high change) are combined with three population projections to give nine pathways (pp.18-19). business as usual scales 2019 per-capita emissions with population (p.22). marginal abatement costs (macs), at a 6% discount rate, inform technology start dates and uptake (p.57). road transport: options modelled include public transport and ride sharing on sh6a between frankton and queenstown, conversion of light vehicles to battery electric, heavy vehicle efficiency, telemetrics, trucking collaboration, and heavy vehicle conversion to battery electric, biodiesel (g2) and hydrogen (p.26). the mode shift input is 60% (modest) or 80% (high) mode shift by 2050 for journeys on sh6a between frankton and queenstown, the modest figure 'based on the mot base case used in the abley transport model' (p.28). the report says mode shift 'will provide modest emissions savings for the district', while light passenger and commercial vehicles produce about 79% of road transport emissions, so electrification gives the greatest savings (p.28). a behaviour change placeholder is set at 0% in both pathways (p.29). full light-vehicle electrification would need around 280 gwh/year, compared with queenstown's 2019 use of 261 gwh, and could add 70 mw to peak demand (p.29). no mac was estimated for mode shift (p.58). results: modest change gives 44% savings by 2050 against business as usual, led by road transport, landfill, aviation, agriculture and lpg (p.51). high change gives much deeper reductions, including a 2040 step from an assumed pyrolysis plant (p.52). high change 'will only just achieve' the combined well-below-2°c science based target and biogenic methane target; the 1.5°c combined target 'will not be achieved by either pathway' (p.54). the cap transport outcome budget falls from 307,800 tco2e in 2020 to 276,600 (modest) or 79,700 (high) in 2050 (p.56). about 233 ktco2e/year would need to be sequestered in 2050 under high change; plantings of around 17,320 ha (under 2% of the district) could sequester over 400 ktco2e/year, with significant landscape and land ownership challenges (pp.10-11, 69). costs: mfe estimates of macs for electrifying light commercial and light passenger vehicles are about -$300/tco2e and -$170/tco2e over 2020-2030 (p.59). heavy truck electrification is expected to become cost-effective within five years; biodiesel and hydrogen keep positive abatement costs but are described as necessary (p.66). switching from lpg is cost-effective for commercial and new builds (p.66). recommendations: the authors hope qldc 'will be bold and ambitious, aiming for the high change pathway', which will need regulatory, policy and community engagement levers (p.70). subsector next steps include full modelling of the district transport network, engagement with airlines and queenstown airport, agricultural trials, engagement with aurora and lpg suppliers, better wastewater emission factors, investigation of a pyrolysis plant, and a verified qldc carbon inventory (pp.70-71). mass rapid transit: the report says nothing about mass rapid transit or offline public transport. it assumes a 60-80% mode shift to public transport and active travel on sh6a between frankton and queenstown by 2050 (p.28) but does not identify the transport infrastructure or services needed to achieve it. emissions reduction roadmap / scenario modelling report qldc. emissions reduction roadmap: pathway to science based targets – scenarios for queenstown lakes district (2020). queenstown lakes district (whole district); sh6a frankton-queenstown for transport mode shift not stated no mass rapid transit reference; assumes a 60-80% mode shift on sh6a between frankton and queenstown by 2050 without specifying how it is delivered. 2019 gross district emissions 659,274 tco2e; road transport 241,755 tco2e (36.7%) (p.14) mode shift to public transport and active travel for sh6a frankton-queenstown journeys: 60% by 2050 (modest), 80% by 2050 (high) (p.28) light passenger and light commercial vehicles about 79% of road transport emissions (p.28) full light-vehicle electrification needs about 280 gwh/year and could add 70 mw to peak demand (133 mw total) (p.29) modest change pathway: 44% emissions savings by 2050 vs business as usual (p.51) high change pathway: about 233 ktco2e/year residual emissions in 2050 to be sequestered (p.10) around 17,320 ha of planting could sequester over 400 ktco2e/year by 2050 (p.11) cap transport budget: 307,800 tco2e (2020) to 276,600 (modest) / 79,700 (high) in 2050 (p.56) mfe macs: about -$300/tco2e (light commercial bev) and -$170/tco2e (light passenger bev), 2020-2030 (p.59) modest-0 reductions: 79% technological, 14% behavioural and technological, 7% behavioural (p.25) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/yytb3e5t/qldc-emissions-reduction-roadmap-final-report.pdf qldc none feasibility or modelling study not stated 2020 walking and cycling walking, cycling, trails and other active travel. roads state highways, local roads and general traffic. freight freight and loading. aviation airport and aviation access. electric vehicles electric and hydrogen vehicle technology. qldc qldc commissioned deta consulting deta consulting prepared maidstone associates maidstone associates prepared sapere research group sapere research group prepared corina comendant author sapere research group sapere research group david taylor author sapere research group sapere research group eugene robson author sapere research group sapere research group george hooper contributor maidstone associates maidstone associates rocky renquist contributor toby stevenson contributor sapere research group sapere research group aim for the high change pathway, using regulatory, policy and community engagement levers, with specific actions to be formulated, discussed, implemented and reviewed. we hope that qldc will be bold and ambitious, aiming for the high change pathway to 2050 not assessed qldc qldc complete full modelling of the district transport network, focusing on trips between key locations and vehicle types, to identify the right technological and behavioural interventions. road transport: complete full modelling of the transport network within the qldc region not assessed qldc qldc engage with air nz, other flight operators and queenstown airport on future flight carbon intensity and actions qldc can encourage or undertake. aviation: engage with air nz (and other flight operators in the region) and queenstown airport not assessed qldc qldc liaise with stakeholders to run trials of ways to reduce agricultural emissions, adapting existing programmes to the district. agriculture: liaise with key stakeholders in the region to perform trials not assessed qldc qldc engage with aurora so electricity infrastructure supports decarbonisation, and review pricing levers such as export rates and peak charges. electricity: engage with aurora to ensure that the electricity infrastructure is in place not assessed qldc qldc engage with lpg suppliers to confirm district lpg consumption, and with contact/rockgas on decarbonising the distribution network, e.g. biomethane. lpg: engage with lpg suppliers to confirm total lpg consumption not assessed qldc qldc confirm detailed emissions factors for wastewater treatment options, including n2o, and assess further reductions; undertake a detailed wastewater ghg analysis. wastewater: confirm detailed emissions factors of various wastewater treatment options not assessed qldc qldc develop a biosolids-specific emissions factor to reduce uncertainty. beca and ourselves recommend that the uncertainty is reduced through the development of a biosolids specific emissions factor not assessed investigate alternative landfill carbon reduction measures, chiefly a pyrolysis plant, and determine feasibility. landfill: investigate alternative means of carbon reduction within the landfill environment high change assumes installation in 2040 (p.47) not assessed qldc qldc analyse costs of qldc-specific waste minimisation programmes once developed. separate analysis should be conducted of qldc-specific programs once these are developed once programmes are developed not assessed qldc qldc complete a full and verified carbon inventory for qldc's own directly and indirectly controlled activities. qldc: complete a full and verified carbon inventory for qldc not assessed qldc qldc main document pdf",
    "sortDate": "2020-11-26",
    "cover": {
      "src": "/covers/QTS-065.webp",
      "srcset": "/covers/QTS-065.webp 400w, /covers/QTS-065-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-065/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-065/QTS-065-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-066",
    "code": "QTS-066",
    "title": "Mode Shift",
    "shortTitle": "Mode Shift",
    "summary": "An 11-slide draft presentation titled 'Mode Shift' by Jeremy O'Brien, Manager - Behaviour + Choice at NZTA (Waka Kotahi), marked 'DRAFT - For discussion purposes only' on every content slide. It sets out national targets (a 40% reduction in deaths and serious injuries by 2030 and net zero greenhouse gas emissions by 2050) and Waka Kotahi's outcomes (safe; meeting current and future needs; environmentally sustainable; effectively and efficiently moving people and freight). It illustrates the safety, sustainability and efficiency case for public transport, walking and cycling using third-party charts and images, and notes the scale of the challenge using Keeping Cities Moving statistics (e.g. 91% of distance travelled by drivers or passengers in a car or van). It presents the mode shift intervention hierarchy (integrated planning, manage demand, best use of existing system, then new infrastructure), the Avoid-Shift-Improve framework, and Waka Kotahi's focus areas (investment, behaviour, partnering, planning). The final slide is a discussion prompt asking what would make walking, cycling or public transport 'awesome' for work, children, shopping and leisure. The deck contains no Queenstown-specific analysis, proposals or figures.",
    "documentType": "Transport strategy",
    "documentForm": "Presentation slide deck (draft, for discussion)",
    "year": 2021,
    "publishedDate": "2021",
    "documentStatus": "Draft",
    "geographicScope": "National (Aotearoa New Zealand); no Queenstown-specific content appears on the slides",
    "owner": "NZTA",
    "citation": "Mode Shift (2021).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "Public source URL not yet recorded.",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-066 mode shift mode shift an 11-slide draft presentation titled 'mode shift' by jeremy o'brien, manager - behaviour + choice at nzta (waka kotahi), marked 'draft - for discussion purposes only' on every content slide. it sets out national targets (a 40% reduction in deaths and serious injuries by 2030 and net zero greenhouse gas emissions by 2050) and waka kotahi's outcomes (safe; meeting current and future needs; environmentally sustainable; effectively and efficiently moving people and freight). it illustrates the safety, sustainability and efficiency case for public transport, walking and cycling using third-party charts and images, and notes the scale of the challenge using keeping cities moving statistics (e.g. 91% of distance travelled by drivers or passengers in a car or van). it presents the mode shift intervention hierarchy (integrated planning, manage demand, best use of existing system, then new infrastructure), the avoid-shift-improve framework, and waka kotahi's focus areas (investment, behaviour, partnering, planning). the final slide is a discussion prompt asking what would make walking, cycling or public transport 'awesome' for work, children, shopping and leisure. the deck contains no queenstown-specific analysis, proposals or figures. context and purpose: this is a short draft slide deck titled 'mode shift', presented by jeremy o'brien, manager - behaviour + choice, nzta (waka kotahi) (p.1). every content slide carries the footer 'draft - for discussion purposes only'. no date, audience or venue is printed; the slides cite web sources accessed on 27-28 july 2021 (pp.4-8). the file name and master list associate it with queenstown, but the slide text and images reviewed contain no reference to queenstown or any local project. content: slide 2 states national targets of a 40% reduction in deaths and serious injuries by 2030 and net zero greenhouse gas emissions by 2050 (p.2). slide 3 lists waka kotahi outcomes: safe; meeting current and future needs; environmentally sustainable; and effectively and efficiently moving people and freight (p.3). slides 4-6 illustrate outcomes using third-party material: a canadian chart showing lower fatality rates for public transport than for car travel (p.4, citing vtpi.org); a chart of emissions per trip by mode (p.5, citing bbc future / union of concerned scientists); and a cycling promotion fund photo comparing road space used by the same number of people in a bus, on bicycles and in cars (p.6, citing humantransit.org). slide 7, 'a big hill to climb', reproduces keeping cities moving statistics: 91% of total distance travelled is by drivers or passengers in a car or van; 83% of total trip legs are made by a driver or passenger in a car or van; 92% of households have access to a car (56% have two or more); and a 55% increase in new zealand's vehicle fleet between 2000 and 2017 (p.7). slide 8 shows the mode shift action plans intervention hierarchy, with integrated planning considered first, then managing demand, best use of the existing system, and new infrastructure last at higher cost (p.8). slide 9 presents avoid-shift-improve (p.9), slide 10 lists focus areas of investment, behaviour, partnering and planning (p.10), and slide 11 asks the audience what would make walking, cycling or public transport 'awesome' for work, children, shopping, and travel and leisure (p.11). the deck makes no recommendations, sets no actions and contains no costs, patronage or mode share figures for queenstown. mass rapid transit: the deck says nothing about mass rapid transit or offline public transport between frankton and the town centre. the only related term is the legend label 'mass transit' on a generic third-party emissions chart (p.5). presentation slide deck (draft, for discussion) mode shift (2021). national (aotearoa new zealand); no queenstown-specific content appears on the slides draft - for discussion purposes only no mass rapid transit reference; a generic national mode-shift presentation. target: 40% reduction in deaths and serious injuries by 2030 (p.2) target: net zero ghg emissions by 2050 (p.2) 91% of total distance travelled is by drivers or passengers in a car or van (p.7) 83% of total trip legs are made by a driver or passenger in a car or van (p.7) 92% of households have access to a car; 56% have two or more (p.7) 55% increase in new zealand's vehicle fleet between 2000 and 2017 (p.7) a study cost has been requested under the official information act or lgoima. no figure has been received. public source url not yet recorded. nzta none transport strategy draft 2021 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published jeremy o'brien presenter nzta waka kotahi nzta main document pdf",
    "sortDate": "2021-01-01",
    "cover": {
      "src": "/covers/QTS-066.webp",
      "srcset": "/covers/QTS-066.webp 400w, /covers/QTS-066-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-066/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-066/QTS-066-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-067",
    "code": "QTS-067",
    "title": "Ten Year Plan 2021-31 | He Mahere Kahurutaka 2021-31 (Volumes One and Two)",
    "shortTitle": "Ten Year Plan 2021-31 | He Mahere Kahurutaka",
    "summary": "QLDC's 2021-2031 Ten Year Plan, adopted 30 June 2021, reshapes the transport programme around the $85m Crown Infrastructure Partners 'shovel-ready' funding for arterial Stage One and town centre street upgrades. Volume Two's capital table (p.12) includes Arterial Stage One ($49.4m, 2021/22-2023/24), Queenstown Street Upgrades ($56.3m), the arterial balance of route ($34.7m, years 7-10), a Queenstown Public Transport Interchange ($24.9m, 2027/28-2028/29) and Queenstown public transport improvements ($17.3m). The Boundary Street car park building was removed, its capital cut from $30m to $5m (Vol 1 p.20). The Infrastructure Strategy places the Wakatipu Active Travel Network ($73.2m and $89m) beyond year 10, and refers to 'Preservation of mass transit corridor options in the longer term' (Vol 2 p.43) and a future step change to a 'mass transit network' by ORC (p.46). No mass rapid transit is named.",
    "documentType": "Statutory plan",
    "documentForm": "Ten Year Plan / Long Term Plan (two volumes)",
    "year": 2021,
    "publishedDate": "2021-06-30",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Ten Year Plan 2021-31 | He Mahere Kahurutaka 2021-31 (Volumes One and Two) (2021).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ruejpl54/qldc_ten-year-plan_volume-one_2021-2031-approved-and-signed-updated-page-77.pdf",
      "https://www.qldc.govt.nz/media/2slfet1y/qldc_ten-year-plan_volume-two_2021-2031-02jul21.pdf",
      "https://www.qldc.govt.nz/media/dgvdimxl/qldc_ten-year-plan_decisions-summary_2021-2031-web.pdf",
      "https://www.qldc.govt.nz/media/oinhwsxe/aa-qldc_ten-year-plan_volume-one_2021-2031.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "nzta",
      "orc"
    ],
    "searchText": "qts-067 ten year plan 2021-31 | he mahere kahurutaka 2021-31 (volumes one and two) ten year plan 2021-31 | he mahere kahurutaka qldc's 2021-2031 ten year plan, adopted 30 june 2021, reshapes the transport programme around the $85m crown infrastructure partners 'shovel-ready' funding for arterial stage one and town centre street upgrades. volume two's capital table (p.12) includes arterial stage one ($49.4m, 2021/22-2023/24), queenstown street upgrades ($56.3m), the arterial balance of route ($34.7m, years 7-10), a queenstown public transport interchange ($24.9m, 2027/28-2028/29) and queenstown public transport improvements ($17.3m). the boundary street car park building was removed, its capital cut from $30m to $5m (vol 1 p.20). the infrastructure strategy places the wakatipu active travel network ($73.2m and $89m) beyond year 10, and refers to 'preservation of mass transit corridor options in the longer term' (vol 2 p.43) and a future step change to a 'mass transit network' by orc (p.46). no mass rapid transit is named. context and purpose. the 2021-2031 plan was adopted on 30 june 2021 after the draft was adopted for consultation on 18 march 2021 (vol 1 p.18). it reflects covid-19 recovery funding: the crown infrastructure partners (cip) 'shovel-ready' contribution of $85m for stage one of the queenstown arterial and cbd street upgrades (vol 1 p.31), and the $90m nz upgrade programme package for a queenstown bus hub, sh6 improvements, a howards drive roundabout and a ladies mile active travel underpass (vol 1 p.5). transport capital. volume two (p.12, $000) lists arterial stage one (cip) 49,353 (2021/22-2023/24); arterial balance of route 34,697 (2027/28-2030/31); queenstown street upgrades (cip) 56,320 (2021/22-2022/23); queenstown parking improvements 5,159; queenstown public transport interchange 24,905 (2027/28-2028/29); queenstown public transport improvements 17,277 (2021/22-2024/25); wānaka primary cycle network 12,385; arthurs point bridge road crossing 14,247; lake wakatipu ferry infrastructure 6,915; frankton track 6,282; lakeview roading 11,560; and low-cost low-risk active travel 7,270. volume one records removal of the boundary street car parking facility, with capital cut from $30m to $5m and temporary cbd parking used instead (p.20), and a waka kotahi (nzta) subsidy shortfall of $7.4m for 2021-24 (pp.22-23). nzta was assumed to fund $183m over ten years, including 51% of the town centre masterplan, unconfirmed until later in 2021 (p.28). infrastructure strategy. the 30-year strategy proposes parking buildings on the town centre fringes, paid parking expansion, park and ride and parking technology (vol 2 p.43), a stanley street public transport hub, and identifies parking management as a mode shift lever (p.40). it schedules the wakatipu active travel network at $73.2m (years 11-20) and $89m (years 21-30) (p.40), a frankton public transport hub ($9m, years 11-20) and wakatipu park-and-ride ($1.8m years 1-3, $2.2m years 4-10) (p.44). first-decade public transport investment is limited to low-level service improvements and hubs at frankton and queenstown (p.46). what followed. arterial stage one opened 30 january 2025 at $128.02m mass rapid transit: passing references only. under the town centre master plan the strategy lists 'preservation of mass transit corridor options in the longer term to enable future growth' (vol 2 p.43), and under public transport infrastructure it anticipates significant orc expenditure including 'a step change to a more frequent, direct mass transit' network (p.46). neither passage names mass rapid transit, and no capital is allocated. ten year plan / long term plan (two volumes) ten year plan 2021-31 | he mahere kahurutaka 2021-31 (volumes one and two) (2021). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted preserve mass rapid transit corridor options for the long term; a later step change to mass rapid transit is anticipated; no funding. volume two's infrastructure strategy refers to mass transit twice. section 4.3.3 (queenstown town centre master plan) lists 'preservation of mass transit corridor options in the longer term to enable future growth' (p.43). section 4.3.9 (public transport infrastructure) anticipates 'significant expenditure by orc in public transport services, including a step change to a more frequent, direct mass transit' network (p.46), while first-decade investment is limited to low-level service improvements and hubs at frankton and queenstown. no mass rapid transit or offline route is named and no capital line is provided. \"preservation of mass transit corridor options in the longer term to enable future growth.\" (p.vol 2 p.43) | \"significant expenditure by orc in public transport services, including a step change to a more frequent, direct mass transit...\" (p.vol 2 p.46) arterial stage one (cip) $49.353m, 2021/22-2023/24 (vol 2 p.12) arterial balance of route $34.697m, 2027/28-2030/31 (vol 2 p.12) queenstown street upgrades (cip) $56.320m (vol 2 p.12) queenstown public transport interchange $24.905m, 2027/28-2028/29 (vol 2 p.12) queenstown public transport improvements $17.277m, 2021/22-2024/25 (vol 2 p.12) boundary st car parking capital cut from $30m to $5m (vol 1 p.20) cip shovel-ready funding $85m for arterial stage one and street upgrades (vol 1 p.31) wakatipu active travel network $73.2m (years 11-20) and $89m (years 21-30) (vol 2 p.40) nzta subsidy shortfall 2021-24 $7.4m (vol 1 pp.22-23) not separately commissioned. this is an internal or corporate document. qldc passing statutory plan adopted 2021 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc build queenstown arterial stage one with crown infrastructure partners funding, $49.4m arterial stage one (crown infrastructure partners) 49,353 2021/22-2023/24 not assessed qldc qldc queenstown street upgrades (cip), $56.3m queenstown street upgrades (crown infrastructure partners) 56,320 2021/22-2022/23 not assessed qldc qldc arterial balance of route (stages 2-3), $34.7m arterial balance of route 34,697 2027/28-2030/31 not assessed qldc qldc queenstown public transport interchange (stanley street hub), $24.9m queenstown public transport interchange 24,905 2027/28-2028/29 not assessed qldc qldc queenstown public transport improvements, $17.3m queenstown public transport improvements 17,277 2021/22-2024/25 not assessed qldc qldc remove the boundary street parking building; cut capital from $30m to $5m and use temporary cbd parking capital was cut from $30m to $5m from 2021/22 not assessed qldc qldc queenstown parking improvements, $5.2m queenstown parking improvements 5,159 2021/22, 2022/23, 2027/28 not assessed qldc qldc wānaka primary cycle network, $12.4m wanaka primary cycle network 12,385 2024/25-2026/27 not assessed qldc qldc lake wakatipu ferry infrastructure improvements, $6.9m lake wakatipu ferry infrastructure improvements 6,915 2021/22; 2026/27-2028/29 not assessed qldc qldc arthurs point bridge road crossing, $14.2m arthurs point bridge - road crossing 14,247 2029/30-2030/31 not assessed qldc qldc wakatipu active travel network, $73.2m and $89m (outside the ten-year plan) wakatipu active travel network los - - $73.2m $89m years 11-30 not assessed qldc qldc frankton new public transport hub, $9m frankton new public transport hub los - - $9m years 11-20 not assessed qldc qldc wakatipu park and ride facility, $1.8m (years 1-3) and $2.2m (years 4-10) wakatipu park & ride facility (tr) renewal $1.8m $2.2m years 1-10 not assessed qldc qldc deliver the $90m nz upgrade programme package: queenstown bus hub, sh6 improvements, howards drive roundabout, ladies mile underpass new zealand upgrade programme package years 1-3 not assessed nzta waka kotahi nzta preserve mass transit corridor options in the longer term preservation of mass transit corridor options in the longer term longer term not assessed qldc qldc step change to a more frequent, direct mass transit network through significant orc public transport expenditure a step change to a more frequent, direct mass transit beyond first ten years not assessed orc orc main document pdf part 2 pdf part 3 pdf",
    "sortDate": "2021-06-30",
    "cover": {
      "src": "/covers/QTS-067.webp",
      "srcset": "/covers/QTS-067.webp 400w, /covers/QTS-067-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-067/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-067/QTS-067-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-067/QTS-067-F1-part2.pdf"
      },
      {
        "label": "Part 3",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-067/QTS-067-F1-part3.pdf"
      }
    ]
  },
  {
    "id": "qts-068",
    "code": "QTS-068",
    "title": "The Queenstown Lakes Spatial Plan (Part 4, printed pp.86-115)",
    "shortTitle": "The Queenstown Lakes Spatial Plan",
    "summary": "This is Part 4 of the Queenstown Lakes Spatial Plan (July 2021), covering printed pages 86-115 as 15 double-page spreads. It contains the transport maps (Map 13 district transport; Maps 14-15 public transport and active travel networks), Outcome 3 (a sustainable tourism system), Outcome 4 (well-designed neighbourhoods), Outcome 5 (a diverse economy) and the Grow Well | Whaiora Partnership joint work programme of 22 priority initiatives. On transport it describes a package of initiatives whose 'backbone' is a Frequent Public Transport Network, initially between Queenstown Town Centre and Frankton, later extending to Ladies Mile and Jacks Point / Homestead Bay via the Airport and Remarkables Park, running at least every 10 minutes. It will initially use buses with bus lanes, intersection priority and a new bus hub on SH6, and is described as scalable to 'higher capacity buses and modes, such as a trackless tram'. It states $175m has been allocated by government through the NZ Upgrade Programme and COVID-19 stimulus, with initial works expected by 2024. Transport priority initiatives include completing the Queenstown business cases and Frequent Transit Network, a mode shift plan with travel demand management, extending the network to Remarkables Park and the Southern Corridor, completing the active travel networks, a Tourism Travel Demand Strategy and investigating sub-regional public transport. An implementation plan was to be developed and the Spatial Plan reviewed in 2024. The buses it describes are not mass rapid transit. A trackless tram, which it names as a possible later upgrade, is.",
    "documentType": "Spatial plan",
    "documentForm": "Spatial plan (extract: Part 4, transport maps, Outcomes 3-5 and joint work programme)",
    "year": 2021,
    "publishedDate": "2021-07",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin; Queenstown Town Centre; Frankton; Ladies Mile / Eastern Corridor; Southern Corridor; Upper Clutha / Wānaka; sub-regional links to Cromwell",
    "owner": "Grow Well Whaiora",
    "citation": "Grow Well Whaiora partnership. The Queenstown Lakes Spatial Plan (Part 4, printed pp.86-115) (2021).",
    "featured": true,
    "featuredOrder": 2,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/hsdjlrv3/the-spatial-plan_a4-booklet_jul21-final-web-for-desktop.pdf",
    "publicSourceConfidence": "same document",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/hsdjlrv3/the-spatial-plan_a4-booklet_jul21-final-web-for-desktop.pdf"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "freight",
      "aviation"
    ],
    "organisationIds": [
      "grow-well-whaiora-partnership",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-068 the queenstown lakes spatial plan (part 4, printed pp.86-115) the queenstown lakes spatial plan this is part 4 of the queenstown lakes spatial plan (july 2021), covering printed pages 86-115 as 15 double-page spreads. it contains the transport maps (map 13 district transport; maps 14-15 public transport and active travel networks), outcome 3 (a sustainable tourism system), outcome 4 (well-designed neighbourhoods), outcome 5 (a diverse economy) and the grow well | whaiora partnership joint work programme of 22 priority initiatives. on transport it describes a package of initiatives whose 'backbone' is a frequent public transport network, initially between queenstown town centre and frankton, later extending to ladies mile and jacks point / homestead bay via the airport and remarkables park, running at least every 10 minutes. it will initially use buses with bus lanes, intersection priority and a new bus hub on sh6, and is described as scalable to 'higher capacity buses and modes, such as a trackless tram'. it states $175m has been allocated by government through the nz upgrade programme and covid-19 stimulus, with initial works expected by 2024. transport priority initiatives include completing the queenstown business cases and frequent transit network, a mode shift plan with travel demand management, extending the network to remarkables park and the southern corridor, completing the active travel networks, a tourism travel demand strategy and investigating sub-regional public transport. an implementation plan was to be developed and the spatial plan reviewed in 2024. the buses it describes are not mass rapid transit. a trackless tram, which it names as a possible later upgrade, is. context and purpose: this file is an extract (part 4) of the queenstown lakes spatial plan, printed pages 86-115, dated july 2021 in the page footers. it sets spatial strategies, maps and priority initiatives for growth across the district. the authorship is the grow well | whaiora partnership; the extract itself does not list the partner organisations or any individual authors. transport: map 13 ('queenstown lakes - transport') identifies key constraints including the shotover bridge, sh6a frankton-town centre, the albert town bridge and the edith cavell bridge, and notes some elements are 'identified in waka kotahi arataki version2 july 2021' (p.1). the accompanying text, 'queenstown's future integrated transport system', describes a multimodal package of a much improved walking and cycling network, enhanced ferry services and a frequent public transport system (p.1). the backbone is a frequent public transport network initially between queenstown town centre and frankton, eventually extending east to ladies mile and south to jacks point / homestead bay via the airport and remarkables park, with services at least every 10 minutes during the day (p.1). it 'will initially use buses with bus lanes and priority over cars at key intersections, along with a new bus hub on sh6', and is 'designed to be scalable and can be upgraded as demand increases to higher capacity buses and modes, such as a trackless tram' (p.1). government has allocated $175m towards the initial stage via the new zealand upgrade programme and the covid-19 economic stimulus package, with initial works expected to be completed by 2024 (p.1). maps 14 and 15 show existing, planned and vision frequent and regular public transport services, active mode networks, ferry, park and ride, major interchanges and a sub-regional network (p.2). tourism (outcome 3): strategy 8 calls for a destination management strategy; strategy 9 notes that by 2031 almost 150,000 people could be in the district at the summer peak, over 90,000 of them visitors, and seeks a more equitable infrastructure funding stream, citing the 2019 referendum support for a visitor accommodation levy (p.4). strategy 10 seeks to promote a car-free destination by encouraging visitors to use public transport, walking and cycling, and presents an aspirational sub-regional network concept linking queenstown, wānaka and cromwell (p.5). neighbourhoods and economy (outcomes 4-5): strategies 11-13 address everyday needs, design guidance and the blue-green network, with education and health facility needs (pp.7-10). strategies 14-16 address economic diversification (tourism accounted for 63% of jobs and 55% of gdp before covid-19), space for business (an additional 10,000-15,000 jobs over 30 years, with queenstown town centre and frankton the major wakatipu employment hubs), and efficient connections, noting that moving people by public transport, walking and cycling will assist freight reliability 'particularly in constrained parts of the network such as between frankton and the queenstown town centre' (pp.11-13). estimated additional business space demand 2016-2046 is shown as 16.2 ha, 38.1 ha and 33.4 ha across industrial, retail and commercial categories (p.12; category-to-figure mapping unclear in extracted text). implementation: the joint work programme lists 22 priority initiatives across five outcomes (p.15). an implementation plan setting out responsibilities and timeframes was to be developed and reviewed annually, and the spatial plan was to be reviewed and updated in 2024 (p.15). a monitoring programme will track delivery and growth (p.15). mass rapid transit: its only reference to a higher-capacity mode is that the bus-based frequent public transport network between the town centre and frankton is scalable 'to higher capacity buses and modes, such as a trackless tram' (p.1). spatial plan (extract: part 4, transport maps, outcomes 3-5 and joint work programme) grow well whaiora partnership. the queenstown lakes spatial plan (part 4, printed pp.86-115) (2021). queenstown lakes district; wakatipu basin; queenstown town centre; frankton; ladies mile / eastern corridor; southern corridor; upper clutha / wānaka; sub-regional links to cromwell not stated (footers read 'the queenstown lakes spatial plan july 2021'; one spread, pdf p.3, reads 'draft queenstown lakes spatial plan') ordinary bus frequent network between the town centre and frankton, described as scalable to higher-capacity buses and to a trackless tram. the bus service is not mass rapid transit; a trackless tram is. the plan names a frequent public transport network, initially between queenstown town centre and frankton, as 'the backbone of the new system' (p.1). it 'will initially use buses with bus lanes and priority over cars at key intersections, along with a new bus hub on sh6', and 'is designed to be scalable and can be upgraded as demand increases to higher capacity buses and modes, such as a trackless tram' (p.1). it cites $175m of government funding through the nz upgrade programme and covid-19 stimulus, with initial works expected by 2024 (p.1). priority initiatives 6 and 8 are to complete and implement the queenstown transport business cases including delivery of the frequent transit network, and to investigate and protect its extension to remarkables park and the southern corridor (p.15). no alignment is protected, and no trigger or timeframe is given for an upgrade. higher-capacity buses are not mass rapid transit; a trackless tram is. \"the frequent network will initially use buses with bus lanes and priority over cars at key intersections, along with a new bus hub on sh6 making it faster than a car during busy times. the system is designed to be scalable and can be upgraded as demand increases to higher capacity buses and modes, such as a trackless tram.\" (p.1 (printed p.86)) | \"the government has already allocated $175m towards the initial stage as part of the new zealand upgrade programme and the covid-19 economic stimulus package. initial works are expected to be completed by 2024.\" (p.1 (printed p.86)) frequent network services at least every 10 minutes during the day (p.1) $175m government allocation (nzup and covid-19 economic stimulus package) towards initial stage; initial works expected by 2024 (p.1) almost 150,000 people could be in the district at peak summer by 2031, over 90,000 of them visitors (p.4) tourism accounted for 63% of jobs and 55% of district gdp before covid-19 (p.11) additional 10,000-15,000 jobs expected over the next 30 years (p.11) approximately 88% of jobs are in the urban areas of queenstown and wānaka (p.11) 22 priority initiatives in the joint work programme; spatial plan to be reviewed and updated in 2024 (p.15) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/hsdjlrv3/the-spatial-plan_a4-booklet_jul21-final-web-for-desktop.pdf grow well whaiora passing spatial plan draft 2021 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. freight freight and loading. aviation airport and aviation access. grow well whaiora partnership grow well whaiora lead grow well whaiora partnership grow well whaiora prepared nzta waka kotahi nzta partner qldc qldc published review zoning and other levers to enable higher densities and more flexible land use within existing and new urban areas identified in the spatial plan. 1. review zoning and other levers to enable higher densities not assessed grow well whaiora partnership grow well whaiora use the grow well whaiora urban growth partnership to unlock joint priority development areas: ladies mile, five mile, queenstown town centre to frankton corridor, southern corridor, wānaka town centre to three parks, southern wānaka. 2. use the grow well whaiora urban growth partnership to improve alignment and coordination to unlock joint priority development areas not assessed grow well whaiora partnership grow well whaiora undertake structure plans for future urban areas, identifying infrastructure triggers to enable and sequence growth and prioritising affordable housing. 3. undertake structure plans for future urban areas identified in the spatial plan, including identifying infrastructure triggers not assessed grow well whaiora partnership grow well whaiora investigate alternative funding and financing tools to accelerate infrastructure delivery. 4. investigate the use of alternative funding and financing tools to accelerate infrastructure delivery not assessed grow well whaiora partnership grow well whaiora establish a coordinated programme drawing together central government, community providers, iwi and council projects to improve affordable housing outcomes. 5. establish a coordinated programme... to improve affordable housing outcomes not assessed grow well whaiora partnership grow well whaiora complete and implement the queenstown transport business cases, including delivery of the frequent transit network. 6. complete and implement the queenstown transport business cases including the delivery of the frequent transit network initial works expected by 2024 (p.1) not assessed grow well whaiora partnership grow well whaiora complete and implement a mode shift plan for queenstown, including travel demand management measures. 7. complete and implement a mode shift plan for queenstown including travel demand management measures not assessed grow well whaiora partnership grow well whaiora investigate and protect the extension of the frequent transit network to remarkables park and the southern corridor. 8. investigate and protect the extension of the frequent transit network to remarkables park and the southern corridor not assessed grow well whaiora partnership grow well whaiora complete the wakatipu and upper clutha active travel networks. 9. complete the wakatipu and upper clutha active travel networks not assessed grow well whaiora partnership grow well whaiora investigate establishing upper clutha and sub-regional public transport networks. 10. investigate establishing upper clutha and sub-regional public transport networks not assessed grow well whaiora partnership grow well whaiora develop and implement a destination management strategy to align decision making and development with sustainable development principles. 11. develop and implement a destination management strategy not assessed grow well whaiora partnership grow well whaiora implement a levy on visitor accommodation across the queenstown lakes. 12. implement a levy on visitor accommodation across the queenstown lakes 'pursued in future years' (p.4) not assessed grow well whaiora partnership grow well whaiora develop and implement a tourism travel demand strategy to encourage visitors to use public and active modes. 13. develop and implement a tourism travel demand strategy to encourage the use of public and active modes by visitors not assessed grow well whaiora partnership grow well whaiora investigate establishing a sub-regional public transport network serving both residents and visitors. 14. investigate establishing a sub-regional public transport network not assessed grow well whaiora partnership grow well whaiora develop open space network plans to deliver the blue-green networks. 15. develop open space network plans to deliver the blue-green networks not assessed grow well whaiora partnership grow well whaiora complete, update and implement qldc community wellbeing, community facilities and parks and reserves strategies and plans. 16. complete, update and implement community wellbeing, qldc community facilities and parks and reserves strategies and plans not assessed qldc qldc develop a grow-well design guide to improve built form quality and embrace kāi tahu cultural values. 17. develop a grow-well design guide not assessed grow well whaiora partnership grow well whaiora develop an economic diversification plan. 18. develop an economic diversification plan not assessed grow well whaiora partnership grow well whaiora support the otago regional economic development network to continue delivering regionally connected initiatives. 19. support the otago regional economic development network not assessed grow well whaiora partnership grow well whaiora review and update district plan zoning of centres and major employment locations to be consistent with the spatial plan. 20. review and update the zoning of centres and major employment locations in the district plan not assessed grow well whaiora partnership grow well whaiora establish a queenstown lakes utility infrastructure providers forum to improve coordination and network resilience. 21. establish a queenstown lakes utility infrastructure providers forum not assessed grow well whaiora partnership grow well whaiora identify and ensure efficient operation of main freight routes by developing a network operating plan. 22. identify and ensure the efficient operation of main freight routes by developing a network operating plan not assessed grow well whaiora partnership grow well whaiora develop a draft joint work programme and an implementation plan setting responsibilities and timeframes, reviewed annually. an implementation plan will be developed that sets out responsibilities and timeframes for delivering the initiatives annual review not assessed review and update the spatial plan. the spatial plan will be reviewed and updated in 2024. 2024 not assessed main document pdf",
    "sortDate": "2021-07-01",
    "cover": {
      "src": "/covers/QTS-068.webp",
      "srcset": "/covers/QTS-068.webp 400w, /covers/QTS-068-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-068/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-068/QTS-068-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-069",
    "code": "QTS-069",
    "title": "2020/21 Annual Report (Rīpoata ā-tau)",
    "shortTitle": "2020/21 Annual Report (Rīpoata ā-tau)",
    "summary": "QLDC's 2020/21 Annual Report records total capital expenditure of $105.3m, 'below estimate by $89.0M' (p.10), partly due to 'delays in the approval process for major transport improvements in Queenstown' (p.12). Carry-forwards of $45.06m include Queenstown Street Upgrades, arterial Stage 1, the Wakatipu Active Travel Network and the arterial balance of route (p.15). The $85m Shovel Ready contribution enabled arterial stage one (p.5), $0.7m was spent on parking options analysis (p.9) and the Queenstown Transport Business Case was approved (p.51). The only cableway reference is to the existing Skyline gondola cableway in a rockfall context (p.43).",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2021,
    "publishedDate": "2021-10-28",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2020/21 Annual Report (Rīpoata ā-tau) (2021).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/jyifmsip/qldc_annual-report_2020-21_combined_021121-adopted.pdf",
      "https://www.qldc.govt.nz/media/4dsb3ddg/1-adopt-annual-report-2021_covering-report.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-069 2020/21 annual report (rīpoata ā-tau) 2020/21 annual report (rīpoata ā-tau) qldc's 2020/21 annual report records total capital expenditure of $105.3m, 'below estimate by $89.0m' (p.10), partly due to 'delays in the approval process for major transport improvements in queenstown' (p.12). carry-forwards of $45.06m include queenstown street upgrades, arterial stage 1, the wakatipu active travel network and the arterial balance of route (p.15). the $85m shovel ready contribution enabled arterial stage one (p.5), $0.7m was spent on parking options analysis (p.9) and the queenstown transport business case was approved (p.51). the only cableway reference is to the existing skyline gondola cableway in a rockfall context (p.43). context and purpose. annual report for the final year of the 2018-2028 plan, signed 28 october 2021 (p.25). transport. overall capital expenditure was $105.3m, 'below estimate by $89.0m' (p.10), with the shortfall partly due to 'delays in the approval process for major transport improvements in queenstown' (pp.12-13). carry-forwards totalled $45.06m (p.15), including queenstown street upgrades - cip $1,477,485, queenstown town centre arterials - cip stage 1 $1,198,689, wakatipu active travel network $1,011,548 and arterial - balance of route $695,793. queenstown street upgrades cost $6,022,515 at year end (p.15). the $85m shovel ready contribution was 'enabling stage one of the proposed queenstown arterial' (p.5). $0.7m of 'preliminary costs for analysis of various parking options' was incurred (p.9). the report lists 'queenstown transport business case approved' (p.51) and nz upgrade programme funding (p.7), and cites 'limited public transport' as a challenge (p.53). performance. mass rapid transit: the only mass rapid transit reference is to the existing 'skyline gondola cableway', in the context of rockfall mitigation above central queenstown (p.43). there is no reference to mass rapid transit or mass transit as public transport. annual report 2020/21 annual report (rīpoata ā-tau) (2021). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no mass rapid transit reference; the only cableway mention is the existing skyline gondola, in a rockfall context. capital expenditure $105.3m, $89.0m below estimate (p.10) carry-forwards $45.06m (p.15) arterials cip stage 1 carry-forward $1,198,689; street upgrades $1,477,485; watn $1,011,548 (p.15) $0.7m preliminary parking options analysis (p.9) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2021 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc carry forward $45.06m of capital projects, including street upgrades, arterial stage 1, wakatipu active travel network and arterial balance of route carried forward 2021/22 not assessed qldc qldc deliver queenstown arterial stage one using the $85m shovel ready contribution enabling stage one of the proposed queenstown arterial from 2021 not assessed qldc qldc implement the approved queenstown transport business case queenstown transport business case approved not assessed way to go way to go main document pdf part 2 pdf",
    "sortDate": "2021-10-28",
    "cover": {
      "src": "/covers/QTS-069.webp",
      "srcset": "/covers/QTS-069.webp 400w, /covers/QTS-069-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-069/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-069/QTS-069-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-069/QTS-069-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-070",
    "code": "QTS-070",
    "title": "Better Ways To Go – More people walking, cycling and using public transport in the Queenstown Lakes District (Mode Shift Plan)",
    "shortTitle": "Better Ways To Go – More people walking, cycling",
    "summary": "Better Ways To Go is the mode shift plan for the Queenstown Lakes District, prepared by the Way to Go partners (NZTA (Waka Kotahi), ORC and QLDC) in response to the Minister of Transport's request that high-growth urban areas plan how to get more people walking, cycling and using public transport. Following the national Keeping Cities Moving framework, it is organised around shaping urban form, improving infrastructure and services, and influencing travel choices. It records that modelling found SH6A Frankton Road would need duplication shortly after 2028, but that this is not feasible, so a strong mode shift strategy requiring 40% of trips on the corridor by bus and other modes (60% by 2048) is pursued instead. The plan's backbone is a bus-based Frequent Public Transport Network from Queenstown Town Centre to Frankton, later Ladies Mile and the Southern Corridor, supported by NZUP bus lanes, bus hubs, the Wakatipu Active Travel Network, park and ride, parking management and travel demand management. An appendix lists about 20 initiatives with lead agencies and timings, and potential performance measures. Most activities beyond NZUP and stimulus funding remain subject to future LTP, RLTP and NLTP funding. Mass rapid transit is not proposed; the network is described as scalable.",
    "documentType": "Transport strategy",
    "documentForm": "Mode shift plan",
    "year": 2022,
    "publishedDate": "2022-05",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District; Whakatipu Basin (Queenstown Town Centre, Frankton, SH6A, SH6, Ladies Mile, Southern Corridor); Wānaka / Upper Clutha",
    "owner": "Way to Go",
    "citation": "Better Ways To Go – More people walking, cycling and using public transport in the Queenstown Lakes District (Mode Shift Plan) (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/ljzhnppz/item-2a-attachment-1-mode-shift-plan.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ljzhnppz/item-2a-attachment-1-mode-shift-plan.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc",
      "way-to-go-partnership",
      "central-government-ministers"
    ],
    "searchText": "qts-070 better ways to go – more people walking, cycling and using public transport in the queenstown lakes district (mode shift plan) better ways to go – more people walking, cycling better ways to go is the mode shift plan for the queenstown lakes district, prepared by the way to go partners (nzta (waka kotahi), orc and qldc) in response to the minister of transport's request that high-growth urban areas plan how to get more people walking, cycling and using public transport. following the national keeping cities moving framework, it is organised around shaping urban form, improving infrastructure and services, and influencing travel choices. it records that modelling found sh6a frankton road would need duplication shortly after 2028, but that this is not feasible, so a strong mode shift strategy requiring 40% of trips on the corridor by bus and other modes (60% by 2048) is pursued instead. the plan's backbone is a bus-based frequent public transport network from queenstown town centre to frankton, later ladies mile and the southern corridor, supported by nzup bus lanes, bus hubs, the wakatipu active travel network, park and ride, parking management and travel demand management. an appendix lists about 20 initiatives with lead agencies and timings, and potential performance measures. most activities beyond nzup and stimulus funding remain subject to future ltp, rltp and nltp funding. mass rapid transit is not proposed; the network is described as scalable. context and purpose: better ways to go was developed by the way to go partnership of nzta (waka kotahi), otago regional council (orc) and queenstown lakes district council (qldc) in response to the minister of transport's request under the national mode shift plan keeping cities moving that each high-growth urban area set out how it will increase walking, cycling and public transport (pp.3, 6). it is a 'live document' to signal the nature and timing of investment for upcoming ltps, the rltp 2021–31 and the nltp (pp.3, 5–6). the district has over 50,000 residents and 2 million visitors a year (p.6); the spatial plan projects average-day population growing from 66,000 (2022) to 123,000 (2052), and peak-day from 102,000 to 202,000 (p.10). transport context: about 16,000 residents work; two-thirds travel by car, 14% walk, 5% bus and 3% cycle (p.14). sh6a linking frankton and the town centre 'is nearing capacity with limited ability to increase due to property and topographical constraints' (p.14). bus patronage rose sharply after the late-2017 network, parking and $2 fare changes (236% monthly increase november 2017–2018) (p.15). late-2018 modelling found traffic would grow 'to a level shortly after 2028 where duplication of frankton sh6a would become necessary'; investigations found this 'not feasible given the geology of the area and the costs involved', so the partners prefer 'a strong mode shift strategy that will require 40% of all trips to be made by bus (and other modes) along this corridor, and 60% by 2048' (p.15). sh6 sections also need duplication post-2028; instead dedicated bus priority on sh6 and sh6a is envisaged (p.15). strategic direction: the plan draws on national climate targets (e.g. 20% reduction in light-vehicle vkt by 2035), the nps-ud, gps, arataki, the rltp, the otago rptp, the spatial plan, the climate and biodiversity plan and the draft destination management plan (pp.17–20). mode shift plan: table 1 lists initiatives under three areas (p.21). shaping urban form: spatial plan, masterplans (ladies mile, frankton, wānaka), nps-ud, locating facilities near 'high quality public transport (ideally rapid transit)' (p.22). infrastructure and services: a frequent public transport network, initially town centre to frankton then to ladies mile and jacks point/homestead bay, using buses with bus lanes and priority; 'designed to be scalable and can be upgraded as demand increases to accommodate a higher capacity'; $200m allocated to the initial stage through nzup and the economic stimulus package, works after 2024 (p.22). also bus hubs, airport facilities, park and ride, a step change with new pt contracts in 2027, potential enhanced ferry services, and the wakatipu active travel network (pp.22–23). the executive summary cites $115m nzup for pt priority on sh6/6a and $85m crown infrastructure partners funding for town centre works (p.5). influencing travel: tdm, school and workplace travel planning (estimated additional 10% reduction in car use in 70% of cases), parking management and a parking strategy (pp.25–26). implementation: funding beyond nzup (crown-funded, waka kotahi-led) and the stimulus package depends on successive ltps, the rltp and nltp (p.26). qldc is developing a monitoring plan; mode shift targets will be set through business cases, not district-wide (p.27). appendix 1 sets out initiatives, lead agencies and timings as at march 2022 (pp.27–28); appendix 2 lists potential measures with 2018 baselines, e.g. 59% single-occupant journey to work and 5% pt (p.29). mass rapid transit: the plan does not propose mass rapid transit. the only cableway reference is to the existing skyline gondola as the end point of the town centre street upgrades (p.5). it refers to locating facilities near 'rapid transit' as a general principle (p.22) and says the bus-based frequent network is scalable to higher capacity (p.22). it records that sh6a duplication is not feasible and that 40–60% non-car mode share is needed on the corridor (p.15), but identifies buses on sh6a as the means. mode shift plan better ways to go – more people walking, cycling and using public transport in the queenstown lakes district (mode shift plan) (2022). queenstown lakes district; whakatipu basin (queenstown town centre, frankton, sh6a, sh6, ladies mile, southern corridor); wānaka / upper clutha published may 2022 ('live document', progress as at march 2022) no mass rapid transit proposal. the frequent network is an ordinary bus service, described as scalable to an unnamed higher capacity; that bus service is not mass rapid transit. a planning principle refers to facilities near rapid transit. the plan contains no proposal for mass rapid transit between frankton and the town centre. its references are passing. as an urban form principle it lists 'locating significant public facilities near high quality public transport (ideally rapid transit)' (p.22). the frequent public transport network 'will initially use buses with bus lanes and priority over cars' and 'is designed to be scalable and can be upgraded as demand increases to accommodate a higher capacity' (p.22), but no higher-capacity mode is named. it records that modelling showed sh6a duplication would become necessary shortly after 2028, that this is 'not feasible given the geology of the area and the costs involved', and that the partners instead prefer a strategy requiring 40% of trips on the corridor by bus and other modes, and 60% by 2048 (p.15). the word 'gondola' appears only as the end point of the town centre street upgrades ('from the queenstown gardens to the gondola') (p.5). \"such a move is not feasible given the geology of the area and the costs involved, preferring instead to pursue a strong mode shift strategy that will require 40% of all trips to be made by bus (and other modes) along this corridor, and 60% by 2048.\" (p.15) | \"the frequent network will initially use buses with bus lanes and priority over cars at key intersections, along with a new bus hub on sh6 making for reliable journey times across peak periods. the system is designed to be scalable and can be upgraded as demand increases to accommodate a higher capacity.\" (p.22) | \"locating significant public facilities near high quality public transport (ideally rapid transit).\" (p.22) average-day population 66,000 (2022) to 123,000 (2052); peak-day 102,000 to 202,000 (p.10) resident population near doubling from 41,000 to 78,000 over 30 years; houses 22,000 to 40,000 (p.5) journey to work: two-thirds by car, 14% walk, 5% bus, 3% cycle (p.14) sh6a corridor: 40% of trips by bus and other modes needed, 60% by 2048, as sh6a duplication not feasible (p.15) 236% increase in monthly bus patronage between november 2017 and 2018 (p.15) $115m nzup committed for pt priority and facilities on sh6 and sh6a (p.5) $200m allocated to initial stage of frequent network via nzup and covid-19 economic stimulus package (p.22) $85m crown infrastructure partners funding for town centre street upgrades and arterial stage 1 (p.5) 2018 baseline single-occupant vehicle journey-to-work share 59%; pt 5% (p.29) district transport-related co2 baseline 264,430 tco2e (2017) (pp.8, 29) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/ljzhnppz/item-2a-attachment-1-mode-shift-plan.pdf way to go passing transport strategy final 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta prepared orc orc prepared qldc qldc prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner central government / ministers central government / ministers recipient queenstown lakes spatial plan: governance established; joint work programme initiated. queenstown lakes spatial plan (qldc)... joint work programme being initiated march 2022 onwards not assessed qldc qldc ladies mile masterplan: develop and publicly notify draft district plan provisions. ladies mile masterplan completed, draft district plan provisions to be developed and publicly notified may 2022 not assessed qldc qldc review frankton masterplan following the public transport services business case. frankton masterplan complete – to be reviewed following public transport services business case 2023/2024 not assessed qldc qldc progress wānaka masterplan and transport programme business case through the network optimisation business case. wānaka masterplan and transport programme business case being progressed procurement started march 2022 not assessed qldc qldc implement nps-ud requirements: remove minimum parking requirements and progress intensification provisions. parking conditions removed and subsequent amendments made february–march 2022 not assessed qldc qldc deliver whakatipu active travel network: stage 1 design and construction; stages 2 and 3 subject to funding. stage 2 design complete on 3 / 4 routes. construction funding required. stage 1 2023/2024; stages 2–3 2024–2027 not assessed nzta waka kotahi nzta edith cavell bridge replacement: complete feasibility report to confirm sites for both structures. bridge feasibility report – required to confirm sites for both structures june 2022 not assessed qldc qldc wānaka network optimisation business case. wānaka network optimisation (qldc)... business case. december 2022 december 2022 not assessed qldc qldc schools to pool – wānaka: move from design to construction following consultation. in design phase, moving to construction following consultation by 2024 not assessed qldc qldc new zealand upgrade programme (bus lanes on sh6/6a, bus hubs, intersections): move from design to construction. in design phase moving to construction. by 2024 by 2024 not assessed nzta waka kotahi nzta public transport improvements business case for whakatipu services (frequency, coverage, capacity). public transport improvements (orc) business case. april 2022 – april 2023 april 2022 – april 2023 not assessed orc orc introduce a step change in pt service provision with new contracts, frequency, routing and higher-capacity vehicles. envisaged to coincide with new contracts starting in 2027 from 2027; further changes 2030 and beyond not assessed orc orc queenstown arterial route: stage 1 construction; stage 2 (2a/2b) design; stage 3 lakeview section; remaining stages further design. queenstown arterial route (qldc) stage 1 - under construction stage 1 by 2024; stage 2–3 design by june 2023 not assessed qldc qldc stanley street corridor improvements (bus hub) design. stanley street corridor improvements (waka kotahi) design phase 2024–2027 not assessed nzta waka kotahi nzta queenstown public transport interchange design. queenstown public transport interchange (qldc / orc) design phase by june 2023 not assessed qldc qldc travel demand management programme business case, including school and workplace travel planning. travel demand management programme (qldc) business case. 2022 / 2023 2022/2023 not assessed qldc qldc develop comprehensive parking management plan and integrated parking strategy, then localised cpmps. an integrated parking strategy will be developed by december 2022; cpmps 2022/2023 not assessed qldc qldc review and amend district plan transport chapter as required. district plan transport chapter (review and amendments as required) (qldc) ongoing ongoing not assessed qldc qldc transport model replacement: scoping then business case. transport model replacement (qldc) scoping phase scoping by june 2022; business case 2024–2027 not assessed qldc qldc transport monitoring programme including mode shift metrics, scoped then business case. an overall transport monitoring plan is being developed by qldc scoping by june 2022; 2024–2027 not assessed qldc qldc district wide network operating plan incorporating one network framework measures. district wide network operating plan... scoping phase scoping by june 2022; 2024–2027 not assessed qldc qldc investigate and introduce park and ride on eastern and southern corridors. park and ride facilities could also be introduced at key locations not assessed set mode shift targets through finalising business cases (not district-wide). mode shift targets, which will be established as part of finalising business cases not assessed way to go way to go report progress on the mode shift plan to the minister via rltp reporting. waka kotahi will use regional land transport plan reporting to update the minister not assessed nzta waka kotahi nzta build community support, including streets for people trials, real-time journey information and values-based communication campaigns. initiatives that would help to build community support, include not assessed way to go way to go seek funding for remaining activities through ltps, the otago/southland rltp and the nltp. subject to funding confirmation through the development of successive qldc and orc long term plans successive ltp/rltp/nltp cycles not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2022-05-01",
    "cover": {
      "src": "/covers/QTS-070.webp",
      "srcset": "/covers/QTS-070.webp 400w, /covers/QTS-070-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-070/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-070/QTS-070-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-071",
    "code": "QTS-071",
    "title": "NZUP Queenstown Package - Governance Group feedback (email)",
    "shortTitle": "NZUP Queenstown Package - Governance Group",
    "summary": "Internal Waka Kotahi email from Richard Osborne (10 May 2022) reporting the NZUP Governance Group's response to that morning's briefing on the NZUP Queenstown Package (document 3 of the OIA-20263 release). The briefing had sought direction on rescoping to the baseline budget, seeking a budget increase, or both. The Governance Group asked for a proposal on projects deliverable within the $115 m baseline budget, noting trade-offs and benefits, with general support for prioritising the BP (SH6/SH6A) and Frankton North area. A further briefing on the prioritisation process and on what $115 m will and won't buy was due to the Governance Group on 23 June 2022, as the basis for a paper to the Minister. Next steps were to discuss prioritisation with project partners QLDC and ORC. The Alliance was to keep working on the full scope until the Minister's decision on scope.",
    "documentType": "Board or committee paper",
    "documentForm": "Internal email reporting Governance Group direction",
    "year": 2022,
    "publishedDate": "2022-05-10",
    "documentStatus": "Recorded",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Queenstown Package - Governance Group feedback (email) (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-071 nzup queenstown package - governance group feedback (email) nzup queenstown package - governance group internal waka kotahi email from richard osborne (10 may 2022) reporting the nzup governance group's response to that morning's briefing on the nzup queenstown package (document 3 of the oia-20263 release). the briefing had sought direction on rescoping to the baseline budget, seeking a budget increase, or both. the governance group asked for a proposal on projects deliverable within the $115 m baseline budget, noting trade-offs and benefits, with general support for prioritising the bp (sh6/sh6a) and frankton north area. a further briefing on the prioritisation process and on what $115 m will and won't buy was due to the governance group on 23 june 2022, as the basis for a paper to the minister. next steps were to discuss prioritisation with project partners qldc and orc. the alliance was to keep working on the full scope until the minister's decision on scope. context: email from richard osborne, regional manager system design (south island), waka kotahi, sent 10 may 2022 to alliance and waka kotahi staff, reporting governance group feedback on the briefing paper presented that morning (p1). the briefing (document 3 of the oia-20263 release) sought direction on whether to rescope the programme of works to the baseline budget, seek a budget increase, or both. governance group direction (p1): develop a proposal on projects that can be completed for the $115 m baseline budget, noting trade-offs and benefits, with general support for prioritising the bp and frankton north area; present a further briefing to the governance group on 23 june 2022 on the prioritisation process and what $115 m will and won't buy, as the basis for a paper to the minister. next step: discuss project prioritisation with project partners qldc and orc. the alliance should keep working on the full scope of works until the minister decides on scope or directs otherwise. the email asks recipients not to circulate it further. mass rapid transit: the email says nothing about mass rapid transit. internal email reporting governance group direction nzta (waka kotahi). nzup queenstown package - governance group feedback (email) (2022). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown email does not mention mass rapid transit. $115 m baseline budget (p1) further governance group briefing scheduled 23 june 2022 (p1) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper recorded 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared richard osborne author nzta waka kotahi nzta develop a proposal on projects that can be completed within the $115 m baseline budget, noting trade-offs and benefits; prioritise bp and frankton north area. a proposal should be developed on projects that can be complete for the $115 m baseline budget not assessed nzta waka kotahi nzta present a further briefing to the nzup governance group on the prioritisation process and what $115 m will and won't buy, as the basis for a paper to the minister. a further briefing paper is to be presented to the nzup governance group on 23 june 2022 23 june 2022 not assessed nzta waka kotahi nzta discuss project prioritisation with project partners qldc and orc. to discuss project prioritisation with the project partners qldc and orc not assessed nzta waka kotahi nzta alliance to continue work on the full scope of works until the minister's decision on scope, or otherwise directed. alliance works should continue to work on the full scope of works until minister's decision on scope not assessed main document pdf",
    "sortDate": "2022-05-10",
    "cover": {
      "src": "/covers/QTS-071.webp",
      "srcset": "/covers/QTS-071.webp 400w, /covers/QTS-071-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-071/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-071/QTS-071-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-072",
    "code": "QTS-072",
    "title": "NZUP Governance Group: NZUP Queenstown Package Update",
    "shortTitle": "NZUP Governance Group: NZUP Queenstown Package",
    "summary": "Briefing to the NZUP Governance Group (meeting 10 May 2022) on the NZUP Queenstown Package's scope, budget, programme, minimum viable projects and risks. A review found costs likely to rise from the $115.0 m baseline (P50, based on Queenstown Transport Business Case estimates and a traditional delivery model) to a $177.4 m advanced cost estimate (April 2022), an increase of $62.4 m. Drivers include the Frankton North rezoning (an extra $23.2 m for signalised intersections, widening and land at SH6/Hawthorne Drive and Grant Road) and Alliance set-up and management costs not foreseen in the baseline (Alliance Management TOC $18.30 m; about $10,000-$14,000 per day). Property is the key programme risk. An early works TOC of about $8.0 m was on hold. An initial minimum viable package (SH6/SH6A, SH6A North Frankton, Howards Drive roundabout) was put at about $140 m. The paper asks the Governance Group whether to rescope to the baseline budget, seek a budget increase, or both.",
    "documentType": "Board or committee paper",
    "documentForm": "Governance Group briefing paper",
    "year": 2022,
    "publishedDate": "2022-05-10",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Governance Group: NZUP Queenstown Package Update (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc"
    ],
    "searchText": "qts-072 nzup governance group: nzup queenstown package update nzup governance group: nzup queenstown package briefing to the nzup governance group (meeting 10 may 2022) on the nzup queenstown package's scope, budget, programme, minimum viable projects and risks. a review found costs likely to rise from the $115.0 m baseline (p50, based on queenstown transport business case estimates and a traditional delivery model) to a $177.4 m advanced cost estimate (april 2022), an increase of $62.4 m. drivers include the frankton north rezoning (an extra $23.2 m for signalised intersections, widening and land at sh6/hawthorne drive and grant road) and alliance set-up and management costs not foreseen in the baseline (alliance management toc $18.30 m; about $10,000-$14,000 per day). property is the key programme risk. an early works toc of about $8.0 m was on hold. an initial minimum viable package (sh6/sh6a, sh6a north frankton, howards drive roundabout) was put at about $140 m. the paper asks the governance group whether to rescope to the baseline budget, seek a budget increase, or both. context and purpose: paper to the nzup governance group for its 10 may 2022 meeting, authored by richard osborne and approved by robyn elston (p1). it updates the group on scope, budget, programme, minimum viable projects and risks, and asks for guidance on rescoping to the baseline budget, seeking a budget increase, or both (p1). background (p2): the queenstown transport business case (qtbc) was completed in november 2020 and endorsed by the way to go partners in early 2021. nzup funding covers sh6a corridor improvements (targeted bus lanes and virtual priority at signalised intersections), sh6 frankton to ladies mile improvements, and grant road to kawarau falls bridge improvements including the frankton bus hub and sh6/sh6a intersection. the alliance was set up in december 2020 under an interim programme alliance agreement. costs (pp2-3): the $115 m baseline was based on qtbc estimates with a parallel estimate by bond cm (0.6% difference), using a traditional delivery model. a march 2022 review gave an advanced estimate of $177.4 m (+$62.4 m). table 1 lists: waka kotahi indirect costs $9.56 m to $15.95 m; direct costs $3.42 m; alliance management toc $18.30 m (new); property $15.85 m to $24.53 m; design $4.51 m to $8.62 m; construction $80.56 m to $94.17 m; escalation (p50) $7.96 m. total p&g is 26% of programme delivery costs, and p50 project contingency is a further $19.8 m (p3). alliance management costs are about $10,000-$14,000 per day (p1). frankton north (pp3-5): 2020 district plan rezoning and an environment court order changed frankton north to mixed use and residential, with forecast added 2028 peak flows of about 1,778-2,344 vehicles. signalised intersections at sh6/hawthorne drive and grant road would need about 2,230 m2 of extra land; cost rises from $24.28 m to $47.44 m (+$23.2 m) (p4). funding options include rma mitigation by developers and swapping $2.1 m of hif underpass funding (p4-5). programme and minimum viable projects (pp5-6, app b): an early works toc (about $8.0 m) is on hold. property is the key risk. a minimum viable set at the sh6/sh6a intersection, sh6a north frankton and the howards drive roundabout would need about $140 m (p5). table c1 compares do-nothing (<$30m), minimum scope (<$115m), reduced scope (about $140m) and full package (about $170m) (pp10-11). the alliance was continuing work on the full programme, with 30% design due august 2022 and independent pricing by 31 october 2022 (pp1, 6). mass rapid transit: the paper says nothing about mass rapid transit. governance group briefing paper nzta (waka kotahi). nzup governance group: nzup queenstown package update (2022). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (in confidence) does not mention mass rapid transit. baseline budget $115.0 m vs advanced cost estimate $177.4 m (april 2022), +$62.4 m (pp1-2) frankton north scope change +$23.2 m ($24.28 m to $47.44 m) (pp1, 4) alliance management toc $18.30 m (not in baseline) (p3) alliance management costs about $10,000-$14,000 per day (p1) total p&g 26% of full programme delivery costs (p3) property $15.85 m to $24.53 m; construction $80.56 m to $94.17 m; escalation (p50) $7.96 m (p3) p50 project contingency an additional $19.8 m (p3) early works toc about $8.0 m, on hold (pp1, 6) minimum viable projects about $140 m (p5); scope options <$30m / <$115m / ~$140m / ~$170m (pp10-11) business case sunk cost about $6 m if the base option is later rebuilt (p6) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient richard osborne author nzta waka kotahi nzta robyn elston approved by nzta waka kotahi nzta governance group to advise whether waka kotahi should rescope the programme to the baseline budget, seek a budget increase, or both. provides guidance on whether waka kotahi should be looking at rescoping meeting 10 may 2022 not assessed nzta waka kotahi nzta refine the minimum viable projects and seek qldc and orc views on project prioritisation. this needs further refinement and views of qldc and otago regional council sought not assessed nzta waka kotahi nzta discuss and agree with qldc and mbie a swap of hif underpass funding towards a fourth leg of the frankton north signalised intersection. this would need to be discussed and agreed upon by qldc and mbie not assessed qldc qldc alliance to continue planning for the full scope of works; complete 30% design and pricing by the alliance and independent estimator. the alliance project team are requested to continue to plan for the full scope of works 30% design aug 2022; pricing 31 oct 2022; reconciliation 16 dec 2022 not assessed explore opportunities for the alliance to fast-track works. opportunities need to be explored for how the alliance can fast track works not assessed main document pdf",
    "sortDate": "2022-05-10",
    "cover": {
      "src": "/covers/QTS-072.webp",
      "srcset": "/covers/QTS-072.webp 400w, /covers/QTS-072-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-072/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-072/QTS-072-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-073",
    "code": "QTS-073",
    "title": "2021 - 2022 Annual Report",
    "shortTitle": "2021 - 2022 Annual Report",
    "summary": "QLDC's 2021/22 Annual Report, year one of the 2021-2031 Ten Year Plan, records capital expenditure of $160.4m, 'below estimate by $86.9M' (p.19). Queenstown Town Centre Arterials Stage 1 spent $26.4m with $4.08m deferred, Queenstown Street Upgrades (CIP) $32.6m with $2.61m deferred, and Whakatipu Public Transport had $1.36m deferred (p.30). Carry-forwards totalled $42.79m (p.30). Arterial construction began in September 2021 (p.5). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2022,
    "publishedDate": "2022-10-10",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2021 - 2022 Annual Report (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/2qmbdosc/qldc_annual-report_2021-2022_combined-101022-adopted.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-073 2021 - 2022 annual report 2021 - 2022 annual report qldc's 2021/22 annual report, year one of the 2021-2031 ten year plan, records capital expenditure of $160.4m, 'below estimate by $86.9m' (p.19). queenstown town centre arterials stage 1 spent $26.4m with $4.08m deferred, queenstown street upgrades (cip) $32.6m with $2.61m deferred, and whakatipu public transport had $1.36m deferred (p.30). carry-forwards totalled $42.79m (p.30). arterial construction began in september 2021 (p.5). no mass rapid transit reference was found. context and purpose. annual report for the first year of the 2021-2031 ten year plan. transport. 'overall capital expenditure was $160.4m which is below estimate by $86.9m for the year ended 30 june 2022' (p.19). queenstown town centre arterials stage 1 cost $26,424,670 at year end with $4,081,434 deferred; queenstown street upgrades (crown infrastructure partners) $32,594,049 with $2,613,435 deferred; and whakatipu public transport $1,362,480 deferred (p.30). carry-forwards totalled $42.79m, approved in september for 2022-23 and 2023-24 (p.30). arterial construction began in september (p.5). the mode shift plan is listed as a priority initiative (p.26), and 'limited public transport' is a spatial plan challenge (p.40). performance. mass rapid transit: no reference to mass rapid transit was found in the text read. annual report 2021 - 2022 annual report (2022). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $160.4m, $86.9m below estimate (p.19) arterials stage 1 $26,424,670 at year end; $4,081,434 deferred (p.30) street upgrades (cip) $32,594,049; $2,613,435 deferred (p.30) whakatipu public transport $1,362,480 deferred (p.30) carry-forwards $42.79m (p.30) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published jim boult signatory qldc qldc mike theelen signatory qldc qldc defer $4.08m of arterial stage 1 budget $4,081,434 deferred 2022/23 not assessed qldc qldc defer $2.61m of queenstown street upgrades budget $2,613,435 deferred 2022/23 not assessed qldc qldc defer $1.36m of whakatipu public transport budget whakatipu public transport: $1,362,480 deferred 2022/23-2023/24 not assessed qldc qldc carry forward $42.79m of capital projects carry-forwards $42.79m 2022/23-2023/24 not assessed qldc qldc main document pdf",
    "sortDate": "2022-10-10",
    "cover": {
      "src": "/covers/QTS-073.webp",
      "srcset": "/covers/QTS-073.webp 400w, /covers/QTS-073-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-073/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-073/QTS-073-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-074",
    "code": "QTS-074",
    "title": "Advice to Minister - Queenstown Package (Budget cost escalation claim: NZUP Queenstown Package)",
    "shortTitle": "Advice to Minister - Queenstown Package",
    "summary": "Budget-sensitive cost escalation claim for the NZUP Queenstown Package, prepared by Waka Kotahi for Joint Ministers (Transport and Finance) on a Treasury template. It states Cabinet allocated the March 2021 baseline P50 estimate of $115 million in May 2021. Design updates, scope expansion (Frankton North), property and escalation then raised the estimate by $65 million (P50) to $95 million (P95): current P50 $180 million, P95 $210 million. Waka Kotahi seeks $95 million in capital (2022/23 to 2025/26: $31m, $24m, $22m, $18m), an 83% increase on the $115 million budget. This is made up of escalation $9m, property $7m, scope change $23m, other cost changes $26m and funding risk contingency $30m, funded to P95. Escalation cannot be funded from the National Land Transport Fund. Main works were expected to start August 2023, with practical completion in August 2026. Scaling the scope would lose mode shift and emissions benefits, but no scaled option is costed.",
    "documentType": "Board or committee paper",
    "documentForm": "Treasury cost escalation claim template (Budget-sensitive advice to Joint Ministers)",
    "year": 2022,
    "publishedDate": "2022-11-02",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Advice to Minister - Queenstown Package (Budget cost escalation claim: NZUP Queenstown Package) (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "the-treasury",
      "central-government-ministers"
    ],
    "searchText": "qts-074 advice to minister - queenstown package (budget cost escalation claim: nzup queenstown package) advice to minister - queenstown package budget-sensitive cost escalation claim for the nzup queenstown package, prepared by waka kotahi for joint ministers (transport and finance) on a treasury template. it states cabinet allocated the march 2021 baseline p50 estimate of $115 million in may 2021. design updates, scope expansion (frankton north), property and escalation then raised the estimate by $65 million (p50) to $95 million (p95): current p50 $180 million, p95 $210 million. waka kotahi seeks $95 million in capital (2022/23 to 2025/26: $31m, $24m, $22m, $18m), an 83% increase on the $115 million budget. this is made up of escalation $9m, property $7m, scope change $23m, other cost changes $26m and funding risk contingency $30m, funded to p95. escalation cannot be funded from the national land transport fund. main works were expected to start august 2023, with practical completion in august 2026. scaling the scope would lose mode shift and emissions benefits, but no scaled option is costed. context and purpose: a budget-sensitive cost escalation claim on a treasury template for the 'nzup queenstown package', with joint ministers as lead ministers (p1). the department contact is craig mitchell (deputy programme director, nzup) and the treasury contact is mark hodge (p1). it is undated; the oia-20263 schedule dates it 2 november 2022. description (p1): the package includes bus priority on sh6/sh6a, bus lanes on sh6, improvements to the frankton bus hub and sh6a/sh6 intersection, and pedestrian access improvements. capacity on sh6a was exceeded on more than 140 days in 2019. kā huanui a tāhuna (the queenstown alliance) delivers the town centre streetscape, arterials stage 1 and nzup works. cost escalation (p2): cabinet allocated the march 2021 baseline p50 estimate of $115 million in may 2021. design updates, scope expansion, property and escalation have added $65 million (p50) to $95 million (p95). the current p50 is $180 million and the p95 $210 million. drivers: material and labour costs, frankton north requirements, and property prices and extra land. escalation cannot be funded from the nltf. cost management includes governance review, quantitative risk assessment, peer-reviewed estimates and quarterly assurance (p2). confidence is moderate because construction has not started (p3). funding sought (pp1, 4, 6): $95 million capital, phased $31m (22/23), $24m (23/24), $22m (24/25), $18m (25/26), against a current budget of $115m ($38m, $30m, $26m, $21m), an 83% change. the breakdown: additional escalation $9m, property $7m, scope change $23m, other cost changes (design, specification, p&g) $26m, and funding risk contingency $30m. the claim moves the project from p50 to p95 funding and would increase the existing nzup appropriation (p6). scaled option (p5): reducing scope would mean no public transport and active travel infrastructure to support mode shift (private cars make up 83% of travel on sh6a) and the emissions reduction programme (the business case forecasts a 15% reduction despite near-doubling of population). no scaled option is costed. delivery (p7): main works expected from august 2023, practical completion august 2026, assuming no environment court appeals. mass rapid transit: the document says nothing about mass rapid transit. treasury cost escalation claim template (budget-sensitive advice to joint ministers) nzta (waka kotahi). advice to minister - queenstown package (budget cost escalation claim: nzup queenstown package) (2022). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (budget sensitive) does not mention mass rapid transit. march 2021 baseline p50 estimate $115 million, allocated by cabinet may 2021 (p2) increase of $65 million (p50) to $95 million (p95); current p50 $180 million, p95 $210 million (p2) capital sought $95m: $31m / $24m / $22m / $18m for 2022/23-2025/26 (pp1, 4) current budget profile $38m / $30m / $26m / $21m = $115m; 83% change (p4) breakdown: escalation $9m; property $7m; scope change $23m; other cost changes $26m; funding risk contingency $30m (p6) sh6a capacity exceeded more than 140 days in 2019 (p1) private car trips 83% of travel on sh6a; package forecast to cut emissions 15% (p5) main works from august 2023; practical completion august 2026 (p7) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared the treasury the treasury partner central government / ministers central government / ministers recipient craig mitchell contributor nzta waka kotahi nzta mark hodge contributor the treasury the treasury joint ministers to provide $95 million additional capital funding (increase to the existing nzup appropriation) to fund the queenstown package to p95. total funding being requested 31 24 22 18 95 2022/23 to 2025/26 not assessed central government / ministers central government / ministers confirm funding as soon as possible to provide commercial certainty to deliver the package. it is critical confirmation of funding is obtained as soon as possible as soon as possible not assessed central government / ministers central government / ministers main document pdf",
    "sortDate": "2022-11-02",
    "cover": {
      "src": "/covers/QTS-074.webp",
      "srcset": "/covers/QTS-074.webp 400w, /covers/QTS-074-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-074/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-074/QTS-074-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-075",
    "code": "QTS-075",
    "title": "New Zealand Upgrade Programme SH1/29, SH58, Canterbury Package and Queenstown Package project updates (BRI-2571)",
    "shortTitle": "New Zealand Upgrade Programme SH1/29, SH58",
    "summary": "Ministerial briefing BRI-2571 (2 November 2022) from Waka Kotahi to Joint Ministers (Hon Grant Robertson and Hon Michael Wood) on four NZUP projects. The Queenstown sections are released and the other projects' detail is removed as out of scope. For Queenstown it reports schedule delays, increased costs and scope change from the Frankton North land use change. The updated estimate is $180 million (P50) to $210 million (P95) against a $115 million allocation (the March 2021 baseline P50, allocated by Cabinet May 2021; P95 then $145 million). The breakdown is escalation $9m, scope change $23m, property $7m, and other cost changes including the cost of running Kā Huanui a Tāhuna $26m, plus contingency $30m. Main works were expected from August 2023, with completions by August 2026. A $95 million Treasury escalation claim had been submitted. Ministers are asked to note the estimate, approve the Frankton North scope change and note schedule changes.",
    "documentType": "Board or committee paper",
    "documentForm": "Ministerial briefing note (extract; out-of-scope projects removed)",
    "year": 2022,
    "publishedDate": "2022-11-02",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). New Zealand Upgrade Programme SH1/29, SH58, Canterbury Package and Queenstown Package project updates (BRI-2571) (2022). BRI-2571.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers"
    ],
    "searchText": "qts-075 new zealand upgrade programme sh1/29, sh58, canterbury package and queenstown package project updates (bri-2571) new zealand upgrade programme sh1/29, sh58 ministerial briefing bri-2571 (2 november 2022) from waka kotahi to joint ministers (hon grant robertson and hon michael wood) on four nzup projects. the queenstown sections are released and the other projects' detail is removed as out of scope. for queenstown it reports schedule delays, increased costs and scope change from the frankton north land use change. the updated estimate is $180 million (p50) to $210 million (p95) against a $115 million allocation (the march 2021 baseline p50, allocated by cabinet may 2021; p95 then $145 million). the breakdown is escalation $9m, scope change $23m, property $7m, and other cost changes including the cost of running kā huanui a tāhuna $26m, plus contingency $30m. main works were expected from august 2023, with completions by august 2026. a $95 million treasury escalation claim had been submitted. ministers are asked to note the estimate, approve the frankton north scope change and note schedule changes. context: bri-2571, dated 2 november 2022, from brett gliddon (waka kotahi) to the minister of finance and minister of transport, covering the sh1/29 intersection, sh58, the canterbury package and the queenstown package (pp1-2). te manatū waka and the treasury could not comment in the time available (p2). pages 3-7, 11 and 13 and parts of pp2, 8 and 12 are removed as out of scope. key point (p2): the queenstown package faces delays and cost increases, plus scope change because frankton north land use was recategorised. the updated estimate is $180 million to $210 million, against a $115 million allocation. queenstown section (pp8-10): the package is described as for sh6/sh6a bus priority, sh6 bus lanes, frankton bus hub, sh6a/sh6 intersection and pedestrian access (p8-9). cabinet allocated the march 2021 baseline p50 of $115 million in may 2021; the baseline p95 was $145 million (footnote p9). the cost table (p9) shows baseline $115m, escalation +$9m, scope change (frankton north) +$23m, property +$7m, other cost changes including running kā huanui a tāhuna +$26m, giving a p50 of $180m, plus contingency $30m for a p95 of $210m. a more detailed estimate was expected in early 2023, and a $95 million treasury escalation claim had been submitted (p9). main works were expected from august 2023, with completions by august 2026, assuming no environment court appeals (p10). the frankton north scope change ($23 million) replaces minor works and signalisation of two roundabouts with a conventional signalised intersection needing more land (p10). key risks are reputational (partner and community expectations of full scope) and cost and programme certainty, as 30% design is due in early 2023 (p10). recommendations (p12): note the queenstown estimate of $180 million (p50) to $210 million (p95); approve the frankton north scope change; note the programme schedule changes. the ministerial decision boxes are not marked in the released copy. mass rapid transit: the briefing says nothing about mass rapid transit. ministerial briefing note (extract; out-of-scope projects removed) nzta (waka kotahi). new zealand upgrade programme sh1/29, sh58, canterbury package and queenstown package project updates (bri-2571) (2022). bri-2571. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown signed by nzta official (commercial in confidence) does not mention mass rapid transit. queenstown package estimate $180 million (p50) to $210 million (p95); allocation $115 million (pp2, 9, 12) march 2021 baseline p95 was $145 million (p9 footnote) escalation $9m; scope change $23m; property $7m; other cost changes incl. running kā huanui a tāhuna $26m; contingency $30m (p9) frankton north scope change $23 million (p10) $95 million treasury escalation claim submitted (p9) main works from august 2023; completion by august 2026 (p10) other nzup projects (p2): sh1/29 $56-61m vs $40m allocation; sh58 $114-134m vs $105m; canterbury package $355m vs $300m not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper final 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared central government / ministers central government / ministers recipient brett gliddon signatory nzta waka kotahi nzta joint ministers to note the current queenstown package cost estimate of $180 million (p50) to $210 million (p95). note that the current cost estimate for the queenstown package is $180 million (p50) to $210 million (p95) not assessed central government / ministers central government / ministers joint ministers to approve the scope change resulting from the frankton north land use change. approve the scope change as a result of the frankton north land use change not assessed central government / ministers central government / ministers joint ministers to note the programme schedule changes. note the programme schedule changes not assessed central government / ministers central government / ministers prepare a more detailed cost estimate from more detailed design information. kā huanui a tāhuna is preparing a more detailed cost estimate early 2023 not assessed continue partnership engagement with qldc and orc on any scope change; alliance to explore cost and programme savings. continue to engage in a partnership approach with queenstown lakes district council and otago regional council not assessed main document pdf",
    "sortDate": "2022-11-02",
    "cover": {
      "src": "/covers/QTS-075.webp",
      "srcset": "/covers/QTS-075.webp 400w, /covers/QTS-075-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-075/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-075/QTS-075-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-076",
    "code": "QTS-076",
    "title": "Travel to a thriving future – Haereka whakamu ki to ao taurikura – A Regenerative Tourism Plan – Te Mahere Whakahaumanu Tāpoi",
    "shortTitle": "Travel to a thriving future – Haereka whakamu ki",
    "summary": "Regenerative tourism plan for the Queenstown Lakes District, developed by a Destination Management Steering Group of Destination Queenstown, Lake Wānaka Tourism and QLDC, with input from the Department of Conservation and Kāi Tahu, and with Destination Think as lead partner on the final plan. It is described as an output and priority initiative of the Grow Well Whaiora Spatial Plan. The goal is regenerative tourism by 2030, with a keystone project for the visitor economy to reach carbon zero by 2030, including Scope 3 emissions from air and ground travel. Three strategic pillars (communities and visitor experience; environment and decarbonisation; economic resilience) and foundations for success contain 19 projects and four foundational projects, delivered through a Destination Management Group and task forces using a 7-30-90 day model, with eight essential year-one projects. It reports district gross emissions of 600,895 tCO2e, with on/off-road transport 27% and aviation 17%. Transport content is limited to decarbonisation actions: EV charging, encouraging visitors to use public transport, cycling and walking, shared low-emission shuttles, and advocating for improved public transport and trials of electric public transport. It does not mention mass rapid transit.",
    "documentType": "Community report",
    "documentForm": "Regenerative tourism / destination management plan",
    "year": 2023,
    "publishedDate": "2023-02",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District (Queenstown, Wānaka, Arrowtown, Glenorchy, Kingston, Makarora)",
    "owner": "Destination Management Steering Group",
    "citation": "Travel to a thriving future – Haereka whakamu ki to ao taurikura – A Regenerative Tourism Plan – Te Mahere Whakahaumanu Tāpoi (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.regenerativetourism.co.nz/",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "community-report",
    "topics": [
      "active-travel",
      "bus",
      "coach",
      "aviation",
      "electric-vehicles"
    ],
    "organisationIds": [
      "destination-queenstown",
      "destination-think",
      "lake-wanaka-tourism",
      "qldc",
      "department-of-conservation",
      "kai-tahu-runaka"
    ],
    "searchText": "qts-076 travel to a thriving future – haereka whakamu ki to ao taurikura – a regenerative tourism plan – te mahere whakahaumanu tāpoi travel to a thriving future – haereka whakamu ki regenerative tourism plan for the queenstown lakes district, developed by a destination management steering group of destination queenstown, lake wānaka tourism and qldc, with input from the department of conservation and kāi tahu, and with destination think as lead partner on the final plan. it is described as an output and priority initiative of the grow well whaiora spatial plan. the goal is regenerative tourism by 2030, with a keystone project for the visitor economy to reach carbon zero by 2030, including scope 3 emissions from air and ground travel. three strategic pillars (communities and visitor experience; environment and decarbonisation; economic resilience) and foundations for success contain 19 projects and four foundational projects, delivered through a destination management group and task forces using a 7-30-90 day model, with eight essential year-one projects. it reports district gross emissions of 600,895 tco2e, with on/off-road transport 27% and aviation 17%. transport content is limited to decarbonisation actions: ev charging, encouraging visitors to use public transport, cycling and walking, shared low-emission shuttles, and advocating for improved public transport and trials of electric public transport. it does not mention mass rapid transit. context and purpose: travel to a thriving future is described as 'queenstown lakes' roadmap to regenerative tourism by 2030' and 'an output and a priority initiative of the grow well | whaiora spatial plan' (p.7). a destination management steering group (dmsg) of destination queenstown, lake wānaka tourism and qldc developed it with input from the department of conservation and kāi tahu (p.7). destination think was 'lead partner in the development of the final plan'; thinkplace, proxima consulting and anna pollock were engaged at earlier stages (p.58). engagement from 2021 included design forums, an operators' forum, 60+ interviews and a public draft; the plan was finalised and presented for endorsement by the council, dq board and lwt board in february 2023 (pp.57, 61). it will be reviewed every three years (p.58). current state: visitor expenditure grew from $1.3b (2009) to $3.1b (2019), with about 3 million visitors a year; tourism was 41% of gdp and 58% of employment in 2019 (p.9). gross district emissions are estimated at 600,895 tco2e; on/off-road transportation is 27% and aviation 17% (p.10). issues include public support for tourism, decarbonisation, hidden costs and benefits, lack of data, economic diversification, and workforce and housing (pp.9–10). plan structure: the keystone project is for the visitor economy to reach carbon zero by 2030, taking responsibility for scope 3 emissions 'from air travel and ground transportation' (pp.4–5). four strategies are: mitigate emissions with clean-energy solutions; understand optimal visitation levels and focus on value; evolve marketing toward lower-carbon, higher-value segments; and invest in carbon removal (pp.6, 29). pillar 1 (enrich communities and enhance the visitor experience) has projects 1–6; pillar 2 (restore the environment and decarbonise) has projects 7–11; pillar 3 (economic resilience, capability and productivity) has projects 12–19; four foundational projects cover governance, operationalising projects, data and brand/marketing (p.21). project 13 supports a visitor levy 'such as the one proposed by qldc' so residents do not pay costs that should be covered by visitors (p.34). transport content: project 9's known actions include reducing 'polluting emissions from road vehicles and relieve traffic congestion by improving infrastructure and changing traveller behaviour', including ev charging, encouraging visitors to use public transport, cycling and walking, ev and e-bike touring routes, walking and cycling networks, fewer and fuller visitor vehicle trips (e.g. an ev or hybrid airport shuttle), and advocacy 'for improved public transport services and trials of non-fossil fuel vehicles', possibly 'trialling an electric public transport system' (p.30). project 9 'needs to align with and supercharge the spatial plan, the climate and biodiversity plan and qldc transport plan' (p.29). appendix 2 notes road transport is 20% of district emissions, orc is responsible for public transport, and qldc is partnering with orc to improve the bus network and decarbonise the fleet (p.53). governance and implementation: an independent governance group oversees the plan; the destination management group assigns task forces, which follow a 7-30-90 day model and report after 12 months (pp.43, 45). essential year-one projects are the four foundations, projects 9, 12, 14, 8 and 2 (p.45). mass rapid transit: the document says nothing about mass rapid transit. its transport references concern decarbonising visitor travel, and include general advocacy for improved public transport and a possible electric public transport trial (p.30). regenerative tourism / destination management plan travel to a thriving future – haereka whakamu ki to ao taurikura – a regenerative tourism plan – te mahere whakahaumanu tāpoi (2023). queenstown lakes district (queenstown, wānaka, arrowtown, glenorchy, kingston, makarora) final (plan finalised and presented for endorsement, february 2023) no mass rapid transit reference; advocates improved public transport and electric public transport trials for visitor decarbonisation. visitor expenditure $1.3b (year to oct 2009) to $3.1b (2019); ~3 million visitors annually (p.9) tourism 41% of gdp and 58% of employment in 2019 (infometrics) (p.9) 5.3% average annual population growth over 10 years to june 2019 (p.9) district gross emissions 600,895 tco2e; on/off-road transportation 27%, aviation 17% (p.10) net emissions (after forestry) 438,591 tco2e; road transport 20% of district emissions; aviation 17.34% (pp.52–53) 19 projects plus 4 foundational projects; 8 year-one projects listed (pp.21, 45) a study cost has been requested under the official information act or lgoima. no figure has been received. destination management steering group none community report final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. coach coach and visitor shuttle services. aviation airport and aviation access. electric vehicles electric and hydrogen vehicle technology. destination queenstown destination queenstown prepared destination think destination think prepared lake wānaka tourism lake wānaka tourism prepared qldc qldc prepared destination queenstown destination queenstown partner department of conservation doc partner kāi tahu / rūnaka kāi tahu / rūnaka partner lake wānaka tourism lake wānaka tourism partner qldc qldc partner keystone project 9: decarbonise the visitor economy to carbon zero by 2030, including scope 3 travel emissions, via mitigation, optimal visitation, marketing mix and carbon removal. this keystone project is the effort to decarbonise the visitor economy of queenstown lakes by 2030 by 2030; year one priority not assessed qldc qldc project 9: support infrastructure for low- and zero-carbon mobility such as ev charging, and ev and e-bike touring routes. support the development of infrastructure to enable lower and zero-carbon mobility short term not assessed qldc qldc project 9: encourage visitors to use public transport, cycling and walking, and develop walking and cycling networks for locals and visitors. encourage visitors to use alternative transport options like public transport, cycling and walking by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 9: support tourism business collaboration to reduce visitor vehicle trips using full, low-emission vehicles (e.g. ev or hybrid airport shuttle). reduce the total number of vehicle trips (and emissions) relating to visitor movements by 2030 (plan goal); not otherwise stated not assessed project 9: advocate for improved public transport services and trials of non-fossil fuel pt vehicles, possibly an electric public transport system trial. advocate for improved public transport services and trials of non-fossil fuel vehicles by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 9: consider a price on carbon or advocate for national carbon pricing; secure funding from all sources for decarbonisation. consider incorporating a price on carbon or advocating for national carbon pricing by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 1: community engagement to ensure continual resident input into the visitor economy. ensure that continual input from residents by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 2: tiaki promise – lead by example in visitor behaviour and experiences. using the kaupapa of the tiaki promise as a starting point essential year one project not assessed qldc qldc project 3: preserve and celebrate kāi tahutaka and mātauraka. preserve and celebrate kāi tahutaka and mātauraka by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 4: develop local, place-based destination plans defining aligned market segments. develop local, place-based plans to define market segments by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 5: develop a migrant and visitor welcome programme. develop a migrant and visitor welcome programme by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 6: arts, culture and heritage development enabling māori and non-māori storytelling. enable māori and non-māori to tell the stories of their heritage by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 7: establish a baseline measure of the visitor economy's environmental footprint. establish a baseline for measuring the visitor economy's by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 8: measure the visitor economy's greenhouse gas emissions, including scope 3 transport. understand the current visitor economy's carbon footprint essential year one project not assessed qldc qldc project 10: zero environmental footprint – mitigate the measured footprint (water, waste, pollution). project 10: zero environmental footprint some targets by 2025 not assessed qldc qldc project 11: restoring ecosystems directly and through tourism. tourism should lead to environmental restoration by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 12: economic leakage assessment and cost-benefit analysis of the visitor economy, including hidden infrastructure costs. assess the hidden costs associated with infrastructure essential year one project not assessed qldc qldc project 13: support an effective local visitor levy (as proposed by qldc) to fund visitor-related infrastructure. support existing work to establish an effective local visitor levy by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 14: love wānaka / love queenstown local campaigns. this project completes the work already begun essential year one project not assessed qldc qldc project 15: product evolution programme aligned with the plan's vision. develop and evolve the tourism product by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 16: tourism business excellence programme. project 16: tourism business excellence programme by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 17: thriving workforce programme to improve workforce availability and retention. finding and retaining skilled employees is an ongoing challenge by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 18: emergency and climate adaptation preparedness for the tourism system. ensure the tourism system is prepared for potential economic shocks by 2030 (plan goal); not otherwise stated not assessed qldc qldc project 19: innovation and economic development. adopting technological innovations will allow the district to diversify by 2030 (plan goal); not otherwise stated not assessed qldc qldc foundational project 1: formal delivery partnership, independent governance group, reporting cadence and inter-regional collaboration. develop a formal partnership for the delivery and future development of this plan essential year one project not assessed qldc qldc foundational project 2: implementation plan, project funding, phase 1 task forces, communication structures and capability building. assign ownership of year 1 projects and allocate resources essential year one project not assessed qldc qldc foundational project 3: data and measurement framework, including visitor capacity, travel patterns and public access to tourism data. study visitor behaviour and travel patterns essential year one project not assessed qldc qldc foundational project 4: update queenstown lakes brand and marketing strategies to align with regenerative tourism and decarbonisation. align marketing plans... to regenerative tourism and decarbonisation essential year one project not assessed destination queenstown destination queenstown review and update the plan every three years, aligned with council long-term planning. this plan will be reviewed and updated every three years every three years not assessed main document pdf",
    "sortDate": "2023-02-01",
    "cover": {
      "src": "/covers/QTS-076.webp",
      "srcset": "/covers/QTS-076.webp 400w, /covers/QTS-076-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-076/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-076/QTS-076-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-077",
    "code": "QTS-077",
    "title": "Memo: NZUP Queenstown",
    "shortTitle": "Memo: NZUP Queenstown",
    "summary": "Internal Waka Kotahi memo (10 March 2023) from two NZTA managers to senior managers on the status of the NZUP Queenstown package. At the 3 February 2023 Target Outturn Cost (TOC) exchange, Kā Huanui a Tāhuna's 30% design estimate was $350.4m, against BondCM's independent estimate of $207.4m, a difference of about $143m. Key differences were risk allocation, rates, productivity and forecast completion date. BondCM considered reconciliation almost impossible given the gap and the risks placed on the owners. The project team reconfirmed the Queenstown Business Case problem definition and investment objectives and ran a prioritisation. The likely preferred Option 5 is the SH6/SH6A (BP) intersection, the Frankton Bus Hub expansion and the Howards Drive roundabout, with affordability to be confirmed (Alliance cost information due about 17 March). Next steps run from a Governance Group report (March 2023) to a report-back (May/June 2023).",
    "documentType": "Board or committee paper",
    "documentForm": "Internal briefing memo",
    "year": 2023,
    "publishedDate": "2023-03-10",
    "documentStatus": "Recorded",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Memo: NZUP Queenstown (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-077 memo: nzup queenstown memo: nzup queenstown internal waka kotahi memo (10 march 2023) from two nzta managers to senior managers on the status of the nzup queenstown package. at the 3 february 2023 target outturn cost (toc) exchange, kā huanui a tāhuna's 30% design estimate was $350.4m, against bondcm's independent estimate of $207.4m, a difference of about $143m. key differences were risk allocation, rates, productivity and forecast completion date. bondcm considered reconciliation almost impossible given the gap and the risks placed on the owners. the project team reconfirmed the queenstown business case problem definition and investment objectives and ran a prioritisation. the likely preferred option 5 is the sh6/sh6a (bp) intersection, the frankton bus hub expansion and the howards drive roundabout, with affordability to be confirmed (alliance cost information due about 17 march). next steps run from a governance group report (march 2023) to a report-back (may/june 2023). context: memo dated 10 march 2023 from two nzta managers to senior managers, copied to other staff, on the nzup queenstown package (p1). current situation (p1): kā huanui a tāhuna provided a 30% design, which bondcm used to prepare an independent estimate. the toc exchange on 3 february 2023 showed a difference of about $143m: independent estimate $207.4m against alliance estimate $350.4m (part of the sentence is removed as out of scope). after further review the gap reduced, but the authors saw no merit in continuing until affordability was known; bondcm said reconciliation would be almost impossible because of the size of the gap and the number of risks put back on the owners. key differences: risk allocation, rates, productivity and forecast completion date. associated work (pp1-2): the queenstown business case problem statements and investment objectives were reviewed and still considered appropriate. an internal prioritisation identified option 5 as the likely preferred option: reconfiguration of the sh6/sh6a intersection (bp roundabout), expansion of the frankton bus hub, and the howards drive roundabout. the bp roundabout and bus hub are described as fundamental to prioritising public transport; howards drive is a safety project linked to the ladies mile masterplan priority development area (p2). further alliance cost information was due around 17 march to confirm affordability. qldc councillors had been briefed in february, but a process to agree prioritisation was still needed. next steps (p2): governance group report (march 2023); agree a prioritisation process with qldc and orc staff (march/april 2023); brief qldc and orc elected members (april/may 2023); report back to the governance group (may/june 2023). mass rapid transit: the memo says nothing about mass rapid transit. internal briefing memo nzta (waka kotahi). memo: nzup queenstown (2023). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown memo does not mention mass rapid transit. toc exchange 3 feb 2023: alliance estimate $350.4m vs bondcm independent estimate $207.4m; difference about $143m (p1) further alliance cost information due about 17 march 2023 (p2) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper recorded 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient prepare a report for the nzup governance group based on available information. march 2023 not assessed nzta waka kotahi nzta agree a prioritisation process with qldc and orc staff. agree a prioritisation process with both qldc and orc staff march/april 2023 not assessed nzta waka kotahi nzta brief qldc and orc elected representatives. april/may 2023 not assessed nzta waka kotahi nzta report back through the nzup governance group when the prioritisation process is complete. may/june 2023 not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-03-10",
    "cover": {
      "src": "/covers/QTS-077.webp",
      "srcset": "/covers/QTS-077.webp 400w, /covers/QTS-077-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-077/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-077/QTS-077-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-078",
    "code": "QTS-078",
    "title": "Public and Active Transport Committee 9 August 2023 – Agenda",
    "shortTitle": "Public and Active Transport Committee 9 August",
    "summary": "Agenda for ORC's Public and Active Transport Committee on 9 August 2023 (co-chairs Cr Alexa Forbes and Cr Andrew Noone). Queenstown-relevant items: draft minutes of 10 May 2023, including a resolution noting that QPTBC public consultation would occur later; the operating environment report (Route 5 extension to Lake Hayes Estate from 4 September 2023 at $151,285.80 + GST a year, indexed $187,529.90); an advisory group report saying the ORC/QLDC focus is congestion in the CBD, Frankton Road, Ladies Mile and the BP roundabout; and the 2022/23 patronage report (Queenstown bus 1,252,982, up 55%, still 15% below 2018/19; ferry 104,240, up 74%). Item 8.5 updates the Queenstown Public Transport Business Case: Way2Go partners agreed a short list of three options, including 'Bus Max' and a Jacks Point–Town Centre spine via the Frankton Hub, and reset assumptions for changed NZUP timing. The report states that more frequent, higher-capacity services 'cannot deliver the whole intent of mode-shift' without parking pricing and other measures. It flags risks to full NZUP delivery and NLTP funding, and says the draft business case will be delivered in Q4 2023. Item 8.6 seeks endorsement of a regional connectivity strategy. Most resolutions sought are to note the reports. No mass rapid transit option is mentioned.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2023,
    "publishedDate": "2023-08-09",
    "documentStatus": "Draft",
    "geographicScope": "Otago region; Queenstown / Wakatipu Basin (SH6A Frankton Road, Frankton, Ladies Mile, Lake Hayes Estate, Fernhill, Sunshine Bay, Jacks Point); Dunedin",
    "owner": "ORC",
    "citation": "Public and Active Transport Committee 9 August 2023 – Agenda (2023). Reports OPS2328, OPS2334, OPS2330, OPS2329, OPS2331, OPS2332.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/14802/patc-agenda-9-august-2023.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/14802/patc-agenda-9-august-2023.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "orc",
      "nzta"
    ],
    "searchText": "qts-078 public and active transport committee 9 august 2023 – agenda public and active transport committee 9 august agenda for orc's public and active transport committee on 9 august 2023 (co-chairs cr alexa forbes and cr andrew noone). queenstown-relevant items: draft minutes of 10 may 2023, including a resolution noting that qptbc public consultation would occur later; the operating environment report (route 5 extension to lake hayes estate from 4 september 2023 at $151,285.80 + gst a year, indexed $187,529.90); an advisory group report saying the orc/qldc focus is congestion in the cbd, frankton road, ladies mile and the bp roundabout; and the 2022/23 patronage report (queenstown bus 1,252,982, up 55%, still 15% below 2018/19; ferry 104,240, up 74%). item 8.5 updates the queenstown public transport business case: way2go partners agreed a short list of three options, including 'bus max' and a jacks point–town centre spine via the frankton hub, and reset assumptions for changed nzup timing. the report states that more frequent, higher-capacity services 'cannot deliver the whole intent of mode-shift' without parking pricing and other measures. it flags risks to full nzup delivery and nltp funding, and says the draft business case will be delivered in q4 2023. item 8.6 seeks endorsement of a regional connectivity strategy. most resolutions sought are to note the reports. no mass rapid transit option is mentioned. context: this 69-page agenda for orc's public and active transport committee meeting of 9 august 2023 in dunedin lists twelve councillor members, with cr alexa forbes and cr andrew noone as co-chairs, and richard saunders (chief executive) as senior officer (p.1). it contains draft minutes of 10 may 2023, the actions register and six reports (pp.2–69). dunedin-only items (fares and frequency business case 8.4, mosgiel express) are not summarised here. minutes of 10 may 2023: resolution pat23-108 noted the qptbc update and 'that public consultation on the queenstown public transport business case will occur at a later stage' (p.5). the interim chief executive said challenging kpis should be set for public and active transport and urged that the ltp be informed by this work (p.5). pat23-110 asked staff to progress a staged regional connectivity strategy, with scoping by 20 august 2023 (p.6). 8.1 operating environment (ops2328): notes the delayed draft gps, rltp mid-term review due by april 2024, and that waka kotahi asked approved organisations to put forward activities 'agnostic' of funding for the 2024–27 nltp (pp.9–10). queenstown youth stored-value fares were adjusted to $1.50 (pp.11–12). the route 5 extension to lake hayes estate, agreed in 2020 but delayed by covid and driver shortages, starts 4 september 2023 at $151,285.80 + gst a year (indexed $187,529.90), with a 51% waka kotahi contribution (pp.13–14). the attached joint otago southland rtc update covers the rltp review, vkt targets and an arataki presentation (pp.16–19). recommendation: note. 8.2 advisory groups (ops2334): one governance-level advisory group meeting with qldc has been held; for orc/qldc 'the focus is on reducing car congestion issues (especially in cbd, frankton rd, ladies mile, bp roundabout)' (p.21). both councils have constrained capital budgets and queenstown is a waka kotahi 'tier 2' centre (p.21). recommendation: note. 8.3 patronage (ops2330): queenstown bus patronage 2022/23 was 1,252,982, up 55% on 2021/22 but 15% below 2018/19; full timetables returned on 1 june 2023 and june was 7% above 2018/19 (pp.23, 28). ferry patronage was 104,240, up 74%, with fare revenue up 244% (pp.23, 30). recommendation: note. 8.5 queenstown public transport services business case update (ops2331): a long list was assessed by multicriteria analysis with way2go partners; a short list of three options was agreed, including 'bus max' and a 'spine corridor from jacks point to queenstown town centre route, connecting with other services at the frankton hub', with sensitivity tests of an arrowtown–malaghans road route and a new kawarau river bridge to remarkables park; bi-articulated buses were assessed (pp.39–40). reference case assumptions were reset for changed nzup timing (p.40). the report states benefits depend on 'a whole package' including 'pricing and availability of parking', and that 'the provision of more frequent and higher capacity services cannot deliver the whole intent of mode-shift' (p.40). risks: nzup may not be fully deliverable within its funding envelope or through the nltf amid 'significant funding constraints for the next national land transport programme'; sh6a bus priority (virtual priority at signals, pedestrian access) needs funding; fernhill and sunshine bay reliability needs bus priority or reduced traffic on lake esplanade and shotover street (p.41). the contract value is $963,852.00 (p.41). the draft business case moves to q4 2023; next steps include the strategic case, indicative costings for ltp and rltp, the emerging preferred option and consultation (p.42). recommendations: note the report and note the q4 2023 delivery (p.39). 8.6 connectivity strategy (ops2332): a regional strategy comprising a mode shift plan, active travel strategy, new rptp and prioritised delivery plan, over 9–12 months (pp.43–44). recommendations: note; endorse the approach and project plan; approve a 'hybrid approach' to resourcing; note ongoing expenditure subject to ltp; receive updates (p.44). mass rapid transit: the agenda says nothing about mass rapid transit. the qptbc short list is bus-based (bus max and a bus spine via frankton), and 'higher capacity services' refers to buses (p.40). committee agenda public and active transport committee 9 august 2023 – agenda (2023). reports ops2328, ops2334, ops2330, ops2329, ops2331, ops2332. otago region; queenstown / wakatipu basin (sh6a frankton road, frankton, ladies mile, lake hayes estate, fernhill, sunshine bay, jacks point); dunedin published agenda (includes unconfirmed draft minutes of 10 may 2023) no mass rapid transit reference; the short list is bus-based, and the report says more bus services alone cannot deliver the mode shift. queenstown bus patronage 2022/23: 1,252,982 (+55% on 2021/22; 15% below 2018/19) (pp.23, 28) queenstown ferry patronage 2022/23: 104,240 (+74%); fare revenue +244% (pp.23, 30) route 5 lake hayes estate extension: $151,285.80 + gst per year (indexed $187,529.90), 51% waka kotahi share (pp.13–14) qptbc contract value $963,852.00 (p.41) qptbc short list: 3 options, incl. bus max and jacks point–town centre spine via frankton hub (pp.39–40) draft qptbc now due q4 2023 (previously q3 2023) (pp.39, 42) queenstown youth fare $1.50; cash fare $4.00 (pp.11–12) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/14802/patc-agenda-9-august-2023.pdf orc none board or committee paper draft 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. orc orc prepared orc orc published orc orc recipient doug rodgers author orc orc gemma wilson author orc orc julian phillips author orc orc lorraine cheyne author orc orc pim borren author orc orc james llewellyn prepared by nzta waka kotahi nzta pim borren approved by orc orc richard saunders approved by orc orc trudi mclaren contributor orc orc note the public & active transport operating environment report (incl. route 5 lake hayes estate extension from 4 september 2023). that the committee: 1) notes this report. 9 august 2023 not assessed orc orc implement route 5 extension to lake hayes estate within the approved operating budget. this route change will take effect as of 4 september from 4 september 2023 not assessed orc orc note the joint pat advisory groups report (orc/qldc focus on congestion in cbd, frankton rd, ladies mile, bp roundabout). that the committee: 1) notes this report. 9 august 2023 not assessed orc orc note the queenstown and dunedin 2022/23 full-year patronage report. that the committee: 1) notes this report. 9 august 2023 not assessed orc orc note the qptbc update and that the draft final business case will be delivered in q4 2023. notes that the draft final business case will now be delivered in q4 2023 q4 2023 not assessed orc orc finalise the qptbc strategic case for partner approval and confirm the emerging preferred option from the short list. upcoming work will finalise the strategic case for partner approval q4 2023 not assessed orc orc develop indicative qptbc costings as input to long term plan and rltp processes. an indicative range of costings will be developed as an input to long term plan not assessed orc orc consult the wakatipu basin community on the qptbc short-list options. the wakatipu basin community will be consulted on the short-list options after the general election (2023) not assessed orc orc identify funding for sh6a frankton–town centre bus priority improvements (virtual priority at signals, safe pedestrian access). a renewed focus will be identifying funding for improvements along on sh6a not assessed prioritise buses and/or reduce traffic on lake esplanade and shotover street for fernhill and sunshine bay service reliability. requires prioritisation of buses and/ or reduced traffic on lake esplanade and shotover street not assessed deliver the wider package of sustainable transport and land use measures, including parking pricing and availability in queenstown town centre. predicated on delivery of a whole package... including the pricing and availability of parking not assessed endorse the approach and project plan for a regional public and active travel connectivity strategy (mode shift plan, active travel strategy, new rptp, delivery plan). endorses the proposed approach to developing the public and active travel connectivity strategy 9–12 months not assessed orc orc approve a 'hybrid approach' to resourcing public and active transport connectivity; note ongoing expenditure subject to ltp; receive regular updates. approves a “hybrid approach” to resourcing subject to ltp not assessed orc orc ceo and co-chairs to develop strategic kpis for public transport reporting for council adoption with annual plan 2023/24 (open action). the ceo and co-chairs of the committee shall meet and develop strategic kpis due 30/06/2023 not assessed orc orc main document pdf",
    "sortDate": "2023-08-09",
    "cover": {
      "src": "/covers/QTS-078.webp",
      "srcset": "/covers/QTS-078.webp 400w, /covers/QTS-078-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-078/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-078/QTS-078-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-079",
    "code": "QTS-079",
    "title": "Statement of Evidence of David John Robert Smith for Waka Kotahi – Traffic (Te Pūtahi Ladies Mile Plan Variation)",
    "shortTitle": "Statement of Evidence of David John Robert Smith",
    "summary": "Primary traffic evidence by Dave Smith, Technical Director – Transportation Planning at Abley, for NZTA (Waka Kotahi) as submitter on QLDC's Te Pūtahi Ladies Mile (TPLM) Plan Variation. Using March 2023 TomTom data, it finds weekday peak delays of 2–6 minutes westbound (AM) and 3–10 minutes eastbound (PM) on SH6, with the lane merges either side of the Shotover Bridge as the bottlenecks. It puts bridge capacity at about 1,590 vehicles per lane per hour, below the 1,700 used by QLDC's expert Colin Shields, and notes Waka Kotahi does not intend to upgrade or duplicate the bridge. Modelling shows bridge flows at or above capacity even with the assumed shift to a 20–21% public transport mode share (from 3.3%), and concludes TPLM will further worsen SH6 intersection performance. Risks identified are NZUP delivery timing, local bus priority, behaviour change and the timing of schools and commercial activity. It recommends nine planning-provision matters, including signalised and urbanised 60 km/h SH6 intersections, completion of key NZUP components before any development, Stalker Road bus priority, monitoring, travel planning and Integrated Transport Assessments. It does not mention mass rapid transit.",
    "documentType": "Expert evidence",
    "documentForm": "Expert statement of evidence (traffic) under the RMA, with TomTom data technical note appendix",
    "year": 2023,
    "publishedDate": "2023-10-20",
    "documentStatus": "Final",
    "geographicScope": "Te Pūtahi Ladies Mile; SH6 Ladies Mile corridor; Shotover Bridge; Frankton; Shotover Country; Lake Hayes Estate",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Statement of Evidence of David John Robert Smith for Waka Kotahi – Traffic (Te Pūtahi Ladies Mile Plan Variation) (2023). Waka Kotahi submitter 62 (file name); Abley job NZTA-J321 (Appendix A).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/kfnlb0p4/dave-smith-traffic-waka-kotahi-submitter-62-20-oct-2023.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/kfnlb0p4/dave-smith-traffic-waka-kotahi-submitter-62-20-oct-2023.pdf"
    ],
    "documentTypeCode": "expert-evidence",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "independent-hearing-panel",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-079 statement of evidence of david john robert smith for waka kotahi – traffic (te pūtahi ladies mile plan variation) statement of evidence of david john robert smith primary traffic evidence by dave smith, technical director – transportation planning at abley, for nzta (waka kotahi) as submitter on qldc's te pūtahi ladies mile (tplm) plan variation. using march 2023 tomtom data, it finds weekday peak delays of 2–6 minutes westbound (am) and 3–10 minutes eastbound (pm) on sh6, with the lane merges either side of the shotover bridge as the bottlenecks. it puts bridge capacity at about 1,590 vehicles per lane per hour, below the 1,700 used by qldc's expert colin shields, and notes waka kotahi does not intend to upgrade or duplicate the bridge. modelling shows bridge flows at or above capacity even with the assumed shift to a 20–21% public transport mode share (from 3.3%), and concludes tplm will further worsen sh6 intersection performance. risks identified are nzup delivery timing, local bus priority, behaviour change and the timing of schools and commercial activity. it recommends nine planning-provision matters, including signalised and urbanised 60 km/h sh6 intersections, completion of key nzup components before any development, stalker road bus priority, monitoring, travel planning and integrated transport assessments. it does not mention mass rapid transit. context and purpose: this is the primary statement of evidence of david john robert smith (technical director – transportation planning, abley limited) for nzta (waka kotahi), a submitter on qldc's te pūtahi ladies mile (tplm) variation to the operative district plan, heard by an independent hearing panel under the resource management act 1991 (p.1–2). mr smith states he has maintained the queenstown lakes tracks transportation model since 2012, was technical lead for the queenstown integrated transport programme business case and led modelling for the queenstown business case (pp.11–12). the model was updated to a 2022 base year with forecasts to 2053 to support orc's wakatipu public transport business case, and interacts with a wsp public transport model (pp.12–13). modelling for tplm was 'handle-turning' on inputs supplied by mr shields (pp.6–7). current performance: march 2023 weekday tomtom data (appendix a, prepared by mat collins, reviewed by dave smith, 11 october 2023) show am peak delays of 2–6 minutes on sh6 westbound, 3.5–12 minutes on stalker road and 45 seconds–5 minutes on howards drive; pm peak delays of 3–10 minutes sh6 eastbound and 1–16 minutes on hawthorne drive (p.8). about 90% of peak-direction delay occurs on the approach side of the shotover bridge (p.8). capacity: mr smith estimates shotover bridge capacity at 1,590 vehicles per lane per hour (1,560 using austroads), within a 1,515–1,600 range, versus 1,700 quoted by mr shields from waka kotahi's submission, which he describes as an upper limit for a rural corridor (pp.9–10). performance deteriorates before theoretical capacity is reached (p.10). future investment: the nzup queenstown package includes signals between sh6/6a and hawthorne drive, westbound bus lanes on ladies mile, a howards drive roundabout with underpass, bus lanes between hardware lane and sh6/6a, and sh6a improvements (pp.10–11). timing is uncertain, and waka kotahi does not intend to upgrade, replace or duplicate the shotover bridge, so 'removing people from their cars and attracting them to public transport is essential to increasing the people movement capacity of the corridor' (p.11). impacts: with tplm, modelled bridge flows are 1,814 westbound am (+14%) and 1,923 eastbound pm (+21%) without mode shift; with the wsp-modelled mode shift, 1,581 westbound am and 1,710 eastbound pm (+8%) (p.14). sidra modelling shows up to 209 vehicles queued on sh6 east of stalker road (about 1.5 km) and a combined queue of about 341 vehicles or 2.4 km; 2053 sh6 westbound am delay of 16–17 minutes (pp.15). he concludes tplm 'will result in further deterioration in the performance of the key intersections along sh6 ladies mile' (p.16). risks: delivery of nzup; local bus priority; behaviour change, as the assessment relies on a shift to 20–21% public transport mode share across the bridge from a 3.3% journey-to-work share; and timing of schools and employment within tplm (pp.17–18). recommendations: signals at sh6/stalker road and howards drive with a 60 km/h urbanised corridor; further design and modelling; staging non-residential development early; completing key nzup components before any development; stalker road and local bus priority; traffic monitoring and travel planning; integrated transport assessments for all consent applications; and ongoing way to go collaboration (pp.18–24). mass rapid transit: the document says nothing about mass rapid transit. its people-moving solution for the shotover bridge constraint is bus priority through nzup and wider public transport investment. expert statement of evidence (traffic) under the rma, with tomtom data technical note appendix nzta (waka kotahi). statement of evidence of david john robert smith for waka kotahi – traffic (te pūtahi ladies mile plan variation) (2023). waka kotahi submitter 62 (file name); abley job nzta-j321 (appendix a). te pūtahi ladies mile; sh6 ladies mile corridor; shotover bridge; frankton; shotover country; lake hayes estate final (filed statement of evidence) no mass rapid transit reference; relies on bus priority and bus-based mode shift across the shotover bridge. sh6 westbound am peak delay 2–6 min; sh6 eastbound pm peak delay 3–10 min (march 2023 tomtom) (p.8) stalker road am delay 3.5–12 min; hawthorne drive pm delay 1–16 min (p.8) approximately 90% of peak-direction sh6 delay occurs on the approach side of the shotover bridge (p.8) shotover bridge theoretical capacity 1,590 veh/lane/hr (1,560 austroads; range 1,515–1,600) vs 1,700 used by mr shields (pp.9–10) modelled bridge flows with tplm, no mode shift: 1,814 wb am (+14%), 1,923 eb pm (+21%) (p.14) modelled bridge flows with mode shift: 1,581 wb am, 1,710 eb pm (+8%) (p.14) sh6 east approach to stalker road: up to 209 vehicles queued (~1.5 km); combined ~341 vehicles / 2.4 km (p.15) 2053 modelled sh6 westbound am delay 16–17 min with tplm (p.15) assumed pt mode share across shotover bridge 20–21% vs current 3.3% journey-to-work share (p.17) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/kfnlb0p4/dave-smith-traffic-waka-kotahi-submitter-62-20-oct-2023.pdf nzta none expert evidence final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared independent hearing panel independent hearing panel recipient qldc qldc recipient david john robert smith author abley abley mat collins prepared by abley abley dave smith reviewed by abley abley upgrade sh6 / stalker road intersection to manage conflicting demands, preferably to traffic signals, and include this in planning provisions. the sh6 / stalker road should be upgraded to traffic signals not assessed qldc qldc build the nzup sh6 / howards drive intersection as a signalised intersection rather than a roundabout, and include an upgrade requirement in planning provisions. should be built as a signalised intersection not assessed nzta waka kotahi nzta reduce sh6 speed environment to 60 km/h and urbanise the corridor so it is self-explaining. accompanied by a reduction in the speed environment along sh6 to 60 kph not assessed nzta waka kotahi nzta undertake additional design work and modelling testing signals, a 60 km/h corridor and signalisation of roundabout approaches, plus pm peak impacts west of the shotover bridge. i recommend that additional design work and modelling be undertaken not assessed qldc qldc retain or enhance objectives 49.2.5 and 49.2.6 and other mechanisms supporting early establishment of non-residential activity (schools, town centre) within tplm. retaining or enhancing objectives 49.2.5 and 49.2.6 before substantial residential development not assessed qldc qldc complete key nzup components (howards drive upgrade, ladies mile westbound bus lanes, sh6 bus lanes shotover bridge to sh6/6a) before any development; add to staging rules 49.5.10, 49.5.33, 49.5.50. should in my view be completed prior to any development prior to any development not assessed nzta waka kotahi nzta install northbound bus priority on stalker road and further bus priority through shotover country and lake hayes estate; add stalker road requirement to staging rules. i recommend that northbound bus priority be installed on stalker road prior to development not assessed undertake regular, ongoing traffic monitoring to measure success of initiatives reducing private vehicle reliance. regular traffic monitoring be undertaken as tplm is established ongoing as tplm is established not assessed qldc qldc integrate effective, ongoing travel planning with regular monitoring into the transport interventions plan. integrated into the transport interventions plan ongoing not assessed qldc qldc require an integrated transport assessment for all development resource consent applications in tplm. integrated transport assessment be a requirement for all development resource consent applications not assessed qldc qldc continue collaboration between way to go partners to coordinate transport infrastructure delivery with tplm staging. ongoing collaboration between the way to go partners is fundamental ongoing not assessed way to go way to go main document pdf",
    "sortDate": "2023-10-20",
    "cover": {
      "src": "/covers/QTS-079.webp",
      "srcset": "/covers/QTS-079.webp 400w, /covers/QTS-079-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-079/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-079/QTS-079-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-080",
    "code": "QTS-080",
    "title": "2022 - 2023 Annual Report (Rīpoata ā-tau)",
    "shortTitle": "2022 - 2023 Annual Report (Rīpoata ā-tau)",
    "summary": "QLDC's 2022/23 Annual Report records capital expenditure of $179.4m, $17.0m below estimate (p.19), with capital grants $18.7m under budget due to timing of the Arterial and Queenstown Street upgrade projects (p.18). Arterial Stage 1 cost $35.15m in the year and $45.46m of carry-forwards were approved (p.30). The Tāhuna streetscape project was officially opened on 23 June 2023 (p.5). Council received an $8.56m Transport Choices award, $7.06m of it for the Arthurs Point to Queenstown route (p.4), and supported NZTA's NZUP1 Frankton improvements (p.5). Orbus ran at reduced levels with 'many cancellations' (p.4). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2023,
    "publishedDate": "2023-10-25",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2022 - 2023 Annual Report (Rīpoata ā-tau) (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/oqeh4xmz/qldc_annual-report_2022-2023_final-251023-adopted.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "nzta"
    ],
    "searchText": "qts-080 2022 - 2023 annual report (rīpoata ā-tau) 2022 - 2023 annual report (rīpoata ā-tau) qldc's 2022/23 annual report records capital expenditure of $179.4m, $17.0m below estimate (p.19), with capital grants $18.7m under budget due to timing of the arterial and queenstown street upgrade projects (p.18). arterial stage 1 cost $35.15m in the year and $45.46m of carry-forwards were approved (p.30). the tāhuna streetscape project was officially opened on 23 june 2023 (p.5). council received an $8.56m transport choices award, $7.06m of it for the arthurs point to queenstown route (p.4), and supported nzta's nzup1 frankton improvements (p.5). orbus ran at reduced levels with 'many cancellations' (p.4). no mass rapid transit reference was found. context and purpose. annual report for year two of the 2021-2031 ten year plan. transport. capital expenditure was $179.4m, with '$17.0m... capital grants were $18.7m under budget 'due to the timing of the arterial and queenstown street upgrade capex projects' (p.18). queenstown town centre arterials stage 1 cost $35,150,589 at year end, and carry-forwards of $45.46m were approved in august (p.30). the tāhuna streetscape upgrade had 'an official opening ceremony on 23 june', with upper brecon and man streets still underway (p.5). council received 'a government transport choices award to council of $8.56m', of which $7.06m was for the arthurs point to queenstown route (p.4), and supported 'waka kotahi's nzup1 proposed improvements' at frankton and the queenstown entranceway (p.5). queenstown orbus services ran at reduced levels with 'many cancellations' (p.4). 114 new car parks were added on ardmore street, wānaka (p.37). mass rapid transit: no reference to mass rapid transit was found in the text read. annual report 2022 - 2023 annual report (rīpoata ā-tau) (2023). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $179.4m, $17.0m below estimate (p.19) arterials stage 1 $35,150,589 at year end (p.30) carry-forwards $45.46m (p.30) transport choices award $8.56m; $7.06m arthurs point-queenstown (p.4) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published glyn lewers signatory qldc qldc mike theelen signatory qldc qldc build the arthurs point to queenstown active travel route with $7.06m transport choices funding a government transport choices award to council of $8.56m 2023/24 not assessed nzta waka kotahi nzta complete upper brecon street and man street upgrades upper brecon street and man street were still underway 2023/24 not assessed qldc qldc carry forward $45.46m of capital projects carry-forward projects totalling $45.46m 2023/24 not assessed qldc qldc support nzta's nzup1 improvements at frankton and the queenstown entranceway waka kotahi's nzup1 proposed improvements not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-10-25",
    "cover": {
      "src": "/covers/QTS-080.webp",
      "srcset": "/covers/QTS-080.webp 400w, /covers/QTS-080-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-080/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-080/QTS-080-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-081",
    "code": "QTS-081",
    "title": "NZUP Governance Group update (Board meeting 9 November 2023) - extract",
    "shortTitle": "NZUP Governance Group update",
    "summary": "Extract from the NZUP Governance Group update to the Waka Kotahi Board meeting of 9 November 2023 (for discussion), from the Governance Group Chair's perspective. On Queenstown, it states that cost estimates significantly exceed the $130 million allocation. As directed by the Governance Group and Board in April 2023, the project is producing a complete design, total outturn cost and reconciliation for a reduced package: the SH6/6A intersection, Frankton bus hub and Howards Drive roundabout. Alliance estimates at 70% design confirm the reduced package is unaffordable, needing about $120 million in additional funding, with independent reconciliation due in early November. To keep momentum, about $50 million of non-abortive in-ground and services relocation works at SH6/6A, not designation-dependent, could start in early 2024. A Board decision on scope and alliance contract variation was due in December 2023.",
    "documentType": "Board or committee paper",
    "documentForm": "Board paper (extract) - for discussion",
    "year": 2023,
    "publishedDate": "2023-11-09",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Governance Group update (Board meeting 9 November 2023) - extract (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-081 nzup governance group update (board meeting 9 november 2023) - extract nzup governance group update extract from the nzup governance group update to the waka kotahi board meeting of 9 november 2023 (for discussion), from the governance group chair's perspective. on queenstown, it states that cost estimates significantly exceed the $130 million allocation. as directed by the governance group and board in april 2023, the project is producing a complete design, total outturn cost and reconciliation for a reduced package: the sh6/6a intersection, frankton bus hub and howards drive roundabout. alliance estimates at 70% design confirm the reduced package is unaffordable, needing about $120 million in additional funding, with independent reconciliation due in early november. to keep momentum, about $50 million of non-abortive in-ground and services relocation works at sh6/6a, not designation-dependent, could start in early 2024. a board decision on scope and alliance contract variation was due in december 2023. context: extract from the 'nzup governance group update' paper for the waka kotahi board meeting of 9 november 2023 (in confidence; for discussion). elt owner brett gliddon; issue owner mark ratcliffe, nzup governance group independent chair (p1). most of the paper is removed as out of scope. key point (p1): the reduced scope queenstown package is unaffordable within the allocated funding; a board decision on the alliance contract will be required in december 2023; the project intends to progress non-abortive works at the sh6/6a intersection. queenstown package section (pp2-3): cost estimates significantly exceed the $130 million allocation. following governance group and board direction in april 2023, the project is producing a complete design, total outturn cost and reconciliation for a reduced package of the sh6/6a intersection, frankton bus hub and howards drive roundabout. at 70% design, alliance estimates confirm the reduced package needs about $120 million in additional funding; independent reconciliation was to finish in early november. non-abortive works of about $50 million (in-ground and services relocation at sh6/6a) would maintain momentum and avoid alliance demobilisation and remobilisation costs; they are not designation-dependent and could start in early 2024. an update to the investment and delivery committee in december would seek a board decision on awarding the reduced package to the alliance. the upcoming decisions table lists 'queenstown package - scope and contract variation - dec-23 - waka kotahi board' (p3). mass rapid transit: the extract says nothing about mass rapid transit. board paper (extract) - for discussion nzta (waka kotahi). nzup governance group update (board meeting 9 november 2023) - extract (2023). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (in confidence) does not mention mass rapid transit. funding allocation $130 million (p2) reduced package requires about $120 million additional funding at 70% design (p3) non-abortive works about $50 million at sh6/6a; could start early 2024 (p3) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient mark ratcliffe author nzta waka kotahi nzta brett gliddon approved by nzta waka kotahi nzta investment and delivery committee to receive an update requesting a board decision on awarding the reduced package of works to the alliance. requesting a board decision on awarding the reduced package of works to the alliance december 2023 not assessed nzta waka kotahi nzta progress about $50 million of non-abortive in-ground and services relocation works at the sh6/6a intersection. the project team is exploring non-abortive works of circa ~$50 million early 2024 not assessed complete independent reconciliation of the 70% design estimate. reconciliation of this estimate is currently being worked through by an independent estimator early november 2023 not assessed main document pdf",
    "sortDate": "2023-11-09",
    "cover": {
      "src": "/covers/QTS-081.webp",
      "srcset": "/covers/QTS-081.webp 400w, /covers/QTS-081-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-081/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-081/QTS-081-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-082",
    "code": "QTS-082",
    "title": "NZUP Queenstown Package (NZUP Governance Group, 24 November 2023) [DRAFT]",
    "shortTitle": "NZUP Queenstown Package",
    "summary": "Draft slide deck for the NZUP Governance Group (24 November 2023) presented by Richard Osborne and Brad Cabell, seeking support for additional funding to complete the SH6/6A (BP) intersection, adjacent bus hub and Howards Drive roundabout. It notes the allocated baseline budget of $130M against an initial Alliance estimate of about $420M for the full programme, and a reduced scope cost estimate of $230M. The Alliance-BondCM difference for the reduced scope is $10.1M. It reports that QLDC cannot afford its component (three waters upgrades). It asks the Group to endorse the reduced scope at $230M, and notes staff recommend reconfirming the Queenstown Business Case programme given Spatial Plan growth changes, affordability and the need to accelerate levers such as road pricing. An options assessment compares full scope (about $420m; $270m-$300m extra), reduced scope ($100m-$120m shortfall), disbanding the Alliance (about $10 million), stopping, and alternative funding (BOOT, road pricing).",
    "documentType": "Board or committee paper",
    "documentForm": "Governance Group presentation slides (draft)",
    "year": 2023,
    "publishedDate": "2023-11-24",
    "documentStatus": "Draft",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Queenstown Package (NZUP Governance Group, 24 November 2023) [DRAFT] (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-082 nzup queenstown package (nzup governance group, 24 november 2023) [draft] nzup queenstown package draft slide deck for the nzup governance group (24 november 2023) presented by richard osborne and brad cabell, seeking support for additional funding to complete the sh6/6a (bp) intersection, adjacent bus hub and howards drive roundabout. it notes the allocated baseline budget of $130m against an initial alliance estimate of about $420m for the full programme, and a reduced scope cost estimate of $230m. the alliance-bondcm difference for the reduced scope is $10.1m. it reports that qldc cannot afford its component (three waters upgrades). it asks the group to endorse the reduced scope at $230m, and notes staff recommend reconfirming the queenstown business case programme given spatial plan growth changes, affordability and the need to accelerate levers such as road pricing. an options assessment compares full scope (about $420m; $270m-$300m extra), reduced scope ($100m-$120m shortfall), disbanding the alliance (about $10 million), stopping, and alternative funding (boot, road pricing). context: draft presentation to the nzup governance group on 24 november 2023, presented by richard osborne (project sponsor) and brad cabell (programme director) (p1). purpose: update on costs and seek support for additional funding to complete the sh6/6a (bp) intersection, adjacent bus hub and howards drive roundabout (p2). in march 2023 the group endorsed instructing the alliance to progress design and toc reconciliation for this reduced package (p2). update (pp3-4): prioritisation re-tested with qldc and orc reconfirmed the reduced package. the alliance-bondcm difference for the reduced scope is $10.1m, and the final cost will significantly exceed the $130m budget regardless. qldc has significant fiscal challenges and cannot afford its component of nzup (to be considered on 6 november 2023). the waka kotahi board supported progressing the reduced scope at the increased cost. rma decisions are progressing. non-designation-dependent works at the bp intersection could start in early 2024, and value engineering has been done. recommendations (p5): note the $130m baseline against an initial alliance estimate of about $420m; note the reprioritisation with qldc and orc; note the reduced scope estimate of $230m; endorse the reduced scope at $230m; note qldc cannot fund its three waters component; note staff recommend that the queenstown business case programme be reconfirmed given changed growth forecasts in the spatial plan, affordability concerns and the need to accelerate other policy levers such as road pricing. rationale and appendix (pp6-12): sh6/sh6a is the cornerstone of public transport improvements; the design has been peer reviewed. peak population is forecast to double by 2051. required non-car mode shares for the am peak are shown for sh6a, shotover bridge and kawarau falls bridge (e.g. 40% on sh6a by 2039 and 47% by 2053, as extracted) (p9). the partners' joint mca ranks the bp intersection and bus hub first and howards drive second (p11). queenstown cost factors include no surfacing from 1 may to 31 august, 36,000 vpd with no detour, no long night works and high fifo costs (p12). options (pp13-14): (1) full scope about $420m, needing $270m-$300m extra, unlikely to be funded; (2) reduced scope, $100m-$120m shortfall; (3) disband the alliance and tender traditionally, about $10 million in exit costs; (4) stop and return later, possibly relooking at the queenstown business case; (5) alternative funding such as boot (judged unlikely to be feasible) or road pricing (many years away). mass rapid transit: the deck says nothing about mass rapid transit. it recommends reconfirming the queenstown business case programme and accelerating road pricing (p5), and judges boot-type concession funding unlikely to be feasible for this package (p14). governance group presentation slides (draft) nzta (waka kotahi). nzup queenstown package (nzup governance group, 24 november 2023) [draft] (2023). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown draft does not mention mass rapid transit. allocated baseline budget $130m vs initial alliance estimate ~$420m (p5) reduced scope estimate $230m (p5) alliance vs bondcm difference for reduced scope $10.1m (p3) full scope ~$420m; $270m-$300m extra required (p13) reduced scope shortfall $100m-$120m (p13) disbanding the alliance likely to cost about $10 million (p13) 36,000 vpd through sh6/6a; no surfacing 1 may-31 aug (p12) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper draft 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient brad cabell presenter nzta waka kotahi nzta richard osborne presenter nzta waka kotahi nzta governance group to endorse the reduced scope (sh6/sh6a intersection, frankton bus hub, howards drive roundabout) at a cost of $230m. endorses the reduced scope of work... at a cost of $230m 24 november 2023 not assessed nzta waka kotahi nzta governance group to note qldc cannot fund its nzup cost share; three waters upgrades for future growth to be done later. these works (upgrades to 3 waters infrastructure to provide for future growth) will need to be done later later, when affordable not assessed nzta waka kotahi nzta reconfirm the queenstown business case programme (incl. qldc and orc interventions) given spatial plan growth changes, affordability and the need to accelerate levers such as road pricing. the queenstown business case programme, which includes qldc and orc interventions, is reconfirmed not assessed progress non-designation-dependent, non-abortive works at the bp intersection (in-ground and service relocations). a package of non-designation dependent works has been explored early 2024 not assessed main document pdf",
    "sortDate": "2023-11-24",
    "cover": {
      "src": "/covers/QTS-082.webp",
      "srcset": "/covers/QTS-082.webp 400w, /covers/QTS-082-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-082/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-082/QTS-082-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-083",
    "code": "QTS-083",
    "title": "Crown Funding delivery (BRI-2886) - extract",
    "shortTitle": "Crown Funding delivery (BRI-2886) - extract",
    "summary": "Extract of ministerial briefing BRI-2886 'Crown Funding delivery' (28 November 2023), with only the Queenstown Package section (paras 32-38) released. It states the package is in pre-implementation under a live alliance contract with a $130 million allocation, but is unaffordable, with full-package costs projected at $290 million to $390 million. Since April 2023 NZTA has progressed a prioritised package (SH6/6A intersection, Frankton bus hub, Howards Drive roundabout) agreed by QLDC and ORC. It is estimated at $250 million, $120 million over the allocation. Additional funding could be drawn from less advanced NZUP projects (e.g. Drury urban arterials, Brougham and Rolleston, Whangārei to Port Marsden), but this would essentially require one to be stopped. The Board would consider funding in December 2023, a physical works decision was due January 2024, and Joint Ministers' direction would be sought before award. The whole package remains a regional priority.",
    "documentType": "Board or committee paper",
    "documentForm": "Ministerial briefing note (extract)",
    "year": 2023,
    "publishedDate": "2023-11-28",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Crown Funding delivery (BRI-2886) - extract (2023). BRI-2886.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers"
    ],
    "searchText": "qts-083 crown funding delivery (bri-2886) - extract crown funding delivery (bri-2886) - extract extract of ministerial briefing bri-2886 'crown funding delivery' (28 november 2023), with only the queenstown package section (paras 32-38) released. it states the package is in pre-implementation under a live alliance contract with a $130 million allocation, but is unaffordable, with full-package costs projected at $290 million to $390 million. since april 2023 nzta has progressed a prioritised package (sh6/6a intersection, frankton bus hub, howards drive roundabout) agreed by qldc and orc. it is estimated at $250 million, $120 million over the allocation. additional funding could be drawn from less advanced nzup projects (e.g. drury urban arterials, brougham and rolleston, whangārei to port marsden), but this would essentially require one to be stopped. the board would consider funding in december 2023, a physical works decision was due january 2024, and joint ministers' direction would be sought before award. the whole package remains a regional priority. context: bri-2886 'crown funding delivery', 28 november 2023; the named telephone contact is richard may, chief of staff (p1). only the queenstown package section is released; the rest is out of scope. the released pages carry the original page number 6 (p2). the signature and recipient pages are not included in the extract. bri-2919 records that bri-2886 went to the minister of transport on 29 november 2023. queenstown package (paras 32-38, pp2-3): the package includes sh6/6a bus priority, sh6 bus lanes, frankton bus hub improvements, the sh6a/sh6 intersection, pedestrian access and a new howards drive roundabout. it is in pre-implementation under a live alliance contract. the allocation is $130 million, but the full package is projected to cost $290 million to $390 million. from april 2023 the agency has progressed a complete design, total cost and reconciliation for a prioritised package (sh6/6a intersection, frankton bus hub, howards drive roundabout), which qldc and orc agree is most important for mode shift, active travel and safety outcomes. this package is estimated at $250 million, exceeding the allocation by $120 million. funding could come from less advanced, uncommitted nzup projects (south auckland package - drury urban arterials; canterbury - brougham and rolleston; whangārei to port marsden safety), but approval would essentially require one of them to be stopped. the board would consider funding in december 2023, a physical works contract decision was needed in january 2024, and the agency would seek joint ministers' direction before award. the reduced scope is recommended within nzup, with the whole package remaining a regional priority. mass rapid transit: the extract says nothing about mass rapid transit. ministerial briefing note (extract) nzta (waka kotahi). crown funding delivery (bri-2886) - extract (2023). bri-2886. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (in confidence) does not mention mass rapid transit. funding allocation $130 million (p2) full package projected cost $290 million to $390 million (p3) reduced package estimate $250 million, $120 million over allocation (p3) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared central government / ministers central government / ministers recipient richard may contributor nzta waka kotahi nzta nzta board to consider additional funding for the reduced scope queenstown package. the agency board will consider additional funding in december 2023 december 2023 not assessed nzta waka kotahi nzta seek joint ministers' direction before the reduced scope queenstown package is awarded to the alliance. the agency will seek direction from joint ministers before the reduced scope queenstown package is awarded before contract decision (january 2024) not assessed nzta waka kotahi nzta progress the reduced scope queenstown package within nzup; provide advice on the whole package as a regional priority for further investment. progressing the reduced scope queenstown package within nzup is recommended not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-11-28",
    "cover": {
      "src": "/covers/QTS-083.webp",
      "srcset": "/covers/QTS-083.webp 400w, /covers/QTS-083-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-083/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-083/QTS-083-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-084",
    "code": "QTS-084",
    "title": "Hearing Summary Statement of Evidence of David John Robert Smith for Waka Kotahi – Traffic",
    "shortTitle": "Hearing Summary Statement of Evidence of David",
    "summary": "Hearing summary statement by Dave Smith (Abley) for NZTA (Waka Kotahi) on the Te Pūtahi Ladies Mile Plan Variation, updating his primary evidence after expert conferencing, Mr Shields' rebuttal and the 27 November 2023 provisions. He accepts that signalising SH6/Stalker Road and SH6/Howards Drive and urbanising SH6 to a 60 km/h environment are broadly agreed. His outstanding concern is that the staging provisions only require upgrades near each precinct, so key bottlenecks (e.g. Stalker Road) may not be addressed if development proceeds out of sequence. He identifies an apparent error (Stalker Road should read Howards Drive for areas D and J) and proposes a revised staging table requiring downstream infrastructure, Stalker Road bus priority and the NZUP package west of the Shotover Bridge before development in all relevant precincts. He repeats his recommendations for traffic monitoring, travel planning in the Transport Interventions Plan and Integrated Transportation Assessments. No reference to mass rapid transit.",
    "documentType": "Expert evidence",
    "documentForm": "Hearing summary statement of expert evidence (traffic)",
    "year": 2023,
    "publishedDate": "2023-12-06",
    "documentStatus": "Final",
    "geographicScope": "Te Pūtahi Ladies Mile; SH6 Ladies Mile corridor; Shotover Bridge; Stalker Road; Howards Drive",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Hearing Summary Statement of Evidence of David John Robert Smith for Waka Kotahi – Traffic (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/dpxavsv5/summary-evidence-dave-smith-traffic-waka-kotahi-8-dec-2023.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/dpxavsv5/summary-evidence-dave-smith-traffic-waka-kotahi-8-dec-2023.pdf"
    ],
    "documentTypeCode": "expert-evidence",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "abley",
      "independent-hearing-panel",
      "qldc"
    ],
    "searchText": "qts-084 hearing summary statement of evidence of david john robert smith for waka kotahi – traffic hearing summary statement of evidence of david hearing summary statement by dave smith (abley) for nzta (waka kotahi) on the te pūtahi ladies mile plan variation, updating his primary evidence after expert conferencing, mr shields' rebuttal and the 27 november 2023 provisions. he accepts that signalising sh6/stalker road and sh6/howards drive and urbanising sh6 to a 60 km/h environment are broadly agreed. his outstanding concern is that the staging provisions only require upgrades near each precinct, so key bottlenecks (e.g. stalker road) may not be addressed if development proceeds out of sequence. he identifies an apparent error (stalker road should read howards drive for areas d and j) and proposes a revised staging table requiring downstream infrastructure, stalker road bus priority and the nzup package west of the shotover bridge before development in all relevant precincts. he repeats his recommendations for traffic monitoring, travel planning in the transport interventions plan and integrated transportation assessments. no reference to mass rapid transit. context: this six-page summary statement was prepared for the independent hearing panel on the te pūtahi ladies mile (tplm) plan variation by david john robert smith, technical director – transportation planning at abley limited, for nzta (waka kotahi) as submitter (p.1–2). he records that he attended transport and combined urban design/traffic conferencing, signed the joint witness statements, read mr shields' rebuttal and reviewed the transport provisions presented on 27 november 2023 (p.2). (para 1.1(a) refers to his primary statement as dated 6 december 2023; the primary evidence is dated 20 october 2023.) agreed matters: signalising sh6/stalker road and sh6/howards drive and urbanising sh6 for a 60 km/h environment have general support among urban design and traffic experts; speed limits are for waka kotahi as road controlling authority (p.2). he understands council intends to add provisions on stalker road bus priority and the nzup package west of the shotover bridge, but had not seen them (pp.2–3). outstanding concerns: table one summarises which upgrades provisions 49.5.10, 49.5.33, 49.5.50 and 49.5.56 require for each precinct (p.3). because they only require nearby upgrades, bottlenecks may remain; for example, if areas c–g and j develop first, the stalker road am bottleneck need not be addressed, and no provision requires west-to-east sequencing (p.4). he notes an error: the stalker road upgrade should read howards drive for areas d and j (p.4). table two proposes revised staging requiring package 1 (stalker road) infrastructure, stalker road bus priority and the nzup package west of shotover bridge for all relevant precincts (p.5). he suggests presenting staging as such a table or with clear sequencing direction (p.5), and reiterates traffic monitoring, travel planning in the transport interventions plan and integrated transportation assessments for all consent applications (pp.5–6). mass rapid transit: the document says nothing about mass rapid transit. hearing summary statement of expert evidence (traffic) nzta (waka kotahi). hearing summary statement of evidence of david john robert smith for waka kotahi – traffic (2023). te pūtahi ladies mile; sh6 ladies mile corridor; shotover bridge; stalker road; howards drive final (hearing summary statement) no mass rapid transit reference; focuses on staging of the sh6 intersection, a bus lane and nz upgrade programme works. staging provisions reviewed: 49.5.10, 49.5.33, 49.5.50 and 49.5.56 (27 november 2023 version) (p.3) revised table two requires stalker road bus priority and nzup package west of shotover bridge for all relevant precincts (p.5) costed with the parent document. https://www.qldc.govt.nz/media/dpxavsv5/summary-evidence-dave-smith-traffic-waka-kotahi-8-dec-2023.pdf nzta none expert evidence final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned abley abley prepared independent hearing panel independent hearing panel recipient qldc qldc recipient david john robert smith author abley abley amend staging provisions so downstream infrastructure (incl. sh6/stalker road package 1 works) is required before development of all relevant precincts, as in revised table two. ensures that the appropriate downstream infrastructure is in place prior to development prior to development not assessed qldc qldc correct provision error: the stalker road intersection upgrade should read howards drive for areas d and j. should be changed to howards drive for areas d and j not assessed qldc qldc require stalker road bus priority and the nzup package west of the shotover bridge before development in the relevant precincts. plus stalker road bus priority... plus nzup package west of shotover bridge prior to development not assessed qldc qldc present staging provisions as a table or with clear direction on development sequencing and infrastructure dependencies. would be more helpfully presented in the plan variation as a table not assessed qldc qldc provide for regular traffic monitoring of initiatives to reduce private vehicle reliance. regular traffic monitoring to be undertaken ongoing not assessed qldc qldc integrate effective, ongoing travel planning with monitoring into the transport interventions plan. be integrated into the transport interventions plan ongoing not assessed qldc qldc require an integrated transportation assessment for all tplm resource consent applications, addressing residential-before-commercial and cumulative effects. the preparation of an integrated transportation assessment for all resource consent applications not assessed qldc qldc main document pdf",
    "sortDate": "2023-12-06",
    "cover": {
      "src": "/covers/QTS-084.webp",
      "srcset": "/covers/QTS-084.webp 400w, /covers/QTS-084-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-084/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-084/QTS-084-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-085",
    "code": "QTS-085",
    "title": "New Zealand Upgrade Programme: options to progress delivery (BRI-2919)",
    "shortTitle": "New Zealand Upgrade Programme: options to progress",
    "summary": "Ministerial briefing BRI-2919 (6 December 2023) from NZTA (Waka Kotahi) to Hon Simeon Brown and Hon Nicola Willis, giving options to deliver NZUP within NZTA's funding envelope, as the Minister of Transport requested on 30 November 2023. Most content is removed as out of scope. Queenstown is grouped with 'significant projects in procurement - deliver planned scope'. It is in commercial negotiations, with contract decisions needed within six months. NZTA notes local government partners' fiscal challenges. It repeats that the full package is unaffordable within NZUP and that a reduced scope of critical elements is being progressed, with the remainder a regional priority outside NZUP. Commercial negotiations are most advanced for Queenstown and it requires the least funding. The Ministry of Transport and Treasury support descoping. Ministers are asked to approve completion of the reduced scope package, with a Joint Ministers decision to be sought in January 2024.",
    "documentType": "Board or committee paper",
    "documentForm": "Ministerial briefing note (redacted extract)",
    "year": 2023,
    "publishedDate": "2023-12-06",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). New Zealand Upgrade Programme: options to progress delivery (BRI-2919) (2023). BRI-2919.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers"
    ],
    "searchText": "qts-085 new zealand upgrade programme: options to progress delivery (bri-2919) new zealand upgrade programme: options to progress ministerial briefing bri-2919 (6 december 2023) from nzta (waka kotahi) to hon simeon brown and hon nicola willis, giving options to deliver nzup within nzta's funding envelope, as the minister of transport requested on 30 november 2023. most content is removed as out of scope. queenstown is grouped with 'significant projects in procurement - deliver planned scope'. it is in commercial negotiations, with contract decisions needed within six months. nzta notes local government partners' fiscal challenges. it repeats that the full package is unaffordable within nzup and that a reduced scope of critical elements is being progressed, with the remainder a regional priority outside nzup. commercial negotiations are most advanced for queenstown and it requires the least funding. the ministry of transport and treasury support descoping. ministers are asked to approve completion of the reduced scope package, with a joint ministers decision to be sought in january 2024. context: bri-2919, 6 december 2023, signed by brett gliddon, to the ministers of transport and finance (pp1-2, 9). it follows bri-2886 (provided 29 november 2023) and responds to the minister of transport's 30 november 2023 request for options to deliver nzup within the nzta funding envelope (p2). the released version is heavily cut: content on other projects, the delivery graphic (p3), the way-forward diagram (p4) and p6 are removed as out of scope. queenstown content: the queenstown package is among 'significant projects in procurement - deliver planned scope', in commercial negotiations expected to finish by mid-2024 with industry mobilised and contract decisions needed within six months (paras 16-17, pp4-5). partner investment is committed (para 17). nzta is aware of local government partners' fiscal challenges and is discussing funding options and cost reduction levers with councils (para 18). the full package is unaffordable within nzup, a reduced scope of critical elements is being progressed for travel choice and safety outcomes, and the remainder is a regional priority for investment outside nzup (para 19). queenstown's negotiations are most advanced and it requires the least funding (para 20). nzta recommends completing the reduced scope package (para 22). the ministry of transport supports descoping and recommends ministers agree (para 38, p7). treasury supports descoping now to avoid further sunk costs (attachment 1, p10). a decision would be sought from joint ministers in january 2024 (para 44, p8). recommendation 2 (p8): approve completion of the reduced scope queenstown package. ministerial signature blocks are unsigned in the released copy (p9). mass rapid transit: the briefing says nothing about mass rapid transit. ministerial briefing note (redacted extract) nzta (waka kotahi). new zealand upgrade programme: options to progress delivery (bri-2919) (2023). bri-2919. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown signed by nzta official does not mention mass rapid transit. commercial negotiations for significant projects expected complete by mid-2024; contract decisions within six months (p5) no queenstown dollar figures appear in the released text not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared central government / ministers central government / ministers recipient brett gliddon signatory nzta waka kotahi nzta joint ministers to approve completion of the reduced scope queenstown package. approve completion of the reduced scope queenstown package not assessed central government / ministers central government / ministers seek a decision from joint ministers on the queenstown package. a decision on the queenstown package will be sought from joint ministers in january 2024 january 2024 not assessed nzta waka kotahi nzta continue discussions with relevant councils on funding options and cost reduction levers. nzta is in discussions with the relevant councils around funding options and cost reduction levers not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-12-06",
    "cover": {
      "src": "/covers/QTS-085.webp",
      "srcset": "/covers/QTS-085.webp 400w, /covers/QTS-085-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-085/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-085/QTS-085-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-086",
    "code": "QTS-086",
    "title": "NZUP Governance Group update (Investment and Delivery Committee, 11 December 2023) - extract",
    "shortTitle": "NZUP Governance Group update",
    "summary": "Extract of the NZUP Governance Group update to the Waka Kotahi Investment and Delivery Committee (11 December 2023), for decision. Management recommends the Board: approve the reduced scope NZUP Queenstown Package (SH6/6A intersection, Frankton bus hub, Howards Drive roundabout) at an estimated $250 million; approve $120 million additional funding, bringing total package funding to $250 million; endorse seeking Joint Minister endorsement because of the impact on other NZUP choices; and delegate to the Group General Manager Transport Services authority to vary the alliance contract up to $250 million. It cites Queenstown delivery constraints as the main cost reasons, notes QLDC's fiscal challenges for three waters upgrades, and says the funding would essentially require another NZUP project to be stopped. A graphic shows NZUP's $6.5B total funding allocation against a $8B+ P95 cost risk.",
    "documentType": "Board or committee paper",
    "documentForm": "Board committee decision paper (extract)",
    "year": 2023,
    "publishedDate": "2023-12-11",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Governance Group update (Investment and Delivery Committee, 11 December 2023) - extract (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-086 nzup governance group update (investment and delivery committee, 11 december 2023) - extract nzup governance group update extract of the nzup governance group update to the waka kotahi investment and delivery committee (11 december 2023), for decision. management recommends the board: approve the reduced scope nzup queenstown package (sh6/6a intersection, frankton bus hub, howards drive roundabout) at an estimated $250 million; approve $120 million additional funding, bringing total package funding to $250 million; endorse seeking joint minister endorsement because of the impact on other nzup choices; and delegate to the group general manager transport services authority to vary the alliance contract up to $250 million. it cites queenstown delivery constraints as the main cost reasons, notes qldc's fiscal challenges for three waters upgrades, and says the funding would essentially require another nzup project to be stopped. a graphic shows nzup's $6.5b total funding allocation against a $8b+ p95 cost risk. context: paper to the investment and delivery committee meeting of 11 december 2023, 'for decision', elt owner brett gliddon and issue owner mark ratcliffe, nzup governance group independent chair (p1). non-queenstown content is removed. recommendations (p1): management recommends the board approve the reduced scope at an estimated $250 million; approve additional funding of $120 million, bringing the total to $250 million; endorse seeking joint minister endorsement; and delegate authority to the group general manager transport services to approve an alliance contract variation and related arrangements up to $250 million. what you need to know (pp2-3): estimates significantly exceed the $130 million allocation. following april 2023 direction, the prioritised package was designed and reconciled; qldc and orc agree it is most important for the mode-shift, active travel and safety outcomes sought in the business case. the reduced package is estimated at $250 million ($120 million over), and independent reconciliation is advanced. main cost reasons are design development and queenstown constraints: no lengthy night works, no viable long-term detour, and a limited resource pool (p2). as presented to the board in september 2023, the programme team recommends (and the governance group supports) the extra $120 million (p3). qldc has signalled fiscal challenges affecting three waters upgrades at sh6/6a. funding must come from remaining nzup projects, essentially requiring one to be stopped, hence joint minister endorsement before award. the delegated contract variation would follow reconciliation, within $250 million, and is subject to joint ministers' endorsement. the remainder of the package remains a priority for further investment (p3). the p3 graphic shows projects contractually committed $2.3b+, award contracts $1.8b+ ($4.1b+ cumulative), total funding allocation $6.5b and p95 cost risk $8b+. mass rapid transit: the extract says nothing about mass rapid transit. board committee decision paper (extract) nzta (waka kotahi). nzup governance group update (investment and delivery committee, 11 december 2023) - extract (2023). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (in confidence) does not mention mass rapid transit. reduced scope estimated cost $250 million (p1) additional funding $120 million; total package funding $250 million (p1) current funding allocation $130 million (p2) nzup graphic: projects contractually committed $2.3b+; award contracts $1.8b+ ($4.1b+); total funding allocation $6.5b; p95 cost risk $8b+ (p3) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient mark ratcliffe author nzta waka kotahi nzta brett gliddon approved by nzta waka kotahi nzta board to approve the reduced scope nzup queenstown package (sh6/6a intersection, frankton bus hub, howards drive roundabout) at an estimated cost of $250 million. approves the reduced scope for the nzup queenstown package december 2023 not assessed nzta waka kotahi nzta board to approve additional funding of $120 million, bringing total package funding to $250 million. approves additional funding of $120 million december 2023 not assessed nzta waka kotahi nzta board to endorse seeking joint minister endorsement for delivery of the reduced scope package, given its impact on remaining nzup choices. endorses seeking joint minister endorsement before award to alliance not assessed nzta waka kotahi nzta board to delegate authority to the group general manager transport services to approve an alliance contract variation up to $250 million. approves the delegation of authority to the group general manager transport services after reconciliation; subject to joint ministers endorsement not assessed nzta waka kotahi nzta continue discussions with qldc on funding options for three waters upgrades at sh6/6a. the project team is continuing discussions with council around funding options for this work not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-12-11",
    "cover": {
      "src": "/covers/QTS-086.webp",
      "srcset": "/covers/QTS-086.webp 400w, /covers/QTS-086-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-086/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-086/QTS-086-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-087",
    "code": "QTS-087",
    "title": "Committee report back - Investment & Delivery (Board meeting 12 December 2023) - extract",
    "shortTitle": "Committee report back - Investment & Delivery",
    "summary": "Extract of the Investment and Delivery Committee's report back to the Waka Kotahi Board meeting of 12 December 2023 (for decision and noting). The Committee's agenda included the NZUP Governance Group update and Queenstown. The released NZUP GG update item repeats the four recommendations for the Board: approve the reduced scope NZUP Queenstown Package (SH6/6A intersection, Frankton bus hub, Howards Drive roundabout) at an estimated $250 million; approve $120 million additional funding, bringing the total to $250 million; endorse seeking Joint Minister endorsement; and delegate to the Group General Manager Transport Services authority to vary the alliance contract up to $250 million. No author or signatory is named in the extract.",
    "documentType": "Board or committee paper",
    "documentForm": "Board committee report back (extract)",
    "year": 2023,
    "publishedDate": "2023-12-12",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Committee report back - Investment & Delivery (Board meeting 12 December 2023) - extract (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-087 committee report back - investment & delivery (board meeting 12 december 2023) - extract committee report back - investment & delivery extract of the investment and delivery committee's report back to the waka kotahi board meeting of 12 december 2023 (for decision and noting). the committee's agenda included the nzup governance group update and queenstown. the released nzup gg update item repeats the four recommendations for the board: approve the reduced scope nzup queenstown package (sh6/6a intersection, frankton bus hub, howards drive roundabout) at an estimated $250 million; approve $120 million additional funding, bringing the total to $250 million; endorse seeking joint minister endorsement; and delegate to the group general manager transport services authority to vary the alliance contract up to $250 million. no author or signatory is named in the extract. context: board paper for 12 december 2023, 'committee report back - investment & delivery', for decision and noting (p1). the committee's agenda included the nzup gg update and queenstown; other items are out of scope (p1). content (p2): under 'nzup gg update' the paper lists the recommendations carried from the 11 december committee paper (document 11 of the oia-20263 release): approve the reduced scope at an estimated $250 million; approve additional funding of $120 million, total $250 million; endorse seeking joint minister endorsement; and delegate authority for an alliance contract variation up to $250 million. bri-2973 (para 25) records that the board considered the reduced package on 11 december 2023 and approved these items. mass rapid transit: the extract says nothing about mass rapid transit. board committee report back (extract) nzta (waka kotahi). committee report back - investment & delivery (board meeting 12 december 2023) - extract (2023). frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown not stated (in confidence) does not mention mass rapid transit. reduced scope estimated cost $250 million (p2) additional funding $120 million; total $250 million (p2) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper not stated 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta recipient board to approve the reduced scope nzup queenstown package at an estimated cost of $250 million. approves the reduced scope for the nzup queenstown package 12 december 2023 not assessed nzta waka kotahi nzta board to approve additional funding of $120 million, bringing total package funding to $250 million. approves additional funding of $120 million 12 december 2023 not assessed nzta waka kotahi nzta board to endorse seeking joint minister endorsement for the reduced scope package. endorses seeking joint minister endorsement 12 december 2023 not assessed nzta waka kotahi nzta board to delegate to the group general manager transport services authority to vary the alliance contract up to $250 million. approves the delegation of authority to the group general manager transport services 12 december 2023 not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2023-12-12",
    "cover": {
      "src": "/covers/QTS-087.webp",
      "srcset": "/covers/QTS-087.webp 400w, /covers/QTS-087-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-087/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-087/QTS-087-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-088",
    "code": "QTS-088",
    "title": "Proposed Te Pūtahi Ladies Mile Plan Variation – Response from Colin Shields and Dave Smith to Further Panel Transport Questions Raised on 13 December 2023",
    "shortTitle": "Proposed Te Pūtahi Ladies Mile Plan Variation",
    "summary": "Response by Colin Shields (Tonkin & Taylor, Council's transport expert) and Dave Smith (Abley, for NZTA (Waka Kotahi)) to Te Pūtahi Ladies Mile hearing panel questions of 13 December 2023. Mr Shields provides population, geographic spread and bus route maps comparing Queenstown (population 33,860 over 156.7 km²) with Aspen, Colorado (10,390 over 83.7 km²). On a proposed additional SH6 access serving the Glenpanel Homestead and up to 180 unconsented dwellings, Mr Smith (Technical Note 3) considers an extra access appropriate if SH6 becomes a 60 km/h corridor, with left-in/left-out if Howards Drive is a roundabout or signals if signalised. Mr Shields disagrees: there is no NZTA agreement to use the access for 180 units, no ORC agreement for bus services, the access was described as temporary, and the NZUP Howards Drive roundabout does not free up capacity; if the Panel allows a permanent access it should be signalised. Appendix B reproduces NZTA's 2022 comment on the Flint's Park fast-track application. No reference to mass rapid transit.",
    "documentType": "Expert evidence",
    "documentForm": "Joint expert response to hearing panel questions, with technical note and appended NZTA fast-track comment",
    "year": 2023,
    "publishedDate": "2023-12-18",
    "documentStatus": "Final",
    "geographicScope": "Te Pūtahi Ladies Mile; SH6 Ladies Mile corridor; Glenpanel Homestead / Flint's Park access; Queenstown (comparison with Aspen, Colorado)",
    "owner": "NZTA and QLDC",
    "citation": "NZTA (Waka Kotahi), QLDC. Proposed Te Pūtahi Ladies Mile Plan Variation – Response from Colin Shields and Dave Smith to Further Panel Transport Questions Raised on 13 December 2023 (2023). Abley Technical Note 3, job NZTA-J321.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/ytehqjws/response-to-further-panel-questions-191223-colin-shields-and-dave-smith.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ytehqjws/response-to-further-panel-questions-191223-colin-shields-and-dave-smith.pdf"
    ],
    "documentTypeCode": "expert-evidence",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc",
      "abley",
      "tonkin-and-taylor",
      "independent-hearing-panel"
    ],
    "searchText": "qts-088 proposed te pūtahi ladies mile plan variation – response from colin shields and dave smith to further panel transport questions raised on 13 december 2023 proposed te pūtahi ladies mile plan variation response by colin shields (tonkin & taylor, council's transport expert) and dave smith (abley, for nzta (waka kotahi)) to te pūtahi ladies mile hearing panel questions of 13 december 2023. mr shields provides population, geographic spread and bus route maps comparing queenstown (population 33,860 over 156.7 km²) with aspen, colorado (10,390 over 83.7 km²). on a proposed additional sh6 access serving the glenpanel homestead and up to 180 unconsented dwellings, mr smith (technical note 3) considers an extra access appropriate if sh6 becomes a 60 km/h corridor, with left-in/left-out if howards drive is a roundabout or signals if signalised. mr shields disagrees: there is no nzta agreement to use the access for 180 units, no orc agreement for bus services, the access was described as temporary, and the nzup howards drive roundabout does not free up capacity; if the panel allows a permanent access it should be signalised. appendix b reproduces nzta's 2022 comment on the flint's park fast-track application. no reference to mass rapid transit. context: the te pūtahi ladies mile (tplm) hearing panel asked further transport questions on 13 december 2023. this joint response sets out the questions and answers from colin shields (tonkin & taylor; council's expert) and dave smith (abley; for nzta (waka kotahi)) (p.1). question 1 – aspen comparison: mr shields gives the wider queenstown population as 33,860 over 156.7 km² (statistics nz 2023 estimates for sa2s with nearby public transport) and aspen at 10,390 over 83.7 km² (p.1), with mesh-block population maps and bus network maps for both, including aspen's velocirfta bus rapid transit (pp.2–7, largely image pages). question 2 – additional sh6 access: the panel asked whether a new sh6 access, consented for a café/gallery reuse of the glenpanel homestead and said to be designed for 180 unconsented dwellings, would be appropriate in a 60 km/h environment, and in what form (p.8). mr smith (technical note 3, revision a, 18 december 2023) answers that an additional access would be appropriate if sh6 were redesigned and posted as 60 km/h, and could support urbanisation; a left-in/left-out configuration if howards drive is a roundabout, or signals if howards drive is signalised (p.12). mr shields considers there is no nzta agreement for 180 residential units on the access, no orc agreement for bus services, and nzta described the access as temporary until the east–west collector road is built (pp.8–9). his sidra assessment of the nzup howards drive roundabout shows a 75-vehicle am queue on the sh6 east approach even without tplm development, so it does not free capacity (p.9). he notes council recommends no development until bus lanes west of the bridge are complete (p.9). he does not consider an additional access appropriate; if the panel allows a permanent one, it should be signalised (p.10). appendix b: nzta's 2022 comment on the flint's park fast-track application (epa ftc000049; richard shaw, team leader south) states sh6 is at capacity in the am peak and 'mode shift at an unprecedented level is necessary' (p.18), supports a 180-unit cap until the collector road is built, and seeks an sh6 underpass, orc-certified bus stops, a 0.27 on-street car parks per dwelling maximum, noise and access consent notices, and advice notes on certification panels (pp.18–25). mass rapid transit: the document says nothing about mass rapid transit for queenstown. the only rapid transit mentioned is aspen's velocirfta bus rapid transit, on a map legend (p.7). joint expert response to hearing panel questions, with technical note and appended nzta fast-track comment nzta (waka kotahi), qldc. proposed te pūtahi ladies mile plan variation – response from colin shields and dave smith to further panel transport questions raised on 13 december 2023 (2023). abley technical note 3, job nzta-j321. te pūtahi ladies mile; sh6 ladies mile corridor; glenpanel homestead / flint's park access; queenstown (comparison with aspen, colorado) final; technical note 3 revision a no queenstown mass rapid transit reference; addresses the form of sh6 access and a comparison with aspen. wider queenstown population 33,860 over 156.7 km² (p.1) aspen area population 10,390 over 83.7 km² (p.1) proposed homestead sh6 access said to serve up to 180 unconsented dwellings (p.8) sidra: nzup howards drive roundabout am queue of 75 vehicles on sh6 east approach with no tplm development (p.9) nzta 2022: ladies mile on-street parking 0.27 x 2,400 units = 650 parks; seeks 0.27 as maximum (p.24) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/ytehqjws/response-to-further-panel-questions-191223-colin-shields-and-dave-smith.pdf nzta and qldc none expert evidence final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. nzta waka kotahi nzta commissioned qldc qldc commissioned abley abley prepared tonkin & taylor tonkin & taylor prepared independent hearing panel independent hearing panel recipient colin shields author tonkin & taylor tonkin & taylor dave smith author abley abley richard shaw contributor nzta waka kotahi nzta if sh6 is posted at 60 km/h, an additional access may be provided: left-in/left-out if howards drive is a roundabout, signalised if howards drive is signalised. a left in left out configuration would be appropriate not assessed independent hearing panel independent hearing panel do not provide the additional homestead access; if a permanent access is allowed it should be a signalised intersection compatible with stalker road and howards drive signals. this should take the form of a signal intersection not assessed independent hearing panel independent hearing panel no tplm development until bus lanes west of the shotover bridge are complete (council's recommended amendment, as reported). no development can take place until the bus lanes are complete west of the bridge prior to development not assessed qldc qldc flint's park (2022 nzta comment): construct a public sh6 underpass in stage 1, location agreed with waka kotahi, accommodating a shared path. construct a public underpass under sh6 stage 1 of development not assessed flint's park (2022 nzta comment): provide bus stops certified by orc; make 0.27 on-street parks per dwelling a maximum, not a minimum. the 0.27 on-street parks per unit should be a maximum rather than a minimum not assessed main document pdf",
    "sortDate": "2023-12-18",
    "cover": {
      "src": "/covers/QTS-088.webp",
      "srcset": "/covers/QTS-088.webp 400w, /covers/QTS-088-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-088/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-088/QTS-088-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-089",
    "code": "QTS-089",
    "title": "2023 - 2024 Annual Report (Rīpoata ā-tau)",
    "shortTitle": "2023 - 2024 Annual Report (Rīpoata ā-tau)",
    "summary": "QLDC's 2023/24 Annual Report records capital expenditure of $173.8m, 85% of the $203.5m adjusted budget (p.28), and $28.15m of carry-forwards approved in September 2024 (p.30). Queenstown Town Centre Arterials CIP Stage One cost $36.07m in the year with $8.15m deferred; Arthurs Point to CBD Active Travel cost $5.06m with $0.71m deferred (p.30). The report restates the vision that public transport is 'the cleanest, greenest, innovative choice' (p.25). No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2024,
    "publishedDate": "2024",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "2023 - 2024 Annual Report (Rīpoata ā-tau) (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/m3ffhk1r/qldc_annual-report_2023-2024_combined_v10_adopted.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-089 2023 - 2024 annual report (rīpoata ā-tau) 2023 - 2024 annual report (rīpoata ā-tau) qldc's 2023/24 annual report records capital expenditure of $173.8m, 85% of the $203.5m adjusted budget (p.28), and $28.15m of carry-forwards approved in september 2024 (p.30). queenstown town centre arterials cip stage one cost $36.07m in the year with $8.15m deferred; arthurs point to cbd active travel cost $5.06m with $0.71m deferred (p.30). the report restates the vision that public transport is 'the cleanest, greenest, innovative choice' (p.25). no mass rapid transit reference was found. context and purpose. annual report for year three of the 2021-2031 ten year plan. transport. 'the actual capital expenditure in 2023/24 was $173.8m, which was 85% of the adjusted budget' of $203.5m (p.28). carry-forward projects of $28.15m were approved in september 2024 (p.30). the capital table shows queenstown town centre arterials - cip stage one at $36,073,215 at year end with $8,146,609 deferred, and arthurs point to cbd active travel at $5,063,214 with $713,851 deferred (p.30). vision beyond 2050 and spatial plan outcomes are restated: 'our public transport is the cleanest, greenest, innovative choice for district-wide connectivity' (p.25) and 'public transport, walking and cycling is the preferred option for daily travel' (p.26). performance. a 61% 'capital works completed' result (p.44) relates to community facilities and property, not transport. mass rapid transit: no reference to mass rapid transit was found in the text read. annual report 2023 - 2024 annual report (rīpoata ā-tau) (2024). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read capital expenditure $173.8m, 85% of $203.5m adjusted budget (p.28) carry-forwards $28.15m (p.30) arterials cip stage one $36,073,215; $8,146,609 deferred (p.30) arthurs point to cbd active travel $5,063,214; $713,851 deferred (p.30) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published glyn lewers signatory qldc qldc mike theelen signatory qldc qldc defer $8.15m of arterial stage one budget to complete the project arterial stage one $8,146,609 deferred 2024/25 not assessed qldc qldc complete arthurs point to cbd active travel ($0.71m deferred) $713,851 deferred 2024/25 not assessed qldc qldc carry forward $28.15m of capital projects carry-forward projects totalling $28.15m 2024/25 not assessed qldc qldc main document pdf",
    "sortDate": "2024-01-01",
    "cover": {
      "src": "/covers/QTS-089.webp",
      "srcset": "/covers/QTS-089.webp 400w, /covers/QTS-089-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-089/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-089/QTS-089-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-090",
    "code": "QTS-090",
    "title": "30 Year Infrastructure Strategy – Water, Transport, Waste and Social 2024–2054",
    "shortTitle": "30 Year Infrastructure Strategy – Water",
    "summary": "QLDC's 30-year Infrastructure Strategy for 2024–2054, the final strategy adopted with the Long Term Plan 2024–2034 on 19 September 2024 to meet section 101B of the Local Government Act 2002. It covers three waters, transport, waste and, for the first time, social infrastructure. It identifies five significant issues: rapid and sustained population growth, increased standards, resilience to shock events, the climate emergency, and an infrastructure deficit. Its 'most likely scenario' is acknowledged not to be the preferred one, because fiscal constraints prevent investment at the optimal pace. For transport, the strategy relies on the Way to Go partnership with NZTA (Waka Kotahi) and ORC. It sets out four options: make best use of existing assets; protect the network for future development; targeted expansions and more travel choices (the most likely option, assuming new funding mechanisms); and transform the way the network operates. Key transport initiatives include Queenstown Arterial Stages 1-3, the Arthurs Point bridge, a PT interchange, parking management, active travel, network optimisation and, long term, a Whakatipu ferry network. Forecast transport capex is $38.3M in Year 1, rising to $53.6M in Year 10, and $154.9M-$227M per five-year block in Years 11-30 (present-day dollars). The strategy contains no proposal for offline mass rapid transit.",
    "documentType": "Infrastructure strategy",
    "documentForm": "30-year infrastructure strategy (LGA 2002 s101B), adopted with the Long Term Plan 2024–2034",
    "year": 2024,
    "publishedDate": "2024-09-19",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu Basin; Queenstown; Frankton; Wānaka / Upper Clutha; Glenorchy; Kingston",
    "owner": "QLDC",
    "citation": "30 Year Infrastructure Strategy – Water, Transport, Waste and Social 2024–2054 (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/o5bprma2/qldc_infrastructure-strategy_2024-2034_final.pdf"
    ],
    "documentTypeCode": "infrastructure-strategy",
    "topics": [
      "active-travel",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-090 30 year infrastructure strategy – water, transport, waste and social 2024–2054 30 year infrastructure strategy – water qldc's 30-year infrastructure strategy for 2024–2054, the final strategy adopted with the long term plan 2024–2034 on 19 september 2024 to meet section 101b of the local government act 2002. it covers three waters, transport, waste and, for the first time, social infrastructure. it identifies five significant issues: rapid and sustained population growth, increased standards, resilience to shock events, the climate emergency, and an infrastructure deficit. its 'most likely scenario' is acknowledged not to be the preferred one, because fiscal constraints prevent investment at the optimal pace. for transport, the strategy relies on the way to go partnership with nzta (waka kotahi) and orc. it sets out four options: make best use of existing assets; protect the network for future development; targeted expansions and more travel choices (the most likely option, assuming new funding mechanisms); and transform the way the network operates. key transport initiatives include queenstown arterial stages 1-3, the arthurs point bridge, a pt interchange, parking management, active travel, network optimisation and, long term, a whakatipu ferry network. forecast transport capex is $38.3m in year 1, rising to $53.6m in year 10, and $154.9m-$227m per five-year block in years 11-30 (present-day dollars). the strategy contains no proposal for offline mass rapid transit. context and purpose. this document is queenstown lakes district council's 30 year infrastructure strategy – water, transport, waste and social 2024–2054, the final strategy adopted with the long term plan 2024–2034 on 19 september 2024. in that plan the strategy pages are numbered from 161, and the footer reads 'long term plan 2024-2034'. it sets the strategic direction for infrastructure in the district, identifies significant issues, principal options and their implications, and fulfils section 101b of the lga 2002 alongside the financial strategy (p3). it is the first version to include social infrastructure (p3). it notes that nzta (waka kotahi) manages state highways and otago regional council (orc) operates public transport (p3). the strategy draws on the queenstown lakes spatial plan 2021, asset management plans, master plans and the queenstown integrated transport business case (pp3, 12). significant issues. the district has almost tripled in size over 30 years, and average day populations are more than 30% above the resident population (p13). five significant issues are identified: rapid and sustained population growth; increased and increasing standards; resilience to shock events; the climate emergency; and an infrastructure deficit, made worse by escalating costs, limited delivery capacity, long project incubation and limited funding (pp13-14). the 'most likely scenario' is explicitly not the preferred scenario: 'current fiscal constraints mean council is unable to invest at the optimal quantum and pace' (p17). the strategy assumes that investment by third-party providers, including nzta and orc, will follow a similar trajectory to council's (p17). council commits to consider non-built solutions first, to partner with others and to advocate nationally (p20). eight significant decisions are set out (p21). transport (significant decision 06). transport assets and services are provided in partnership with nzta and orc through way to go (w2g) (p48). the strategy reports that investment in whakatipu is well advanced: a low-cost frequent pt service is operating, active travel and cbd upgrades are complete, arterial stage 1 is under construction, and nz upgrade programme works on sh6/6a are planned (p48). the most likely scenario assumes w2g partners keep investing in line with agreed plans, with timing realigned to government policy statement funding priorities (p49). four options are assessed: - option 1, make best use of existing assets: low impact; travel times are expected to worsen (p49). - option 2, protect the network for future development: corridor protection and land acquisition only (p50). - option 3, targeted expansions and more travel choices (most likely): bypass routes in queenstown and wānaka, major pt network upgrades and active travel expansion, underpinned by an assumption that new funding mechanisms will be introduced; some interim deterioration in levels of service is possible (p50). - option 4, transform the way the transportation network operates: 'new high-capacity high-frequency public transport modalities, major streetscape upgrades, and secondary cycle networks', with 'blue-sky thinking'. this depends on behaviour change, technology, new funding and partner support, may require deprioritising other activities, and would take effect only in later years (p51). key initiatives under the most likely scenario (p52, bubble chart) include: - short term: renewals, demand and parking management, active travel and pt low-cost low-risk programmes, model replacement, arterial stage 1 completion, capell ave extension, shepherds creek bridge. - medium term: arthurs point bridge, arterial and pt interchange early design and land acquisition, the quail rise to hawthorne link, frankton road 10 formation, and corridor network optimisations. - long term: arterial stages 2 and 3, the pt interchange, queenstown street upgrades, the ballantyne road freight link and a whakatipu ferry network. travel demand management is listed as a key behaviour-change programme (p62). key figures. transport capex (present day, uninflated) runs from $38.3m in year 1 to $53.6m in year 10. it is $189.8m (y11-15), $193.2m (y16-20), $227m (y21-25) and $154.9m (y26-30). transport opex is about $12.5m-$13.0m a year. capex drivers are growth 37%, renewal 29% and levels of service 34% (p63). three waters capex is substantially larger, for example $161.5m in year 6 (p63). mass rapid transit: the strategy does not mention mass rapid transit between frankton and the town centre. the nearest references are option 4, which is not the most likely option, with its 'new high-capacity high-frequency public transport modalities' (p51), and a long-term 'whakatipu ferry network' initiative (p52). neither has a route, cost or timeframe. 30-year infrastructure strategy (lga 2002 s101b), adopted with the long term plan 2024–2034 30 year infrastructure strategy – water, transport, waste and social 2024–2054 (2024). queenstown lakes district; whakatipu basin; queenstown; frankton; wānaka / upper clutha; glenorchy; kingston final. adopted with the long term plan 2024–2034 on 19 september 2024. does not propose mass rapid transit. option 4, which is not the most likely option, mentions unspecified new high-capacity, high-frequency public transport. the strategy does not mention mass rapid transit or offline public transport. the only related reference is in transport option 4, 'transform the way the transportation network operates', which is not the most likely scenario. option 4 states: 'new high-capacity high-frequency public transport modalities, major streetscape upgrades, and secondary cycle networks feature in this option' and that 'blue-sky thinking will be an underpinning principle, investing in new and innovative technologies' (p51). it says the option is 'critically dependent on the pace of behaviour change, technological advancements, and the availability of new funding' and that material changes 'would be given effect in later years' (p51). the most likely option (option 3) instead relies on bypass routes, 'major upgrades to public transport networks' and active travel (p50). a long-term 'whakatipu ferry network' appears among key initiatives (p52). \"new high-capacity high-frequency public transport modalities, major streetscape upgrades, and secondary cycle networks feature in this option, in addition to the targeted expansions and network effectiveness interventions described in previous options.\" (p.51) | \"the extent to which this option could be given effect is critically dependent on the pace of behaviour change, technological advancements, and the availability of new funding.\" (p.51) | \"current fiscal constraints mean council is unable to invest at the optimal quantum and pace required to respond to issues and realise council's vision.\" (p.17) transport capex y1 $38.3m, y2 $21.4m, y3 $21.6m, y4 $25.3m, y5 $35.1m, y6 $40.4m, y7 $40.5m, y8 $27.9m, y9 $42.5m, y10 $53.6m (present day, uninflated) (p63) transport capex y11-15 $189.8m; y16-20 $193.2m; y21-25 $227m; y26-30 $154.9m (p63) transport opex $12.5m (y1) to $13.0m (y10); $65.7m-$70.1m per five-year block y11-30 (p63) transport capex drivers: growth 37%, renewal 29%, levels of service 34% (p63) district has almost tripled in size over the past 30 years; average day populations over 30% higher than resident population (p13) eight significant infrastructure decisions identified (p21) a study cost has been requested under the official information act or lgoima. no figure has been received. qldc passing infrastructure strategy adopted 2024 walking and cycling walking, cycling, trails and other active travel. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc prepared qldc qldc published keep collaborating with and advocating to way to go partners (nzta, orc) so that state highway, network and pt investment plans stay aligned with district needs. council will continually collaborate with, and advocate to, the w2g partners over life of strategy (30 years) not assessed qldc qldc follow option 3 (most likely): targeted expansions and more travel choices, including bypass routes in queenstown and wānaka, major pt upgrades and active travel expansion. investment will deliver the formation of critical bypass routes in the hubs of queenstown and wānaka, major upgrades to public transport networks 2024-2054 not assessed qldc qldc continue transport renewals, sealed road rehabilitation and minor improvements programmes. renewals; sealed road rehabs; minor improvements programme short, medium and long term not assessed qldc qldc deliver travel demand management and parking management plans. demand management; parking management plans short, medium and long term not assessed qldc qldc deliver active travel and public transport low-cost low-risk (lclr) improvement programmes. active travel lclr programme; public transport lclr programme short, medium and long term not assessed qldc qldc replace the transport model; prepare strategic and network plans. model replacement; strategic & network plans short term (y1-3) not assessed qldc qldc complete queenstown arterial stage 1. arterial stage 1 (completion) short term (y1-3) not assessed qldc qldc deliver butlers green retaining wall, capell ave extension and shepherds creek bridge. butlers green retaining wall; capell ave extension; shepherds creek bridge short term (y1-3) not assessed qldc qldc deliver glenorchy/kinloch area resilience works, the resilience programme and resilience/land stabilisation programmes. glenorchy/kinloch area resilience; resilience programme short, medium and long term not assessed qldc qldc build the arthurs point bridge. medium term (y4-10) not assessed qldc qldc carry out queenstown arterial early design and land acquisition (medium term); arterial land acquisition (long term). arterial early design & land acquisition medium and long term not assessed qldc qldc carry out pt interchange early design and land acquisition (medium term); deliver the pt interchange (long term). pt interchange early design & land acquisition; pt interchange medium and long term not assessed qldc qldc build the quail rise to hawthorne link. medium term (y4-10) not assessed qldc qldc rehabilitate fernhill road with active travel improvements; deliver gorge road/robins road active travel. fernhill road rehab & active travel; gorge road/robins road active travel medium term (y4-10) not assessed qldc qldc deliver frankton road 10 formation. medium term (y4-10) not assessed qldc qldc deliver the wānaka cycle network, additional wānaka street lighting and wānaka network optimisation. wānaka cycle network; additional wānaka street lighting; wānaka network optimisation medium and long term not assessed qldc qldc optimise the southern corridor, eastern corridor and hāwea networks, development-area networks and the pt network. southern corridor network optimisation; eastern corridor network optimisation; pt network optimisation medium and long term not assessed qldc qldc deliver queenstown arterial stages 2 and 3. arterial stage 2; arterial stage 3 long term (y11+) not assessed qldc qldc deliver queenstown street upgrades. long term (y11+) not assessed qldc qldc expand the whakatipu active travel network. long term (y11+) not assessed qldc qldc build the ballantyne road freight link. long term (y11+) not assessed qldc qldc develop a whakatipu ferry network. long term (y11+) not assessed qldc qldc invest in travel demand management behaviour-change programmes to reduce or shift per-capita demand, including uptake of public and active transport. travel demand management: reducing the need to travel, changing the time of travel, and facilitating/incentivising uptake of public transport not assessed qldc qldc seek new funding and financing tools and bring forward key projects if fiscal constraints ease. if fiscal constraints are alleviated, council will bring forward key projects not assessed qldc qldc main document pdf",
    "sortDate": "2024-09-19",
    "cover": {
      "src": "/covers/QTS-090.webp",
      "srcset": "/covers/QTS-090.webp 400w, /covers/QTS-090-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-090/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-090/QTS-090-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-091",
    "code": "QTS-091",
    "title": "NZ Upgrade Programme: Queenstown Package way forward (OIA-15181, 28 May 2024)",
    "shortTitle": "NZ Upgrade Programme: Queenstown Package way",
    "summary": "Ministerial briefing BRI-2973 (1 February 2024), released under OIA-15181 on 28 May 2024 with the cost figures withheld. It is from Brett Gliddon, NZTA (Waka Kotahi) Group General Manager Transport Services, to Hon Simeon Brown (Transport) and Hon Nicola Willis (Finance). It seeks Joint Minister endorsement of the NZTA Board's 11 December 2023 decision to deliver a reduced scope NZUP Queenstown Package (SH6/6A intersection, Frankton bus hub, Howards Drive roundabout) at an estimated $250 million (P50, including a risk-adjusted contingency of [withheld s 9(2)(j)]). The package's allocation is $130 million; the additional $120 million would come from existing contingency within the $6.54 billion NZUP funding (principally the [withheld s 9(2)(j)] programme contingency), affecting choices for other NZUP projects. It explains costs by Queenstown constraints and the enlarged intersection. A decision was needed by mid-February 2024 for construction from March 2024 to 2028; delay would cost a year plus escalation and alliance costs of [withheld s 9(2)(j)] per month. The Ministry of Transport supports the approach but notes uncertainty whether $250 million is P50 or P95, and that NZUP would have no contingency left. The remaining scope is described as a regional priority outside NZUP.",
    "documentType": "Board or committee paper",
    "documentForm": "Ministerial briefing note",
    "year": 2024,
    "publishedDate": "2024-02-01",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZ Upgrade Programme: Queenstown Package way forward (2024). BRI-2973.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-15181, 28 May 2024)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers"
    ],
    "searchText": "qts-091 nz upgrade programme: queenstown package way forward (oia-15181, 28 may 2024) nz upgrade programme: queenstown package way ministerial briefing bri-2973 (1 february 2024), released under oia-15181 on 28 may 2024 with the cost figures withheld. it is from brett gliddon, nzta (waka kotahi) group general manager transport services, to hon simeon brown (transport) and hon nicola willis (finance). it seeks joint minister endorsement of the nzta board's 11 december 2023 decision to deliver a reduced scope nzup queenstown package (sh6/6a intersection, frankton bus hub, howards drive roundabout) at an estimated $250 million (p50, including a risk-adjusted contingency of [withheld s 9(2)(j)]). the package's allocation is $130 million; the additional $120 million would come from existing contingency within the $6.54 billion nzup funding (principally the [withheld s 9(2)(j)] programme contingency), affecting choices for other nzup projects. it explains costs by queenstown constraints and the enlarged intersection. a decision was needed by mid-february 2024 for construction from march 2024 to 2028; delay would cost a year plus escalation and alliance costs of [withheld s 9(2)(j)] per month. the ministry of transport supports the approach but notes uncertainty whether $250 million is p50 or p95, and that nzup would have no contingency left. the remaining scope is described as a regional priority outside nzup. context and purpose: bri-2973, 'nz upgrade programme: queenstown package way forward', dated 1 february 2024 and signed by brett gliddon (pp1, 6), seeks endorsement from the minister of transport and minister of finance of the nzta board's 11 december 2023 decision to deliver a reduced scope queenstown package at an estimated $250 million (p2). the ministry of transport and treasury were consulted (p2). context (pp2-3): earlier briefings (bri-2886, bri-2919) advised the package was unaffordable within its $130 million allocation. from april 2023 nzta progressed a reduced package (bp intersection, frankton bus hub, howards drive roundabout), which nzta assessed as the most critical elements and qldc and orc agreed were most important. the full scope also included sh6/6a bus priority, sh6 bus lanes and pedestrian improvements. peak day population is projected to rise from 103,000 in 2021 to 204,000 in 2051, and the 2020 detailed business case estimated $670 million to $1.2 billion of economic losses over 40 years without investment (p3). cost (p3): the reduced package is $250 million, a p50 estimate including a risk-adjusted contingency of [withheld s 9(2)(j)]. it was independently reconciled and value engineered. reasons given: short construction season, imported labour and materials, 36,000 vehicles per day with no viable detour, no lengthy night works, an enlarged intersection for bus priority, walking, cycling and bus hub facilities, and complex utility and stormwater works. funding (pp4-5): in august 2023 the board received delegations to make scope decisions and reallocate funding between nzup projects, but not to stop a project. nzup funding for nzta projects is $6.54 billion, including [withheld s 9(2)(j)] set aside as programme contingency, initially intended for the queenstown and canterbury packages. the extra funding above $130 million would come principally from that contingency. drury urban arterials, rolleston and brougham are said to remain affordable, with further advice after mid-2024 negotiations. the board's 11 december 2023 approvals are listed in para 25. timing (p5): detailed design is complete and consents are in place. a decision by mid-february 2024 would allow construction from march 2024 to 2028. later decisions would delay completion by at least a year and add escalation and ongoing alliance and management costs of [withheld s 9(2)(j)] per month. agency comments (p5): the ministry of transport supports the reduced scope as consistent with the august 2023 delegation. it notes uncertainty whether $250 million is p50 or p95, that it has not reviewed the alliance contract, and that nzup will be fully subscribed with no contingency for further escalation. treasury did not have time to provide substantive comment. recommendations (p6): endorse the board decision; note $120 million additional funding; note affordability within $6.54 billion from existing contingencies; note timing impacts; note public communication; and note most remaining scope is a regional priority outside nzup. ministerial signature blocks are blank in the release. attachments: nzup way-forward diagram (p7), location map with element prioritisation 1-7 (p8), and the updated sh6/sh6a intersection and bus hub layout (p9). mass rapid transit: the briefing says nothing about mass rapid transit. the deferred elements include the sh6a corridor improvements between frankton and queenstown (attachment 2, priorities 4-5). ministerial briefing note nzta (waka kotahi). nz upgrade programme: queenstown package way forward (2024). bri-2973. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown signed by nzta official; ministerial decision not shown does not mention mass rapid transit. reduced package estimated cost $250 million (p50) (p3) current queenstown allocation $130 million (p2, p4) additional funding $120 million from wider nzup (p6) nzup funding available for nzta projects $6.54 billion (p4) peak day population 103,000 (2021) to 204,000 (2051) (p3) 2020 dbc: estimated economic losses $670 million to $1.2 billion over 40 years without investment (p3) 36,000 vehicles per day through sh6/6a (p3) construction march 2024 to 2028 (p5) risk-adjusted contingency, programme contingency and monthly alliance cost withheld under s 9(2)(j) (pp3-5) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-15181, 28 may 2024) nzta none board or committee paper final 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared central government / ministers central government / ministers recipient brett gliddon signatory nzta waka kotahi nzta joint ministers to endorse the nzta board decision to complete the reduced scope queenstown package at an estimated cost of $250 million. endorse the decision by the nzta board to complete the reduced scope queenstown package by mid-february 2024 not assessed central government / ministers central government / ministers joint ministers to note that the reduced scope requires $120 million additional funding from the wider nzup, drawn from existing contingencies within the $6.54 billion allocation. note that progressing the reduced scope queenstown package will require additional funding of $120 million not assessed central government / ministers central government / ministers subject to endorsement, change the current alliance contract to deliver the reduced scope up to the $250 million funding limit. make changes to the current alliance contract construction from march 2024 not assessed nzta waka kotahi nzta communicate with the public about the updated project scope and cost once the decision is confirmed. once decision confirmed not assessed nzta waka kotahi nzta provide a further briefing on affordability of the canterbury package and drury urban arterials once other nzup negotiations conclude. we will provide you with a further briefing at that point mid-2024 not assessed nzta waka kotahi nzta treat most of the remaining queenstown package scope as a regional priority for transport investment outside nzup; provide further advice to joint ministers. nzta considers most of the remaining scope remains a regional priority not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2024-02-01",
    "cover": {
      "src": "/covers/QTS-091.webp",
      "srcset": "/covers/QTS-091.webp 400w, /covers/QTS-091-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-091/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-091/QTS-091-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-092",
    "code": "QTS-092",
    "title": "NZ Upgrade Programme: Queenstown Package way forward (OIA-20263, 30 January 2026)",
    "shortTitle": "NZ Upgrade Programme: Queenstown Package way",
    "summary": "Ministerial briefing BRI-2973 (1 February 2024), released under OIA-20263 on 30 January 2026 with the cost figures included. It is from Brett Gliddon, NZTA (Waka Kotahi) Group General Manager Transport Services, to Hon Simeon Brown (Transport) and Hon Nicola Willis (Finance). It seeks Joint Minister endorsement of the NZTA Board's 11 December 2023 decision to deliver a reduced scope NZUP Queenstown Package (SH6/6A intersection, Frankton bus hub, Howards Drive roundabout) at an estimated $250 million (P50, including a risk-adjusted contingency of $20 million). The package's allocation is $130 million; the additional $120 million would come from existing contingency within the $6.54 billion NZUP funding (principally the $116 million programme contingency), affecting choices for other NZUP projects. It explains costs by Queenstown constraints and the enlarged intersection. A decision was needed by mid-February 2024 for construction from March 2024 to 2028; delay would cost a year plus escalation and alliance costs of $900,000 per month. The Ministry of Transport supports the approach but notes uncertainty whether $250 million is P50 or P95, and that NZUP would have no contingency left. The remaining scope is described as a regional priority outside NZUP.",
    "documentType": "Board or committee paper",
    "documentForm": "Ministerial briefing note",
    "year": 2024,
    "publishedDate": "2024-02-01",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZ Upgrade Programme: Queenstown Package way forward (2024). BRI-2973.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "central-government-ministers"
    ],
    "searchText": "qts-092 nz upgrade programme: queenstown package way forward (oia-20263, 30 january 2026) nz upgrade programme: queenstown package way ministerial briefing bri-2973 (1 february 2024), released under oia-20263 on 30 january 2026 with the cost figures included. it is from brett gliddon, nzta (waka kotahi) group general manager transport services, to hon simeon brown (transport) and hon nicola willis (finance). it seeks joint minister endorsement of the nzta board's 11 december 2023 decision to deliver a reduced scope nzup queenstown package (sh6/6a intersection, frankton bus hub, howards drive roundabout) at an estimated $250 million (p50, including a risk-adjusted contingency of $20 million). the package's allocation is $130 million; the additional $120 million would come from existing contingency within the $6.54 billion nzup funding (principally the $116 million programme contingency), affecting choices for other nzup projects. it explains costs by queenstown constraints and the enlarged intersection. a decision was needed by mid-february 2024 for construction from march 2024 to 2028; delay would cost a year plus escalation and alliance costs of $900,000 per month. the ministry of transport supports the approach but notes uncertainty whether $250 million is p50 or p95, and that nzup would have no contingency left. the remaining scope is described as a regional priority outside nzup. context and purpose: bri-2973, 'nz upgrade programme: queenstown package way forward', dated 1 february 2024 and signed by brett gliddon (pp1, 6), seeks endorsement from the minister of transport and minister of finance of the nzta board's 11 december 2023 decision to deliver a reduced scope queenstown package at an estimated $250 million (p2). the ministry of transport and treasury were consulted (p2). context (pp2-3): earlier briefings (bri-2886, bri-2919) advised the package was unaffordable within its $130 million allocation. from april 2023 nzta progressed a reduced package (bp intersection, frankton bus hub, howards drive roundabout), which nzta assessed as the most critical elements and qldc and orc agreed were most important. the full scope also included sh6/6a bus priority, sh6 bus lanes and pedestrian improvements. peak day population is projected to rise from 103,000 in 2021 to 204,000 in 2051, and the 2020 detailed business case estimated $670 million to $1.2 billion of economic losses over 40 years without investment (p3). cost (p3): the reduced package is $250 million, a p50 estimate including a risk-adjusted contingency of $20 million. it was independently reconciled and value engineered. reasons given: short construction season, imported labour and materials, 36,000 vehicles per day with no viable detour, no lengthy night works, an enlarged intersection for bus priority, walking, cycling and bus hub facilities, and complex utility and stormwater works. funding (pp4-5): in august 2023 the board received delegations to make scope decisions and reallocate funding between nzup projects, but not to stop a project. nzup funding for nzta projects is $6.54 billion, including $116 million set aside as programme contingency, initially intended for the queenstown and canterbury packages. the extra funding above $130 million would come principally from that contingency. drury urban arterials, rolleston and brougham are said to remain affordable, with further advice after mid-2024 negotiations. the board's 11 december 2023 approvals are listed in para 25. timing (p5): detailed design is complete and consents are in place. a decision by mid-february 2024 would allow construction from march 2024 to 2028. later decisions would delay completion by at least a year and add escalation and ongoing alliance and management costs of $900,000 per month. agency comments (p5): the ministry of transport supports the reduced scope as consistent with the august 2023 delegation. it notes uncertainty whether $250 million is p50 or p95, that it has not reviewed the alliance contract, and that nzup will be fully subscribed with no contingency for further escalation. treasury did not have time to provide substantive comment. recommendations (p6): endorse the board decision; note $120 million additional funding; note affordability within $6.54 billion from existing contingencies; note timing impacts; note public communication; and note most remaining scope is a regional priority outside nzup. ministerial signature blocks are blank in the release. attachments: nzup way-forward diagram (p7), location map with element prioritisation 1-7 (p8), and the updated sh6/sh6a intersection and bus hub layout (p9). mass rapid transit: the briefing says nothing about mass rapid transit. the deferred elements include the sh6a corridor improvements between frankton and queenstown (attachment 2, priorities 4-5). ministerial briefing note nzta (waka kotahi). nz upgrade programme: queenstown package way forward (2024). bri-2973. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown signed by nzta official; ministerial decision not shown does not mention mass rapid transit. reduced package estimated cost $250 million (p50) (p3) risk-adjusted contingency $20 million included in $250 million (p3) current queenstown allocation $130 million (p2, p4) additional funding $120 million from wider nzup (p6) nzup funding available for nzta projects $6.54 billion (p4) peak day population 103,000 (2021) to 204,000 (2051) (p3) 2020 dbc: estimated economic losses $670 million to $1.2 billion over 40 years without investment (p3) 36,000 vehicles per day through sh6/6a (p3) construction march 2024 to 2028 (p5) nzup programme contingency $116 million, initially intended for queenstown and canterbury packages (p4) ongoing alliance and management costs $900,000 per month (p5) attachment 1: nzup total funding allocation $6.5b; p95 cost risk $8b+; projects in construction $2.3b+; significant projects in procurement $3.5b+ (cumulative $5.8b+); pre-implementation $0.7b+; paused $0.6b (p7) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none board or committee paper final 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared central government / ministers central government / ministers recipient brett gliddon signatory nzta waka kotahi nzta joint ministers to endorse the nzta board decision to complete the reduced scope queenstown package at an estimated cost of $250 million. endorse the decision by the nzta board to complete the reduced scope queenstown package by mid-february 2024 not assessed central government / ministers central government / ministers joint ministers to note that the reduced scope requires $120 million additional funding from the wider nzup, drawn from existing contingencies within the $6.54 billion allocation. note that progressing the reduced scope queenstown package will require additional funding of $120 million not assessed central government / ministers central government / ministers subject to endorsement, change the current alliance contract to deliver the reduced scope up to the $250 million funding limit. make changes to the current alliance contract construction from march 2024 not assessed nzta waka kotahi nzta communicate with the public about the updated project scope and cost once the decision is confirmed. once decision confirmed not assessed nzta waka kotahi nzta provide a further briefing on affordability of the canterbury package and drury urban arterials once other nzup negotiations conclude. we will provide you with a further briefing at that point mid-2024 not assessed nzta waka kotahi nzta treat most of the remaining queenstown package scope as a regional priority for transport investment outside nzup; provide further advice to joint ministers. nzta considers most of the remaining scope remains a regional priority not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2024-02-01",
    "cover": {
      "src": "/covers/QTS-092.webp",
      "srcset": "/covers/QTS-092.webp 400w, /covers/QTS-092-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-092/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-092/QTS-092-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-093",
    "code": "QTS-093",
    "title": "Queenstown Public Transport Business Case – Advisory Papers (compiled: Public Transport Hubs and Infrastructure; Service Patterns; System Management; Park & Ride; On-Demand Services; Ownership and Operating Model; Fleet Decarbonisation; Sustainable Funding Model; Forecast Demand)",
    "shortTitle": "Queenstown Public Transport Business Case",
    "summary": "Nine WSP advisory papers prepared for Otago Regional Council (one for 'Way to Go') that support the Queenstown Public Transport Business Case. They cover public transport hubs and infrastructure, service patterns, system management, park and ride, on-demand services, ownership and operating models, fleet decarbonisation, sustainable funding, and forecast demand, including the demand-modelling methodology and technical note. Key findings: standard buses cannot meet future SH6A demand; articulated buses are the most feasible vehicle; a Bus Max network is the likely optimum; battery electric technology is preferred; a roughly 10,000 m2 electric depot is needed, ideally publicly owned, in Frankton or Coneburn; and congestion charging and developer contributions are the most promising extra funding sources. On mass transit, the service patterns paper compares mass rapid transit capacity once and finds it sufficient only at 240 departures per hour. The modelling brief lists a 'gondola versus no gondola' sensitivity and the PT model includes an MRT (off-road corridor) mode, but no mass rapid transit or MRT results are reported: MRT patronage is zero in every 2053 output table. The model concludes that even a high bus mode share would not bring the road network within capacity and that a 'new system (e.g. cable-based system)' could carry the target volumes. The hubs paper sets a trigger for investigating off-line PT.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Compiled technical advisory papers supporting a business case, including demand-modelling methodology statement and technical note",
    "year": 2024,
    "publishedDate": "2024-04",
    "documentStatus": "Draft",
    "geographicScope": "Whakatipu Basin; Queenstown Town Centre (Stanley Street hub); Frankton (Frankton hub, Five Mile, Remarkables Park, Lucas Place, Hawthorne Drive); SH6A Frankton–Queenstown; SH6 southern corridor (Kawarau Falls Bridge, Boyd Road, Hanley's Farm, Jack's Point, Homestead Bay); SH6 eastern corridor (Shotover Bridge, Lake Hayes, Ladies Mile, Arrowtown); Arthurs Point; Speargrass Flat; Cromwell; Coneburn",
    "owner": "ORC",
    "citation": "ORC, Way to Go partnership. Queenstown Public Transport Business Case – Advisory Papers (compiled: Public Transport Hubs and Infrastructure; Service Patterns; System Management; Park & Ride; On-Demand Services; Ownership and Operating Model; Fleet Decarbonisation; Sustainable Funding Model; Forecast Demand) (2024). WSP Project Number 6-XO014.00 (Consultant Agreement / Contract TCTB1 dated 22 July 2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://orc.govt.nz/media/hphfhfgo/queenstown-public-transport-business-case-advisory-papers.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://orc.govt.nz/media/hphfhfgo/queenstown-public-transport-business-case-advisory-papers.pdf"
    ],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "on-demand",
      "electric-vehicles"
    ],
    "organisationIds": [
      "orc",
      "way-to-go-partnership",
      "wsp",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-093 queenstown public transport business case – advisory papers (compiled: public transport hubs and infrastructure; service patterns; system management; park & ride; on-demand services; ownership and operating model; fleet decarbonisation; sustainable funding model; forecast demand) queenstown public transport business case nine wsp advisory papers prepared for otago regional council (one for 'way to go') that support the queenstown public transport business case. they cover public transport hubs and infrastructure, service patterns, system management, park and ride, on-demand services, ownership and operating models, fleet decarbonisation, sustainable funding, and forecast demand, including the demand-modelling methodology and technical note. key findings: standard buses cannot meet future sh6a demand; articulated buses are the most feasible vehicle; a bus max network is the likely optimum; battery electric technology is preferred; a roughly 10,000 m2 electric depot is needed, ideally publicly owned, in frankton or coneburn; and congestion charging and developer contributions are the most promising extra funding sources. on mass transit, the service patterns paper compares mass rapid transit capacity once and finds it sufficient only at 240 departures per hour. the modelling brief lists a 'gondola versus no gondola' sensitivity and the pt model includes an mrt (off-road corridor) mode, but no mass rapid transit or mrt results are reported: mrt patronage is zero in every 2053 output table. the model concludes that even a high bus mode share would not bring the road network within capacity and that a 'new system (e.g. cable-based system)' could carry the target volumes. the hubs paper sets a trigger for investigating off-line pt. context and purpose: wsp was commissioned by orc under a consultant agreement of 22 july 2022 (contract tctb1) to prepare the queenstown public transport business case. these nine advisory papers (project 6-xo014.00) underpin it (p12, p393). the compiled pdf contains, in order: public transport hubs and infrastructure (p1-92), service patterns (p93-195), system management (p196-218), park & ride (p219-258), on-demand services (p259-284), ownership and operating model (p285-303), fleet decarbonisation (p304-364), sustainable funding model (p365-387) and forecast demand with its modelling appendices (p388-473). forecast demand and modelling: updated qldc land-use projections (november 2022) via abley's tracks update show fewer households, tourists and jobs than the earlier business case (p394). to keep links at 90% v/c, am peak pt is needed on sh6a at 27% (2027), 40% (2039) and 47% (2053), and on kawarau falls bridge at 53% by 2053 (about 1,700 passengers per hour) (p395). the pt model is a simplified excel logit mode-choice model run on tracks matrices and has no crowding or capacity constraint (p412, p416, p448). thirteen short-list options (bus max, a split jp/rp version and a jack's point spine, with ferry, pt bridge, malaghans and northbound bus lane variants) were tested (p449-450). bus max with a split service and malaghans routing was the likely optimum (p451). even the preferred option falls short of targets: for example, 2053 westbound sh6a am is 1,281 predicted against 1,466 needed, and shotover bridge is less than half its target (p452). abundant parking at frankton flats is cited as a factor (p452). service patterns: an 11-option long list (bus max variants, rapid transit (bus) spines, a one-seat network, two ferries and a jet boat) was narrowed to four (p103, p159). standard buses cannot meet demand even at 30 buses per hour on sh6a (p102). a capacity matrix finds articulated buses at 20 departures per hour or bi-articulated at 15 meet the 2053 target of 1,700 per hour (p151-152). articulated buses are recommended (p102). continuous pt priority on sh6a is described as difficult because of space constraints, making traffic flow on sh6a critical to bus reliability (p192). hubs and infrastructure: minor design changes let the stanley street and frankton hubs take articulated buses (p10, p43). preferred interchanges are on sh6 near grant road (five mile) and on hawthorne drive near tex smith lane (p10). a boyd road–red oaks drive pt bridge and sh6 northbound bus lanes are documented (p9, p15-16). up to 56 articulated and seven standard buses need a depot of about 10,000 m2, preferably in frankton with coneburn as the alternative (p64-67, p91). other papers: system management recommends that orc partner with the queenstown lakes community housing trust to fund affordable rental housing for pt staff (p201). park & ride recommended sites at speargrass flat and cromwell as supplementary add-ons (p225-226), but the business case later excluded park and ride. on-demand recommends investigating a queenstown hill/goldfields service (p280). ownership recommends public (or third-party) ownership of the depot, with operator-owned fleet and contracted operations (p302). fleet decarbonisation recommends battery electric buses (p322). sustainable funding puts 2039 operating costs at $19.3m–$29.8m a year ($25m for the preferred option). it finds the boyd road bridge unaffordable for qldc, and congestion charging and developer contributions the most promising funding sources (p370). conclusion of the modelling: 'the model predicts a high pt share... but this would be not sufficient to result in the road network operating within capacity' (p454). target volumes above 1,500 per hour could be carried by higher-capacity buses, which will 'reach a maximum practical capacity shortly after 2053', or 'by the addition of a new system (e.g. cable-based system)'. these would be combined with parking management, road user or congestion charging, land-use change and home-working (p454). mass rapid transit: the methodology statement (14 october 2022), the forecast demand paper and the technical note all list 'range of mass transit options (i.e. gondola)' among interventions the model would test. they also list a 'gondola versus no gondola' sensitivity, which appears three times (p404, p412-413, p418). the model can represent 'off-road corridors (e.g. gondola, ferry)' (p409, p448), and an mrt (off-road corridor) mode is built into its cost and choice structure (p422, p424-425). no mass rapid transit option appears among the 13 tested options (p450). in the appendix f 2053 five-point summaries, all 30 mrt rows (three periods, five screenlines, two directions) show 0 passengers and 0% in all 13 options (p470-473). no sensitivity results are reported anywhere. the only mass rapid transit assessment is the service patterns capacity matrix: 10 passengers per cabin (8 planning), and sufficient 'only when operating a very high frequencies (240 departures per hour or 15 sec headway)', a frequency the table bands as 'too high' (p151-152). the hubs paper sets the off-line trigger (p11, p34). compiled technical advisory papers supporting a business case, including demand-modelling methodology statement and technical note orc, way to go partnership. queenstown public transport business case – advisory papers (compiled: public transport hubs and infrastructure; service patterns; system management; park & ride; on-demand services; ownership and operating model; fleet decarbonisation; sustainable funding model; forecast demand) (2024). wsp project number 6-xo014.00 (consultant agreement / contract tctb1 dated 22 july 2022). whakatipu basin; queenstown town centre (stanley street hub); frankton (frankton hub, five mile, remarkables park, lucas place, hawthorne drive); sh6a frankton–queenstown; sh6 southern corridor (kawarau falls bridge, boyd road, hanley's farm, jack's point, homestead bay); sh6 eastern corridor (shotover bridge, lake hayes, ladies mile, arrowtown); arthurs point; speargrass flat; cromwell; coneburn final (various revisions): hubs and infrastructure rev 3.1 final (revised) 27/03/2024; park & ride rev 4.1 and on-demand rev 3.1 final 03/04/2024; others final 15/03/2024. some document-detail pages still read 'draft for comment' (service patterns, on-demand) or 'final draft' (forecast demand). covers marked 'confidential' a mass rapid transit capacity test was briefed once, but no results were reported and mass rapid transit was zero in the outputs. was the 'gondola versus no gondola' sensitivity / mrt mode run? on the evidence in these papers, no results were reported and the mrt class was not active in any reported run. the modelling brief (methodology statement v3, matthew gatenby, 14 october 2022) says the simplified model would allow a 'range of mass transit options (i.e. gondola), which also have route, stop and capacity variations'. it says sensitivities would follow, including 'gondola versus no gondola' (p412-413), and the same wording recurs in the forecast demand paper (p404) and the technical note (p418). the model structure includes 'mrt (off-road corridor)' links and generalised cost (p422, p424-425). however, the 13 short-list options contain no mass rapid transit/mrt variant (p450), and every mrt row in the 2053 am, interpeak and pm five-point summaries is 0 passengers / 0% for all options (p470-473). the only mass rapid transit assessment is in service patterns: 'gondola can provide sufficient capacity but only when operating a very high frequencies (240 departures per hour or 15 sec headway)' (p151). table 16 assumes 8 planning passengers per cabin and bands 60+ departures per hour as 'frequency too high' (p152). mass rapid transit is not in the 11-option long list (p159). the technical note concludes that buses would not bring the road network within capacity and names 'the addition of a new system (e.g. cable-based system)' (p454). the hubs paper sets a trigger for investigating off-line pt, recommends integrating any off-line solution into network design (p11), and finds an off-line frankton interchange unnecessary unless an off-line route is built (p10). \"gondola can provide sufficient capacity but only when operating a very high frequencies (240 departures per hour or 15 sec headway).\" (p.151) | \"range of mass transit options (i.e. gondola), which also have route, stop and capacity variations\" (p.412) | \"it is expected that initial runs will determine the likely service / route / frequency / system requirements, from which sensitivities can be assessed (p&r system versus no p&r system; gondola versus no gondola; higher/lower residential growth sensitivities etc)\" (p.412-413) | \"in summary, the model predicts a high pt share (by traditional nz levels) would be achieved by 2053... but this would be not sufficient to result in the road network operating within capacity.\" (p.454) | \"these levels could be accommodated by pt – either using higher-capacity buses (albeit this system will also reach a maximum practical capacity shortly after 2053), or by the addition of a new system (e.g. cable-based system)\" (p.454) | \"therefore, a potential trigger for investigating an off-line public transport solution would be when it is no longer feasible to hold traffic back in frankton.\" (p.11) | \"it is recommended that an offline solution is integrated into the design of the public transport network to avoid forced transfers where possible.\" (p.11) critical pt share to keep links at 90% v/c (am): sh6a 27% (2027), 40% (2039), 47% (2053); kawarau falls bridge 53% by 2053, about 1,700 passengers/hour (p395) 2053 am westbound sh6a (suburb): target 1,466 vs predicted 1,281 pt passengers; shotover bridge westbound target 772 vs predicted 358 (p452) 2053 capacity matrix (table 16): gondola 10 max / 8 planning passengers per cabin; 1,920 pph at 240 departures/hour; articulated bus 110/88 per vehicle (p152) appendix f 2053 five-point summaries: mrt = 0 passengers and 0% in all 30 rows for all 13 options; park and ride also 0 (p470-473) 13 short-list options tested in pt model (table 20, p450); 11 long-list service pattern options (p159) depot for up to 56 articulated and 7 standard buses; about 10,000 m2 (p64, p67) 2039 operating costs $19.3m–$29.8m p.a. across short-list options; preferred option $25m p.a. with fare revenue $8.7m (p370) capital funding split: orc $29m; qldc $1.8m–$29.9m; nzta $24.8m–$54.0m depending on option (p370) whakatipu park & ride facility $1,937,000 not in draft ltp 2024-2034; queenstown pt interchange $12,203,000 – off-road interchange 'could be required if offline public transport route is adopted' (p380) spatial plan average-day population 51,000 (2021) to 120,000 (2051); peak day 103,000 to 204,000 (p394) a study cost has been requested under the official information act or lgoima. no figure has been received. https://orc.govt.nz/media/hphfhfgo/queenstown-public-transport-business-case-advisory-papers.pdf orc substantive business case chapter or appendix draft 2024 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. on-demand transport on-demand public transport. electric vehicles electric and hydrogen vehicle technology. orc orc commissioned way to go way to go commissioned wsp (including opus) wsp prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner way to go way to go partner hilary fowler author wsp (including opus) wsp i. wong author wsp (including opus) wsp l.g author wsp (including opus) wsp matthew gatenby author wsp (including opus) wsp chris groom prepared by wsp (including opus) wsp hilary fowler prepared by wsp (including opus) wsp joanne tan prepared by wsp (including opus) wsp kristian jensen prepared by wsp (including opus) wsp matt gatenby prepared by wsp (including opus) wsp thomas prince prepared by wsp (including opus) wsp arnaud deutsch reviewed by wsp (including opus) wsp brian smith reviewed by wsp (including opus) wsp chris groom reviewed by wsp (including opus) wsp eric whitfield reviewed by wsp (including opus) wsp chris fox approved by wsp (including opus) wsp chris groom approved by wsp (including opus) wsp eric whitfield approved by wsp (including opus) wsp investigate an off-line public transport solution when it is no longer feasible to hold traffic back in frankton (e.g. excessive queuing delaying buses). a potential trigger for investigating an off-line public transport solution would be when it is no longer feasible to hold traffic back in frankton trigger-based not assessed integrate any offline solution into the design of the public transport network to avoid forced transfers where possible. it is recommended that an offline solution is integrated into the design of the public transport network not assessed pursue additional measures to reach target pt volumes: higher-capacity buses or a new system (e.g. cable-based), parking supply and cost management, road user or congestion charging, and land-use change. to achieve this would likely take additional measures by 2053 not assessed incorporate articulated-bus modifications into the nzup frankton hub design now; design option 1 preferred; move sh6 stops closer to the pedestrian crossing. they should be incorporated into the nzup designs now rather than waiting until a later date now not assessed investigate an interim bus layover on memorial street for stanley street hub operations; extend the jack's point route to one mile after arterials stage 3. an interim bus layover on memorial street should be investigated interim / after arterials stage 3 not assessed identify a depot site: engage aurora on grid capacity, engage frankton and coneburn landowners, and carry out due diligence once ownership is confirmed. the next steps to identify a preferred location would be: engage with aurora after business case endorsement not assessed conduct a technical assessment of the remarkables park (boyd road) bridge and alternatives such as sh6 bus lanes south of kawarau falls. recommended that a technical assessment on the feasibility of remarkables park bridge and considering alternatives not assessed publicly consult on the bus max and rapid transit to jack's point options, with malaghans road as an add-on. recommended the bus max and rapid transit to jacks point base options to be publicly consulted on not assessed partner with the queenstown lakes community housing trust (or similar) to fund affordable rental accommodation for public transport staff. it is recommended that otago regional council partners with queenstown lakes community housing trust before new network not assessed orc orc minimise split shifts and improve driver facilities at termini to support recruitment and retention of drivers. other support measures for hiring and retaining bus drivers is to minimise split shifts not assessed provide park and ride at speargrass flat and cromwell as a supplemental add-on to the preferred service pattern (later excluded from the business case's preferred option). a park and ride service, if provided, is recommended as a supplemental add-on not assessed further investigate an on-demand service for queenstown hill and goldfields, triggered by further development such as silver creek subdivision. recommended that an on-demand service for queenstown hill and goldfields is considered for further investigation trigger-based not assessed adopt public ownership of the electric bus depot (third-party investor as second option), retain operator-owned fleet and performance-based operating contracts. public ownership of the bus depot is the recommended ownership model not assessed orc orc further consider battery electric buses as the preferred technology, and plan electricity network and grid reinforcement early. recommended to further consider battery electric buses as the preferred technology short term not assessed fund the orc depot through debt; amend qldc's development contributions policy; pursue congestion charging, which requires legislative change. congestion charging and developer contributions have the greatest potential as a funding source not assessed qldc qldc main document pdf",
    "sortDate": "2024-04-01",
    "cover": {
      "src": "/covers/QTS-093.webp",
      "srcset": "/covers/QTS-093.webp 400w, /covers/QTS-093-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-093/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-093/QTS-093-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-094",
    "code": "QTS-094",
    "title": "Queenstown Public Transport Business Case – Summary Report",
    "shortTitle": "Queenstown Public Transport Business Case",
    "summary": "Two-part summary of the Queenstown Public Transport Business Case prepared for Otago Regional Council and the Way to Go partners (NZTA (Waka Kotahi), QLDC). Part A answers the key questions the business case addressed; Part B summarises the five cases. The preferred programme is an enhanced Bus Max (Composite) network of frequent bus routes with battery electric articulated and standard buses, a more frequent Kelvin Heights ferry, hub and interchange changes, an SH6 bus lane and a new ORC-owned electric bus depot, staged over about 12 years. The BCR is 2.3; capital costs are put at $63.7m (excluding depot land) and operating costs at $25.0m a year by 2035. No park and ride is included. Modelled 2053 AM peak non-car mode shares (34% on SH6A, 16% on Shotover Bridge, 24% on Kawarau Falls Bridge) achieve roughly half of the investment objective, so the report says operational and demand management measures, such as congestion charging, are also needed. A section headed 'An Off-line Solution' recommends that an offline solution such as mass rapid transit be investigated in the 2024-27 period, and that project partners investigate offline public transport options within the next NLTP period. A list of 2024-27 NLTP funding requirements by lead organisation (ORC, NZTA, QLDC) is included.",
    "documentType": "Business case chapter or appendix",
    "documentForm": "Business case summary report",
    "year": 2024,
    "publishedDate": "2024-04-03",
    "documentStatus": "Final",
    "geographicScope": "Whakatipu Basin; Queenstown Town Centre (Stanley Street hub); Frankton (Frankton hub, Five Mile, Remarkables Park); SH6A; SH6 southern and eastern corridors (Kawarau Falls Bridge, Shotover Bridge, Jack's Point, Lake Hayes, Arrowtown); Kelvin Heights ferry",
    "owner": "ORC",
    "citation": "ORC. Queenstown Public Transport Business Case – Summary Report (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/tbpbqmlm/queenstown-public-transport-business-case-summary-document.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/tbpbqmlm/queenstown-public-transport-business-case-summary-document.pdf"
    ],
    "documentTypeCode": "business-case-chapter",
    "topics": [
      "bus",
      "gondola",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management",
      "on-demand"
    ],
    "organisationIds": [
      "orc",
      "wsp",
      "nzta",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-094 queenstown public transport business case – summary report queenstown public transport business case two-part summary of the queenstown public transport business case prepared for otago regional council and the way to go partners (nzta (waka kotahi), qldc). part a answers the key questions the business case addressed; part b summarises the five cases. the preferred programme is an enhanced bus max (composite) network of frequent bus routes with battery electric articulated and standard buses, a more frequent kelvin heights ferry, hub and interchange changes, an sh6 bus lane and a new orc-owned electric bus depot, staged over about 12 years. the bcr is 2.3; capital costs are put at $63.7m (excluding depot land) and operating costs at $25.0m a year by 2035. no park and ride is included. modelled 2053 am peak non-car mode shares (34% on sh6a, 16% on shotover bridge, 24% on kawarau falls bridge) achieve roughly half of the investment objective, so the report says operational and demand management measures, such as congestion charging, are also needed. a section headed 'an off-line solution' recommends that an offline solution such as mass rapid transit be investigated in the 2024-27 period, and that project partners investigate offline public transport options within the next nltp period. a list of 2024-27 nltp funding requirements by lead organisation (orc, nzta, qldc) is included. context and purpose: this summary of the queenstown public transport business case (qptbc) has two parts. part a gives the business case's response to the key questions it had to address, and part b summarises the strategic, economic, commercial, financial and management cases (p5). it describes the qptbc as an indicative business case responding to the 2020 queenstown business case, which orc and qldc approved in january 2021 and waka kotahi in february 2021 (p12). it assumes nzup bus priority on sh6/sh6a by 2028, and town centre arterials stages and project manawa completing between 2024 and 2032 (p6). the business case was reviewed by invise (case documents), aecom (capex) and mrcagney (opex), with nzta investment quality assurance involvement (p13). the copy held is version 0.6 of 3 april 2024, stamped 'attachment a', with added page numbers (27-54). demand and problem: peak hour trip demand is forecast to more than double over 30 years, with the largest growth in the southern corridor (p7). required am peak pt volumes on sh6a are 592 (2027), 1,082 (2039) and 1,466 (2053) people per hour, against current capacity of 260 (p14-15). modelled 2053 am peak non-car mode shares for the preferred option are 34% on sh6a, 16% on shotover bridge and 24% on kawarau falls bridge, 'so achieving roughly half of the investment objective' (p7). free parking in frankton is identified as limiting mode shift (p7). preferred programme: an enhanced bus max (composite) network with battery electric buses, supporting infrastructure and a kelvin heights ferry (p17). articulated buses (around 110 passengers) are the preferred vehicle (p8). it has eight core interventions (p18), staged over about 12 years in three tranches. full electrification is planned for 2035 with a new depot, using large diesel buses under an interim contract until then (p8). indicative service levels by nltp period are tabled (p20-21). on-demand service is proposed for queenstown hill and goldfields (p8). park and ride is excluded because of limited patronage uplift and high land costs (p8-9). ferry frequency is to rise to 60 minutes in 2024-27 and 30 minutes in 2027-30 (p10). public consultation drew 231 submissions, with most preferring bus max plus the malaghans road option (p17). costs and economics: capital costs are stated as $63.7m, of which the depot is $45.5m excluding land or lease (p10). elsewhere the depot is given as '$54.4m + land or lease' (p9) and, in the capital table, $59.5m including land (p19). about $14m is budgeted for depot land (p10). operating cost is $25.0m by 2035 (p11), although the financial case section gives $14.3m by 2039 and $22.6m by 2053 (p25). the bcr is 2.3 (p19). lead-organisation costs are disaggregated on p10, and an interventions table with lead organisation, trigger, activity class and nltp period is on p26-27. performance: am peak pt mode share on sh6a is predicted to rise from 14% to 34% by 2053, short of the 47% objective (p19). the objective to maintain a functional network 'cannot be fully achieved by the public transport services alone', and additional travel demand measures such as congestion charging are recommended (p20). commercial and management: the unit 7 contract is to be extended to 19 november 2028 and a new contract let that includes 18 articulated electric buses (p22). the depot should be publicly or investor owned, with frankton flats preferred and coneburn the alternative, and a 20-plus-year lease of queenstown airport land should be explored (p22-23). orc is to create a contracted kelvin heights ferry unit (p23). orc is the procuring organisation and will appoint a project sponsor/director; qldc and nzta are road controlling authorities and funding partners (p23). key risks include depot timing, power supply, funding, the sh6 bus lane, driver shortages and the edith cavell bridge weight limit (p24). demand management tools are described as critical but left to 'a subsequent project' (p24). next steps are endorsement, reframing of the way to go partnership, nltp funding applications and review each nltp period (p28). mass rapid transit: section 2.13 'an off-line solution' states that 'an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period' to allow lead time for investigation, consultation, land acquisition, design, procurement and construction (p11). part b adds that, while outside the scope of the business case, 'an offline public transport system has the potential to drive further uptake in public transport' and recommends that project partners 'investigate offline public transport options within the next nltp period' (p20). the next-phase scope includes investigating an off-line route to supplement the bus and ferry network (p11, p28). no cost or lead organisation is given for this, and it does not appear in the 2024-27 funding list (p11). business case summary report orc. queenstown public transport business case – summary report (2024). whakatipu basin; queenstown town centre (stanley street hub); frankton (frankton hub, five mile, remarkables park); sh6a; sh6 southern and eastern corridors (kawarau falls bridge, shotover bridge, jack's point, lake hayes, arrowtown); kelvin heights ferry version 0.6, 3 april 2024 (document review status 'final'); pre-dates the final combined v7.0 business case of 6 may 2024 recommends that partners investigate offline mass rapid transit in 2024-27; this is outside the business case scope and absent from the listed funding requirements. the summary gives off-line public transport its own heading in part a. section 2.13 'an off-line solution' states: 'given the rapid growth occurring in queenstown, an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period. this will allow a lead time for investigation, consultation, land acquisition, design, procurement and construction' (p11). in part b, after noting that the objective to maintain a functional network cannot be fully achieved by public transport services alone, it states: 'while outside the scope of this business case, an offline public transport system has the potential to drive further uptake in public transport. it is also recommended that the project partners investigate offline public transport options within the next nltp period' (p20). the indicative scope for the next phase includes 'investigation of off-line public transport route to supplement the bus and ferry based public transport network' (p11, p28). the list of elements requiring funding in the 2024-27 nltp (p11) and the interventions table (p26-27) do not include this investigation, and no lead organisation or cost is given. unlike the final combined business case, the summary does not include the statement that the articulated-bus network has capacity until 2053. \"given the rapid growth occurring in queenstown, an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period. this will allow a lead time for investigation, consultation, land acquisition, design, procurement and construction.\" (p.11) | \"while outside the scope of this business case, an offline public transport system has the potential to drive further uptake in public transport. it is also recommended that the project partners investigate offline public transport options within the next nltp period.\" (p.20) | \"investigation of off-line public transport route to supplement the bus and ferry based public transport network.\" (p.28) 2053 am peak non-car mode share (preferred option): sh6a 34%, shotover bridge 16%, kawarau falls bridge 24% – 'roughly half of the investment objective' (p7) required am peak pt on sh6a: 592 (2027), 1,082 (2039), 1,466 (2053) people/hour vs current capacity 260 (p14-15) bcr 2.3 (p19) capital cost $63.7m, of which depot $45.5m excluding land/lease (p10); depot also stated as $54.4m + land (p9) and $59.5m incl. land (p19); depot land budget $14m (p10) lead-organisation split: orc depot $45.5m + land; nzta stanley st $0.6m, frankton hub $1.6m, southern corridor bus lane $3.6m, sh bus stops $0.6m; qldc intersections $0.5m, local stops $0.6m, remarkables park hub $0.8m, five mile hub $0.4m (p10) operating cost $25.0m by 2035 (p11); $14.3m by 2039 and $22.6m by 2053 (p25); current $6.7m vs preferred $25.0m (p19) 2024-27 nltp: pt service improvements $11.0m per annum (orc) (p11) frankton hub modifications $1.9m (p10); stanley st interim $0.7m (95th percentile) (p10); interchanges $1.2m (p10) 18 high-capacity articulated electric buses in the new contract (p22) 231 public submissions on short-listed options (p17) depot minimum footprint about 10,000 m2; $17m for charging and power connection (p9) funding mix fy2023/24: 31% rates, 41% fuel excise duty, 28% fares (p24) costed with the parent document. https://www.orc.govt.nz/media/tbpbqmlm/queenstown-public-transport-business-case-summary-document.pdf orc substantive business case chapter or appendix final 2024 bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. on-demand transport on-demand public transport. orc orc commissioned wsp (including opus) wsp prepared nzta waka kotahi nzta partner qldc qldc partner way to go way to go recipient c. groom author wsp (including opus) wsp e. whitfield author wsp (including opus) wsp l. goodman author wsp (including opus) wsp chris groom reviewed by wsp (including opus) wsp fund public transport service improvements at $11.0m per annum in 2024-27, increasing to $25.0m per year by 2035. public transport service improvements, orc lead organisation, $11.0m per annum 2024-27+ / ongoing not assessed orc orc make interim stanley street bus hub changes for articulated buses ($0.6m). stanley street interim bus hub changes, nzta lead organisation, $0.6m 2024-27 not assessed nzta waka kotahi nzta modify the frankton bus hub (nzup design) for articulated buses ($1.6m); lead shown as 'way to go' on p11 and 'nzta / qldc / orc' in the table. frankton bus hub changes, way to go lead organisation, $1.6m 2024-27 not assessed way to go way to go develop the remarkables park hub ($0.8m); orc is lead on p11 and p26 but the item is listed under qldc on p10. remarkables park hub, orc lead organisation, $0.8m 2027-2030 not assessed qldc qldc develop the five mile hub ($0.4m), dependent on grant road signalisation under nzup; orc is lead on p11 and p26 but the item is listed under qldc on p10. five mile hub, orc lead organisation, $0.4m 2027-2030 not assessed qldc qldc deliver an electric bus depot ($45.5m plus $14m land or lease); preferred staging 2024-27, secondary staging 2030-33. electric bus depot under preferred staging, orc lead organisation, $45.5m 2024-27 (preferred) / 2030-33 (secondary) not assessed orc orc deliver the sh6 bus lane from kawarau falls bridge to william rees cottage ($3.6m), triggered by southern corridor growth. sh6 bus lane – kawarau falls bridge to william rees cottage | nzta tbc – 2027-30 not assessed nzta waka kotahi nzta improve local road intersections for articulated buses ($0.5m). local intersection improvements, qldc lead organisation, $0.5m 2024-27 not assessed qldc qldc make bus stop changes on local roads ($0.6m). bus stop changes on local roads, qldc lead organisation, $0.6m 2024-27 not assessed qldc qldc make bus stop changes on the state highway network ($0.6m). bus stop changes on state highway network, nzta lead organisation, $0.6m 2024-27 not assessed nzta waka kotahi nzta investigate an offline solution such as mass rapid transit to allow lead time for consultation, land acquisition, design, procurement and construction. an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period 2024-27 period not assessed project partners to investigate offline public transport options. recommended that the project partners investigate offline public transport options within the next nltp period within the next nltp period not assessed nzta waka kotahi nzta investigate an off-line public transport route to supplement the bus and ferry network (next phase scope). investigation of off-line public transport route next phase not assessed project partners to investigate additional travel demand measures such as congestion charging. additional travel demand measures such as congestion charging are investigated by the project partners not stated (implementation left to 'a subsequent project', p24) not assessed nzta waka kotahi nzta endorse the business case by the way to go partners. endorsement of this business case by way to go partners next step not assessed way to go way to go reconfirm and reframe the way to go partnership to define responsibilities and accountabilities. reconfirmation and reframing of way to go partnership next step not assessed way to go way to go make the necessary nltp funding applications and forward-work planning. necessary funding applications from nltp and forward-work planning next step not assessed review the business case at least once per nltp period. review of the business case at least once per ntlp period each nltp period not assessed extend unit 7 to 19 november 2028 and procure a new contract under the sptf, including electric buses (18 articulated), new depot arrangements and more drivers. contract for unit 7 be extended to match the completion date of unit 6 2028 not assessed orc orc identify a depot site: engage aurora, landowners in frankton and coneburn, and bus operators; carry out due diligence; explore a 20-plus-year queenstown airport land lease. next steps to identify a preferred location would be: engage with aurora after endorsement and ownership decision not assessed orc orc create a new contracted unit for the kelvin heights ferry, improving frequency to hourly and revisiting fares. recommended that orc creates a new unit and contracts out this service 60-min 2024-27; 30-min 2027-30 not assessed orc orc appoint a project sponsor/project director to oversee the programme. orc will appoint a project sponsor/ project director not assessed orc orc all partners to commit to prioritising public transport in traffic signal operation and enforcing bus lanes. commitment to prioritise public transport in the operation of traffic signals and the enforcement of bus lanes not assessed way to go way to go develop on-demand services and factor them into consenting and approvals so growth can be serviced as it happens. on-demand services should be developed and factored with consenting and approvals not assessed consider vehicle internal layout (luggage, ski equipment, mobility devices, prams) during fleet procurement. internal layout of the vehicle is strongly considered during fleet procurement fleet procurement not assessed main document pdf",
    "sortDate": "2024-04-03",
    "cover": {
      "src": "/covers/QTS-094.webp",
      "srcset": "/covers/QTS-094.webp 400w, /covers/QTS-094-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-094/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-094/QTS-094-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-095",
    "code": "QTS-095",
    "title": "Queenstown Public Transport Business Case",
    "shortTitle": "Queenstown Public Transport Business Case",
    "summary": "Business case commissioned by Otago Regional Council (ORC) and delivered under the Way to Go partnership with NZTA (Waka Kotahi) and QLDC, setting a 30-year plan for public transport in the Whakatipu Basin, including fleet decarbonisation. It finds the current bus network (about 260 passengers per hour on SH6A) cannot carry the public transport volumes needed to keep the network functioning (1,466 people per AM peak hour on SH6A by 2053). The preferred option is an enhanced 'Bus Max' (Composite) network of high-frequency routes using battery electric articulated and standard buses and ferries, supported by hub changes at Stanley Street and Frankton, a new electric bus depot, an SH6 northbound bus lane and local stop and intersection changes. The BCR is 2.3 and the largest capital item is a $59.5m depot (including land) led by ORC. The business case states that the objective to maintain a functional network cannot be fully achieved by public transport alone: predicted AM peak PT share on SH6A rises from 14% to 34% by 2053 against a 47% objective, and travel demand management is recommended. Off-line public transport was out of scope, but the document recommends that an offline solution such as mass rapid transit be investigated in the 2024-27 period, while stating the articulated-bus network has sufficient capacity until 2053. Park and ride is not part of the preferred option.",
    "documentType": "Indicative business case",
    "documentForm": "Public transport business case (combined Strategic, Economic, Commercial, Financial and Management Cases)",
    "year": 2024,
    "publishedDate": "2024-05-06",
    "documentStatus": "Final",
    "geographicScope": "Whakatipu Basin; Queenstown Town Centre (Stanley Street hub); Frankton (Frankton hub, Five Mile, Remarkables Park); SH6A Frankton–Queenstown; SH6 southern corridor (Kawarau Falls Bridge, Hanley's Farm, Jack's Point, Homestead Bay); SH6 eastern corridor (Shotover Bridge, Lake Hayes, Ladies Mile, Arrowtown); Arthurs Point / Malaghans Road; Kelvin Heights (Frankton Arm ferry)",
    "owner": "ORC",
    "citation": "ORC. Queenstown Public Transport Business Case (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://orc.govt.nz/media/rasnp1qg/queenstown-public-transport-business-case-final-2024.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://orc.govt.nz/media/rasnp1qg/queenstown-public-transport-business-case-final-2024.pdf"
    ],
    "documentTypeCode": "indicative-business-case",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "on-demand"
    ],
    "organisationIds": [
      "orc",
      "wsp",
      "nzta",
      "qldc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-095 queenstown public transport business case queenstown public transport business case business case commissioned by otago regional council (orc) and delivered under the way to go partnership with nzta (waka kotahi) and qldc, setting a 30-year plan for public transport in the whakatipu basin, including fleet decarbonisation. it finds the current bus network (about 260 passengers per hour on sh6a) cannot carry the public transport volumes needed to keep the network functioning (1,466 people per am peak hour on sh6a by 2053). the preferred option is an enhanced 'bus max' (composite) network of high-frequency routes using battery electric articulated and standard buses and ferries, supported by hub changes at stanley street and frankton, a new electric bus depot, an sh6 northbound bus lane and local stop and intersection changes. the bcr is 2.3 and the largest capital item is a $59.5m depot (including land) led by orc. the business case states that the objective to maintain a functional network cannot be fully achieved by public transport alone: predicted am peak pt share on sh6a rises from 14% to 34% by 2053 against a 47% objective, and travel demand management is recommended. off-line public transport was out of scope, but the document recommends that an offline solution such as mass rapid transit be investigated in the 2024-27 period, while stating the articulated-bus network has sufficient capacity until 2053. park and ride is not part of the preferred option. context and purpose: orc commissioned the queenstown public transport business case (qptbc) to follow the 2020 queenstown business case (qbc), which was endorsed on the basis that separate tdm and public transport business cases would be developed (p10-11). delivered under the way to go partnership with nzta (waka kotahi) and qldc, it sets out a 30-year public transport investment plan for the whakatipu basin, including decarbonisation, and was prepared to nzta better business cases guidance (p10). pricing mechanisms and tdm implementation, off-line public transport options (other than recommending when one should be investigated), a new strategic model and detailed stop planning were out of scope (p11, p39). the uncertainty log also treats bus lanes, road widening and an off-line system as beyond scope (p31). detail sits in nine advisory papers (p34-35; the text says eight papers but lists nine). problem: two problem statements were agreed at an october 2022 ilm workshop (p18). current bus capacity on sh6a is estimated at 260 passengers per hour, against 2021 peak loads of 199 (am) and 174 (pm) (p18). to keep the network functioning, am peak pt volumes on sh6a must reach 592 people per hour by 2027, 1,082 by 2039 and 1,466 by 2053 (27%, 40% and 47% mode share) (p19). sh6a's practical capacity was exceeded on 140 days in 2019 (p19). investment objectives cover mode share (2053 targets of 50% southern, 35% eastern and 48% western corridors), a 100% cut in pt co2 by 2035, a 20% vkt reduction by 2035 and improved access to jobs and destinations (p29-30). options: service patterns and decarbonisation technologies were assessed in parallel through mca with partner decision conferencing (p39). an 11-option long list of service patterns (bus max variants, spine options, a one-seat-ride network and three ferry options) was assessed; spine, one-seat and ferry options other than the jack's point spine were rejected as failing the capacity critical success factor (p42, p49). the short list centred on bus max versus a jack's point spine, with bridge, malaghans road and ferry variants (p50). the composite option scored highest in every mca sensitivity test (p63) and had the highest bcr (2.4) and incremental bcr (7.9) (p64). battery electric technology was preferred; hydrogen was treated as fatally flawed for the first 15 years (p65-66). articulated buses (about 110 passengers) were chosen because standard buses cannot meet sh6a demand even at 30 buses per hour (p42). preferred option: an enhanced bus max (composite) network with battery electric buses and ferries, staged to a walk-up (15-minute or better) network by 2035 (p79-82). it comprises eight core interventions: service and fleet improvements, stanley street and frankton hub changes, an electric bus depot, an sh6 bus lane (kawarau falls bridge to william rees cottage), local intersection changes, and bus stop changes on local roads and state highways (p81). a secondary option delays the depot to 2035, with work starting by 2031 (p82, p97). on-demand service is suggested for queenstown hill and goldfield heights (about $750,000 a year) (p69, p108). park and ride was agreed not to be part of the preferred option and not value for money (p77). the recommended ownership model is public (orc) ownership of the depot, with operators keeping the fleet (p94). economics and finance: monetised benefits are dominated by network productivity ($1,019m), plus safety ($53m), air quality ($30m) and greenhouse gas ($7m) (p84). the bcr is 2.3 (38-year evaluation, 4% discount rate), with sensitivity tests of 1.6 to 2.5 (p84-86). p50 capital costs total about $68.2m, including the depot at $59.5m (including land), the sh6 bus lane at $3.6m and the frankton hub at $1.6m (p108). preferred-option operating costs are $25m a year against $6.7m now (p108; table 10-3 on p85 instead gives $11m for the do minimum in 2039). the funding forecast for the next nltp period is $9.5m, $36.0m and $24.9m for fy24/25 to fy26/27 (p112). capital estimates carry a 70% contingency for p95 (p107). congestion charging and developer contributions are seen as the most promising alternative funding sources (p113). performance: predicted am peak pt mode share on sh6a rises from 14% to 34% in 2053, short of the 47% objective, and the objective to maintain a functional network 'cannot be fully achieved by the public transport services alone' (p81, p86-87). travel demand measures are recommended (p81). management: table 12-3 assigns lead organisations (orc, nzta, qldc) and nltp periods (p110-111). orc is the procuring organisation and will appoint a project sponsor/director, qldc and nzta act as road controlling authorities, and the way to go partnership is to be reconfirmed and reframed (p116). next steps are partner endorsement, nltp funding applications and review of the business case at least once per nltp period (p121). mass rapid transit: off-line options are out of scope 'other than to recommend when an off-line service should be investigated' (p39). the document states that 'the next logical infrastructure would be an off-line public transport system, which should be in place before a bus-based system reaches capacity', which is 'being considered as a separate study' with nzta seeking feasibility funding in the 2024-27 nltp (p40). it recommends that 'an offline solution such as a gondola' be investigated in the 2024-27 period, starting with more detailed town centre modelling, and says articulated buses have sufficient capacity until 2053 (p82). investigating an off-line route is listed in the next-phase scope (p121). no lead organisation, cost or nltp period is given for this in table 12-3. public transport business case (combined strategic, economic, commercial, financial and management cases) orc. queenstown public transport business case (2024). whakatipu basin; queenstown town centre (stanley street hub); frankton (frankton hub, five mile, remarkables park); sh6a frankton–queenstown; sh6 southern corridor (kawarau falls bridge, hanley's farm, jack's point, homestead bay); sh6 eastern corridor (shotover bridge, lake hayes, ladies mile, arrowtown); arthurs point / malaghans road; kelvin heights (frankton arm ferry) version 7.0 (final combined), 6 may 2024 off-line public transport is outside the business case scope; recommends mass rapid transit be investigated in 2024-27, while stating articulated buses suffice until 2053. articulated buses are not mass rapid transit. the business case excludes 'off-line options for public transport, other than to recommend when an off-line service should be investigated' (p39), and its uncertainty log lists 'an off-line public transport system' with bus lanes and road widening as beyond scope (p31). it notes that because the network is constrained, 'the next logical infrastructure would be an off-line public transport system, which should be in place before a bus-based system reaches capacity', and that this is 'being considered as a separate study, with feasibility study funding being sought by nzta for the 2024-27 national land transport programme' (p40). in describing the preferred option it states that 'an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period' to allow lead time for investigation, consultation, land acquisition, design, procurement and construction. the first stage would be more detailed town centre modelling under scenarios (project timing, town centre parking, bus signal priority), to test whether buses could circulate in all foreseeable scenarios and 'the degree to which an offline route would support further public transport mode shift'. it adds that the articulated-bus network 'has sufficient capacity to accommodate the desired mode shift and population growth until 2053' (p82). the next-phase scope includes 'investigation of off-line public transport route to supplement the bus and ferry based public transport network' (p121). the recommendation is not costed or assigned to a lead organisation in the interventions table (p110-111), and no mass rapid transit option was assessed in the long or short lists (p42, p49-50). \"off-line options for public transport, other than to recommend when an off-line service should be investigated\" (p.39) | \"given the constrained network, the next logical infrastructure would be an off-line public transport system, which should be in place before a bus-based system reaches capacity. this is being considered as a separate study, with feasibility study funding being sought by nzta for the 2024-27 national land transport programme (nltp).\" (p.40) | \"in addition, given the rapid growth occurring in queenstown, an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period. this will allow a lead time for investigation, consultation, land acquisition, design, procurement, and construction.\" (p.82) | \"the proposed public transport network using articulated buses has sufficient capacity to accommodate the desired mode shift and population growth until 2053.\" (p.82) | \"investigation of off-line public transport route to supplement the bus and ferry based public transport network\" (p.121) current bus capacity on sh6a about 260 passengers/hour; 2021 peak loads 199 (am) and 174 (pm) (p18) am peak pt volumes needed on sh6a: 592 (2027), 1,082 (2039), 1,466 (2053) people/hour, i.e. 27%/40%/47% mode share (p19) sh6a practical capacity exceeded on 140 days in 2019 (p19) preferred option bcr 2.3; sensitivity range 1.6–2.5 (p85-86); short-list composite bcr 2.4, incremental bcr 7.9 (p64) monetised benefits: network productivity $1,019m; deaths and serious injuries $53m; air emissions $30m; ghg $7m (p84) p50 capital costs (table 12-1): depot incl. land $59.53m; sh6 northbound bus lane $3.62m; frankton hub $1.57m; five mile and remarkables interchanges $1.21m; bus stops $1.19m; stanley street hub $0.56m; four intersections $0.54m; total about $68.2m (computed) (p108) depot $45.5m (p50, excluding land) plus about $14m land for a ~10,000 m2 site; $17m of depot cost is charging and power connection (p96, p101) operating cost $25m/yr preferred vs $6.7m current (table 12-2, p108); table 10-3 gives do minimum $11m in 2039 (p85) predicted am peak pt mode share on sh6a 14% to 34% by 2053, against 47% objective (p86) funding forecast next nltp: $9.5m (fy24/25), $36.0m (fy25/26), $24.9m (fy26/27) (p112) capital contingency: 40% plus 30% for p95, i.e. 70% on delivery-phase capex (p107) on-demand service queenstown hill/goldfield heights about $750,000/yr (p108) current orc pt funding mix: 31% rates, 41% fuel excise duty, 28% fares (p112) a study cost has been requested under the official information act or lgoima. no figure has been received. https://orc.govt.nz/media/rasnp1qg/queenstown-public-transport-business-case-final-2024.pdf orc substantive indicative business case final 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. on-demand transport on-demand public transport. orc orc commissioned wsp (including opus) wsp prepared nzta waka kotahi nzta partner qldc qldc partner way to go way to go recipient a deutsch author wsp (including opus) wsp e. whitfield author wsp (including opus) wsp h. fowler author wsp (including opus) wsp i. wong author wsp (including opus) wsp j. tan author wsp (including opus) wsp l. goodman author wsp (including opus) wsp s. hubbard project manager orc orc c. groom reviewed by wsp (including opus) wsp e. whitfield reviewed by wsp (including opus) wsp s. hubbard reviewed by orc orc implement public transport service improvements (frequency, span, routes), increasing to about $25.0m a year by 2035; funding approval required. public transport services improvements | orc 2024-27+ / ongoing not assessed orc orc make interim changes to the stanley street bus hub to accommodate articulated buses ahead of town centre upgrades ($0.6m). stanley street hub interim changes | nzta 2024-27 (needed before 2028) not assessed nzta waka kotahi nzta modify the nzup frankton hub design to accommodate articulated buses ($1.6m incremental). frankton hub changes | nzta / qldc / orc 2024-27 (needed before 2028) not assessed nzta waka kotahi nzta develop a remarkables park hub (hawthorne drive near tex smith lane) ($0.8m). remarkables park hub | orc 2027-2030 not assessed orc orc develop a five mile hub on sh6 near grant road, tied to signalisation of grant road under nzup ($0.4m). five miles hub | orc 2027-2030 not assessed orc orc establish an electric bus depot (or two depots) ($45.5m plus $14m land or lease); preferred staging 2024-27, secondary staging 2030-33. electric bus depot(s) preferred option staging | orc 2024-27 (preferred) / 2030-33 (secondary) not assessed orc orc deliver sh6 bus lane from kawarau falls bridge to william rees cottage ($3.6m), triggered by southern corridor growth; nzta to develop a business case. sh6 bus lane – kawarau falls bridge to william rees cottage | nzta tbc – 2027-30 not assessed nzta waka kotahi nzta modify four local road intersections (sylvan/howards, sylvan/hope, rere/acheron, jack's point/maori jack) for articulated buses ($0.5m). local road intersection improvements | qldc 2024-27 not assessed qldc qldc make bus stop changes and related infrastructure on local roads ($0.6m), as part of qldc low-cost low-risk programme. bus stop changes and related infrastructure on local roads | qldc 2024-27 not assessed qldc qldc make bus stop changes and related infrastructure on state highways ($0.6m). bus stop changes and related infrastructure on state highway | nzta 2024-27 not assessed nzta waka kotahi nzta investigate an offline solution such as mass rapid transit, starting with detailed town centre modelling under several scenarios; no lead organisation named (p40 notes nzta seeking feasibility funding). an offline solution such as a gondola is suggested to be further investigated in the 2024-27 period 2024-27 period not assessed investigate an off-line public transport route to supplement the bus and ferry network as part of the next phase. investigation of off-line public transport route to supplement the bus and ferry based public transport network next phase not assessed investigate travel demand measures (promotion, pricing incl. parking/congestion charges, first and last mile, limiting private vehicle access) to support the business case. it is recommended that travel demand measures are investigated not assessed way to go partnership to direct partners to develop tdm implementation plans that support the business case. recommend w2g partnership directs partners to develop tdm implementation plans not assessed way to go way to go retest the queenstown business case with the new service patterns and spatial plan to determine additional demand management measures; consider further bus priority (e.g. at signals). retesting of the queenstown business case with the new service patterns and spatial plan not assessed endorse the business case by way to go partners; then orc councillors to approve it and confirm the ownership model. final versions sent to way to go board for endorsement next step not assessed way to go way to go reconfirm and reframe the way to go partnership to define responsibilities, including an mou or similar for this project. reconfirmation and reframing of way to go partnership next step not assessed way to go way to go appoint a project sponsor/project director to oversee the programme, subject to w2g board approval. orc will appoint a project sponsor/ project director not assessed orc orc commit all partners to prioritising public transport in traffic signal operation and enforcing bus lanes. commitment to prioritise public transport in the operation of traffic signals and the enforcement of bus lanes not assessed way to go way to go make nltp funding applications and forward-work planning; nzta to include items in pt activity classes and qldc to include local items in its ltp. necessary funding applications from nltp and forward-work planning next step not assessed way to go way to go review the business case at least once per nltp period to adjust service levels for growth, development and policy change. review the business case at least once per nltp period each nltp period not assessed extend the unit 7 bus contract to 19 november 2028 so all queenstown services can be tendered as one combined unit to 2035. contract for unit 7 be extended to match the completion date of unit 6 to 19 november 2028 not assessed orc orc issue advance notice, rfi and rfp to the market for zero emission articulated and standard bus services, weighting driver recruitment and retention. orc completes an advance notice to potential suppliers before new contracts not assessed orc orc review school bus services in the whakatipu basin before letting the new combined bus contract. review of school bus services within the whakatipu basin is completed by orc before new combined contract not assessed orc orc create a new contracted unit for the frankton arm ferry, with hourly then half-hourly frequency from 2027, and revisit ferry fares. orc creates a new unit and contracts out this service to a ferry operator hourly initially; half-hourly from 2027 not assessed orc orc investigate an on-demand service for queenstown hill and goldfield heights, tendered as a separate unit at the same time as the bus unit. on-demand services... separate unit from the bus services but is tendered at the same time with bus contract tender not assessed orc orc identify a depot site: engage aurora on grid capacity, frankton and coneburn landowners, bus operators and queenstown airport (long-term lease), and carry out due diligence. next steps to identify a preferred location(s) would be: engage with aurora after endorsement and ownership decision not assessed orc orc consider short-term land purchase for the bus depot if a suitable opportunity arises. consideration is given to land purchase in the short-term short term not assessed carry out detailed timetabling of new services and develop specifications for the new bus and ferry fleet, including luggage and ski space. detailed timetabling of new services; developing specifications for the new bus and ferry fleet next phase not assessed orc orc provide wharf and jetty assets to support ferry services. provision of wharf and jetty assets to support ferry services not assessed qldc qldc be responsible for benefits realisation and monitor kpis; partnership to adjust the programme if benefits are off track. orc will be responsible for benefits realisation ongoing not assessed way to go way to go main document pdf",
    "sortDate": "2024-05-06",
    "cover": {
      "src": "/covers/QTS-095.webp",
      "srcset": "/covers/QTS-095.webp 400w, /covers/QTS-095-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-095/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-095/QTS-095-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-096",
    "code": "QTS-096",
    "title": "OIA-15181 response: Request made under the Official Information Act 1982 (Queenstown Package $250m - costs, contingencies and risk)",
    "shortTitle": "OIA-15181 response: Request made under",
    "summary": "NZTA (Waka Kotahi) response of 28 May 2024 (ref OIA-15181) to Crux Publishing Ltd's 17 April 2024 request asking how the Government agreed the $250m figure for the Queenstown Package: what information was supplied, including cost breakdowns, contingencies and risk levels, and how the spend is broken down by stage. NZTA extended the response time on 16 May 2024. It released one document, BRI-2973, the briefing to Hon Simeon Brown and Hon Nicola Willis seeking endorsement of a reduced scope Queenstown Package at an estimated $250 million (see BRI2973). Information was withheld under s 9(2)(a) (privacy), s 9(2)(f)(iv) (confidentiality of advice) and s 9(2)(j) (negotiations). No other documents, cost breakdowns or stage breakdowns were released. The letter was signed by Mark Kinvig, National Manager Infrastructure Delivery.",
    "documentType": "Official information release",
    "documentForm": "OIA response letter",
    "year": 2024,
    "publishedDate": "2024-05-28",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "OIA-15181 response: Request made under the Official Information Act 1982 (Queenstown Package $250m - costs, contingencies and risk) (2024). OIA-15181.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-15181, 28 May 2024)",
    "sourceUrls": [],
    "documentTypeCode": "official-information",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "crux-publishing"
    ],
    "searchText": "qts-096 oia-15181 response: request made under the official information act 1982 (queenstown package $250m - costs, contingencies and risk) oia-15181 response: request made under nzta (waka kotahi) response of 28 may 2024 (ref oia-15181) to crux publishing ltd's 17 april 2024 request asking how the government agreed the $250m figure for the queenstown package: what information was supplied, including cost breakdowns, contingencies and risk levels, and how the spend is broken down by stage. nzta extended the response time on 16 may 2024. it released one document, bri-2973, the briefing to hon simeon brown and hon nicola willis seeking endorsement of a reduced scope queenstown package at an estimated $250 million (see bri2973). information was withheld under s 9(2)(a) (privacy), s 9(2)(f)(iv) (confidentiality of advice) and s 9(2)(j) (negotiations). no other documents, cost breakdowns or stage breakdowns were released. the letter was signed by mark kinvig, national manager infrastructure delivery. context: response letter dated 28 may 2024 from nzta to crux publishing ltd, ref oia-15181 (p1). the request of 17 april 2024 asked how the government reached agreement on the $250m figure, what information was supplied (cost breakdowns, contingencies and risk levels from nzta project leads), and for comment on what the budget reflects, how fixed it is and how spend is broken down by stage. it referred to reader scepticism about how a project budget could 'double overnight' and to the queenstown arterial road stage one overrun (p1). response: nzta extended the 20 working day limit on 16 may 2024 under section 15a (p1). it attached bri-2973, sent to the minister of transport and minister of finance seeking endorsement of a reduced scope package at an estimated $250 million (p1). information was withheld under s 9(2)(a), s 9(2)(f)(iv) and s 9(2)(j), and nzta found no public interest factors outweighing withholding (p1). the letter notes the right to ombudsman review and names andy knackstedt, senior media manager, as contact (p2). it does not answer the requested commentary on stage breakdowns or how fixed the budget is beyond releasing the briefing. comparison: the briefing as released here (key bri2973) withholds the risk-adjusted contingency, the nzup programme contingency and the monthly alliance cost under s 9(2)(j). these figures ($20 million, $116 million, $900,000 per month) were released in january 2026 under oia-20263 (document 13 of the oia-20263 release). mass rapid transit: the letter says nothing about mass rapid transit. oia response letter oia-15181 response: request made under the official information act 1982 (queenstown package $250m - costs, contingencies and risk) (2024). oia-15181. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown final (signed response letter) does not mention mass rapid transit. request dated 17 april 2024; extension 16 may 2024; response 28 may 2024 (p1) released bri-2973 seeking endorsement of reduced scope at an estimated $250 million (p1) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-15181, 28 may 2024) nzta none official information release final 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published crux publishing crux publishing recipient mark kinvig signatory nzta waka kotahi nzta andy knackstedt contributor nzta waka kotahi nzta main document pdf",
    "sortDate": "2024-05-28",
    "cover": {
      "src": "/covers/QTS-096.webp",
      "srcset": "/covers/QTS-096.webp 400w, /covers/QTS-096-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-096/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-096/QTS-096-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-097",
    "code": "QTS-097",
    "title": "Queenstown Road Pricing Proof-of-Concept Study",
    "shortTitle": "Queenstown Road Pricing Proof-of-Concept Study",
    "summary": "Proof-of-concept study by Abley for QLDC, developed with officers from QLDC, ORC and NZTA (Waka Kotahi) through four workshops, testing whether road pricing could help Queenstown's congested network. It states that earlier business case work found a 'clear deficit' between what infrastructure and public transport improvements can deliver and what is needed, and that public transport improvements alone will be insufficient. Network performance was agreed as the primary objective. Of three short-listed concepts, the preferred is Concept B: five charging gates (SH6A east of Marina Drive, Gorge Road, Fernhill, Shotover River Bridge, Kawarau Falls Bridge), $5 in the weekday peaks and $2 interpeak, one charge per trip. Indicative analysis on 2023 data estimates a 10–17% reduction in SH6A traffic, shorter 95th-percentile travel times, 300,000–400,000 extra annual bus boardings and about $27m annual net revenue (other figures in the report differ). It concludes road pricing 'appears' feasible and recommends further investigation, including equity, tourist impacts, detailed modelling and staged public engagement. The study states there is no enabling legislation and that it does not constitute Council policy. It does not mention mass rapid transit.",
    "documentType": "Policy review",
    "documentForm": "Proof-of-concept study / summary report",
    "year": 2024,
    "publishedDate": "2024-07-25",
    "documentStatus": "Draft",
    "geographicScope": "Whakatipu Basin; SH6A Frankton–Queenstown; SH6 (Shotover River Bridge, Kawarau Falls Bridge); Gorge Road; Fernhill; Queenstown Town Centre; Frankton",
    "owner": "QLDC",
    "citation": "QLDC. Queenstown Road Pricing Proof-of-Concept Study (2024). QLDC-J074.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "Public source URL not yet recorded.",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "policy-review",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc",
      "abley",
      "nzta",
      "orc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-097 queenstown road pricing proof-of-concept study queenstown road pricing proof-of-concept study proof-of-concept study by abley for qldc, developed with officers from qldc, orc and nzta (waka kotahi) through four workshops, testing whether road pricing could help queenstown's congested network. it states that earlier business case work found a 'clear deficit' between what infrastructure and public transport improvements can deliver and what is needed, and that public transport improvements alone will be insufficient. network performance was agreed as the primary objective. of three short-listed concepts, the preferred is concept b: five charging gates (sh6a east of marina drive, gorge road, fernhill, shotover river bridge, kawarau falls bridge), $5 in the weekday peaks and $2 interpeak, one charge per trip. indicative analysis on 2023 data estimates a 10–17% reduction in sh6a traffic, shorter 95th-percentile travel times, 300,000–400,000 extra annual bus boardings and about $27m annual net revenue (other figures in the report differ). it concludes road pricing 'appears' feasible and recommends further investigation, including equity, tourist impacts, detailed modelling and staged public engagement. the study states there is no enabling legislation and that it does not constitute council policy. it does not mention mass rapid transit. context and purpose: the whakatipu basin population is expected to double in 30 years, with an 80% increase in housing and 45% in employment (p.2). recent business cases (qbc 2021, qptbc 2024, tdm ssbc 2023) identified solutions, but also 'a clear deficit between what the infrastructure and public transport improvements can deliver, and what is required to maintain acceptable network function', and funding remains uncertain (p.2). qldc, as part of way to go, commissioned this proof of concept (poc) to understand how road pricing might support transport objectives (p.7). it is 'for conceptualisation and framing only' and 'does not constitute council policy' (pp.2, 7). there is no enabling legislation; the gps 2024 signals time-of-use charging reform (pp.2, 13–14). method: four facilitated workshops with qldc, orc and nzta officers set principles and objectives, generated and shortlisted concepts, considered complementary measures and future-proofing (pp.7, 15). analysis used elasticities from stockholm (-0.87) and gothenburg (-0.69), tomtom origin–destination data calibrated to nzta counts, mbcm diversion rates (40% of trip reductions to pt), a $0.75 transaction cost and a 50% revenue reduction for variable pricing (pp.20–21). equity and environmental impacts were out of scope (p.8). context findings: the qbc found sh6a practical capacity was exceeded on about 140 days in 2019 (p.9). business case analysis 'indicated that the public transport improvements alone will be insufficient to maintain an acceptable transport network level of service', and there is a risk that mode shift will not be achieved through 'pull' measures alone, since buses largely use the same congested network (pp.9–10). options: six concepts were reduced to three (p.18): a, a single sh6a gate (17–24% sh6a reduction, $10m net revenue, but diversion via gorge road and the one-lane edith cavell bridge); b, multiple gates (10–17%, 95th-percentile sh6a time 25→20 min, $27m, 300–400k new pt boardings); c, multiple zones (11–18%, $35m, 400–900k boardings) (p.21). stakeholders preferred b as more targeted, user-centric and legible (p.23). gates: sh6a east of marina drive, gorge road, fernhill, shotover river bridge, kawarau falls bridge; $5 peak (7–10am, 4–7pm), $2 interpeak, weekdays, capped at one charge per trip (p.23). future years: against qptbc 2039 scenarios, maintaining 2023-equivalent performance needs about $15 peak charge with minimal pt (do minimum) or about $10 with bus max, each generating about $40m net revenue (p.25). road pricing 'can make a significant contribution to achieving the target mode share' but is 'not a complete solution' (p.26). three of the five gates are on state highways, so nzta could set charges with revenue returned to the region (p.27). engagement and recommendations: a staged approach is proposed: council briefing (stage 0), key stakeholders, public engagement and a deliberative democracy process (pp.28–30). the study 'does not recommend that the scheme concept be implemented without further investigation', and lists equity, tourist impacts, pre-requisites (viable pt alternatives) and revenue hypothecation for further work (pp.31–32). key findings: road pricing could reduce congestion, increase pt mode share and generate net revenue (p.32). mass rapid transit: the document says nothing about mass rapid transit. complementary measures discussed are bus-based (the qptbc 'bus max' option), active modes, trip timing and travel demand management. proof-of-concept study / summary report qldc. queenstown road pricing proof-of-concept study (2024). qldc-j074. whakatipu basin; sh6a frankton–queenstown; sh6 (shotover river bridge, kawarau falls bridge); gorge road; fernhill; queenstown town centre; frankton final issued (25 july 2024); earlier draft for review 1 july 2024 no mass rapid transit reference; finds bus-based improvements alone insufficient and proposes road pricing as a complement. population expected to double in 30 years; housing +80%, employment +45% (p.2) preferred five-gate scheme: $5 am/pm peak, $2 interpeak, weekdays, max one charge per trip (p.23) executive summary: sh6a am peak traffic -8 to -14%, pm -7 to -12%; travel times -18%/-20%; +170,000–250,000 pt boardings; ≈$22m annual revenue (p.3) concept b: sh6a traffic -10 to -17%; 95th percentile sh6a time 25→20 min; $27m annual net revenue; 300–400k new annual pt boardings (p.21) concept a: -17 to -24%, $10m; concept c: -11 to -18%, $35m (p.21) 2023 preferred concept at $5: ~$11m net revenue, sh6a 25→19 min (table 4.4, p.25) 2039: ~$15 peak charge needed with qptbc do minimum, ~$10 with bus max, each ~$40m net revenue (p.25) sh6a practical capacity exceeded on ~140 days in 2019 (qbc, cited p.9) assumed transaction cost $0.75 per charging event (p.20) a study cost has been requested under the official information act or lgoima. no figure has been received. public source url not yet recorded. qldc none policy review draft 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc commissioned abley abley prepared nzta waka kotahi nzta partner orc orc partner joe corbett-davies prepared by abley abley matthew noon reviewed by abley abley matthew noon approved by abley abley investigate road pricing further; do not implement the scheme concept without further investigation of equity, social acceptability and detailed modelling. road pricing is feasible and further investigation is recommended not assessed way to go way to go undertake detailed transportation modelling addressing poc limitations (variable pricing, diversion, travel times, base/future year alignment). detailed transport modelling addressing these limitations is undertaken if taken forward not assessed assess equity impacts on low-income and car-dependent households and identify mitigations, including minimal discounts/exemptions. further modelling and analysis is recommended if the scheme is to be advanced if scheme advanced not assessed assess tourist impacts and the cost share between residents and visitors. perceived cost share between residents and visitors was appropriately assessed not assessed determine scheme pre-requisites: viable pt alternatives and infrastructure upgrades programmed to align with any scheme introduction. having viable and attractive alternatives... was seen as desirable prior to any scheme not assessed hypothecate net revenue to transport system maintenance, operation and enhancement; consider nzta setting charges with revenue returned to the region. allocating all revenue generation to system maintenance, operation and enhancements not assessed nzta waka kotahi nzta stage 0: hold briefing workshop with councillors and qldc executive to socialise poc findings. it is recommended that a briefing workshop is held with councillors and qldc executive before further public engagement not assessed qldc qldc stage 1–2: engage key stakeholders and the public to build understanding of congestion and social licence before socialising road pricing. stage 1 – key stakeholder engagement... stage 2 – public engagement not assessed qldc qldc stage 3: use a two-phase deliberative democracy process with broader consultation, delivered by qualified practitioners (e.g. iap2). a two-phase approach is recommended that combines a deliberative democracy approach dependent on council timeline not assessed qldc qldc consider bringing forward analysis so qldc concerns inform government time-of-use charging legislation decisions (q3 2024 action plan). bringing forward development and analysis activity may be warranted q3 2024 not assessed qldc qldc main document pdf",
    "sortDate": "2024-07-25",
    "cover": {
      "src": "/covers/QTS-097.webp",
      "srcset": "/covers/QTS-097.webp 400w, /covers/QTS-097-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-097/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-097/QTS-097-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-098",
    "code": "QTS-098",
    "title": "National Land Transport Programme 2024-27",
    "shortTitle": "National Land Transport Programme 2024-27",
    "summary": "The National Land Transport Programme 2024–27, prepared by NZTA (Waka Kotahi) to give effect to the Government Policy Statement on land transport 2024, sets out three years of prioritised land transport activities with a 10-year revenue and expenditure forecast. Forecast total investment is $32.9 billion, 35% more than 2021–24, including $7 billion for state highway improvements, $6.4 billion for public transport infrastructure and services and $5.5 billion for pothole prevention. Priorities are economic growth and productivity, maintenance and resilience, safety and value for money, delivered largely through the Roads of National Significance and Roads of Regional Significance programmes. For Otago/Southland, forecast total investment is $1.4 billion, including $125 million for public transport. Queenstown content is limited: the Queenstown Package is progressed as a Road of Regional Significance (SH6A corridor improvements, SH6/6A Frankton intersection improvements, SH6 improvements including a bus hub); $5 million of public transport service improvements is allocated to Queenstown; the Shepherds Hut Creek culvert ($2.176m) is to be replaced with QLDC; and resilience work starts on SH6 Cromwell–Frankton and Frankton–Kingston. No Queenstown offline public transport or mass rapid transit study or project appears in the programme.",
    "documentType": "Statutory plan",
    "documentForm": "National land transport programme (statutory investment programme under the LTMA)",
    "year": 2024,
    "publishedDate": "2024-09",
    "documentStatus": "Final",
    "geographicScope": "New Zealand (national), with regional summaries; Otago/Southland summary covers Queenstown (SH6, SH6A, Frankton)",
    "owner": "NZTA",
    "citation": "National Land Transport Programme 2024-27 (2024). 24-EX-NLTP-002; ISBN 978-1-991311-02-3.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.nzta.govt.nz/assets/planning-and-investment/nltp/2024/docs/2024-27-national-land-transport-programme.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/planning-and-investment/nltp/2024/docs/2024-27-national-land-transport-programme.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "rapid-transit",
      "roads",
      "demand-management",
      "safety"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-098 national land transport programme 2024-27 national land transport programme 2024-27 the national land transport programme 2024–27, prepared by nzta (waka kotahi) to give effect to the government policy statement on land transport 2024, sets out three years of prioritised land transport activities with a 10-year revenue and expenditure forecast. forecast total investment is $32.9 billion, 35% more than 2021–24, including $7 billion for state highway improvements, $6.4 billion for public transport infrastructure and services and $5.5 billion for pothole prevention. priorities are economic growth and productivity, maintenance and resilience, safety and value for money, delivered largely through the roads of national significance and roads of regional significance programmes. for otago/southland, forecast total investment is $1.4 billion, including $125 million for public transport. queenstown content is limited: the queenstown package is progressed as a road of regional significance (sh6a corridor improvements, sh6/6a frankton intersection improvements, sh6 improvements including a bus hub); $5 million of public transport service improvements is allocated to queenstown; the shepherds hut creek culvert ($2.176m) is to be replaced with qldc; and resilience work starts on sh6 cromwell–frankton and frankton–kingston. no queenstown offline public transport or mass rapid transit study or project appears in the programme. national document: the 2024–27 nltp is a 3-year programme of prioritised activities with a 10-year forecast, prepared by nzta (waka kotahi) to give effect to gps 2024 and reflecting a partnership between nzta and local government (p.4). activities come through regional land transport plans, nzta's state highway investment proposal and national programmes; some are committed, others proposed and awaiting confirmation (p.4). gps 2024 priorities are economic growth and productivity, increased maintenance and resilience, safety, and value for money (p.7). forecast total funds are $32.9 billion, 35% more than 2021–24, including about $23.6 billion from the nltf, $5.8 billion local share, $3.1 billion crown loan and $3.1 billion crown capital grant (pp.5–6). expenditure includes $7 billion for state highway improvements, $6.4 billion for public transport infrastructure and services, $5.5 billion for pothole prevention, $4.6 billion for maintenance and operations, $1.7 billion for road policing and safety, $1.3 billion for local road improvements and $460 million for footpaths and cycleways (p.5). the roads of national significance (rons) and roads of regional significance (rors), 'a package of transport projects on key corridors at a regional level', are central (pp.7, 9). nzta notes further funding outside the nltf and 'reform of legislation to allow for road pricing initiatives such as time of use charging' will be required (p.17). the public transport infrastructure class ($2.64 billion) focuses on auckland (eastern busway, city rail link, northwest rapid transit) and the lower north island rail (p.30). public transport service improvements total $136 million: $100 million auckland, $23 million palmerston north, $8 million christchurch and $5 million queenstown (p.29). otago/southland: forecast total investment is $1.4 billion, with $313 million maintenance operations, $562 million pothole prevention, $333 million improvements and $125 million public transport (p.78). the summary says queenstown lakes is the fastest-growing district and that its 'popularity as a holiday and tourist destination and the resort town's housing crisis has placed severe pressure on the town's infrastructure, including transport' (p.78). under roads of regional significance: 'investment in queenstown's transport infrastructure will accommodate growth and address congestion', progressing the queenstown package, which includes sh6a corridor improvements, sh6 and 6a frankton intersection improvements, and sh6 improvements including a bus hub (p.79). resilience work will start on sh6 cromwell to frankton, sh6 frankton to kingston and sh6 haast to hawea (p.79). with queenstown lakes district council, nzta will replace the shepherds hut creek culvert between queenstown and glenorchy, listed nationally at $2.176m (pp.20, 79). otago state highway maintenance is $95m, with $134m ringfenced for pothole prevention; local roads in otago and southland receive $504 million in total (p.79). the national ticketing solution will be completed (p.80). the key projects map shows the queenstown package and bus priority improvements (dunedin) (p.81). the 2027–30 'future investment' list does not include any otago activity (p.34). mass rapid transit: the document says nothing about mass rapid transit in queenstown. no queenstown offline pt feasibility study, business case or project is listed. queenstown public transport content is limited to $5 million for new or enhanced public transport services (p.29) and a bus hub within the queenstown package (p.79). 'rapid transit' appears only for auckland's northwest rapid transit corridor (p.30). national land transport programme (statutory investment programme under the ltma) national land transport programme 2024-27 (2024). 24-ex-nltp-002; isbn 978-1-991311-02-3. new zealand (national), with regional summaries; otago/southland summary covers queenstown (sh6, sh6a, frankton) published september 2024 no queenstown mass rapid transit study or project is funded or listed; queenstown public transport funding shown here is bus services and a bus hub. forecast total investment $32.9 billion, +35% on 2021–24 nltp (p.6) state highway improvements $7 billion; public transport infrastructure and services $6.4 billion; pothole prevention $5.5 billion (p.5) public transport service improvements $136m, incl. $5 million for queenstown (p.29) otago/southland forecast total investment $1.4 billion; public transport $125 million; improvements $333 million (p.78) otago/southland local roads $504 million; otago sh maintenance $95m and $134m sh pothole prevention (p.79) shepherds hut creek culvert, queenstown $2.176m (p.20) public transport infrastructure activity class $2.64 billion nationally (p.30) not separately commissioned. this is an internal or corporate document. https://www.nzta.govt.nz/assets/planning-and-investment/nltp/2024/docs/2024-27-national-land-transport-programme.pdf nzta none statutory plan final 2024 walking and cycling walking, cycling, trails and other active travel. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. safety road safety. nzta waka kotahi nzta prepared nzta waka kotahi nzta published progress the queenstown package (road of regional significance): sh6a corridor improvements, sh6/6a frankton intersection improvements, sh6 improvements including a bus hub. the queenstown package a road of regional significance which includes 2024–27 nltp period not assessed nzta waka kotahi nzta fund $5 million of new or enhanced public transport service improvements for queenstown. public transport service improvements of $136 million... $5 million for queenstown 2024–27 nltp period not assessed nzta waka kotahi nzta replace the shepherds hut creek culvert between queenstown and glenorchy with qldc ($2.176m). with queenstown lakes council we'll replace the culvert at shepherds hut creek 2024–27 nltp period not assessed nzta waka kotahi nzta start resilience work on sh6 cromwell to frankton, sh6 frankton to kingston and sh6 haast to hawea. we'll start work on increased resilience for these corridors 2024–27 nltp period not assessed nzta waka kotahi nzta complete the national ticketing solution (contactless tag on/off) within the funding period. implementation of the national ticketing solution... will be completed within this funding period 2024–27 nltp period not assessed nzta waka kotahi nzta progress the roads of national significance and roads of regional significance programmes nationally. progress the roads of national significance (rons) programme and the roads of regional significance (rors) programme 2024–27 nltp period not assessed nzta waka kotahi nzta secure further funding outside the nltf and reform legislation to allow road pricing such as time-of-use charging and transition all vehicles to ruc. reform of legislation to allow for road pricing initiatives such as time of use charging not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2024-09-01",
    "cover": {
      "src": "/covers/QTS-098.webp",
      "srcset": "/covers/QTS-098.webp 400w, /covers/QTS-098-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-098/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-098/QTS-098-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-099",
    "code": "QTS-099",
    "title": "Long Term Plan 2024-2034 | He Mahere Pae Tawhiti (and Summary of Decisions)",
    "shortTitle": "Long Term Plan 2024-2034 | He Mahere Pae Tawhiti",
    "summary": "QLDC's Long Term Plan 2024-2034, adopted 19 September 2024 with a ten-year capital programme of about $2.4b (p.21), was set in a financially constrained environment. It names 'Enhance the performance of the transport network' as a strategic priority (p.15) and records that confirmed NLTP funding is about $14.8m short over three years, requiring Council to 'reprioritise various expenditure programmes' (p.24). The Summary of Decisions records reduced active travel funding, arterial Stage 1 costs moved to the Whakatipu roading rates, central Queenstown carparking (including possibly advancing Stanley Street) deferred for further review, and the A7 Jacks Point-Frankton route unlikely to proceed in the 2024-27 NLTP. Transport capital of $411.7m over ten years is also stated in the 2025-28 Transport Procurement Strategy. No mass rapid transit reference was found in the portion read.",
    "documentType": "Statutory plan",
    "documentForm": "Long Term Plan",
    "year": 2024,
    "publishedDate": "2024-09-19",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Long Term Plan 2024-2034 | He Mahere Pae Tawhiti (and Summary of Decisions) (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/pcrjnhiu/qldc_long-term-plan_2024-2034_v25-190924-adopted.pdf",
      "https://www.qldc.govt.nz/media/s5il3xb5/qldc_long-term-plan_summary-of-decisions_2024-2034_oct24.pdf",
      "https://qldc.govt.nz/media/k4ucoazu/1a-att-a-qldc_long-term-plan_2024-2034c.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc",
      "nzta"
    ],
    "searchText": "qts-099 long term plan 2024-2034 | he mahere pae tawhiti (and summary of decisions) long term plan 2024-2034 | he mahere pae tawhiti qldc's long term plan 2024-2034, adopted 19 september 2024 with a ten-year capital programme of about $2.4b (p.21), was set in a financially constrained environment. it names 'enhance the performance of the transport network' as a strategic priority (p.15) and records that confirmed nltp funding is about $14.8m short over three years, requiring council to 'reprioritise various expenditure programmes' (p.24). the summary of decisions records reduced active travel funding, arterial stage 1 costs moved to the whakatipu roading rates, central queenstown carparking (including possibly advancing stanley street) deferred for further review, and the a7 jacks point-frankton route unlikely to proceed in the 2024-27 nltp. transport capital of $411.7m over ten years is also stated in the 2025-28 transport procurement strategy. no mass rapid transit reference was found in the portion read. context and purpose. the 2024-2034 long term plan was adopted on 19 september 2024, later than the usual 30 june, after nzta's 2024-27 national land transport programme allocations were known. the ten-year capital programme is approximately $2.4b, of which growth accounts for $979m (40%) (pp.20-21). transport. the plan lists 'enhance the performance of the transport network' as a strategic priority, noting the network is geographically constrained and that 'many people are reliant on private vehicles to move around' (pp.15-16). confirmed nltp funding for the first three years is below what was assumed: 'the shortfall in funding is estimated at $14.8m over three years', the budgets were not adjusted, and 'it will be necessary for council to reprioritise various expenditure programmes to match the level available' (p.24). councillors chose to fund queenstown arterial costs from 2025-26 through the existing whakatipu roading rates (p.22; summary of decisions p.6). the spatial plan outcome that 'public transport, walking and cycling is the preferred option for daily travel' is restated (p.46). the 2025-28 transport procurement strategy, written to this plan, gives transport capital of $411.7m and operating expenditure of $127.1m over ten years (tps p.22). summary of decisions. the decisions summary records 'reduced funding for active travel'; retention of a targeted rate on wider cbd ratepayers for the town centre street upgrades (p.5); the arterial rating decision (p.6); that council will look further at central queenstown carparking, including possibly advancing the stanley street carpark, with 'further information... published before the end of 2024' (p.10); and that the a7 jacks point-frankton active travel route, an nzta responsibility, is unlikely to proceed in this nltp period (p.10). it does not address public transport, park-and-ride or rapid transit. mass rapid transit: no reference to mass rapid transit was found in the main plan pages read (to p.47) or in the summary of decisions. long term plan long term plan 2024-2034 | he mahere pae tawhiti (and summary of decisions) (2024). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted (19 september 2024) no reference to mass rapid transit found in the text read ten-year capital programme approximately $2.4b not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc prepared qldc qldc published glyn lewers signatory qldc qldc mike theelen signatory qldc qldc reprioritise expenditure programmes to match the lower confirmed nltp funding (shortfall $14.8m over three years) necessary for council to reprioritise various expenditure programmes september-october 2024 not assessed qldc qldc fund queenstown arterial (stage 1) costs from the existing whakatipu roading rates rather than a targeted rate applying costs to the existing whakatipu roading rates from 2025-26 not assessed qldc qldc retain a targeted rate on wider queenstown cbd ratepayers for town centre street upgrades from 2024-25 not assessed qldc qldc review central queenstown carparking further, including possibly advancing the stanley street carpark further information will be published before the end of 2024 information by end of 2024 not assessed qldc qldc a7 jacks point-frankton active travel route unlikely to proceed to construction this nltp period unlikely the a7 route is able to proceed to construction in this nltp period 2024-27 nltp not assessed nzta waka kotahi nzta arterial stages 2-3: $11.5m land acquisition and $4.4m initial design; construction not funded preliminary design from year 6 (2029/30) not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2024-09-19",
    "cover": {
      "src": "/covers/QTS-099.webp",
      "srcset": "/covers/QTS-099.webp 400w, /covers/QTS-099-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-099/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-099/QTS-099-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-099/QTS-099-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-100",
    "code": "QTS-100",
    "title": "Attachment B: Finance YTD CAPEX Project Report - July to December 2024",
    "shortTitle": "Attachment B: Finance YTD CAPEX Project Report",
    "summary": "QLDC's year-to-date capital project report for July-December 2024 shows total capital of $60.7m against a $70.0m year-to-date budget (87%), a $152.5m full-year adjusted budget and a $144.3m forecast. Transport lines include arterial Stage 1 within the Crown Infrastructure Partners programme ('opening scheduled for 30 January 2025'), Public Transport Assets - Whakatipu 'placed on hold pending decision on local share allocation of transport budgets', Arthurs Point to CBD active travel close-out, Wānaka Pool to School active travel, Stanley Street site works and temporary parking (final sealing October 2025) and $100k unsubsidised to update the Arthurs Point Bridge business case. No mass rapid transit reference.",
    "documentType": "Accountability report",
    "documentForm": "Capital expenditure project report (committee attachment)",
    "year": 2024,
    "publishedDate": "2024-12",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Attachment B: Finance YTD CAPEX Project Report - July to December 2024 (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://sportrec.qldc.govt.nz/media/xjpd1e0u/2b-attachment-b-finance-ytd-capex-project-report-july-to-december-2024.pdf",
      "https://sportrec.qldc.govt.nz/media/hynljtau/2a-attachment-a-december-2024-finance-management-report.pdf",
      "https://www.qldc.govt.nz/media/gh5ctkmn/2-december-2024-ytd-financial-overview-paper.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-100 attachment b: finance ytd capex project report - july to december 2024 attachment b: finance ytd capex project report qldc's year-to-date capital project report for july-december 2024 shows total capital of $60.7m against a $70.0m year-to-date budget (87%), a $152.5m full-year adjusted budget and a $144.3m forecast. transport lines include arterial stage 1 within the crown infrastructure partners programme ('opening scheduled for 30 january 2025'), public transport assets - whakatipu 'placed on hold pending decision on local share allocation of transport budgets', arthurs point to cbd active travel close-out, wānaka pool to school active travel, stanley street site works and temporary parking (final sealing october 2025) and $100k unsubsidised to update the arthurs point bridge business case. no mass rapid transit reference. context and purpose. this is attachment b (item 2b) to qldc's december 2024 finance reporting, listing each capital project's year-to-date actual, budget and forecast with commentary (pp.79-83 of the agenda). totals. year-to-date actual $60,666,969 against a $69,994,394 budget (87%); full-year adjusted budget $152,509,508 and forecast $144,349,894, $8.16m below. transport lines. within the crown infrastructure partners programme (combined ytd $20.0m against $21.5m; full-year $32.3m), arterial stage 1 is reported 'with opening scheduled for 30 january 2025', and queenstown street upgrades ($657k ytd, $2.4m full-year) note a snag programme resuming in march 2025. in the pmo transport group, public transport assets - whakatipu is 'placed on hold pending decision on local share allocation of transport budgets'; arthurs point to cbd active travel ($366k ytd, $847k full-year) is closing out with 100% transport choices funding; wānaka pool to school active travel ($651k ytd, $1.4m) is due for completion by june 2025; the minor improvements programme ($3.3m full-year) includes $1.2m subsidised for ballantyne road. stanley street site works and temporary parking ($28k ytd, $1.1m) has final sealing deferred to october 2025. arthurs point bridge crossing carries '$100k unsub budget to update business case'. resilience works on the crown range and bennetts bluff have 75% nzta funding with procurement imminent. transport renewals total $11.3m full-year. background. the live report shows the line within a combined pmo transport row ($1.21m full-year) with the 'local share allocation' wording above. mass rapid transit: none. the only public transport item is the public transport assets - whakatipu line. capital expenditure project report (committee attachment) attachment b: finance ytd capex project report - july to december 2024 (2024). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka committee attachment (2b) no reference to mass rapid transit found in the text read ytd capital $60,666,969 vs $69,994,394 budget (87%) full-year adjusted budget $152,509,508; forecast $144,349,894 cip programme (arterial stage 1 and street upgrades) ytd $20.0m; full-year $32.3m arthurs point to cbd active travel full-year $847k; stanley st site works $1.1m not separately commissioned. this is an internal or corporate document. qldc none accountability report recorded 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published open arterial stage 1 with opening scheduled for 30 january 2025 30 january 2025 not assessed hold public transport assets - whakatipu pending a decision on local share allocation of transport budgets placed on hold pending decision on local share allocation of transport budgets pending decision not assessed qldc qldc complete stanley street site works and temporary parking final sealing final sealing construction works now to be completed oct 2025 october 2025 not assessed qldc qldc update the arthurs point bridge crossing business case ($100k unsubsidised) $100k unsub budget to update business case 2024/25 not assessed qldc qldc complete wānaka pool to school active travel project completion anticipated by jun 25 june 2025 not assessed qldc qldc procure crown range and bennetts bluff resilience works (75% nzta funded) procurement imminent 2024/25 not assessed qldc qldc main document pdf part 2 pdf part 3 pdf",
    "sortDate": "2024-12-01",
    "cover": {
      "src": "/covers/QTS-100.webp",
      "srcset": "/covers/QTS-100.webp 400w, /covers/QTS-100-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-100/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-100/QTS-100-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-100/QTS-100-F1-part2.pdf"
      },
      {
        "label": "Part 3",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-100/QTS-100-F1-part3.pdf"
      }
    ]
  },
  {
    "id": "qts-101",
    "code": "QTS-101",
    "title": "Annual Report 2024-2025",
    "shortTitle": "Annual Report 2024-2025",
    "summary": "QLDC's 2024/25 Annual Report, year one of the 2024-2034 Long Term Plan, reports that arterial Stage One, 'linking Melbourne and Henry streets was officially opened in January 2025' (p.10), improving access for public transport. The Arthurs Point to CBD bike path and McChesney Bridge-Arthurs Point-Queenstown shared pathway were completed and the Wānaka Schools to Pool footpath upgrades finished in September 2024 (pp.10, 25). Capital totals and the transport section were not in the text returned. No mass rapid transit reference was found.",
    "documentType": "Accountability report",
    "documentForm": "Annual Report",
    "year": 2025,
    "publishedDate": "2025",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Report 2024-2025 (2025).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ough0b2n/qldc_annual-report-2024-2025-adopted.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-101 annual report 2024-2025 annual report 2024-2025 qldc's 2024/25 annual report, year one of the 2024-2034 long term plan, reports that arterial stage one, 'linking melbourne and henry streets was officially opened in january 2025' (p.10), improving access for public transport. the arthurs point to cbd bike path and mcchesney bridge-arthurs point-queenstown shared pathway were completed and the wānaka schools to pool footpath upgrades finished in september 2024 (pp.10, 25). capital totals and the transport section were not in the text returned. no mass rapid transit reference was found. context and purpose. annual report for the first year of the 2024-2034 long term plan. transport. the chief executive reports that arterial road 'stage one, linking melbourne and henry streets was officially opened in january 2025', improving 'access for public transport' (p.10). the mcchesney bridge-arthurs point-queenstown shared pathway was completed (p.10) and the arthurs point to cbd bike path opened (p.25); the schools to pool footpath upgrades in wānaka finished in september 2024 (p.10). no costs are given in the portion read. performance. the 90% 'capital works completed' kpi against an 80-110% target (p.38) relates to community facilities and property, not transport. mass rapid transit: no reference to mass rapid transit was found in the text read. annual report annual report 2024-2025 (2025). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read arterial stage one officially opened january 2025 (p.10) capital works kpi 90% vs 80-110% target (community facilities and property) (p.38) not separately commissioned. this is an internal or corporate document. qldc none accountability report adopted 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published glyn lewers signatory qldc qldc mike theelen signatory qldc qldc main document pdf",
    "sortDate": "2025-01-01",
    "cover": {
      "src": "/covers/QTS-101.webp",
      "srcset": "/covers/QTS-101.webp 400w, /covers/QTS-101-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-101/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-101/QTS-101-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-103",
    "code": "QTS-103",
    "title": "Otago Regional Public Transport Plan 2025–2035 (Final/Adopted)",
    "shortTitle": "Otago Regional Public Transport Plan 2025–2035",
    "summary": "Final Otago Regional Public Transport Plan (RPTP) 2025-2035, Otago Regional Council's (ORC) statutory ten-year plan for public transport services, information and infrastructure, prepared with Otago's territorial authorities and NZTA (Waka Kotahi) (p7). The ORC Chair's foreword highlights Motu Move ticketing from 2026, a fully electric fleet in Dunedin and Queenstown, higher Queenstown bus frequencies and support for community transport, while noting Government expectations to recover more costs through fares (p5). For Queenstown the plan sets staged service increases: a direct Queenstown-Arrowtown connection and 30-minute peak connectors (2025-2028); a coordinated 7.5-minute Queenstown-Frankton frequency, Homestead Bay extension and articulated buses (2028-2031); additional peak services and Wānaka/Alexandra links (2031-2035); and network-wide frequent services (2035-2055) (pp63-66). It supports an electric bus depot in Queenstown (p82), a replacement for the Stanley Street hub (p78) and parking management that supports public transport (p83). It retains the draft's statement 'we support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies' (p56), and adds 'cable/rope technologies' to the mode-neutrality policy (SD P5, p52). The 'Potential for rapid off-line service between Queenstown and Homestead Bay (not shown)' now sits in the 10-30 year (2035-2055) horizon rather than the draft's 6-30 years (p66).",
    "documentType": "Statutory plan",
    "documentForm": "Regional Public Transport Plan (final)",
    "year": 2025,
    "publishedDate": "2025",
    "documentStatus": "Final",
    "geographicScope": "Otago region; Dunedin; Queenstown / Whakatipu (Queenstown Town Centre, Frankton, Southern Corridor to Homestead Bay, Arrowtown); Wānaka; Ōamaru; rural Otago",
    "owner": "ORC",
    "citation": "ORC. Otago Regional Public Transport Plan 2025–2035 (2025).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/d4rd2stz/pt-rptp-otago-regional-public-transport-plan-2025-2035.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/d4rd2stz/pt-rptp-otago-regional-public-transport-plan-2025-2035.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "on-demand"
    ],
    "organisationIds": [
      "orc",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-103 otago regional public transport plan 2025–2035 (final/adopted) otago regional public transport plan 2025–2035 final otago regional public transport plan (rptp) 2025-2035, otago regional council's (orc) statutory ten-year plan for public transport services, information and infrastructure, prepared with otago's territorial authorities and nzta (waka kotahi) (p7). the orc chair's foreword highlights motu move ticketing from 2026, a fully electric fleet in dunedin and queenstown, higher queenstown bus frequencies and support for community transport, while noting government expectations to recover more costs through fares (p5). for queenstown the plan sets staged service increases: a direct queenstown-arrowtown connection and 30-minute peak connectors (2025-2028); a coordinated 7.5-minute queenstown-frankton frequency, homestead bay extension and articulated buses (2028-2031); additional peak services and wānaka/alexandra links (2031-2035); and network-wide frequent services (2035-2055) (pp63-66). it supports an electric bus depot in queenstown (p82), a replacement for the stanley street hub (p78) and parking management that supports public transport (p83). it retains the draft's statement 'we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p56), and adds 'cable/rope technologies' to the mode-neutrality policy (sd p5, p52). the 'potential for rapid off-line service between queenstown and homestead bay (not shown)' now sits in the 10-30 year (2035-2055) horizon rather than the draft's 6-30 years (p66). context and purpose. the rptp 2025-2035 is orc's statutory plan under the land transport management act 2003, renewed after the 2024 mid-term review of the otago southland rltp (p9). it guides orc's design and delivery of public transport, with emphasis on the first three years after adoption (2025-2027) (p7). it was prepared with dcc, qldc, codc, cdc, wdc and nzta, and informed by engagement with mana whenua, operators, community groups and ltp/annual plan submissions (p7). this is the final version following consultation on the march 2025 draft (rptp_draft); the document does not print an adoption date. structure and method. policies and actions are grouped under five focus areas: passenger experience; building trust; environmental sustainability; a connected and integrated network; and value for money, followed by implementation and monitoring. network design follows the principles of serving diverse trips, a patronage-oriented network and mode-neutrality (p49). policy sd p5 (p52) states public transport 'will be delivered using the most appropriate mode (e.g. bus, ferry, rail, cable/rope technologies, etc.)'. key figures. otago public transport trips rose from 3.4 million (2019/20) to 5.3 million (2023/24), +54% (p15). queenstown's fleet is expected to be 23 electric buses (100% of fleet) by about 2029 (figure 10, p48). the urban rapid service target is every 10 minutes or better 6am-8pm on a dedicated right-of-way (p56). queenstown has one frequent service; connector services are hourly, half-hourly at peak on the strongest routes (pp56-57). the queenstown urban unit (unit 8) runs november 2029-june 2041 with staged increases subject to funding; queenstown school and regional units (units 9-10) are 'not currently funded'; the lake whakatipu ferry unit runs july 2025-june 2030 (p126). queenstown policies and actions. queenstown is described as a high-growth centre where public transport must proactively support growth. the most popular route will likely be homestead bay-jack's point-hanley's farm-frankton-queenstown, served by high-capacity articulated buses, and 'there may be a future study of the case for other modes... including an off-line option and a direct ferry service' (p63). staged maps: next 3 years (2025-2028), direct queenstown-arrowtown connection and 30-minute peak connectors (p64); 3-6 years (2028-2031), 30-minute all-day connectors, timetables coordinated to create 7.5-minute frequency between queenstown and frankton, homestead bay extension, articulated buses and on-demand services (p64); 6-10 years (2031-2035), additional peak services and queenstown-wānaka and queenstown-alexandra services (p65); 10-30 years (2035-2055), frequent services across the network 'per business case', missing links such as the quail rise western access road, a potential ferry to homestead bay and potential rapid off-line service (p66). the frankton bus hub is being redeveloped by nzta, and a stronger central queenstown facility to replace the on-street stanley street bus hub is 'a key action in the long-term implementation of the queenstown public transport business case' (p78). orc plans to secure land for an electric depot because strategic land is hard to access and the network runs as a single contract (p80; in a4, p82). parking in dunedin and queenstown is to be managed to support public transport growth (pm p1/pm a1, p83). a zone fare structure is being considered for queenstown (pp100-101). kpis cover whakatipu boardings, on-time performance (>90%), service delivery (>99%) and satisfaction (>90%) (p97). the queenstown engagement story again records interest in 'expanding ferry access or ropeway services' (p108). the grow well whaiora partnership and queenstown lakes spatial plan are cited as complementary (p47). changes from the draft relevant to queenstown. (1) sd p5 mode list changed from 'bus, ferry, tram, etc.' (draft p54) to 'bus, ferry, rail, cable/rope technologies, etc.' (p52). (2) the ropeway sentence is unchanged apart from a lower-case 'we' (draft p58; final p56). (3) the network horizons changed from 0-3, 3-6 and 6-30 years to dated horizons of 2025-2028, 2028-2031, 2031-2035 and 2035-2055; the potential rapid off-line service moved from the 6-30 year map to the 10-30 year (2035-2055) map, i.e. beyond the plan period (draft p66; final p66). (4) a 6-10 year stage was added. (5) queenstown school and regional units move from november 2028 to november 2029 start (draft p126; final p126). the final retains a stray sentence inviting submissions on the draft, consultation 'currently scheduled for march 2025' (p108). recommendations. the plan does not itself commit funding; activities depend on nltp and ltp funding. mass rapid transit: the plan states 'no current plans to implement full rapid service, but... we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p56); says there 'may be a future study' of other modes including 'an off-line option' (p63); lists 'potential for rapid off-line service between queenstown and homestead bay (not shown)' in the 2035-2055 horizon (p66); and names 'cable/rope technologies' in policy sd p5 (p52). no corridor, owner, cost or date is given for the study. regional public transport plan (final) orc. otago regional public transport plan 2025–2035 (2025). otago region; dunedin; queenstown / whakatipu (queenstown town centre, frankton, southern corridor to homestead bay, arrowtown); wānaka; ōamaru; rural otago final (adopted plan; adoption date not printed) supports future study of off-line rapid service in queenstown, likely ropeway; no current plans; potential service placed in 2035-2055 horizon, unmapped. the final plan keeps the draft's position and strengthens one policy reference, while moving the time horizon later. the urban rapid row of the service-layer table states: 'no current plans to implement full rapid service, but: we want to enhance key spines... we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p56). this wording is identical to the draft (p58) apart from capitalisation. policy sd p5 (mode neutrality) now reads 'bus, ferry, rail, cable/rope technologies, etc.' (p52); the draft read 'bus, ferry, tram, etc.' (draft p54). the queenstown section repeats that 'there may be a future study of the case for other modes... including an off-line option and a direct ferry service' (p63). on the staged maps, 'potential for rapid off-line service between queenstown and homestead bay (not shown)' appears under '10–30 years (2035–2055)' (p66). in the draft it appeared under '6-30 years' (draft p66). the new dated horizons place any off-line service after the plan's 2035 end date. the engagement summary records queenstown interest in 'expanding ferry access or ropeway services' (p108). the plan does not name a corridor such as frankton-town centre, a lead agency, funding or a date for the study. \"no current plans to implement full rapid service, but: • we want to enhance key spines, where the combined service may approach rapid standards • we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies\" (p.56) | \"mode neutrality: public transport will be delivered using the most appropriate mode (e.g. bus, ferry, rail, cable/rope technologies, etc.) to meet demand, purpose, community need and value for money.\" (p.52) | \"additionally, there may be a future study of the case for other modes to serve this area, including an off-line option and a direct ferry service.\" (p.63) | \"10–30 years (2035–2055)... potential for rapid off-line service between queenstown and homestead bay (not shown).\" (p.66) | \"exploring the potential for new transport modes, including expanding ferry access or ropeway services\" (p.108) otago public transport trips rose from 3.4 million (2019/20) to 5.3 million (2023/24), +54% (p15) queenstown fleet expected to be 23 electric buses (100% of fleet) by c.2029 (figure 10, p48) coordinated 7.5-minute queenstown-frankton frequency in 2028-2031 horizon (p64) urban rapid service target: every 10 minutes or better 6am-8pm, dedicated right-of-way (p56) queenstown urban (unit 8) contract november 2029-june 2041; units 9-10 (queenstown school, regional) not currently funded (p126) lake whakatipu ferry (unit 11) july 2025-june 2030 (p126) kpis: on-time >90%, service delivery >99%, satisfaction >90% for whakatipu (p97) total mobility fare subsidy cap $37.50 to be investigated (tm p4, p36) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/d4rd2stz/pt-rptp-otago-regional-public-transport-plan-2025-2035.pdf orc substantive statutory plan final 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. on-demand transport on-demand public transport. orc orc lead orc orc prepared nzta waka kotahi nzta partner qldc qldc partner gretchen robertson signatory orc orc further study of an off-line rapid service in queenstown, likely using ropeway technologies (stated aspiration; no owner or date). we support the future study of an “off-line” rapid service in queenstown not stated; potential rapid off-line service in 10-30 year horizon (2035-2055) (p66) not assessed possible future study of the case for other modes in the homestead bay-frankton-queenstown corridor, including an off-line option and a direct ferry service. there may be a future study of the case for other modes not assessed deliver public transport using the most appropriate mode, including cable/rope technologies, to meet demand, purpose, community need and value for money. sd p5 mode neutrality... cable/rope technologies plan period (2025-2035) not assessed orc orc introduce a direct queenstown-arrowtown connection and 30-minute peak frequency on all queenstown connector routes. direct queenstown-arrowtown connection. next 3 years (2025-2028) not assessed orc orc move queenstown connectors to 30-minute all-day frequency and coordinate timetables to create 7.5-minute frequency between queenstown and frankton. timetables to be coordinated to create 7.5-minute frequency 3-6 years (2028-2031) not assessed orc orc extend services to homestead bay as development occurs, introduce articulated buses and develop on-demand services away from core routes. articulated buses begin to be introduced to increase capacity. 3-6 years (2028-2031) not assessed orc orc add peak services across the queenstown network and develop queenstown-wānaka and queenstown-alexandra services. additional peak services across network. 6-10 years (2031-2035) not assessed orc orc increase services across the network to frequent levels per business case; serve new links such as quail rise western access road; consider ferry to homestead bay. services across network to be increased to frequent levels (per business case). 10-30 years (2035-2055) not assessed orc orc support development of a long-term electric bus depot in queenstown, possibly including land purchase and long-term control of the depot. in a4 support the development of a long-term electric bus depot in queenstown not assessed orc orc develop a stronger central queenstown facility to replace the on-street stanley street bus hub, as part of implementing the queenstown public transport business case. a key action in the long-term implementation of the queenstown public transport business case long term not assessed collaborate with partner agencies so parking strategies and fare policies align and support public transport, including parking management plans for mode shift (dunedin and queenstown). pm a1 collaborate with partner agencies to ensure parking strategies and fare policies align not assessed orc orc collaborate with territorial and road-controlling authorities to implement public transport priority or other efficiency measures for reliability and punctuality. sq a5 collaborate with territorial and road-controlling authorities not assessed orc orc implement integrated mode-shift packages in urban areas with partners: services, bus priority, fares and parking pricing, and promotion. nf a4 work collaboratively with key stakeholders to implement integrated packages not assessed orc orc develop and design service improvements in line with the future network structures in section 5.2. nf a1 develop and design service improvements not assessed orc orc phase out diesel buses in favour of zero-emission electric buses when procuring new unit contracts; fully decarbonised fleet by 2035. dc a1 phase out diesel buses by 2035 not assessed orc orc consider adopting a zone fare structure for the queenstown and dunedin urban bus networks. orc is considering adopting a zone fare structure not assessed orc orc use statutory planning processes and engage developers and territorial authorities so new urban areas integrate with public transport. lu a1 use statutory planning processes not assessed orc orc transition from the bee card to the motu move ticketing system with nzta, including public education and card replacement. ts a2 collaborate with nzta to effectively transition motu move introduced 2026 (p5) not assessed nzta waka kotahi nzta develop a regional public and active transport connectivity strategy and programme of activities. mm a1 develop a regional public and active transport connectivity strategy not assessed orc orc main document pdf",
    "sortDate": "2025-01-01",
    "cover": {
      "src": "/covers/QTS-103.webp",
      "srcset": "/covers/QTS-103.webp 400w, /covers/QTS-103-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-103/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-103/QTS-103-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-104",
    "code": "QTS-104",
    "title": "Policy Review - Travel Demand Management Summary Report",
    "shortTitle": "Policy Review - Travel Demand Management Summary",
    "summary": "Stantec's summary of a travel demand management (TDM) policy review for Queenstown Lakes District Council. It screened 23 QLDC and regional policies and plans, interviewed 32 QLDC staff from 18 teams and three Way2Go representatives, and set out prioritised recommendations to strengthen TDM, with detail in a Decision Issue and Resolution Tracker (DIRT) provided separately. It finds that the Spatial Plan and District Plan contain relatively strong TDM objectives, but these are not carried into rules, consent conditions, the Code of Practice or delivery documents. Behaviour change messaging is weak. Parking pricing is the only TDM pricing strategy in the documents reviewed, and it applies only to 'a small area of Queenstown CBD'. The Mode Shift Plan 'lacks a funded implementation plan'. The persistent funding shortfall for public transport and active modes is described as perhaps the most significant barrier, and staff were reluctant to adopt TDM 'sticks' without good alternatives in place. Recommendations include: costing network gaps and funding them through development contributions, parking revenue and advocacy for fuel tax and time-of-use charging; establishing a Transport Management Association; rebranding the Mode Shift Plan as a funded TDM Strategy; reviewing the Parking Strategy, Code of Practice, development contributions policy and Minor Improvements Policy; a TDM plan change; and annual monitoring. The report does not refer to mass rapid transit.",
    "documentType": "Policy review",
    "documentForm": "Policy review summary report",
    "year": 2025,
    "publishedDate": "2025-01-20",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District (district-wide policy review; references to Queenstown CBD, Frankton, SH6 and SH6A)",
    "owner": "QLDC",
    "citation": "QLDC. Policy Review - Travel Demand Management Summary Report (2025). Stantec Project/File 310206284.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/2nnfeg1l/4-travel-demand-management-policy-review.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "policy-review",
    "topics": [
      "active-travel",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc",
      "stantec",
      "nzta",
      "orc"
    ],
    "searchText": "qts-104 policy review - travel demand management summary report policy review - travel demand management summary stantec's summary of a travel demand management (tdm) policy review for queenstown lakes district council. it screened 23 qldc and regional policies and plans, interviewed 32 qldc staff from 18 teams and three way2go representatives, and set out prioritised recommendations to strengthen tdm, with detail in a decision issue and resolution tracker (dirt) provided separately. it finds that the spatial plan and district plan contain relatively strong tdm objectives, but these are not carried into rules, consent conditions, the code of practice or delivery documents. behaviour change messaging is weak. parking pricing is the only tdm pricing strategy in the documents reviewed, and it applies only to 'a small area of queenstown cbd'. the mode shift plan 'lacks a funded implementation plan'. the persistent funding shortfall for public transport and active modes is described as perhaps the most significant barrier, and staff were reluctant to adopt tdm 'sticks' without good alternatives in place. recommendations include: costing network gaps and funding them through development contributions, parking revenue and advocacy for fuel tax and time-of-use charging; establishing a transport management association; rebranding the mode shift plan as a funded tdm strategy; reviewing the parking strategy, code of practice, development contributions policy and minor improvements policy; a tdm plan change; and annual monitoring. the report does not refer to mass rapid transit. context and purpose: stantec reviewed qldc policies and plans to strengthen travel demand management, defined broadly to cover pricing, land use, parking management, incentives, information and improved travel options (p5). it notes that the district's growth and infrastructure deficit, with insufficient funding, make tdm particularly relevant (p5). qldc's preferred user hierarchy places walking and wheeling first and the private car last (p6). method: there were four stages (p7). the first screened 23 documents, including the proposed district plan, code of practice, ltp 2024-34 and development contributions policy, parking strategy, spatial plan, mode shift plan, otago southland rltp and otago ltp (appendix a, p20). the second involved interviews with 32 qldc staff from 18 teams and three way2go representatives. in the third, recommendations were prioritised with an impact/difficulty matrix in the dirt tracker, and the fourth was follow-up interviews (p7). no elected members or community representatives were interviewed (p16). key findings: only some staff recognised tdm as a way to make best use of assets and delay upgrades (p8). behaviour change messaging is weak, with no general campaigns (p8). the spatial plan and district plan have relatively strong tdm objectives, but the link to rules, assessment matters, consent conditions and the code of practice is weak (p8). the spatial plan outcome that pt, walking and cycling are preferred is not translated into delivery documents (p8). a 'persistent and longstanding funding shortfall' means new housing is built without alternative mode connections (p8). divided responsibilities (nzta for sh6/sh6a, orc for public transport) make quick responses difficult (p8, p17). staff were reluctant to include tdm 'sticks' without quality alternatives (p8-9). follow-up interviews raised the need for leadership direction and noted that some actions may need owners outside qldc, such as orc (p9). pricing and funding: the funding shortfall is 'perhaps the most significant factor' (p11). 'parking pricing is the only tdm pricing strategy mentioned in the documents reviewed, however even the application of this measure is limited to a small area of queenstown cbd', which is described as a significant weakness (p11). the report recommends investigating development contributions, time-of-use charging (with legislation expected and revenue ring-fenced for qldc) and a regional fuel tax, alongside wider parking pricing (p11-12). recommendations: cost all public transport and active mode network gaps from the spatial plan into orc, qldc and nzta programmes. fund them through development contributions, a higher funding assistance rate, ring-fenced parking revenue, fuel tax and time-of-use charging advocacy, with orc differential rating for pt operations in new areas (p10). update district plan rules and the code of practice to prioritise walking, cycling and pt access (10-minute walk to frequent bus), minimise parking and require travel plans (p11). establish a transport management association with the chamber of commerce (p12). priority document reviews (table 4-1, p13-15) cover the spatial plan (priority 1), district plan plan change (priority 3), code of practice (1), mode shift plan rebranded as a funded tdm strategy (1), parking strategy (1), ltp and dc policy (high), and minor improvements policy (1). other recommendations cover live gis tools (p16), staff, political and community engagement (p16-17), consideration of a unitary authority or transfer of powers (p17), and monitoring with annual progress reports (p17). conclusion: success depends on aligning qldc and orc documents into a coherent, actionable framework. that means elevating the mode shift plan, a tdm plan change, travel planning, addressing the funding shortfall, and political and community buy-in (p18). mass rapid transit: the report says nothing about mass rapid transit or offline public transport. public transport is discussed only in general terms (network gaps, funding, the parking strategy recommendation to relocate parking to peripheries and park and ride sites). policy review summary report qldc. policy review - travel demand management summary report (2025). stantec project/file 310206284. queenstown lakes district (district-wide policy review; references to queenstown cbd, frankton, sh6 and sh6a) final (revision 3, 20/01/25) no mass rapid transit reference; documents gaps in travel-demand pricing, funding and implementation. 23 policies and plans screened (p5, p7, p20) 32 qldc staff from 18 teams and three way2go representatives interviewed (p7, p16) parking pricing limited to 'a small area of queenstown cbd' (p11) auckland regional fuel tax 10c/litre (plus gst), july 2018–june 2024, ended by legislation march 2024 (p12) priority ratings: spatial plan, code of practice, mode shift plan, parking strategy, minor improvements policy = priority 1; dc policy high priority; district plan tdm plan change = priority 3 (p13-15) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/2nnfeg1l/4-travel-demand-management-policy-review.pdf qldc none policy review final 2025 walking and cycling walking, cycling, trails and other active travel. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc commissioned stantec stantec prepared sarah connolly prepared by stantec stantec kylie huard reviewed by stantec stantec susan lilley approved by stantec stantec identify existing and future housing and employment areas in the spatial plan, with maps of how they are or will be served by active mode and pt networks, including visitor needs. ensure the spatial plan identifies existing and future housing and employment areas current spatial plan review / fds work (priority 1) not assessed qldc qldc cost all gaps in pt and active mode networks and include them in orc, qldc ltp or nzta ship programmes. cost all gaps in the public transport and active mode networks and include in the relevant orc, qldc ltp or nzta ship programmes not assessed nzta waka kotahi nzta update and review the development contributions policy to collect contributions for network gaps and incentivise higher-density, well-located development; ensure projects are in the ltp. update the development contribution (dc) policy high priority – review now; ltp at next review not assessed qldc qldc fund any shortfall by negotiating a higher nzta funding assistance rate and ring-fencing qldc parking revenue, potentially including levies on staff parking. negotiating a higher funding assistance rate subsidy from nzta; ringfence qldc parking revenue not assessed qldc qldc consider differential rating for new development areas without pt services to cover additional pt operating costs. orc could consider differential rating not assessed orc orc advocate for policy changes to address nltp funding constraints, including additional fuel tax ring-fenced for tdm. qldc, nzta and orc should advocate for changes to the policy settings not assessed nzta waka kotahi nzta advocate for time-of-use charging and light vehicle ruc, with revenue ring-fenced for qldc to deliver tdm, and design a scheme aligned with the spatial plan. advocate for time of use charging... revenue collected through such a scheme in the district to be ringfenced when tools become available (bill expected late 2024) not assessed qldc qldc discuss a regional fuel tax with elected members, the rltp committee and other officials, and confirm a position. recommended that this option be discussed with qldc elected members... and a position confirmed not assessed qldc qldc investigate further roll-out of parking pricing and other pricing strategies, alongside engagement with elected members, stakeholders and the community. it is recommended that these options be further investigated not assessed qldc qldc update district plan rules, assessment matters and the code of practice to prioritise walking and cycling, locate housing within a 10-minute walk of frequent bus or centres, minimise parking and require travel plans. update district plan rules and assessment matters, and code of practice not assessed qldc qldc work with the chamber of commerce to establish a transport management association (e.g. frankton or queenstown cbd), with qldc seed funding. it is recommended that qldc work with the chamber of commerce not assessed qldc qldc take a stronger line in the spatial plan on low-density sprawl; recognise tdm as essential because 'predict and provide' road and parking supply is not achievable; stocktake community facilities. take a stronger line on low density residential development and urban sprawl priority 1 – current review and fds work not assessed qldc qldc prepare a district plan change to facilitate mode shift district-wide (stronger objectives, rules, matters of discretion, mandatory travel plans, links to the spatial plan). prepare a plan change to facilitate mode shift across the district priority 3 – some time away not assessed qldc qldc fully update the code of practice transport section to integrate with the planning framework (wider footpaths, sight lines, less car focus). full transport update. start now to inform scheduled update in 2025 priority 1 – start now for 2025 update not assessed qldc qldc rebrand the mode shift plan as a tdm strategy with clear mode share targets and a funded, phased implementation plan (timelines, budgets, milestones), including travel plans and tmas. rebrand as a travel demand management strategy... funded, phased implementation plan priority 1 – review now not assessed qldc qldc align the parking strategy with spatial plan and tdm goals: shift centre parking from sovs to other users, relocate sov parking to peripheries and park and ride sites, acquire land now, and link parking charges to pt fares. align the parking strategy with the spatial plan and mode shift/tdm goals priority 1 – before document is finalised not assessed qldc qldc add tdm as a criterion in evaluating and prioritising minor improvements. add travel demand management as a criterion priority 1 – update now not assessed qldc qldc invest in live gis tools to replace static plans, and use technology to scale up micromobility and trial new travel solutions. this requires investing in gis tools not assessed qldc qldc transport strategy team to continue tdm conversations across qldc departments, with senior staff messaging and compulsory awareness forums. it is recommended that the transport strategy team continue the tdm conversation not assessed qldc qldc work with elected members to secure political support for a more radical and concerted tdm approach, including champions and coordinated messaging. it is recommended that staff work closely with elected members not assessed qldc qldc engage the community early with evidence-based communication and co-benefits, and roll out changes in phases. community support will be needed for a more radical and concerted tdm approach phased not assessed qldc qldc consider a unitary authority or transfer of powers to streamline transport decision-making across qldc, orc and nzta responsibilities. opportunities to establish a unitary authority or transfer of powers would streamline decision making not assessed review mode shift plan measures, develop a comprehensive monitoring set, collect baseline data and publish annual progress reports. recommended that these are reviewed and a comprehensive set of measures developed annual not assessed qldc qldc main document pdf",
    "sortDate": "2025-01-20",
    "cover": {
      "src": "/covers/QTS-104.webp",
      "srcset": "/covers/QTS-104.webp 400w, /covers/QTS-104-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-104/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-104/QTS-104-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-105",
    "code": "QTS-105",
    "title": "Otago Regional Public Transport Plan 2025–2035 (Draft/Consultation)",
    "shortTitle": "Otago Regional Public Transport Plan 2025–2035",
    "summary": "Consultation draft of Otago Regional Council's (ORC) statutory Regional Public Transport Plan (RPTP) for 2025-2035, prepared under the Land Transport Management Act 2003 in collaboration with Otago's territorial authorities and NZTA (Waka Kotahi) (p7). It sets policies and actions under five focus areas: passenger experience, building trust, environmental sustainability, a connected and integrated network, and value for money, plus implementation and monitoring. For Queenstown it plans progressive service increases: a direct Queenstown-Arrowtown connection and 30-minute peak connector frequencies in 0-3 years; coordinated 7.5-minute Queenstown-Frankton frequency, extension to Homestead Bay and articulated buses in 3-6 years; and network-wide frequent services in 6-30 years (pp64-66). It supports a long-term electric bus depot in Queenstown (p80), a replacement for the Stanley Street hub (p76), parking management that supports public transport (p81) and a possible zone fare structure (pp98-99). The draft states 'No current plans to implement full rapid service' but 'We support the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies' (p58), and shows a 'Potential for rapid off-line service between Queenstown and Homestead Bay (not shown)' in the 6-30 year horizon (p66). Several front-matter items are placeholders (foreword in placeholder text, p5; 'References to go here', p2).",
    "documentType": "Statutory plan",
    "documentForm": "Regional Public Transport Plan (consultation draft)",
    "year": 2025,
    "publishedDate": "2025-03",
    "documentStatus": "Draft",
    "geographicScope": "Otago region; Dunedin; Queenstown / Whakatipu (Queenstown Town Centre, Frankton, Southern Corridor to Homestead Bay, Arrowtown); Wānaka; Ōamaru; rural Otago",
    "owner": "ORC",
    "citation": "ORC. Otago Regional Public Transport Plan 2025-2035 (2025).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf",
    "publicSourceConfidence": "same document",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "on-demand"
    ],
    "organisationIds": [
      "orc",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-105 otago regional public transport plan 2025–2035 (draft/consultation) otago regional public transport plan 2025–2035 consultation draft of otago regional council's (orc) statutory regional public transport plan (rptp) for 2025-2035, prepared under the land transport management act 2003 in collaboration with otago's territorial authorities and nzta (waka kotahi) (p7). it sets policies and actions under five focus areas: passenger experience, building trust, environmental sustainability, a connected and integrated network, and value for money, plus implementation and monitoring. for queenstown it plans progressive service increases: a direct queenstown-arrowtown connection and 30-minute peak connector frequencies in 0-3 years; coordinated 7.5-minute queenstown-frankton frequency, extension to homestead bay and articulated buses in 3-6 years; and network-wide frequent services in 6-30 years (pp64-66). it supports a long-term electric bus depot in queenstown (p80), a replacement for the stanley street hub (p76), parking management that supports public transport (p81) and a possible zone fare structure (pp98-99). the draft states 'no current plans to implement full rapid service' but 'we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p58), and shows a 'potential for rapid off-line service between queenstown and homestead bay (not shown)' in the 6-30 year horizon (p66). several front-matter items are placeholders (foreword in placeholder text, p5; 'references to go here', p2). context and purpose. the draft rptp 2025-2035 is orc's ten-year statutory plan for public transport services, information and infrastructure, with emphasis on how funding and effort are spent in the first three years after adoption (p7). the ltma requires the rptp to be renewed after the rltp mid-term review, completed in 2024 (p9). it was prepared with dunedin city, queenstown lakes, central otago, clutha and waitaki district councils and nzta (waka kotahi), informed by engagement with mana whenua, operators, community groups, customers and 2024 ltp/annual plan submissions (p7). this version is the consultation draft received by orc's public and active transport committee on 5 march 2025 (see patc2025). it contains unfinished front matter: the foreword is placeholder text (p5) and page 2 reads 'src reference: ##### references to go here'. structure and method. policies (p) and actions (a) are grouped under five focus areas: passenger experience (information, safety, customer service, ticketing, branding, special events, service and vehicle standards, total mobility and community transport); building trust (equity, engagement, collaborative relationships); environmental sustainability (land use integration, fleet decarbonisation); a connected and integrated network (service design, routes and service levels, multi-modal access, infrastructure, parking); and value for money (funding, fares, procurement, workforce). network design follows three principles: diverse trip types, a patronage-oriented network, and mode-neutrality (p51). policy sd p5 says public transport 'will be delivered using the most appropriate mode (e.g. bus, ferry, tram, etc.)' (p54). key figures. otago public transport trips rose from 3.4 million in 2019/20 to 5.3 million in 2023/24, a 54% increase (p15). queenstown's bus fleet is expected to be 23 electric buses (100% of fleet) by about 2029 (figure 10, p49). urban rapid service targets are every 10 minutes or better 6am-8pm on a dedicated right-of-way (p58). the queenstown urban bus unit (unit 8) contract is shown as november 2029-june 2041 with staged service increases, subject to funding; queenstown school and regional units are 'not currently funded' (p126). queenstown policies and actions. the draft says queenstown is a high-growth centre where public transport must proactively support growth; its most popular route will likely run from homestead bay through jacks point and hanley's farm into frankton and queenstown, served by high-capacity articulated buses, and 'there may be a future study of the case for other modes... including an off-line option and a direct ferry service' (p64). staged network maps show: 0-3 years, direct queenstown-arrowtown connection and 30-minute peak connector frequency; 3-6 years, 30-minute all-day connectors, timetables coordinated to create 7.5-minute frequency between queenstown and frankton, extension to homestead bay, articulated buses and on-demand services; 6-30 years, network increased to frequent levels 'per business case', missing road links such as quail rise, a potential ferry to homestead bay and potential rapid off-line service (pp65-66). infrastructure text notes the frankton bus hub is being redeveloped by nzta waka kotahi and that a stronger central queenstown facility to replace the on-street stanley street hub is a key action in the long-term implementation of the queenstown public transport business case (p76). orc plans to secure land for an electric depot in queenstown so multiple operators can compete for the single network contract (p78; action in a4, p80). parking in dunedin and queenstown is to be managed to support public transport growth (pm p1, p81). regional aspirations include contracted alexandra-queenstown and wānaka-queenstown services (p59). a zone fare structure is being considered for queenstown and dunedin (attachment 1, pp98-99). kpis include annual boardings, on-time performance (>90%) and service delivery (>99%) for whakatipu (p95). the engagement summary records queenstown feedback on 'exploring the potential for new transport modes, including expanding ferry access or ropeway services' (p108). recommendations. as a policy plan it does not commit funding to specific projects; implementation depends on nltp and ltp funding. implementation and monitoring arrangements and a significance policy are in part 3 (pp93-97). mass rapid transit: the draft makes explicit but brief statements. under urban rapid service it says 'no current plans to implement full rapid service' and 'we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p58). the queenstown section says there 'may be a future study' of other modes including 'an off-line option' (p64), and the 6-30 year map lists 'potential for rapid off-line service between queenstown and homestead bay (not shown)' (p66). engagement feedback mentions ropeway services (p108). there is no alignment, cost, timing, owner or funding for an off-line service, and sd p5's mode list does not name cable or rope technology (p54). regional public transport plan (consultation draft) orc. otago regional public transport plan 2025-2035 (2025). otago region; dunedin; queenstown / whakatipu (queenstown town centre, frankton, southern corridor to homestead bay, arrowtown); wānaka; ōamaru; rural otago draft (consultation draft; the document itself is not marked 'draft' - status from the 5 march 2025 patc agenda and placeholder content) supports future study of an off-line rapid service in queenstown, likely ropeway; no current plans; placed in 6-30 year horizon, not mapped. the draft gives a short, explicit position on off-line rapid transit for queenstown. in the table of network service layers, the urban rapid row records that otago lacks urban rapid services and states: 'no current plans to implement full rapid service, but: we want to enhance key spines... we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p58). the queenstown urban network section says the main corridor will be served by articulated buses and that 'there may be a future study of the case for other modes to serve this area, including an off-line option and a direct ferry service' (p64). the 6-30 year network map lists 'potential for rapid off-line service between queenstown and homestead bay (not shown)' (p66); the off-line route is not drawn on any map. the engagement summary ('the queenstown story') records stakeholders raising 'the potential for new transport modes, including expanding ferry access or ropeway services' (p108). the mode-neutrality policy sd p5 lists 'bus, ferry, tram, etc.' (p54) and does not mention cable or rope technologies. the draft does not assign responsibility, a budget or a date for the study, and does not identify a corridor (e.g. frankton-town centre). \"no current plans to implement full rapid service, but: • we want to enhance key spines, where the combined service may approach rapid standards • we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies\" (p.58) | \"additionally, there may be a future study of the case for other modes to serve this area, including an off-line option and a direct ferry service.\" (p.64) | \"potential for rapid off-line service between queenstown and homestead bay (not shown)\" (p.66) | \"exploring the potential for new transport modes, including expanding ferry access or ropeway services\" (p.108) | \"mode neutrality: public transport will be delivered using the most appropriate mode (e.g. bus, ferry, tram, etc.) to meet demand, purpose, community need and value for money.\" (p.54) otago public transport trips rose from 3.4 million (2019/20) to 5.3 million (2023/24), +54% (p15) queenstown fleet expected to be 23 electric buses (100% of fleet) by c.2029 (figure 10, p49) coordinated 7.5-minute queenstown-frankton frequency planned in 3-6 year horizon (p65) urban rapid service target: every 10 minutes or better 6am-8pm, dedicated right-of-way (p58) queenstown urban (unit 8) contract november 2029-june 2041 with staged increases subject to funding (p126) kpis: on-time performance >90%, service delivery >99% for whakatipu and dunedin (p95) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf orc substantive statutory plan draft 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. on-demand transport on-demand public transport. orc orc lead orc orc prepared nzta waka kotahi nzta partner qldc qldc partner further study of an off-line rapid service in queenstown, likely using ropeway technologies (stated as an aspiration; no owner or date). we support the future study of an “off-line” rapid service in queenstown not stated (aspiration); potential rapid off-line service in 6-30 year horizon (p66) not assessed possible future study of the case for other modes in the homestead bay-frankton-queenstown corridor, including an off-line option and a direct ferry service. there may be a future study of the case for other modes not assessed introduce a direct queenstown-arrowtown connection and 30-minute peak frequency on all queenstown connector routes. direct queenstown-arrowtown connection 0-3 years not assessed orc orc move all queenstown connector routes to 30-minute all-day frequency and coordinate timetables to create 7.5-minute frequency between queenstown and frankton. timetables to be coordinated to create 7.5-minute frequency between queenstown and frankton 3-6 years not assessed orc orc extend services to homestead bay as development occurs, begin introducing articulated buses, and develop on-demand services away from core routes. articulated buses begin to be introduced to increase capacity 3-6 years not assessed orc orc increase queenstown services to frequent levels per business case; serve new road links such as quail rise; consider a ferry to homestead bay. services across network to be increased to frequent levels (per business case) 6-30 years not assessed orc orc support development of a long-term electric bus depot in queenstown, which may include land purchase and long-term control of the depot. in a4 support the development of a long-term electric bus depot in queenstown not assessed orc orc develop a stronger central queenstown public transport facility to replace the on-street stanley street hub, as part of the queenstown public transport business case. a key action in the long-term implementation of the queenstown public transport business case long term not assessed collaborate with partner agencies so parking strategies and fare policies align and support public transport use, including parking management plans (applies to dunedin and queenstown). pm a1 collaborate with partner agencies to ensure parking strategies and fare policies align not assessed orc orc collaborate with territorial and road-controlling authorities to implement public transport priority or other efficiency measures to improve reliability and punctuality. sq a5 collaborate with territorial and road-controlling authorities not assessed orc orc develop and design service improvements in line with the future network structures in section 5.2. nf a1 develop and design service improvements in line with future network structures not assessed orc orc implement integrated mode-shift packages in urban areas with partners: services, bus priority, pricing (fares and parking) and promotion. nf a4 work collaboratively with key stakeholders to implement integrated packages not assessed orc orc pursue contracted alexandra-queenstown and wānaka-queenstown regional services. implement contracted daily or secondary services aspiration; not currently funded (p126) not assessed orc orc phase out diesel buses in favour of zero-emission electric buses when procuring new unit contracts; deploy fully decarbonised bus fleet by 2035. dc a1 phase out diesel buses in favour of zero-emission electric buses by 2035 not assessed orc orc consider adopting a zone fare structure for the queenstown and dunedin urban bus networks. orc is considering adopting a zone fare structure not assessed orc orc use statutory planning processes and engage developers and territorial authorities so land use and new urban areas integrate with public transport. lu a1 use statutory planning processes and proactively engage not assessed orc orc transition from the bee card to the motu move ticketing system with nzta. ts a2 collaborate with nzta to effectively transition from the bee card to motu move not assessed nzta waka kotahi nzta develop a regional public and active transport connectivity strategy and programme of activities. mm a1 develop a regional public and active transport connectivity strategy not assessed orc orc main document pdf",
    "sortDate": "2025-03-01",
    "cover": {
      "src": "/covers/QTS-105.webp",
      "srcset": "/covers/QTS-105.webp 400w, /covers/QTS-105-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-105/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-105/QTS-105-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-106",
    "code": "QTS-106",
    "title": "Public and Active Transport Committee 5 March 2025 - Agenda",
    "shortTitle": "Public and Active Transport Committee 5 March 2025",
    "summary": "Agenda for Otago Regional Council's (ORC) Public and Active Transport Committee meeting of 5 March 2025 in Dunedin. It contains the 6 November 2024 minutes and four staff reports: (9.1) Transport Operating Environment, covering bike racks on buses, the second Emissions Reduction Plan (including possible time-of-use charging to support public transport in Queenstown), the new Minister of Transport, GTFS and early Queenstown Public Transport Business Case service changes, and Ministry of Education school bus withdrawals; (9.2) the public transport 6-month performance report for July-December 2024 (Queenstown bus patronage 975,520 trips, +5%; Queenstown ferry 32,119, -12%); (9.3) Updates on the Regional Public Transport Plan, which attaches the draft RPTP 2025-2035 (pp31-170) and recommends Council approve it for consultation from 24 March to 2 May 2025 and set the hearings panel composition; and (9.4) SuperGold concessions on Dunedin Route 1. The staff reports do not discuss mass rapid transit. The attached draft RPTP contains ORC's statement of support for 'the future study of an “off-line” rapid service in Queenstown, likely using ropeway technologies' (p88).",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda (with draft RPTP 2025-2035 attached)",
    "year": 2025,
    "publishedDate": "2025-03-05",
    "documentStatus": "Final",
    "geographicScope": "Otago region; Dunedin; Queenstown / Whakatipu",
    "owner": "ORC",
    "citation": "Public and Active Transport Committee 5 March 2025 - Agenda (2025). Report Nos. POL2502, GOV2520, POL2503, GOV2527.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "on-demand"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-106 public and active transport committee 5 march 2025 - agenda public and active transport committee 5 march 2025 agenda for otago regional council's (orc) public and active transport committee meeting of 5 march 2025 in dunedin. it contains the 6 november 2024 minutes and four staff reports: (9.1) transport operating environment, covering bike racks on buses, the second emissions reduction plan (including possible time-of-use charging to support public transport in queenstown), the new minister of transport, gtfs and early queenstown public transport business case service changes, and ministry of education school bus withdrawals; (9.2) the public transport 6-month performance report for july-december 2024 (queenstown bus patronage 975,520 trips, +5%; queenstown ferry 32,119, -12%); (9.3) updates on the regional public transport plan, which attaches the draft rptp 2025-2035 (pp31-170) and recommends council approve it for consultation from 24 march to 2 may 2025 and set the hearings panel composition; and (9.4) supergold concessions on dunedin route 1. the staff reports do not discuss mass rapid transit. the attached draft rptp contains orc's statement of support for 'the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p88). context and purpose. this is the published agenda for orc's public and active transport committee (patc) meeting on 5 march 2025 (co-chairs cr alexa forbes and cr andrew noone; p1). it includes the draft minutes of 6 november 2024 (pp3-6), four staff reports, the draft regional public transport plan 2025-2035 as attachment 9.3.1 (pp31-170) and the rptp consultation legislation as attachment 9.3.2 (pp171-173). 9.1 transport operating environment (pol2502). reports the national disabling of bus bike racks after an nzta industry alert and the co-funded modification pathway (pp7-8); the second emissions reduction plan, including $44.721 million over four years for zero-emission buses and proposed time-of-use schemes that 'could potentially reduce congestion and support use of public transport in queenstown' (p9); the appointment of hon chris bishop as minister of transport (p9); delay of the gtfs update to july to include early queenstown public transport business case changes (increased jack's point and kelvin heights frequencies and a new malaghan's road service) (p10); ministry of education school service withdrawals, with jack's point & kelvin heights frequency increasing from hourly to 30 minutes as 'early implementation of the queenstown pt business case' (p11); and delays installing nine of ten queenstown e-stops pending bracket design with qldc (p12). recommendation: note the report. 9.2 public transport 6-month network performance report 2024/25 (gov2520). dunedin bus patronage 1,737,559 (+4%); queenstown bus 975,520 (+5%); queenstown ferry 32,119 (-12%); total mobility 72,298 (+18%); 99.6% of scheduled services operated (p13). every month in the period was a queenstown patronage record (p16). ferry decline is attributed to the return of full fares in july 2023 (p18). recommendation: note the report. 9.3 updates on the rptp 2025-2035 (pol2503). staff developed the draft from august 2024, engaged with more than 100 stakeholders (40 engaged, 50+ survey responses) and co-designed it with territorial authorities and nzta (waka kotahi) (p25). key differences from the current rptp are branding and marketing, community transport support, and a value-for-money approach to increase private share, which may affect concessions, fares and fare structure (pp26-27). consultation is proposed for 24 march-2 may 2025 with in-person sessions including frankton and queenstown (pp27-28); hearings 12-16 may and deliberations 19-30 may 2025 (p28). staff recommend a hearings panel of three regional councillors only (p28). up to $200,000 is budgeted for rptp work in 2024/25, expected to be 51% funded from the national land transport fund (p29). 9.4 super gold concession on route 1 (gov2527). recommends ending the inconsistent supergold concession on afternoon city-palmerston and city-warrington services (p174). mass rapid transit: the staff reports do not mention mrt, mass rapid transit or off-line public transport. the attached draft rptp (identical in substance to rptp_draft) states 'we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p88), says there may be a future study of 'an off-line option' (p94), and shows 'potential for rapid off-line service between queenstown and homestead bay (not shown)' in the 6-30 year horizon (p96). the covering report does not draw these statements to the committee's attention. committee agenda (with draft rptp 2025-2035 attached) public and active transport committee 5 march 2025 - agenda (2025). report nos. pol2502, gov2520, pol2503, gov2527. otago region; dunedin; queenstown / whakatipu published agenda staff reports silent; attached draft rptp supports future study of an off-line queenstown rapid service, likely ropeway. none of the four staff reports refers to mass rapid transit or offline public transport. the mrt content is confined to the attached draft rptp 2025-2035 (agenda pp31-170), which is the same document as rptp_draft (agenda page = draft page + 30). in the urban rapid row of the service-layer table it states 'no current plans to implement full rapid service' and 'we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies' (p88). the queenstown network section says 'there may be a future study of the case for other modes to serve this area, including an off-line option and a direct ferry service' (p94), and the 6-30 year map lists 'potential for rapid off-line service between queenstown and homestead bay (not shown)' (p96). the engagement summary records queenstown feedback on 'expanding ferry access or ropeway services' (p138). report 9.3's list of key differences from the current rptp (pp26-27) does not mention the off-line/ropeway aspiration. \"we support the future study of an “off-line” rapid service in queenstown, likely using ropeway technologies\" (p.88) | \"potential for rapid off-line service between queenstown and homestead bay (not shown)\" (p.96) queenstown bus patronage q1-q2 2024/25: 975,520 trips, +5% (p13) queenstown ferry patronage q1-q2 2024/25: 32,119 trips, -12% (p13) dunedin bus patronage q1-q2 2024/25: 1,737,559 trips, +4% (p13) 99.6% of scheduled services operated (229,719 trips) (p13) erp2: $44.721 million over four years for zero-emission buses nationally (p9) rptp development budget up to $200,000 in 2024/25, expected 51% nltf funded (p29) proposed rptp consultation 24 march-2 may 2025; hearings 12-16 may 2025 (p28) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/0hum1srk/20250305-patc-agenda.pdf orc passing board or committee paper final 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. on-demand transport on-demand public transport. orc orc prepared orc orc published gemma wilson author orc orc julian phillips author orc orc lorraine cheyne author orc orc robyn hyde author orc orc anita dawe approved by orc orc richard saunders approved by orc orc alexa forbes contributor orc orc andrew noone contributor orc orc kylie darragh contributor orc orc committee to note the transport operating environment report. a) notes this report. 5 march 2025 not assessed staff to report back on time-of-use scheme details (potential to support public transport in queenstown) as they emerge. staff will report back as and when any new details emerge. as details emerge not assessed orc orc committee to note the 6-month public transport performance summary for 2024/25. a) notes this summary of public transport activity in otago 5 march 2025 not assessed provide a review of performance to q3 2024/25 to the next committee meeting. a review of performance to 2024/25 quarter 3 will be provided next patc meeting not assessed orc orc committee to receive the rptp update report and the draft rptp 2025-2035. b) receives the draft regional public transport plan (2025-2035) 5 march 2025 not assessed recommend to council that the draft rptp go out for public consultation (proposed 24 march-2 may 2025, decision at 19 march council meeting). c) recommends to the council that the draft rptp goes out for public consultation 19 march 2025 council; consultation 24 march-2 may 2025 not assessed orc orc recommend to council a preferred hearings panel composition; staff recommend three regional councillors only (option a). staff recommend a hearings panel composition in line with option (a) 19 march 2025 council not assessed orc orc delegate the chief executive to approve minor editorial changes to the draft rptp before consultation. e) delegates the chief executive to approve minor editorial changes before consultation not assessed orc orc hold in-person rptp consultation sessions in public areas including frankton and queenstown, plus online/print advertising and a submissions form. staff will hold in-person consultation sessions consultation period not assessed orc orc hold rptp hearings 12-16 may 2025 and deliberations 19-30 may 2025 (proposed). staff propose that hearings take place 12-16 may 2025 may 2025 not assessed orc orc recommend to council that the supergold concession not apply on afternoon city-palmerston and city-warrington services, and communicate the decision. recommends to council that the supergold bee card concession is not applied not assessed orc orc divert one regular queenstown service via whakatipu high school before and after school (proposed), and work with moe on lake hayes/shotover transition in 2026. we are proposing to divert one regular service via whakatipu high school term 3 2025; 2026 not assessed orc orc main document pdf",
    "sortDate": "2025-03-05",
    "cover": {
      "src": "/covers/QTS-106.webp",
      "srcset": "/covers/QTS-106.webp 400w, /covers/QTS-106-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-106/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-106/QTS-106-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-107",
    "code": "QTS-107",
    "title": "Public and Active Transport Committee - Minutes (ordinary meeting, 5 March 2025)",
    "shortTitle": "Public and Active Transport Committee - Minutes",
    "summary": "Minutes of Otago Regional Council's (ORC) Public and Active Transport Committee meeting on 5 March 2025, chaired by Cr Alexa Forbes. The Committee noted the transport operating environment report and, by resolution PAT25-102 (Cr Mepham and Cr Somerville against), recommended that Council write to the Minister of Transport seeking legislative change to give public transport priority on the roading network. It noted the 6-month public transport performance report (PAT25-103). Under PAT25-104 it received the draft Regional Public Transport Plan 2025-2035, recommended that Council release it for public consultation, recommended a hearings panel of three Regional Councillors only (amended recommendation 4), and delegated minor editorial changes to the Chief Executive. Under PAT25-105 it recommended that the SuperGold concession continue on the afternoon City-Palmerston and City-Warrington services pending final RPTP decisions, reversing the staff recommendation. The minutes do not record any discussion of mass rapid transit or offline public transport.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee minutes",
    "year": 2025,
    "publishedDate": "2025-03-05",
    "documentStatus": "Final",
    "geographicScope": "Otago region; Dunedin; Queenstown",
    "owner": "ORC",
    "citation": "Public and Active Transport Committee - Minutes (ordinary meeting, 5 March 2025) (2025). Resolutions PAT25-101 to PAT25-105.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.youtube.com/watch?v=6MjLsBxZbek",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-107 public and active transport committee - minutes (ordinary meeting, 5 march 2025) public and active transport committee - minutes minutes of otago regional council's (orc) public and active transport committee meeting on 5 march 2025, chaired by cr alexa forbes. the committee noted the transport operating environment report and, by resolution pat25-102 (cr mepham and cr somerville against), recommended that council write to the minister of transport seeking legislative change to give public transport priority on the roading network. it noted the 6-month public transport performance report (pat25-103). under pat25-104 it received the draft regional public transport plan 2025-2035, recommended that council release it for public consultation, recommended a hearings panel of three regional councillors only (amended recommendation 4), and delegated minor editorial changes to the chief executive. under pat25-105 it recommended that the supergold concession continue on the afternoon city-palmerston and city-warrington services pending final rptp decisions, reversing the staff recommendation. the minutes do not record any discussion of mass rapid transit or offline public transport. context. ordinary meeting of orc's public and active transport committee, council chamber, philip laing house, dunedin, 5 march 2025, 9:00am-10:48am (pp1, 4). ten councillors present; cr forbes chaired. apologies for lateness from cr laws and cr malcolm and an apology from cr mccall were accepted (p2). a member of the public spoke on bus timetables, zoning and driver behaviour toward supergold card holders (p2). the nzta presentation was not held (p2). minutes of 6 november 2024 were confirmed (p2). 9.1 transport operating environment. the committee noted the report (pat25-101) and added a recommendation (pat25-102) that council write to the minister of transport seeking legislative change to give public transport priority on the roading network 'to improve the effectiveness and efficiency of substantial government investment'; carried, cr mepham and cr somerville against (pp2-3). 9.2 public transport 6-month network performance report 2024/25. noted (pat25-103) (p3). 9.3 updates on the rptp 2025-2035. staff (anita dawe, robyn hyde, lorraine cheyne) presented the draft rptp for approval for consultation, with decisions to go to the 19 march 2025 council meeting. resolution pat25-104: receive the report and draft rptp; recommend public consultation; recommend that the hearings panel be solely regional councillors and include three councillors (recommendation 4 amended); and delegate minor editorial changes to the chief executive (p3). 9.4 super gold concession on route 1. resolution pat25-105 recommended to council that the supergold concession continue on the afternoon (not evening) city-palmerston and city-warrington services, with a final decision as part of the new rptp, and directed staff to tell the waikouaiti community board and public (p4). this differs from the agenda recommendation to stop the concession (patc2025 p174). mass rapid transit: the minutes say nothing about mrt, mass rapid transit, ropeway or off-line public transport. the draft rptp received under pat25-104 contains orc's statement of support for future study of an off-line, likely ropeway, rapid service in queenstown (see rptp_draft p58), but the minutes do not record any discussion of it. committee minutes public and active transport committee - minutes (ordinary meeting, 5 march 2025) (2025). resolutions pat25-101 to pat25-105. otago region; dunedin; queenstown confirmed minutes (signed by chairperson, dated 5 june 2025) no mrt reference; committee received the draft rptp (which contains the ropeway study statement) without recorded discussion of it. costed with the parent document. orc none board or committee paper final 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc prepared orc orc published alexa forbes signatory orc orc anita dawe presenter orc orc julian phillips presenter orc orc laura faulkner presenter orc orc lorraine cheyne presenter orc orc robyn hyde presenter orc orc alan somerville contributor orc orc andrew noone contributor orc orc elliot weir contributor orc orc gretchen robertson contributor orc orc kate wilson contributor orc orc richard saunders contributor orc orc tim mepham contributor orc orc committee noted the transport operating environment report (pat25-101). resolution pat25-101... notes this report. 5 march 2025 not assessed recommend that council write to the minister of transport seeking legislative change to give public transport priority on the roading network (pat25-102). recommends that council write to the minister of transport seeking changes to legislation not assessed orc orc committee noted the public transport activity summary for q1 2024/25 (pat25-103). notes this summary of public transport activity in otago for q1 2024/25. 5 march 2025 not assessed received the rptp update report and the draft rptp 2025-2035 (pat25-104, items 1-2). receives the draft regional public transport plan (2025-2035). 5 march 2025 not assessed recommend to council that the draft rptp go out for public consultation (pat25-104, item 3). recommends to the council that the draft rptp goes out for public consultation. 19 march 2025 council meeting not assessed orc orc recommend to council that the rptp hearings panel be solely regional councillors and include three councillors (pat25-104, item 4, amended). composition of the hearings panel is solely regional councillors and includes three councillors 19 march 2025 council meeting not assessed orc orc delegate the chief executive to approve minor editorial changes to the draft rptp ahead of consultation (pat25-104, item 5). delegates the chief executive to approve minor editorial changes before consultation not assessed orc orc committee noted the supergold concession report (pat25-105, item 1). 1) notes this report. 5 march 2025 not assessed recommend to council that the supergold concession continue on afternoon city-palmerston and city-warrington services, with final decision through the new rptp (pat25-105, item 2). supergold bee card concession continue to apply on the afternoon service final decision as part of rptp decisions not assessed orc orc direct staff to communicate the supergold decision to the waikouaiti community board and the public (pat25-105, item 3). directs staff to communicate this decision to the waikouaiti community board not assessed orc orc main document pdf",
    "sortDate": "2025-03-05",
    "cover": {
      "src": "/covers/QTS-107.webp",
      "srcset": "/covers/QTS-107.webp 400w, /covers/QTS-107-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-107/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-107/QTS-107-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-108",
    "code": "QTS-108",
    "title": "Annual Plan 2025-2026 (Mahere ā tau), 1 July 2025 - 30 June 2026",
    "shortTitle": "Annual Plan 2025-2026 (Mahere ā tau), 1 July 2025",
    "summary": "QLDC's 2025/26 Annual Plan, year two of the 2024-2034 Long Term Plan, reduces transport capital by $6.1m, to $23.6m against $29.6m in the LTP, 'to align with subsidised transport budgets approved by NZTA and re-prioritise non-subsidised 'local share' budgets' (pp.16, 37). Named transport capital projects of $500k or more are mostly renewals, plus Arterial Stage One ($958,622), Crown Range resilience ($685,501) and Transport Model Replacement ($567,861) (p.18). Public transport is left to Otago Regional Council, which is increasing bus frequency and adding a route (p.9). No mass rapid transit reference was found.",
    "documentType": "Statutory plan",
    "documentForm": "Annual Plan",
    "year": 2025,
    "publishedDate": "2025-06-26",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Annual Plan 2025-2026 (Mahere ā tau), 1 July 2025 - 30 June 2026 (2025).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/fwmppqne/qldc_draft-annual-plan_section-1-4_2025-2026-v16_final-adopted-3.pdf",
      "https://www.qldc.govt.nz/media/meol1gii/9a-adopted-annual-plan-2025-26.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "orc"
    ],
    "searchText": "qts-108 annual plan 2025-2026 (mahere ā tau), 1 july 2025 - 30 june 2026 annual plan 2025-2026 (mahere ā tau), 1 july 2025 qldc's 2025/26 annual plan, year two of the 2024-2034 long term plan, reduces transport capital by $6.1m, to $23.6m against $29.6m in the ltp, 'to align with subsidised transport budgets approved by nzta and re-prioritise non-subsidised 'local share' budgets' (pp.16, 37). named transport capital projects of $500k or more are mostly renewals, plus arterial stage one ($958,622), crown range resilience ($685,501) and transport model replacement ($567,861) (p.18). public transport is left to otago regional council, which is increasing bus frequency and adding a route (p.9). no mass rapid transit reference was found. context and purpose. the 2025/26 annual plan sets the budget for year two of the 2024-2034 long term plan and was adopted on 26 june 2025 (p.5). it notes the opening of the town centre arterial road in late january 2025 (p.3). transport. transport capital asset expenditure is $23.6m against $29.6m in the ltp, a variance of $(6.1)m; roading and footpaths capital is $23.2m against $29.5m, 'decrease to align with nzta sub funding' (p.37). the narrative explains the change as being 'to align with subsidised transport budgets approved by nzta and re-prioritise non-subsidised 'local share' budgets' (p.16). grants and subsidies fall from $26.0m to $20.0m, reflecting a 'reduction in nzta roading subsidy' (p.32). transport operating expenditure is $47.4m against $49.2m (p.36). parking facilities capital rises to $411k from $160k (p.37). the list of projects of $500k or more (p.18) is dominated by renewals (whakatipu sealed road resurfacing $2.93m, wānaka $1.73m, rehabilitation and metalling), plus unsubsidised minor improvements (whakatipu $1.18m, upper clutha $0.73m), crown range resilience $685,501, arterial stage one $958,622 and transport model replacement $567,861; the stated total is $16,812,955. arterial stages 2-3, active travel capital and travel demand management are not itemised. public transport and parking. council aims to 'encourage alternative transport options like walking, cycling, and public transport'; 'otago regional council is increasing bus service frequency and introducing a new route from mid-year' (p.9). the transport improvement fund, to subsidise public transport and its infrastructure, has a closing balance of $604k (p.42). the plan refers to reopening the stanley and ballarat street car parks (p.9). mass rapid transit: no reference to mass rapid transit was found in the pages read (to p.47 of at least 81). annual plan annual plan 2025-2026 (mahere ā tau), 1 july 2025 - 30 june 2026 (2025). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka adopted no reference to mass rapid transit found in the text read transport capital $23.6m vs $29.6m ltp, variance $(6.1)m (p.37) roading and footpaths capital $23.2m vs $29.5m (p.37) transport operating expenditure $47.4m vs $49.2m (p.36) arterial stage one $958,622; transport model replacement $567,861; crown range resilience $685,501 (p.18) parking facilities capital $411k vs $160k (p.37) not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published glyn lewers signatory qldc qldc mike theelen signatory qldc qldc reduce transport capital by $6.1m to align with nzta-approved subsidised budgets and reprioritise local share to align with subsidised transport budgets approved by nzta 2025/26 not assessed qldc qldc arterial stage one close-out, $958,622 arterial stage one: $958,622 2025/26 not assessed qldc qldc replace the transport model, $567,861 transport model replacement 2025/26 not assessed qldc qldc crown range resilience works (whakatipu), $685,501 crown range resilience 2025/26 not assessed qldc qldc parking facilities capital $411k; reopen stanley and ballarat street car parks reopening of the stanley and ballarat street car parks 2025/26 not assessed qldc qldc increase bus service frequency and introduce a new route otago regional council is increasing bus service frequency from mid-2025 not assessed orc orc main document pdf part 2 pdf",
    "sortDate": "2025-06-26",
    "cover": {
      "src": "/covers/QTS-108.webp",
      "srcset": "/covers/QTS-108.webp 400w, /covers/QTS-108-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-108/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-108/QTS-108-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-108/QTS-108-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-109",
    "code": "QTS-109",
    "title": "Strategy for the Procurement of Transport Infrastructure (Transport Procurement Strategy 2025-28)",
    "shortTitle": "Strategy for the Procurement of Transport",
    "summary": "QLDC's transport procurement strategy for 2025-28 (v2.1, July 2025), endorsed by NZTA on 18 July 2025 until 18 July 2028, sets out how the Council will procure its land transport programme. It describes an LTP 2024-34 'set in a financially constrained environment and focused on a baseline approach', with building defect and weathertightness claims producing 'a significant de-escalation of the proposed programme' (pp.7, 21). Transport capital is $411.7m and operating $127.1m over ten years (p.22), and NLTP approved funding fell $39m short of the request (p.21). The next three years focus on 'key pre-implementation activities, behaviour change through travel demand management and planning' (p.5). It notes in passing that 'The conversation around mass rapid transport become key solutions which are being explored' (p.20).",
    "documentType": "Infrastructure strategy",
    "documentForm": "Transport procurement strategy (NZTA-endorsed)",
    "year": 2025,
    "publishedDate": "2025-07-15",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Strategy for the Procurement of Transport Infrastructure (Transport Procurement Strategy 2025-28) (2025).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/w1yl1sct/2025-07-15-queenstown-lakes-dc-transport-procurement-strategy-25-28-final-plus-endorse.pdf"
    ],
    "documentTypeCode": "infrastructure-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc",
      "nzta",
      "consultant",
      "way-to-go-partnership"
    ],
    "searchText": "qts-109 strategy for the procurement of transport infrastructure (transport procurement strategy 2025-28) strategy for the procurement of transport qldc's transport procurement strategy for 2025-28 (v2.1, july 2025), endorsed by nzta on 18 july 2025 until 18 july 2028, sets out how the council will procure its land transport programme. it describes an ltp 2024-34 'set in a financially constrained environment and focused on a baseline approach', with building defect and weathertightness claims producing 'a significant de-escalation of the proposed programme' (pp.7, 21). transport capital is $411.7m and operating $127.1m over ten years (p.22), and nltp approved funding fell $39m short of the request (p.21). the next three years focus on 'key pre-implementation activities, behaviour change through travel demand management and planning' (p.5). it notes in passing that 'the conversation around mass rapid transport become key solutions which are being explored' (p.20). context and purpose. nzta requires approved organisations to hold an endorsed procurement strategy to receive national land transport fund co-investment. this qldc strategy (version 2.1, july 2025) was prepared by paul rogers (consultant) and alison tomlinson, reviewed by geoff mayman, katherine harbrow and pamela parker, and approved by tony avery, general manager property & infrastructure (p.2). nzta's dean hollis endorsed it on 18 july 2025; the endorsement expires 18 july 2028. programme. the ltp 2024-34 'was set in a financially constrained environment and focused on a baseline approach' (p.21). two building defect and weathertightness claims 'required qldc to seriously review its capital works programme and service delivery' and 'saw a significant de-escalation of the proposed programme' (p.7). the ten-year transport budget is 'circa $412m' (p.6): $411.7m capital and $127.1m operating (p.22). 'overall, there was a shortfall between requested and approved funding of $39m' (p.21). 'the next three years of transport capital expenditure will focus on key pre-implementation activities, behaviour change through travel demand management and planning and preparing for our future transport needs' (p.5). the kā huanui a tāhuna alliance will focus on 'nzta's $250m queenstown upgrades programme', with arterial practical completion targeted for late 2025 (p.7). procurement programme (table 5, p.25, uninflated, 2025/26-2027/28): road maintenance $10.8m, $11.2m, $11.7m, with a new 5+3+3 contract tendered by open rfp in april 2026 to start 1 april 2027 (p.8); reseals $4.4-4.6m a year; pavement rehabilitation $2m a year; low-cost low-risk improvements $3.6m, $2.2m, $3.6m; travel demand management $100k a year; transport modelling $1.3m in 2025/26, cost-shared with nzta and orc; transport master planning and activity management planning $0 (no subsidised budget); engineering and specialist support panel $3m, $5m, $8m. public transport and parking. 'the council does not run any public transport' (p.19); orc contracts bus and ferry services, and qldc subsidises local bus services and maintains stops and wharves through the way to go partnership (mou december 2018) (pp.19-20). parking buildings and machines are part of the roading activity (p.5), but no parking procurement line appears. mass rapid transit: in describing the way to go partnership's public transport workstream (section 4.1.1), the strategy states: 'the conversation around mass rapid transport become key solutions which are being explored' (p.20). no mass rapid transit corridor or budget is named, and no mrt procurement activity appears in the 2025-28 programme. transport procurement strategy (nzta-endorsed) strategy for the procurement of transport infrastructure (transport procurement strategy 2025-28) (2025). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka version 2.1, july 2025; endorsed by nzta 18 july 2025 notes mass rapid transport is being explored via way to go; no mrt activity or budget in the 2025-28 procurement programme section 4.1.1 (way to go partnership) lists the public transport workstream (services, stops and shelters, bee cards, trialling services such as water ferries) and adds: 'the conversation around mass rapid transport become key solutions which are being explored' (p.20). no mode, corridor or mass rapid transit is named, and the 2025-28 procurement programme (table 5, p.25) contains no mrt investigation or study; transport master planning has no subsidised budget. \"the conversation around mass rapid transport become key solutions which are being explored.\" (p.20) | \"the next three years of transport capital expenditure will focus on key pre-implementation activities, behaviour change through travel demand management and planning and preparing for our future transport needs.\" (p.5) ten-year transport capital $411.7m and operating $127.1m (p.22) shortfall between requested and approved nltp funding $39m (p.21) road maintenance $10.8m / $11.2m / $11.7m, 2025/26-2027/28 (p.25) travel demand management $100k a year (p.25) transport modelling $1.3m in 2025/26 (p.25) nzta endorsement expires 18 july 2028 a study cost has been requested under the official information act or lgoima. no figure has been received. qldc passing infrastructure strategy final 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc prepared qldc qldc published nzta waka kotahi nzta recipient alison tomlinson prepared by qldc qldc paul rogers prepared by consultant (unnamed) consultant (unnamed) geoff mayman reviewed by qldc qldc katherine harbrow reviewed by qldc qldc pamela parker reviewed by qldc qldc tony avery approved by qldc qldc dean hollis signatory nzta waka kotahi nzta tender a new road network maintenance contract (5+3+3) by open-market rfp council intends to tender this new agreement via an open market rfp in april 2026 rfp april 2026; contract from 1 april 2027 not assessed qldc qldc procure a transport model, $1.3m, cost-shared with nzta and orc transport modelling: $1.3m 2025/26 not assessed nzta waka kotahi nzta fund travel demand management at $100k a year travel demand management: $100k each year 2025/26-2027/28 not assessed qldc qldc reseals ($4.4-4.6m a year) and pavement rehabilitation ($2m a year) via pqm procurement reseals: $4.4m, $4.5m, $4.6m 2025/26-2027/28 not assessed qldc qldc low-cost, low-risk local road improvements, $3.6m, $2.2m, $3.6m 2025/26-2027/28 not assessed qldc qldc engineering and specialist support services panel (3 waters and transport), $3m, $5m, $8m 2025/26-2027/28 not assessed qldc qldc focus capital on pre-implementation, travel demand management behaviour change and planning for future needs will focus on key pre-implementation activities 2025-28 not assessed qldc qldc explore mass rapid transport options through the way to go partnership mass rapid transport become key solutions which are being explored not assessed way to go way to go main document pdf",
    "sortDate": "2025-07-15",
    "cover": {
      "src": "/covers/QTS-109.webp",
      "srcset": "/covers/QTS-109.webp 400w, /covers/QTS-109-2x.webp 800w",
      "width": 400,
      "height": 567
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-109/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-109/QTS-109-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-112",
    "code": "QTS-112",
    "title": "Finance Management Report, January 2026 (Attachment A)",
    "shortTitle": "Finance Management Report, January 2026",
    "summary": "No separate January 2026 capex projects report (Attachment B) was located. The January 2026 Finance Management Report (Attachment A) reports year-to-date capital of $60.0m, 89% of budget, and a full-year forecast of $136.0m, 93% of budget. Transport commentary records a forecast $2.1m underspend on Arterial Stage One (offsetting a $1.9m 2024/25 overspend), $0.5m of road metalling budget ringfenced to carry forward to 2026/27 for rehabilitation, and an expected $0.6m carry-forward for unsubsidised Whakatipu minor improvements. No mass rapid transit or mass transit reference.",
    "documentType": "Accountability report",
    "documentForm": "Finance management report with capital expenditure commentary (committee attachment)",
    "year": 2026,
    "publishedDate": "2026-01",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Finance Management Report, January 2026 (Attachment A) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/r3obvrd1/4a-january-2026-finance-management-report-smart-finance-committee.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-112 finance management report, january 2026 (attachment a) finance management report, january 2026 no separate january 2026 capex projects report (attachment b) was located. the january 2026 finance management report (attachment a) reports year-to-date capital of $60.0m, 89% of budget, and a full-year forecast of $136.0m, 93% of budget. transport commentary records a forecast $2.1m underspend on arterial stage one (offsetting a $1.9m 2024/25 overspend), $0.5m of road metalling budget ringfenced to carry forward to 2026/27 for rehabilitation, and an expected $0.6m carry-forward for unsubsidised whakatipu minor improvements. no mass rapid transit or mass transit reference. context and purpose. the master list records a qldc capital expenditure projects report for january 2026. a dedicated attachment b capex projects report for that month was not found; the closest published document is the january 2026 finance management report (attachment a, item 4a, labelled for the smart finance committee in its file name), which contains the capital expenditure commentary recorded here. totals. year-to-date capital spend $60.0m, 89% of the year-to-date budget; full-year forecast $136.0m, 93% of the full-year budget. the renewals budget is $31.1m (forecast $3.0m below) and the new capital budget $115.3m (forecast $7.3m below). transport. 'transport $0.5m of road metalling budget to be ringfenced for carry forward to 2026/27 for rehab construction'; 'transport ($3.0m) - forecast underspend of $2.1m for arterial stage one', described as offsetting a 2024/25 overspend of $1.9m; and 'carry forward of $0.6m expected for minor improvements unsub whakatipu for construction 26/27'. no lines are shown for active travel, public transport assets, stanley street, parking or the transport model. mass rapid transit: none. finance management report with capital expenditure commentary (committee attachment) finance management report, january 2026 (attachment a) (2026). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka committee attachment no reference to mass rapid transit found in the text read ytd capital $60.0m, 89% of ytd budget full-year forecast $136.0m, 93% of budget arterial stage one forecast underspend $2.1m road metalling $0.5m ringfenced for 2026/27 not separately commissioned. this is an internal or corporate document. qldc none accountability report recorded 2026 roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published ringfence $0.5m of road metalling budget to carry forward for rehabilitation construction $0.5m of road metalling budget to be ringfenced for carry forward 2026/27 not assessed qldc qldc carry forward $0.6m for unsubsidised whakatipu minor improvements construction carry forward of $0.6m expected for minor improvements unsub whakatipu 2026/27 not assessed qldc qldc arterial stage one forecast underspend of $2.1m, offsetting the 2024/25 overspend forecast underspend of $2.1m for arterial stage one 2025/26 not assessed qldc qldc main document pdf",
    "sortDate": "2026-01-01",
    "cover": {
      "src": "/covers/QTS-112.webp",
      "srcset": "/covers/QTS-112.webp 400w, /covers/QTS-112-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-112/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-112/QTS-112-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-113",
    "code": "QTS-113",
    "title": "OIA-20263 response: Request made under the Official Information Act 1982 (NZUP Queenstown Package cost overrun)",
    "shortTitle": "OIA-20263 response: Request made under",
    "summary": "NZTA (Waka Kotahi) response to an Official Information Act request from a requester (name withheld) about the cost overrun on the NZ Upgrade Programme (NZUP) Queenstown Package. It states the project budget was originally approved at $107.6 million in 2020 (a high-level estimate using national construction rates), revised to $115 million to include NZTA core costs and earlier project costs. After Alliance investigations and independent parallel pricing, a reconciled delivery price of $329.97 million (excluding several cost categories) was reached. The scope was consolidated as the Roads of Regional Significance (RoRS) Queenstown package with a $250 million budget. Of seven original scope items (a-g), only a (five Frankton signalised intersections), b (Frankton bus hub) and c (Howards Drive roundabout) were funded to construction in 2024; items d-g were designed but not progressed and have no robust cost estimates. The letter lists cost drivers (COVID-19 escalation, local rates, utilities, short construction season, labour and materials, 36,000 vehicles per day, no night works, enlarged intersection). It releases 13 documents (schedule p5), withholds information under s 9(2)(a) and s 9(2)(i), removes out-of-scope material, quotes a 27 September 2023 Board extract stating the package was unaffordable within $130 million, and withholds the Alliance contract in full under s 9(2)(i).",
    "documentType": "Official information release",
    "documentForm": "OIA response letter with document schedule",
    "year": 2026,
    "publishedDate": "2026-01-30",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "OIA-20263 response: Request made under the Official Information Act 1982 (NZUP Queenstown Package cost overrun) (2026). OIA-20263.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-20263, 30 Jan 2026)",
    "sourceUrls": [],
    "documentTypeCode": "official-information",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-113 oia-20263 response: request made under the official information act 1982 (nzup queenstown package cost overrun) oia-20263 response: request made under nzta (waka kotahi) response to an official information act request from a requester (name withheld) about the cost overrun on the nz upgrade programme (nzup) queenstown package. it states the project budget was originally approved at $107.6 million in 2020 (a high-level estimate using national construction rates), revised to $115 million to include nzta core costs and earlier project costs. after alliance investigations and independent parallel pricing, a reconciled delivery price of $329.97 million (excluding several cost categories) was reached. the scope was consolidated as the roads of regional significance (rors) queenstown package with a $250 million budget. of seven original scope items (a-g), only a (five frankton signalised intersections), b (frankton bus hub) and c (howards drive roundabout) were funded to construction in 2024; items d-g were designed but not progressed and have no robust cost estimates. the letter lists cost drivers (covid-19 escalation, local rates, utilities, short construction season, labour and materials, 36,000 vehicles per day, no night works, enlarged intersection). it releases 13 documents (schedule p5), withholds information under s 9(2)(a) and s 9(2)(i), removes out-of-scope material, quotes a 27 september 2023 board extract stating the package was unaffordable within $130 million, and withholds the alliance contract in full under s 9(2)(i). context and purpose: this is nzta (waka kotahi)'s 30 january 2026 response (ref oia-20263) to a requester (name withheld), whose request of 11 november 2025 was refined on 20 and 28 november 2025 (p1). it answers four points: (1) a cost-overrun analysis; (2) papers and formal correspondence reporting on the overruns; (3) the procurement recommendation for the alliance and supporting documents; (4) the alliance contract. point 1 - cost history: the project budget was originally approved at $107.6 million in 2020, described as a high-level estimate based on national rather than local construction rates. it was revised to include nzta core costs and pre-2020 project costs, giving a revised budget of $115 million (p1). once the delivery alliance was established, topographical and geotechnical investigations enabled a delivery proposal which was tested against a full parallel pricing process by an independent estimator, giving a reconciled delivery price of $329.97 million, excluding former business case costs, property, alliance management, consenting and nzta core and directly managed costs (p1). the utility diversion scope was larger than envisaged and escalation was high, partly due to covid-19 (p1). the project was funded from the crown nzup appropriation within a nationally allocated programme envelope (p1). original scope (pp1-2): (a) signalised intersections at five frankton locations (sh6/sh6a replacing the roundabout; sh6/joe o'connell drive; sh6 bus hub exit and entry; sh6a/mcbride street); (b) a new and expanded frankton bus hub; (c) a new roundabout at sh6/howards drive (ladies mile); (d) four further signalised intersections and three pedestrian signals on sh6a between frankton and queenstown; (e) hawthorne drive and grant road intersection signalisation and pedestrian signals near hardware lane (sh6 eastern corridor); (f) humphrey street and lucas place (airport) roundabouts to signals and relocated pedestrian signals near ross street (sh6 kawarau road/southern corridor); (g) a new eastbound bus lane on sh6 ladies mile between howards drive and the shotover river bridge. the scope was consolidated and renamed the roads of regional significance (rors) queenstown package with a $250 million budget (p2). all items were designed, but only a, b and c were funded to proceed to construction in 2024, and robust cost estimates have not been developed for the rest (p2). cost drivers listed (p2): covid-19 escalation; generic national rather than local rates in the original estimate; extensive utility relocation in the first 12 months of construction; a shorter construction season from may; a limited labour pool (some fly-in fly-out) and imported concrete and bitumen; no detour for about 36,000 vehicles per day through sh6/6a; no lengthy night works; and an enlarged intersection footprint to provide bus priority, walking, cycling and the bus hub. points 2 and 3 (p3, schedule p5): 13 documents are listed, from the 17 september 2020 board procurement paper to bri-2973 of 1 february 2024. information is withheld under s 9(2)(a) (privacy) and s 9(2)(i) (commercial activities), and out-of-scope material is removed. the letter reproduces (as an image) an extract from the nzup governance group update to the nzta board of 27 september 2023: the package is unaffordable within the funding allocation of $130 million, detailed design and costing is progressing for a reduced scope package, it will be highly challenging to include all the critical components, and options would go to the investment and delivery committee in november (p3). point 4: the alliance contract documents are withheld in full under s 9(2)(i) (p3). the letter notes the right to ombudsman review and that the response will be published with personal information removed (p3). mass rapid transit: the letter says nothing about mass rapid transit. the sh6a corridor works between frankton and queenstown (item d) are among the deferred items. oia response letter with document schedule oia-20263 response: request made under the official information act 1982 (nzup queenstown package cost overrun) (2026). oia-20263. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown final (signed response letter) does not mention mass rapid transit. project budget originally approved at $107.6 million in 2020 (p1) revised project budget $115 million adopted (p1) reconciled delivery price $329.97 million, excluding business case, property, alliance management, consenting and nzta core/direct costs (p1) rors queenstown package budget $250 million adopted (p2) only scope items a, b and c funded to construction in 2024; items d-g designed but not progressed, no robust cost estimates (p2) approximately 36,000 vehicles per day through sh6/6a intersection (p2) 27 sep 2023 board extract: package unaffordable within funding allocation of $130 million (p3) 13 documents in scope, listed in schedule (p5) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-20263, 30 jan 2026) nzta none official information release final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published sam russell signatory nzta waka kotahi nzta james caygill contributor nzta waka kotahi nzta main document pdf",
    "sortDate": "2026-01-30",
    "cover": {
      "src": "/covers/QTS-113.webp",
      "srcset": "/covers/QTS-113.webp 400w, /covers/QTS-113-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-113/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-113/QTS-113-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-114",
    "code": "QTS-114",
    "title": "Comprehensive Parking Management Plan (QLDC Parking Bundle Working Version: Parking Strategy, Parking Guidelines, and Frankton, Queenstown and Wānaka Parking Management Plans)",
    "shortTitle": "Comprehensive Parking Management Plan",
    "summary": "Draft working compilation of Queenstown Lakes District Council's parking management documents: the Parking Strategy (developed in 2024), the Parking Guidelines with technology, cost and implementation appendices, and Parking Management Plans for Frankton, Queenstown and Wānaka. The initial work was by Stantec on behalf of QLDC, with later updates by QLDC. The strategy sets five objectives, from prioritising access by user need to quality, people-focused urban environments. It notes that parking availability and cost are among the most significant factors in how people choose to travel, and that parking changes need to be paired with better public transport, walking and cycling. The guidelines set out restrictions, pricing, permits, enforcement, technology and monitoring, and say increasing supply does not align with the strategy. The area plans propose expanded paid parking and time limits by precinct (e.g. $6.50/hour in Queenstown's historic core, rising to $7.50 by 2027/28), resident permit schemes for Queenstown and Frankton, coach, campervan, loading, mobility, bike and motorcycle parking changes, and real-time parking information. Frankton's public parking remains free, with 48-hour limits on 90% of on-street spaces. Queenstown expects 548 extra publicly available off-street spaces in 2024/25. Dedicated park and ride is described as not yet viable. The document does not refer to mass rapid transit; 'gondola' refers only to the Skyline tourist gondola and its car park.",
    "documentType": "Transport strategy",
    "documentForm": "Parking strategy, guidelines and area parking management plans (draft working compilation)",
    "year": 2026,
    "publishedDate": "2026-02",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Lakes District; Queenstown town centre (historic core, inner, outer and fringe precincts); Frankton (Frankton Village, residential streets near the airport, Remarkables Primary and Wakatipu High School); Wānaka town centre",
    "owner": "QLDC",
    "citation": "QLDC. Comprehensive Parking Management Plan (QLDC Parking Bundle Working Version: Parking Strategy, Parking Guidelines, and Frankton, Queenstown and Wānaka Parking Management Plans) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/0b3lrfoq/1b-item-1-attachment-b-qldc-parking-bundle.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/0b3lrfoq/1b-item-1-attachment-b-qldc-parking-bundle.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "park-and-ride",
      "parking",
      "demand-management",
      "coach",
      "electric-vehicles"
    ],
    "organisationIds": [
      "qldc",
      "stantec"
    ],
    "searchText": "qts-114 comprehensive parking management plan (qldc parking bundle working version: parking strategy, parking guidelines, and frankton, queenstown and wānaka parking management plans) comprehensive parking management plan draft working compilation of queenstown lakes district council's parking management documents: the parking strategy (developed in 2024), the parking guidelines with technology, cost and implementation appendices, and parking management plans for frankton, queenstown and wānaka. the initial work was by stantec on behalf of qldc, with later updates by qldc. the strategy sets five objectives, from prioritising access by user need to quality, people-focused urban environments. it notes that parking availability and cost are among the most significant factors in how people choose to travel, and that parking changes need to be paired with better public transport, walking and cycling. the guidelines set out restrictions, pricing, permits, enforcement, technology and monitoring, and say increasing supply does not align with the strategy. the area plans propose expanded paid parking and time limits by precinct (e.g. $6.50/hour in queenstown's historic core, rising to $7.50 by 2027/28), resident permit schemes for queenstown and frankton, coach, campervan, loading, mobility, bike and motorcycle parking changes, and real-time parking information. frankton's public parking remains free, with 48-hour limits on 90% of on-street spaces. queenstown expects 548 extra publicly available off-street spaces in 2024/25. dedicated park and ride is described as not yet viable. the document does not refer to mass rapid transit; 'gondola' refers only to the skyline tourist gondola and its car park. context and purpose: the bundle brings together qldc's parking strategy, parking guidelines and three area parking management plans (pmps) as one 'comprehensive parking management plan' (p2). it is marked 'working version' and carries a draft watermark (p1-2). the strategy is said to have been developed in 2024 and consulted on over the 2023/24 summer, with parking surveys in october 2023 and february 2024 (p2, p86). the acknowledgement notes that stantec initiated the documents for qldc and that qldc has updated them since 2024/25 (p143). parking strategy: the five objectives are to prioritise access according to user needs, encourage mode shift and reduce emissions, support a prosperous local economy, support a safe and efficient transport network, and contribute to quality, people-focused urban environments (p2). the strategy says 'the availability and cost of parking is one of the most significant factors that determines how a person chooses to get around' (p6). context includes high car ownership (nearly three-quarters of households with two or more vehicles in 2023), bus patronage records in 2024/25, removal of minimum parking requirements under the nps-ud, and residential parking pressure (p10-13). the strategy states that parking changes in isolation from practical alternatives are unlikely to be supported. it describes complementary tdm (pricing, traffic and speed management, shared mobility, behaviour change, integrated land use) and notes that road pricing and congestion charging need central government legislation (p14-15). it ends with principles, engagement, and monitoring and evaluation (p23-25). parking guidelines: these set out user and vehicle priorities and allocation by land use (p30-40), how supply is managed (p41), and demand management through time restrictions, paid parking (fees reviewed annually through the annual plan/ltp), permits and enforcement (p42-52). the guidelines state that 'managing demand through increasing parking supply does not align with the objectives in our parking strategy' (p46). parking revenue is expected to rise, and transport management associations could help decide how it is reinvested, including possibly subsidising public transport (p53). other sections cover land-use planning and the proposed district plan (p53-55) and school parking (p56). dedicated park and ride facilities 'are not yet viable due to the investment required... combined with the infrequent public transport and lack of bus priority on our key arterial transport corridors' (p57). appendices cover technology, indicative permit costs and an implementation plan with pmp triggers (generally sustained occupancy above 85%), permits, advocacy (infringement penalties, rental vehicle fines, berm parking) and monitoring (p58-66). frankton pmp: there are 1,537 public spaces (1,497 on-street), all free, with 48-hour limits on 90% of on-street spaces, plus about 1,560 private spaces (p71). airport-related overspill affects residential streets (p73). the plan describes the queenstown package and the queenstown public transport business case (p71). actions include a residential permit zone, a review of the 48-hour limit, p180 in the gray street car park, shorter frankton village limits from 2027, school-area changes and mobility parking (p76-78). queenstown pmp: there are 3,006 public spaces (2,168 on-street, 838 off-street) and about 2,530 private spaces (p85). only 182 on-street spaces are paid (p86). the skyline car park (297 spaces, july 2024) and ballarat street (120 reinstated april 2025, 131 new by december 2025) add 548 off-street spaces (p86). surveys show very high on-street demand (p87-94). the plan proposes precinct pricing and time limits: historic core $6.50/hour rising to $7.50 by 2027/28 with p90; inner $4/hour with p180; outer $2.50-$4/hour with a six-hour cap; and fringe p180 (p107-114). other measures are a resident permit scheme, coach, campervan, spsv, loading, motorcycle and bike parking changes, and real-time occupancy and wayfinding (p95-106). wānaka pmp: all public parking is currently free (p125). proposed actions are paid parking at $1-$2/hour in core and pembroke precincts, coach and campervan charges, staged fringe restrictions with resident permits, and event measures (p129-142). mass rapid transit: the document says nothing about mass rapid transit or offline public transport between frankton and the town centre. the only cableway references are to the skyline gondola tourist attraction, which is not mass rapid transit, its upgrade works and its new multi-storey car park (p83-84, p86, p109). public transport is discussed in terms of buses, the queenstown public transport business case's bus-based preferred option (p84) and the non-viability of park and ride (p57). parking strategy, guidelines and area parking management plans (draft working compilation) qldc. comprehensive parking management plan (qldc parking bundle working version: parking strategy, parking guidelines, and frankton, queenstown and wānaka parking management plans) (2026). queenstown lakes district; queenstown town centre (historic core, inner, outer and fringe precincts); frankton (frankton village, residential streets near the airport, remarkables primary and wakatipu high school); wānaka town centre working version – 'draft' watermark (p2); header 'attachment b: qldc parking bundle working version' (p1); described as living documents updated by qldc since 2024/25 (p143) no mass rapid transit reference; cableway mentions concern only the skyline tourist gondola and its car park. queenstown study area: 3,006 public spaces (2,168 on-street, 838 off-street) and about 2,530 private spaces (p85) only 182 on-street spaces in queenstown town centre are paid (p86) 548 additional publicly available off-street spaces in queenstown 2024/25: skyline 297 (july 2024), ballarat st reinstated 120 (april 2025), ballarat st new 131 (december 2025) (p86) historic core pricing $6.50/hr (2025/26), $7.00 (2026/27), $7.50 (2027/28), p90 (p109); inner precinct $4/hr, p180 (p110); outer $2.50–$4/hr with six-hour cap (p113) frankton: 1,537 public spaces, all free; 48-hour limits on 90% of on-street spaces; about 1,560 private spaces (p71) nearly three-quarters of district households had two or more vehicles in 2023 (p10) pmp trigger: sustained average parking demand above 85% occupancy (p64) wānaka proposed core paid parking $2/hr; pembroke $1/hr or $6/day (p138, p140) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/media/0b3lrfoq/1b-item-1-attachment-b-qldc-parking-bundle.pdf qldc none transport strategy draft 2026 walking and cycling walking, cycling, trails and other active travel. park and ride park-and-ride sites and services. parking parking supply, pricing and management. travel demand travel demand management, pricing and time-of-use charging. coach coach and visitor shuttle services. electric vehicles electric and hydrogen vehicle technology. qldc qldc commissioned qldc qldc prepared stantec stantec prepared qldc qldc published review parking fees annually through the schedule of fees and charges in the annual plan/ltp, adjusting prices according to on-street demand. a review of parking fees will be undertaken annually annual not assessed qldc qldc investigate park and ride facilities further as part of the district's public transport improvement programmes (currently considered not viable). further investigation of park and ride facilities will be undertaken as part of the district's public transport improvement programmes not assessed qldc qldc develop or review pmps where sustained average parking demand exceeds 85% occupancy or transport and land-use changes affect parking. triggers to develop or review a pmp for an area include... average parking demand exceeds 85% occupancy trigger-based not assessed qldc qldc implement integrated parking technology (access control, payment, real-time information and wayfinding, data, enforcement) to support permits and pmp actions. it is crucial to ensure that the implementation and procurement of these systems include an integrated delivery not assessed qldc qldc implement permit schemes by updating the traffic and parking operations manual and bylaw schedule, setting fees in the annual plan/ltp, and building online application portals. implementation of most of these permit provisions relies on the implementation of parking technology not assessed qldc qldc advocate to central government and others on infringement penalties, rental vehicle fines and berm parking; work with ski hire shops, campgrounds and the bus and coach association. opportunities to advocate for changes to central government and other organisations not assessed qldc qldc monitor parking occupancy, enforcement, permit, private car park, census, travel survey, traffic count and pt occupancy data to guide changes. parking occupancy rates are one of the main triggers used to influence changes not assessed qldc qldc consider transport management associations to involve communities in decisions on reinvesting parking revenue, e.g. subsidising public transport. establishment of transport management associations (tmas) can be used not assessed qldc qldc frankton: introduce a residential parking zone permit scheme and investigate changing the 48-hour time restriction. introduce a residential parking zone permit scheme for frankton not assessed qldc qldc frankton: change gray street car park from 10 hours to p180, reduce frankton village restrictions to p60/p120 and install bike hoops. change the parking restrictions in the gray street car park from 10hr to p180 shorter restrictions introduced in 2027 not assessed qldc qldc frankton: implement p180 on one side of copper beech road and nearby streets; add mobility parking where gaps exist (e.g. frankton beach). implement p180 restrictions on one side of copper beech road not assessed qldc qldc queenstown: introduce paid parking 8am–9pm across historic core on- and off-street parking at $6.50/hr rising to $7.50 by 2027/28, with p90 on-street limits. paid parking to apply to both on-street and off-street car parks 2025/26 to 2027/28 not assessed qldc qldc queenstown: apply inner precinct paid parking at $4/hr (8am–6pm) with p180, and coach parking at $8/hr and $20 overnight. paid parking to apply to both on-street and off-street car parks, at a rate of $4/hour not assessed qldc qldc queenstown: apply outer precinct paid parking at $2.50–$4/hr with a six-hour cap, paid parking in queenstown gardens and one mile, and p180 limits. paid parking to apply at a rate of $2.50 - $4 /hour not assessed qldc qldc queenstown: implement p180 on one side of fringe precinct streets and introduce a residential parking permit scheme. introduce a residential parking permit scheme for queenstown not assessed qldc qldc queenstown: implement coach, campervan, spsv, loading zone, p10, mobility, motorcycle and bicycle parking changes, including dedicated coach parking and cctv monitoring of spsv bays. implement dedicated coach parking across queenstown town centre not assessed qldc qldc queenstown: implement real-time occupancy capture and integrate it, including private car parks, with wayfinding signage and apps. implement technology to capture real-time on-street and off-street parking occupancy not assessed qldc qldc queenstown: investigate limiting vehicle access to shared spaces and introduce a service vehicle pre-registration database. investigate opportunities to limit vehicle access and enforce parking in queenstown's shared spaces not assessed qldc qldc support ev charging providers to install chargers in council off-street car parks (queenstown and wānaka). support ev charging providers to implement additional ev chargers not assessed qldc qldc wānaka: introduce paid parking in core ($2/hr) and pembroke ($1/hr or $6/day) precincts, coach and campervan charges, and lakefront paid parking. paid parking to apply to both on-street and off-street car parks, at a rate of $2/hour not assessed qldc qldc wānaka: stage fringe restrictions with a resident permit scheme, relocate coach drop-off to dungarvon street, and explore how parking revenue is reinvested. implement residential parking permit scheme for eligible permanent residents stage 1 / stage 2 not assessed qldc qldc wānaka: use shuttle or temporary bus services, temporary paid parking and extra enforcement during major events. use shuttle or temporary bus services to improve access not assessed qldc qldc main document pdf",
    "sortDate": "2026-02-01",
    "cover": {
      "src": "/covers/QTS-114.webp",
      "srcset": "/covers/QTS-114.webp 400w, /covers/QTS-114-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-114/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-114/QTS-114-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-115",
    "code": "QTS-115",
    "title": "Otago and Southland Regional Transport Committees 23 February 2026 - Agenda",
    "shortTitle": "Otago and Southland Regional Transport Committees",
    "summary": "Agenda for the combined Otago and Southland Regional Transport Committees (RTCs) meeting of 23 February 2026, the first of the 2025-2028 triennium. It includes the 28 July 2025 minutes and action register, an induction briefing on RTC functions under the Land Transport Management Act 2003, a Terms of Reference review, ministerial correspondence (KiwiRail representation, policy and funding certainty, South Island passenger rail), a road safety update, NLTP expenditure to December 2025 and an NZTA update. The central item (8.4) reports on development of the Otago Southland Regional Land Transport Plan (RLTP) 2027-2037: a proposed structure including a 'Tourism and Growth Story' for Queenstown Lakes and Central Otago, and a revised draft vision, five objectives and 17 policies, including P4.1 'maximising the use of the existing transport system before investing in new infrastructure' (p46). Committees are asked to confirm the early engagement approach and comment on the draft framework. Attachment 2 summarises early engagement feedback. Queenstown Airport said the Queenstown PT network needs greater frequency and longer hours, network capacity issues require significant mode shift, and 'Any future proposals such as a PT gondola in Queenstown should align with transport planning and investment and integrate with the existing network' (p53).",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda (joint Regional Transport Committees)",
    "year": 2026,
    "publishedDate": "2026-02-23",
    "documentStatus": "Final",
    "geographicScope": "Otago and Southland regions; Queenstown (Queenstown Airport feedback); Dunedin; Invercargill",
    "owner": "Regional transport committee",
    "citation": "Otago and Southland Regional Transport Committees 23 February 2026 - Agenda (2026). Report Nos. RTC2601-RTC2607.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/1ofjha0l/20260223-rtc-agenda.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/1ofjha0l/20260223-rtc-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "freight",
      "aviation"
    ],
    "organisationIds": [
      "environment-southland",
      "orc",
      "regional-transport-committees",
      "nzta",
      "qldc"
    ],
    "searchText": "qts-115 otago and southland regional transport committees 23 february 2026 - agenda otago and southland regional transport committees agenda for the combined otago and southland regional transport committees (rtcs) meeting of 23 february 2026, the first of the 2025-2028 triennium. it includes the 28 july 2025 minutes and action register, an induction briefing on rtc functions under the land transport management act 2003, a terms of reference review, ministerial correspondence (kiwirail representation, policy and funding certainty, south island passenger rail), a road safety update, nltp expenditure to december 2025 and an nzta update. the central item (8.4) reports on development of the otago southland regional land transport plan (rltp) 2027-2037: a proposed structure including a 'tourism and growth story' for queenstown lakes and central otago, and a revised draft vision, five objectives and 17 policies, including p4.1 'maximising the use of the existing transport system before investing in new infrastructure' (p46). committees are asked to confirm the early engagement approach and comment on the draft framework. attachment 2 summarises early engagement feedback. queenstown airport said the queenstown pt network needs greater frequency and longer hours, network capacity issues require significant mode shift, and 'any future proposals such as a pt gondola in queenstown should align with transport planning and investment and integrate with the existing network' (p53). context. joint meeting of the otago and southland rtcs at orc, dunedin, 23 february 2026 (p1). otago rtc: cr kate wilson (chair), cr matt hollyer (deputy), district council representatives including cr quentin smith (qldc), and james cargill (nzta); southland rtc chaired by cr phil morrison (p1). the staff reports are jointly authored by dean lowry (orc) and russell hawkes (environment southland). minutes and actions. the 28 july 2025 minutes (pp4-9) record resolutions to submit on going for housing growth and the draft national infrastructure plan, seek updates on the otago lakes regional deal, reword the rltp strategic section, and write to ministers on policy certainty, invercargill-christchurch commuter rail and kiwirail representation (pp6-9). the action register shows all as completed; regional deal updates are limited to publicly available information because of confidentiality (pp10-11). 8.1 induction and 8.2 terms of reference. sets out rtc functions under sections 105-106 of the ltma, membership and alternates for 2025-2028, and seeks adoption of updated terms of reference (pp12-31). 8.3 correspondence. ministerial replies: the minister of transport supports kiwirail attendance when rail is on the agenda; the minister for rail notes passenger rail funding requires a business case (p33). 8.4 rltp 2027-2037 development (rtc2603). the rltp must be developed every six years (p43). proposed structure includes place-based stories (rural, urban, and 'tourism and growth' covering queenstown, wānaka and cromwell), the transport system, vulnerabilities, investment priorities, funding programmes and monitoring (pp43-44). tranche one early engagement contacted aukaha, te ao mārama, the national public health service, port otago, south port, dunedin, queenstown and invercargill airports, transporting new zealand and calder stewart; tranche two continues through early 2026 (pp44-45). the draft vision seeks 'an integrated transport system that is efficient, safe, resilient and sustainable' (p45). objectives cover safety, resilience, connectivity, sustainability and a future focus. policies include p3.3 support for accessible and integrated public transport 'with a focus on enhancing existing services and extending services where feasible', p3.4 bespoke solutions where conventional options are not feasible, p4.1 maximising use of the existing system before new infrastructure, and p5.2 aligning transport with long-term land use through integrated spatial planning (p46). staff say the refreshed framework 'does not introduce new strategic or policy issues' (p46). wider public consultation has not started (p47). attachment 2: early engagement feedback (pp51-53). queenstown airport: supportive of transport choice language; queenstown pt network 'is good but requires greater frequency and longer operating hours', especially for the airport as a commuter hub; lack of pt from wānaka and cromwell causes car dependence; 'queenstown network capacity issues require significant mode shift to public and active transport'; a pt mass rapid transit should align with planning and integrate with the existing network; and reliance on a few major bridges is a resilience concern (pp52-53). 8.6 expenditure. qldc's 2025/26 nltp allocation is $27,481,000, with $10,073,991 (37%) spent to december 2025; transport model procurement delays are noted (p62). mass rapid transit: the only reference is queenstown airport's feedback: 'any future proposals such as a pt gondola in queenstown should align with transport planning and investment and integrate with the existing network' (p53). staff do not comment on it, and the draft rltp vision, objectives and policies (pp45-46) do not mention mrt, mass rapid transit or off-line public transport. committee agenda (joint regional transport committees) otago and southland regional transport committees 23 february 2026 - agenda (2026). report nos. rtc2601-rtc2607. otago and southland regions; queenstown (queenstown airport feedback); dunedin; invercargill published agenda queenstown airport feedback: any mass rapid transit proposal should align with transport planning and integrate with the existing network; the draft regional transport programme is silent. the agenda's only mrt reference is in attachment 2 to report 8.4, the summary of early engagement feedback on the rltp 2027-2037. among queenstown airport's points: 'any future proposals such as a pt gondola in queenstown should align with transport planning and investment and integrate with the existing network' (p53). the same feedback says the queenstown pt network 'requires greater frequency and longer operating hours, particularly to serve the airport and surrounding area as a major commuter hub' and that 'queenstown network capacity issues require significant mode shift to public and active transport' (p53). staff do not respond to mass rapid transit point. the draft rltp vision, objectives and policies (table 2, pp45-46) do not mention mrt, mass rapid transit or off-line public transport; draft policy p4.1 prioritises 'maximising the use of the existing transport system before investing in new infrastructure' (p46). \"any future proposals such as a pt gondola in queenstown should align with transport planning and investment and integrate with the existing network.\" (p.53) | \"queenstown network capacity issues require significant mode shift to public and active transport\" (p.53) | \"deliver value for money by prioritising integrated planning, managing demand and maximising the use of the existing transport system before investing in new infrastructure.\" (p.46) qldc nltp approved allocation 2025/26 $27,481,000; $10,073,991 (37%) spent to december 2025 (p62) orc nltp approved allocation 2025/26 $43,275,220; 44% spent to december 2025 (p61) draft rltp 2027-2037 framework: 1 vision, 5 objectives, 17 policies (pp45-46) not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/1ofjha0l/20260223-rtc-agenda.pdf regional transport committee passing board or committee paper final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. freight freight and loading. aviation airport and aviation access. environment southland environment southland prepared orc orc prepared environment southland environment southland partner orc orc published regional transport committees regional transport committees recipient dean lowry author orc orc russell hawkes author environment southland environment southland anita dawe approved by orc orc fleur matthews approved by orc orc hayley fitchett approved by environment southland environment southland liz devery approved by environment southland environment southland cara jordan contributor orc orc james cargill contributor nzta waka kotahi nzta kate wilson contributor orc orc phil morrison contributor environment southland environment southland quentin smith contributor qldc qldc committees to note the rltp 2027-2037 development report. 1) note this report. 23 february 2026 not assessed regional transport committees regional transport committees confirm the current approach of early engagement to inform development of the rltp. 23 february 2026 not assessed regional transport committees regional transport committees advise any changes to the draft rltp vision, objectives and policies (table 2). advise any changes they wish to make to the content of table 2 23 february 2026 not assessed regional transport committees regional transport committees continue early engagement (tranche two) with stakeholders who previously gave rltp feedback. early engagement is anticipated to continue through early 2026 early 2026 not assessed orc orc adjust and further develop the strategic framework and main body of the draft rltp and bring updated content to future rtc meetings. staff will make recommended adjustments and continue to develop future meetings not assessed orc orc note the induction briefing and give direction on further information or actions required. provide comment and direction on further information or actions 23 february 2026 not assessed regional transport committees regional transport committees review and adopt the updated terms of reference for the rtcs and the regional technical advisory group, or direct changes. adopt the terms of reference as attached to this report 23 february 2026 not assessed regional transport committees regional transport committees note ministerial correspondence and decide any follow-up, including whether to begin a passenger rail business case process. provide any feedback and subsequent actions they wish to take. not assessed regional transport committees regional transport committees note the regional road safety update. 1) note this report. 23 february 2026 not assessed regional transport committees regional transport committees note the nltp expenditure summary to december 2025. 1) note this report. 23 february 2026 not assessed regional transport committees regional transport committees note the nzta update (including queenstown projects) and provide feedback to nzta. provide any feedback to the nzta on the topics included in the update. 23 february 2026 not assessed regional transport committees regional transport committees request regional deal joint committee to provide updates to the rtcs (from 28 july 2025 resolution rtc25-106). ms dawe will make a request to the joint committee, to provide updates underway (17/11/2025) not assessed orc orc main document pdf",
    "sortDate": "2026-02-23",
    "cover": {
      "src": "/covers/QTS-115.webp",
      "srcset": "/covers/QTS-115.webp 400w, /covers/QTS-115-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-115/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-115/QTS-115-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-117",
    "code": "QTS-117",
    "title": "National Infrastructure Plan 2026 (Mahere Tūāhanga ā-Motu)",
    "shortTitle": "National Infrastructure Plan 2026",
    "summary": "Te Waihanga's 2026 National Infrastructure Plan sets a 30-year framework for planning, funding and delivering New Zealand's infrastructure, prepared under statutory requirement and provided to the Minister for Infrastructure in December 2025 (p.2). It finds New Zealand spends around 5.8% of GDP on infrastructure but ranks near the bottom of the OECD for efficiency (p.10), and that the National Infrastructure Pipeline holds 11,925 projects worth $275 billion, more than can be afforded (p.11). It sets out four themes, 16 recommendations and ten priorities for the decade (pp.14-15), including Forward Guidance on sustainable sector investment (land transport moderating from 1.3% to 1.0% of GDP, p.12), time-of-use charging and road user charges (p.62), sequencing major road and rapid transit projects by demonstrated demand and cost benchmarks with low-cost improvements first (p.66), upzoning around transport corridors (p.116), and reform of land transport funding and oversight (p.71). Queenstown appears as one of five centres with concentrated congestion pressure for joint pricing design (p.63), in a chart estimating when the 'Queenstown PT package' bus-lane capacity could be exceeded (around the 2040s, p.67), and in the list of IPP endorsements ('Queenstown Transport', multiple applicants, Stage 1; QLDC Arthurs Point Crossing, Stage 1) (p.102).",
    "documentType": "Infrastructure strategy",
    "documentForm": "National infrastructure plan (statutory)",
    "year": 2026,
    "publishedDate": "2026-03-03",
    "documentStatus": "Final",
    "geographicScope": "New Zealand (national); Queenstown referenced for congestion pricing, the Queenstown PT package and IPP endorsements",
    "owner": "Crown",
    "citation": "National Infrastructure Plan 2026 (Mahere Tūāhanga ā-Motu) (2026). D.18; ISBN 978-1-0671325-0-7.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://media.umbraco.io/te-waihanga-30-year-strategy/zsunnlry/national-infrastructure-plan-03032026.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://media.umbraco.io/te-waihanga-30-year-strategy/zsunnlry/national-infrastructure-plan-03032026.pdf"
    ],
    "documentTypeCode": "infrastructure-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "demand-management",
      "aviation"
    ],
    "organisationIds": [
      "te-waihanga",
      "central-government-ministers",
      "price-waterhouse-cooper",
      "nzta",
      "the-treasury"
    ],
    "searchText": "qts-117 national infrastructure plan 2026 (mahere tūāhanga ā-motu) national infrastructure plan 2026 te waihanga's 2026 national infrastructure plan sets a 30-year framework for planning, funding and delivering new zealand's infrastructure, prepared under statutory requirement and provided to the minister for infrastructure in december 2025 (p.2). it finds new zealand spends around 5.8% of gdp on infrastructure but ranks near the bottom of the oecd for efficiency (p.10), and that the national infrastructure pipeline holds 11,925 projects worth $275 billion, more than can be afforded (p.11). it sets out four themes, 16 recommendations and ten priorities for the decade (pp.14-15), including forward guidance on sustainable sector investment (land transport moderating from 1.3% to 1.0% of gdp, p.12), time-of-use charging and road user charges (p.62), sequencing major road and rapid transit projects by demonstrated demand and cost benchmarks with low-cost improvements first (p.66), upzoning around transport corridors (p.116), and reform of land transport funding and oversight (p.71). queenstown appears as one of five centres with concentrated congestion pressure for joint pricing design (p.63), in a chart estimating when the 'queenstown pt package' bus-lane capacity could be exceeded (around the 2040s, p.67), and in the list of ipp endorsements ('queenstown transport', multiple applicants, stage 1; qldc arthurs point crossing, stage 1) (p.102). context and purpose: the national infrastructure plan is prepared by the new zealand infrastructure commission, te waihanga in response to a statutory requirement and was provided to the minister for infrastructure in december 2025 (p.2). the foreword is signed by board chair raveen jaduram and chief executive geoff cooper (p.5). it is framed around four themes (planning what we can afford; looking after what we've got; prioritising the right projects; making it easier to build better), 16 recommendations and ten priorities for the decade ahead (pp.11-15). key findings: new zealand invested around 5.8% of gdp annually in infrastructure over 20 years but ranks towards the bottom of the oecd for efficiency; consenting costs projects $1.3 billion a year; net crown debt is forecast to reach 200% of gdp by 2065 without change (p.10). the pipeline holds 11,925 projects worth $275 billion; projects under $100 million make up 98% by number, but unfunded megaprojects account for much of the value (p.11). forward guidance expects 5-7% of gdp on capital infrastructure annually, with land transport moderating from 1.3% (2010-2022) to 1.0% (2024-2054) of gdp and hospitals and electricity rising (p.12). most infrastructure needed in 30 years already exists; up to 60 cents in every dollar may be needed for renewals (p.12). transport: the plan states current land transport investment plans exceed what users can sustainably fund and calls for reform so spending aligns with user revenue (p.11). priority 3 is to implement time-of-use charging and fleetwide road user charges (p.14); the key actions note 'congestion pressures are concentrated in auckland, wellington, christchurch, tauranga, and queenstown' and call for joint design with local government and for business cases to account for pricing effects (p.63). priority 4 is to prioritise and sequence major road and rapid transit projects based on demonstrated demand and cost benchmarking, using low-cost targeted improvements first (pp.14, 66). the plan gives an indicative benchmark that a well-designed bus lane can move roughly 2,400 passengers per hour each direction (p.66). figure 24 estimates when bus-lane infrastructure capacity could be exceeded for five corridors, including the 'queenstown pt package' (p.67). key actions include using intervention hierarchies and congestion pricing before expensive upgrades, sequencing major projects using value-for-money thresholds supported by ipp assessments, and investigating tolls and targeted levies where projects cannot proceed within existing funds (p.68). recommendation 2 (land transport funding and oversight) is led by the ministry of transport (p.71). priority 9 is to upzone around key transport corridors (p.116). prioritising projects: the commission's ipp has assessed over 120 applications and finds recurring gaps in problem definition, option development and value-for-money testing; many business cases 'converge too early on a preferred solution' (p.100). recommendations include a consolidated system-wide assurance function (rec. 7, p.103) and investment readiness assurance (rec. 9, p.104). figure 35 lists ipp endorsements from rounds 1 and 2, including 'queenstown transport' (multiple applicants, ota, stage 1) and qldc's 'arthurs point crossing' (stage 1) (p.102). other queenstown references: the otago pipeline lists qldc projects including the queenstown events centre and shotover wastewater disposal field (p.17); queenstown airport is one of six airports with international services (p.180). mass rapid transit: the plan does not mention mass rapid transit for queenstown. its references to rapid transit are national and general: sequence major road and rapid transit investments to demonstrated demand, low-cost options first (p.66). national infrastructure plan (statutory) national infrastructure plan 2026 (mahere tūāhanga ā-motu) (2026). d.18; isbn 978-1-0671325-0-7. new zealand (national); queenstown referenced for congestion pricing, the queenstown pt package and ipp endorsements final (parliamentary paper d.18) no queenstown mass rapid transit discussion; national guidance is to sequence rapid transit by demonstrated demand, low-cost options and pricing first. the plan does not refer to mass rapid transit in queenstown. its rapid transit guidance is national: 'prioritise and sequence major land transport projects: restore affordability by timing major road and rapid transit investments based on demonstrated demand and cost benchmarking, while using low-cost and targeted improvements first to lift network performance' (p.14). it gives a benchmark that 'a well-designed bus lane can move roughly 2,400 passengers per hour each direction' (p.66). figure 24 includes the 'queenstown pt package' among corridors where bus-lane capacity could be exceeded, with a range read from the chart of about the late 2030s to around 2050 (p.67). queenstown is named as a congestion-pricing candidate (p.63). figure 35 lists 'queenstown transport' (multiple applicants) as an ipp stage 1 endorsement, alongside christchurch and auckland mass rapid transit endorsements (p.102). \"prioritise and sequence major land transport projects: restore affordability by timing major road and rapid transit investments based on demonstrated demand and cost benchmarking, while using low-cost and targeted improvements first to lift network performance.\" (p.14) | \"congestion pressures are concentrated in auckland, wellington, christchurch, tauranga, and queenstown. joint design, timing, and supporting investments will help ensure schemes are effective and publicly sustainable.\" (p.63) | \"as an indicative benchmark, a well-designed two-lane road can carry around 2,600 to 3,000 vehicles per hour, depending on traffic mix, while a well-designed bus lane can move roughly 2,400 passengers per hour each direction.\" (p.66) infrastructure investment ~5.8% of gdp annually over 20 years (p.10) national infrastructure pipeline: 11,925 projects worth $275 billion (p.11) forward guidance: land transport capital investment 1.3% of gdp (2010-2022) to 1.0% (2024-2054) (p.12) net crown debt forecast 200% of gdp by 2065 without change (p.10) consenting costs infrastructure projects $1.3 billion a year (p.10) bus lane benchmark ~2,400 passengers/hour/direction; two-lane road 2,600-3,000 vehicles/hour (p.66) queenstown pt package bus-lane capacity exceedance: range c. late 2030s to c. 2050, midpoint c. early-mid 2040s (read from figure 24, p.67) ipp: over 120 applications assessed (p.100); queenstown transport endorsed at stage 1 (p.102) a separate study cost was not requested. https://media.umbraco.io/te-waihanga-30-year-strategy/zsunnlry/national-infrastructure-plan-03032026.pdf crown passing infrastructure strategy final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. aviation airport and aviation access. te waihanga (nz infrastructure commission) te waihanga prepared te waihanga (nz infrastructure commission) te waihanga published central government / ministers central government / ministers recipient geoff cooper signatory pwc (pricewaterhousecoopers) pwc raveen jaduram signatory te waihanga (nz infrastructure commission) te waihanga implement time-of-use charging and fleetwide road user charges; partner with local government (congestion pressures in auckland, wellington, christchurch, tauranga and queenstown) on joint design and timing. partner with local government. congestion pressures are concentrated in... queenstown not assessed business cases should explicitly account for the effect of congestion charging on travel patterns and the timing of investment needs. business cases should explicitly account for these effects not assessed prioritise and sequence major road and rapid transit projects by demonstrated demand and cost benchmarking, using low-cost targeted improvements first. timing major road and rapid transit investments based on demonstrated demand not assessed nzta waka kotahi nzta sequence major projects using value-for-money thresholds (traffic, pt patronage, safety, cost benchmarking), supported by ipp assessments. sequence major projects using value for money thresholds not assessed where projects cannot proceed within existing funds, investigate tolls, targeted levies and other revenue mechanisms, with budget envelopes reflecting credible revenue. tolls, targeted levies, and other revenue mechanisms should be investigated not assessed reform the land transport funding and investment oversight system to align investment with available revenue and strengthen efficiency and accountability; consult on reform within 24 months of the government's response. responsible agencies: ministry of transport (lead) public consultation within 24 months of government response not assessed nzta waka kotahi nzta commit to upzoning around key transport corridors to maximise the value of transport infrastructure investment. not assessed establish a consolidated system-wide assurance function giving ministers a view of infrastructure planning, delivery and asset management performance and risk. system-wide assurance: establish a consolidated assurance function not assessed the treasury the treasury strengthen investment assurance through transparent, independent readiness assessment of major government-funded proposals (including the ipp). investment readiness assurance not assessed te waihanga (nz infrastructure commission) te waihanga ensure fiscal strategy and capital allowances are informed by the commission's independent assessment of long-term needs. needs-based capital allowances not assessed ensure spatial planning in the resource management system aligns infrastructure investment with land-use planning and regulation. integrated spatial planning 3-5 years not assessed central government / ministers central government / ministers set land-use policies enabling maximum efficient use of existing and new infrastructure. optimised infrastructure use not assessed central government / ministers central government / ministers main document pdf",
    "sortDate": "2026-03-03",
    "cover": {
      "src": "/covers/QTS-117.webp",
      "srcset": "/covers/QTS-117.webp 400w, /covers/QTS-117-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-117/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-117/QTS-117-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-118",
    "code": "QTS-118",
    "title": "Attachment B: Finance YTD CAPEX Project Report - July 2025 to April 2026",
    "shortTitle": "Attachment B: Finance YTD CAPEX Project Report",
    "summary": "QLDC's year-to-date capital project report to April 2026 shows total capital of $93.78m against a $111.89m year-to-date budget (84%), with a $146.36m full-year adjusted budget and a $125.54m forecast. Transport lines show Arterial Stage 1 at practical completion (September 2025), Stanley Street site works and temporary parking complete in late December 2025 ($1.6m of $2.0m), Whakatipu bus stop improvements under way for June 2026, Gorge Road/Robins Road active travel at $0 of a $300k year-to-date budget with 'Bulk of spend now anticipated 26/27', and the transport model replacement continuing into 2026/27. No mass rapid transit reference.",
    "documentType": "Accountability report",
    "documentForm": "Capital expenditure project report (committee attachment)",
    "year": 2026,
    "publishedDate": "2026-04",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown Lakes District; Whakatipu (Wakatipu) Basin; Queenstown Town Centre; Frankton; Wānaka",
    "owner": "QLDC",
    "citation": "Attachment B: Finance YTD CAPEX Project Report - July 2025 to April 2026 (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/ftepotsk/1b-attachment-b-2025-26-capex-projects-report-apr-26.pdf",
      "https://www.qldc.govt.nz/media/qj4iwns2/1a-april-2026-finance-management-report.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-118 attachment b: finance ytd capex project report - july 2025 to april 2026 attachment b: finance ytd capex project report qldc's year-to-date capital project report to april 2026 shows total capital of $93.78m against a $111.89m year-to-date budget (84%), with a $146.36m full-year adjusted budget and a $125.54m forecast. transport lines show arterial stage 1 at practical completion (september 2025), stanley street site works and temporary parking complete in late december 2025 ($1.6m of $2.0m), whakatipu bus stop improvements under way for june 2026, gorge road/robins road active travel at $0 of a $300k year-to-date budget with 'bulk of spend now anticipated 26/27', and the transport model replacement continuing into 2026/27. no mass rapid transit reference. context and purpose. attachment b (item 1b) to qldc's april 2026 finance reporting, listing each capital project's year-to-date position, full-year budget, forecast and commentary (agenda pp.37-38 visible). totals. year-to-date actuals $93,782,582 against a $111,885,428 budget (84%); full-year adjusted budget $146,358,750; forecast $125,542,641 (86%), $20.8m below. transport lines. arterial stage 1 (cip): practical completion september 2025, $218k ytd against $62k. queenstown street upgrades: final completion with close-out costs. pt assets whakatipu (unsubsidised): $501k ytd of $635k full-year, construction contract awarded january 2026, bus stop improvements from february for completion in june 2026. stanley street site works and temporary parking: $1.6m of $2.0m, works completed late december 2025. network planning ($475k full-year) includes speed and parking management plans, with jims way safety design due june. minor improvements ($1.5m) expects a carry-forward to 2026/27. gorge road/robins road active travel: $0 against $300k ytd ($844k full-year), award letter issued, construction may-august 2026, 'bulk of spend now anticipated 26/27'. transport model replacement: $58k of $500k, ongoing into 2026/27. renewals: 2025/26 reseal programme complete; cardrona valley road rehabilitation programmed for 2026/27. transport subtotals: renewals $8.65m ytd (forecast $9.95m); other capital $3.18m ytd (forecast $4.97m, 80%). there is no park-and-ride line. mass rapid transit: none. capital expenditure project report (committee attachment) attachment b: finance ytd capex project report - july 2025 to april 2026 (2026). queenstown lakes district; whakatipu (wakatipu) basin; queenstown town centre; frankton; wānaka committee attachment (1b) no reference to mass rapid transit found in the text read ytd capital $93,782,582 vs $111,885,428 budget (84%) full-year adjusted budget $146,358,750; forecast $125,542,641 gorge rd/robins rd active travel $0 vs $300k ytd; full-year $844k stanley st site works and temp parking $1.6m of $2.0m pt assets whakatipu $501k ytd; full-year $635k; forecast $605k not separately commissioned. this is an internal or corporate document. qldc none accountability report recorded 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published complete whakatipu bus stop improvements (pt assets whakatipu) completion due june 2026 june 2026 not assessed qldc qldc construct gorge road/robins road active travel; bulk of spend now 2026/27 bulk of spend now anticipated 26/27 may-august 2026 not assessed qldc qldc replace the transport model (build, peer review, data collection) ongoing into 26/27 into 2026/27 not assessed qldc qldc review districtwide network planning, including speed and parking management plans; jims way safety design june 2026 not assessed qldc qldc rehabilitate cardrona valley road ($0.5m metalling ringfenced) construction programmed for 26/27 2026/27 not assessed qldc qldc carry forward part of the districtwide minor improvements programme carry-forward to 26/27 expected 2026/27 not assessed qldc qldc main document pdf part 2 pdf",
    "sortDate": "2026-04-01",
    "cover": {
      "src": "/covers/QTS-118.webp",
      "srcset": "/covers/QTS-118.webp 400w, /covers/QTS-118-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-118/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-118/QTS-118-F1.pdf"
      },
      {
        "label": "Part 2",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-118/QTS-118-F1-part2.pdf"
      }
    ]
  },
  {
    "id": "qts-122",
    "code": "QTS-122",
    "title": "Blue Green Network Plan",
    "shortTitle": "Blue Green Network Plan",
    "summary": "The Blue Green Network (BGN) Plan, dated July 2026, is a strategic, long-term framework for protecting and integrating water systems ('blue'), land-based ecosystems and open space ('green'), and community networks such as parks, trails and civic spaces across Queenstown Lakes District's urban areas. It was developed by QLDC with the other Grow Well Whaiora partners (Kāi Tahu, ORC and the New Zealand Government), with Boffa Miskell and Kāi Tahu entities Aukaha and Te Ao Mārama Inc. Building on the 2021 Queenstown Lakes Spatial Plan, it identifies 21 BGN Focus Areas, clustered into eight, and sets out a Local Blue Green Plan for each, listing numbered projects such as riparian restoration, new parks, ecological corridors and active travel routes. The plan does not add regulation to private land. It is based on data up to July 2024, is described as an initial version, and is to be monitored and reviewed. Implementation actions (0.01-0.16) align QLDC strategies, structure plans, the District Plan, development contributions, asset management and the W2G 'Better Ways to Go' mode shift plan with the BGN, and seek funding through ORC and QLDC Annual and Long Term Plans. Projects are to be scheduled in a separate QLDC BGN Action Plan. The plan does not address mass rapid transit.",
    "documentType": "Spatial plan",
    "documentForm": "District open space / blue-green network plan with 21 Local Blue Green Plans",
    "year": 2026,
    "publishedDate": "2026-07",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Lakes District; Whakatipu Basin (Queenstown, Queenstown Hill / Frankton Road, Frankton, Eastern and Southern Corridors, Kelvin Heights, Arthurs Point, Arrowtown, Glenorchy, Kingston); Upper Clutha (Wānaka, Albert Town, Luggate, Lake Hāwea, Cardrona, Makarora)",
    "owner": "QLDC",
    "citation": "QLDC. Blue Green Network Plan (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/your-council/council-projects/blue-green-network-plan",
    "publicSourceConfidence": "landing page",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/your-council/council-projects/blue-green-network-plan"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "active-travel"
    ],
    "organisationIds": [
      "qldc",
      "boffa-miskell",
      "kai-tahu-runaka",
      "kauati",
      "grow-well-whaiora-partnership",
      "orc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-122 blue green network plan blue green network plan the blue green network (bgn) plan, dated july 2026, is a strategic, long-term framework for protecting and integrating water systems ('blue'), land-based ecosystems and open space ('green'), and community networks such as parks, trails and civic spaces across queenstown lakes district's urban areas. it was developed by qldc with the other grow well whaiora partners (kāi tahu, orc and the new zealand government), with boffa miskell and kāi tahu entities aukaha and te ao mārama inc. building on the 2021 queenstown lakes spatial plan, it identifies 21 bgn focus areas, clustered into eight, and sets out a local blue green plan for each, listing numbered projects such as riparian restoration, new parks, ecological corridors and active travel routes. the plan does not add regulation to private land. it is based on data up to july 2024, is described as an initial version, and is to be monitored and reviewed. implementation actions (0.01-0.16) align qldc strategies, structure plans, the district plan, development contributions, asset management and the w2g 'better ways to go' mode shift plan with the bgn, and seek funding through orc and qldc annual and long term plans. projects are to be scheduled in a separate qldc bgn action plan. the plan does not address mass rapid transit. context and purpose. the blue green network plan (bgn plan) is dated july 2026 on its cover, which carries the logos of qldc, grow well whaiora, boffa miskell, kāuati, te ao mārama inc and aukaha (p1). it provides 'a strategic, long-term framework that identifies opportunities for protecting and integrating these natural systems and open spaces into the planning and development of queenstown lakes district's urban areas and settlements' (p3, p5). it embeds the kāi tahu philosophy of ki uta ki tai (p5). it was developed by qldc alongside the other grow well whaiora partners (kāi tahu, orc and the new zealand government) with stakeholder input (p5). a separate kāi tahu report, 'a kāi tahu blue green network ki uta ki tai' (august 2024), was commissioned by qldc (p3). the plan 'currently does not add regulation to private land' (p5). structure and method. the plan has four sections (introduction, setting the scene, local blue green plans, implementation) and appendices covering process, policy summary, spatial gaps analysis, engagement summary and glossary (p2). the method involved existing-state mapping, a literature review of five policy documents, gis gap analysis, workshops and site visits, and preparation of 21 local blue green plans (p18). the plan is described as 'an initial version', based on 'policy, parks planning and spatial data up until july 2024', and relies on desktop datasets, some of which 'may not be entirely reliable or complete' (p6). interactive gis layers held by qldc are to be published online (p6). engagement included hui and wānanga with aukaha and tami, a partner workshop, key stakeholder participatory design workshops in whakatipu and upper clutha, and planned community consultation and drop-in sessions (pp57-58, 103-104). content. the plan builds on the 2021 spatial plan's priority areas and future urban areas. it identifies 21 bgn focus areas clustered into eight: whakatipu basin areas, including tāhuna queenstown, queenstown hill / frankton road, te kirikiri frankton, the eastern and southern corridors, kelvin heights, arthurs point, arrowtown, glenorchy and kingston; and upper clutha areas including wānaka, albert town, luggate, lake hāwea, cardrona and makarora (p4). each local blue green plan maps existing and proposed waterways, ecology, parks, trails, destinations and arrival nodes and lists numbered projects. for queenstown and queenstown hill / frankton road these include horne creek restoration, ben lomond and queenstown hill revegetation and the arthurs point to queenstown active travel route (p37). for frankton they include active travel routes linking the shotover bridge and sh6 (p39). the plan relates the bgn to the spatial plan outcome 'public transport, walking and cycling is the preferred option for daily travel' (p16). appendix b summarises the w2g 'better ways to go 2022' mode shift plan, noting that sh6a between frankton and the town centre 'is nearing capacity with limited ability to increase due to property and topographical constraints' (p61). implementation. local blue green plans will inform structure plans, the future development strategy, subdivision open space planning and the annual and long term plans (p55). sixteen implementation projects (0.01-0.16) align qldc strategies and plans with the bgn, seek orc and qldc funding, and set out collaboration with kāi tahu (p56). priorities, timeframes, responsibilities and funding are to be set in a separate qldc bgn action plan (p6). no costs are given. mass rapid transit: the plan says nothing about mass rapid transit or offline public transport between frankton and the town centre. its transport content is limited to active travel and trails and a summary of the 2022 mode shift plan (p61). 'skyline' appears only as a destination label on the queenstown map (p37). district open space / blue-green network plan with 21 local blue green plans qldc. blue green network plan (2026). queenstown lakes district; whakatipu basin (queenstown, queenstown hill / frankton road, frankton, eastern and southern corridors, kelvin heights, arthurs point, arrowtown, glenorchy, kingston); upper clutha (wānaka, albert town, luggate, lake hāwea, cardrona, makarora) july 2026 (cover); several inner running headers still read 'draft blue green network plan' not addressed; transport content limited to active travel/trails and a summary of the 2022 mode shift plan. 21 bgn focus areas, clustered into 8 (p4) 21 local blue green plans prepared (p18) based on policy, parks planning and spatial data up until july 2024 (p6) 16 district-wide implementation projects 0.01-0.16 (p56) appendix b review: sh6a 'nearing capacity with limited ability to increase due to property and topographical constraints' (p61) a study cost has been requested under the official information act or lgoima. no figure has been received. https://www.qldc.govt.nz/your-council/council-projects/blue-green-network-plan qldc none spatial plan draft 2026 walking and cycling walking, cycling, trails and other active travel. qldc qldc commissioned boffa miskell boffa miskell prepared kāi tahu / rūnaka kāi tahu / rūnaka prepared kāuati kāuati prepared qldc qldc prepared grow well whaiora partnership grow well whaiora partner kāi tahu / rūnaka kāi tahu / rūnaka partner orc orc partner integrate bgn plan values, principles and high-level projects into the grow well whaiora spatial plan gen 2.0 / future development strategy to give them greater statutory weight. 0.01 grow well whaiora spatial plan gen 2.0 / future development strategy not assessed qldc qldc integrate bgn plan values and refine local blue green plan projects in priority development area and settlement structure plans. 0.02 qldc structure plans not assessed qldc qldc review the development contributions policy, contributing area maps and asset schedules to integrate the bgn plan and fund local blue green plan projects. 0.03 qldc development contributions policy (dc policy) not assessed qldc qldc align revisions of the parks and open spaces strategy 2021, including park typologies and definitions, with the bgn plan. 0.04 qldc parks and open spaces strategy 2021 not assessed qldc qldc align the future parks and reserve provisions plan 2022 with the bgn plan, proactively identifying open space locations and filling gaps. 0.05 qldc future parks and reserve provisions plan 2022 not assessed qldc qldc align the qldc asset management plan with the bgn plan to integrate and refine local blue green plan projects. 0.06 qldc asset management plan 202x not assessed qldc qldc align the community facilities strategy 2021 with the bgn plan to optimise co-location opportunities. 0.07 qldc community facilities strategy 2021 not assessed qldc qldc align any revision of the way to go 'better ways to go' mode shift plan with the bgn plan to address trail network gaps and integrate transport and open space planning. 0.08 w2g better ways to go 2022 not assessed way to go way to go integrate bgn plan values and refine projects when reviewing relevant reserve management plans. 0.09 qldc reserve management plans not assessed qldc qldc seek operational and capital funding through orc and qldc annual and long term plans to progress the bgn plan and deliver local blue green plan projects. 0.10 orc / qldc annual and long term plans not assessed qldc qldc when updating or replacing the district plan, seek to align or integrate the blue green network so it can be delivered. 0.11 qldc district plan not assessed qldc qldc allocate time and resources to enable kāi tahu to undertake mana whenua-led assessments informing a final kāi tahu blue green network. 0.12 mana whenua-led assessments not assessed qldc qldc collaborate with kāi tahu on a tree and planting guide and operating policy that enhances kāi tahu outcomes. 0.13 kāi tahu tree and planting guide not assessed qldc qldc map all waterways in the district to inform a catchment-based approach (e.g. wai whakaata). 0.14 waterways mapping not assessed confirm a strategic work programme with kāi tahu testing the kāi tahu blue green network at priority sites (e.g. horne creek, wai whakaata, te tapuae southern corridor). 0.15 kāi tahu strategic work programme not assessed qldc qldc collaborate with kāi tahu on mahinga kai implementation plans. 0.16 mahinga kai implementation plans not assessed qldc qldc schedule and detail local blue green plan projects (priorities, timeframes, responsibilities, funding) in a separate blue green network action plan. detailed in a separate blue green network action plan prepared by qldc not assessed qldc qldc main document pdf",
    "sortDate": "2026-07-01",
    "cover": {
      "src": "/covers/QTS-122.webp",
      "srcset": "/covers/QTS-122.webp 400w, /covers/QTS-122-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-122/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-122/QTS-122-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-123",
    "code": "QTS-123",
    "title": "Council Briefing/Workshop - Item 1: Transport Strategy Update (Attachment A: Transforming Transport - Transport Planning and Investment)",
    "shortTitle": "Council Briefing/Workshop - Item 1: Transport",
    "summary": "QLDC staff briefing to a Council workshop on 14 July 2026, presented by the Strategy Planning Manager (Transport). Part A covers the Otago Central Lakes Transport Network Plan (TNP), a consolidated all-mode plan for the sub-region due in early September 2026, and how it relates to NZTA (Waka Kotahi)'s Strategic Network Plan (SNP), the proposed Regional Deal and ORC public transport planning. The SNP is described as limited to the state highway network around Frankton, and both plans are said to recognise that major transport projects have not attracted committed funding. A slide on 'Offline Mass Rapid Transport' states that Whakatipu will need either more road capacity for public transport vehicles or an off-line system, and lists QLDC's requirements for it. Part B sets out the transport section of the Infrastructure Strategy: significant issues, objectives, an enabling toolkit (travel demand management, parking management, network planning, ITS), area programmes for Wānaka ($53M short term), Queenstown Town Centre ($60M short term; $346M medium term) and Whakatipu ($73M medium term), and three investment pathways (Reactive $120M; Progressive and Aggressive $650M each), on top of about $300M of continuous low-cost programmes over ten years. Alternative funding (development contributions, IFFA levies, time-of-use charging, tolls) is said to be needed.",
    "documentType": "Board or committee paper",
    "documentForm": "Council briefing/workshop paper with presentation slides",
    "year": 2026,
    "publishedDate": "2026-07-14",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Lakes District; Otago Central Lakes sub-region; Whakatipu Basin; Queenstown Town Centre; Frankton; Wānaka / Upper Clutha; Arthurs Point",
    "owner": "QLDC",
    "citation": "Council Briefing/Workshop - Item 1: Transport Strategy Update (Attachment A: Transforming Transport - Transport Planning and Investment) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/1u0klttt/1-workshop-infrastructure-strategy-transport.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/1u0klttt/1-workshop-infrastructure-strategy-transport.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management",
      "its"
    ],
    "organisationIds": [
      "qldc",
      "orc",
      "nzta"
    ],
    "searchText": "qts-123 council briefing/workshop - item 1: transport strategy update (attachment a: transforming transport - transport planning and investment) council briefing/workshop - item 1: transport qldc staff briefing to a council workshop on 14 july 2026, presented by the strategy planning manager (transport). part a covers the otago central lakes transport network plan (tnp), a consolidated all-mode plan for the sub-region due in early september 2026, and how it relates to nzta (waka kotahi)'s strategic network plan (snp), the proposed regional deal and orc public transport planning. the snp is described as limited to the state highway network around frankton, and both plans are said to recognise that major transport projects have not attracted committed funding. a slide on 'offline mass rapid transport' states that whakatipu will need either more road capacity for public transport vehicles or an off-line system, and lists qldc's requirements for it. part b sets out the transport section of the infrastructure strategy: significant issues, objectives, an enabling toolkit (travel demand management, parking management, network planning, its), area programmes for wānaka ($53m short term), queenstown town centre ($60m short term; $346m medium term) and whakatipu ($73m medium term), and three investment pathways (reactive $120m; progressive and aggressive $650m each), on top of about $300m of continuous low-cost programmes over ten years. alternative funding (development contributions, iffa levies, time-of-use charging, tolls) is said to be needed. context and purpose. this is a queenstown lakes district council (qldc) council briefing/workshop item, 'item 1: transport strategy update', held on tuesday 14 july 2026, with 30 minutes of presentation and 60 minutes of discussion (p1). it was prepared by tony pickard, strategy planning manager (transport), on 25 june 2026 and reviewed and authorised by tony avery, general manager, property and infrastructure, on 3 july 2026 (p1). its stated purpose is to update councillors on several transport workstreams, including external programmes, and to clarify the overlaps between the otago central lakes transport network plan and the nzta (waka kotahi) strategic network plan (p1). attachment a is a slide presentation, 'transforming transport: transport planning and investment', in two parts (pp2-3). part a: transport network plan. the slides note that alignment is needed across several workstreams in this ltp cycle: qldc strategy planning, the way to go (w2g) programme with orc and nzta, the otago central lakes (ocl) regional deal, the ltp/rltp/nltp, the infrastructure strategy and nzta's strategic network plan (p5). the tnp is meant to bring earlier single-location or single-mode strategies together into one document describing the current state, a vision and a future state, with projects and actions to close the gap, covering all of queenstown lakes district and key central otago centres and corridors, for all modes (pp6-7). deliverables are due in early september 2026 (p9). the snp is described as limited to the state highway network in and around frankton. common features are that major transport projects have not attracted committed funding through existing mechanisms and that a different funding approach is required (p10). 'offline public transport' is listed as a link with the proposed regional deal (p11). orc public transport planning slides cover wānaka/upper clutha and sub-regional services. they state that the tnp will look at options for a future multi-modal pt network integrating buses, active travel and offline solutions (p14). an indicative wānaka service is costed at $1,172,700 with a bcr of 1.1 (p15). a timeline shows the upper clutha service launching in ltp year 2 and an ocl sub-regional service in ltp year 4 (p17). part b: infrastructure strategy (transport). significant issues include growth outpacing capacity, investment processes unsuited to the task, a local ratepayer base too small to fund a network serving many tourists, a vulnerable network with few alternative routes, environmental effects, and affordability. central government support is described as insufficient, so levels of service are now dropping (p21). under the strategic direction, nzta will focus on gps-led improvements around frankton, and orc on service improvements in the whakatipu basin, sub-regional services and possibly wānaka. the slide adds: 'at the time of writing, this may also include a first national aerial network to provide predominantly public transport services' (p22). qldc must either find new ways to fund the planned programme or prioritise part of it, possibly focusing on wānaka, the queenstown town centre or the whakatipu basin (p22). an enabling toolkit covers tdm, parking management plans for queenstown, frankton and wānaka, network planning, and its to enable time-of-use charging and tolls (p23). area programmes: wānaka/upper clutha corridor, active travel, optimisation and pt infrastructure, $53m short term and $20m (to be confirmed) medium term (p24). queenstown town centre: arterial route stages 3 and 2, a pt interchange, parking for a modelled shortfall of 1,100 spaces, and street upgrades, $60m short term and $346m medium term (p25). whakatipu: arthurs point crossing (the existing historic bridge is at end of life; a toll should be considered), malaghans corridor, park and ride at the eastern, southern and western network limits, active travel and vulnerable roads, short term to be confirmed and $73m medium term (p26). the slide notes that road capacity freed by orc's fleet improvements is likely to be absorbed by induced demand (p26). three pathways are set out (pp27-28). reactive: toolkit plus essential replacements, $120m. progressive: wānaka first, then queenstown and whakatipu, $650m. aggressive: wānaka and queenstown accelerated in the first ten years, $650m. all are in addition to continuous low-cost, low-risk programmes of about $300m over ten years (p28). the slides state that traditional ltp and nltp pathways are unlikely to be sufficient and that the programme will not be funded wholly by rates (pp27-28). mass rapid transit: the paper deals with the topic directly but briefly. slide 18, 'offline mass rapid transport', states that 'whakatipu will need an alternative to either the current road network, to create more capacity for pt vehicles, or an off-line system'. it lists qldc's requirements: a service that supports planned growth areas, a fully protected route, integration with other modes, complementing rather than replacing planned interventions, affordability and accessibility (p18). offline pt is also listed under the regional deal (p11) and orc planning (p14), and the strategy slide refers to a possible 'first national aerial network to provide predominantly public transport services' (p22). the paper does not name mass rapid transit, identify a route, cost or programme for offline mrt, or include it in the pathway costings. council briefing/workshop paper with presentation slides council briefing/workshop - item 1: transport strategy update (attachment a: transforming transport - transport planning and investment) (2026). queenstown lakes district; otago central lakes sub-region; whakatipu basin; queenstown town centre; frankton; wānaka / upper clutha; arthurs point not stated (briefing paper; prepared 25 june 2026, reviewed and authorised 3 july 2026) states whakatipu will need more road capacity for pt or an off-line system; sets qldc requirements; notes possible national aerial network; uncosted. a dedicated slide, 'offline mass rapid transport' (p18), states that 'whakatipu will need an alternative to either the current road network, to create more capacity for pt vehicles, or an off-line system'. it lists 'qldc requirements from pt': a service that supports planned growth areas, a fully protected route, integration with other transport modes, complementing rather than replacing planned interventions, affordability and accessibility. 'offline public transport' is listed as one of four links with the proposed regional deal (p11). under orc public transport planning, the tnp 'will include looking at options for future a multi-modal pt network including integration between buses, active travel and offline solutions', with 'offline mass rapid transport' as a further bullet (p14). the infrastructure strategy direction slide says orc's role 'may also include a first national aerial network to provide predominantly public transport services' (p22). the document does not name a technology, route, operator, cost or timeframe. offline mrt is not included in the reactive, progressive or aggressive pathway costings (p28). \"whakatipu will need an alternative to either the current road network, to create more capacity for pt vehicles, or an off-line system.\" (p.18) | \"qldc requirements from pt: service that supports planned growth areas; fully protected route; integrated with other transport modes; complements planned interventions, not replaces them; affordable; accessible\" (p.18) | \"at the time of writing, this may also include a first national aerial network to provide predominantly public transport services.\" (p.22) | \"the tnp will include looking at options for future a multi-modal pt network including integration between buses, active travel and offline solutions.\" (p.14) wānaka / upper clutha programme: $53m short term (y1-3); $20m (tbc) medium term (y4-10) (p24) queenstown town centre programme: $60m short term (y1-3); $346m medium term (y4-10) (p25) whakatipu programme: tbc short term; $73m medium term (y4-10) (p26) modelled queenstown town centre parking shortfall of 1,100 spaces (p25) pathway improvement programme totals: reactive $120m; progressive $650m; aggressive $650m (p28) toolkit projects $20m and arthurs point crossing $80m in y1-3 under all pathways (p28) continuous and low-cost low-risk programmes approximately $300m over ten years, additional to the improvement programme (p28) indicative wānaka pt service cost $1,172,700; bcr 1.1 (p15) presentation 30 minutes; questions/discussion 60 minutes (p1) not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/1u0klttt/1-workshop-infrastructure-strategy-transport.pdf qldc substantive board or committee paper not stated 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. traffic systems intelligent transport systems and traffic signals. qldc qldc prepared qldc qldc published qldc qldc recipient tony pickard prepared by qldc qldc tony avery approved by qldc qldc tony pickard presenter qldc qldc complete the otago central lakes transport network plan (current state, vision, desired future state, aspirational network plan and implementation plan). deliverables due early september 2026 deliverables due early september 2026 not assessed qldc qldc include in the tnp actions common to the tnp and nzta's strategic network plan, especially travel demand and parking management. the tnp will include actions that are common to both, especially travel demand and parking management not assessed qldc qldc through the tnp, examine options for a future multi-modal whakatipu pt network integrating buses, active travel and offline solutions. the tnp will include looking at options for future a multi-modal pt network including integration between buses, active travel and offline solutions not assessed qldc qldc provide an offline (or road-capacity) pt alternative for whakatipu meeting qldc requirements: supports growth areas, fully protected route, integrated, complementary, affordable, accessible. whakatipu will need an alternative to either the current road network... or an off-line system not assessed take upper clutha and ocl sub-regional pt investigations to council, then into orc ltp work programme development. upper clutha and ocl sub-regional pt investigations goes to council july 2026; aug-sep 2026 not assessed orc orc procure an upper clutha pt operator, launch the service in ltp year 2 and improve to up to 8 trips per day in years 3-10. upper clutha service improvements up to 8 trips per day (ltp y3-y10) ltp y1-y10 not assessed orc orc launch the ocl sub-regional pt service in ltp year 4 and improve it towards the preferred option in years 5-10. ocl sub-regional service launch (ltp y4) ltp y4-y10 not assessed orc orc develop parking management plans for queenstown, frankton and wānaka, and monitor occupancy to inform further changes. parking management plans are being developed for areas within queenstown, frankton & wānaka not assessed qldc qldc improve transport technology (its) to enable parking monitoring, time-of-use charging, tolls and variable network controls. technology is also required to enable time of use charging, tolls and variable controls not assessed qldc qldc deliver wānaka / upper clutha corridor improvements, active travel routes, network optimisation and pt infrastructure supporting orc services. public transport infrastructure will be provided to support investment from the orc short term (y1-3) $53m; medium term (y4-10) $20m (tbc) not assessed qldc qldc progress the remaining queenstown arterial route stages now (stage 3 to establish the full route, then stage 2) and secure property early. the remaining stages of the arterial route should be progressed now short/medium term not assessed qldc qldc create a central queenstown public transport interchange. pt interchange will create a central public transport hub short/medium term not assessed qldc qldc provide town centre parking to meet a modelled 1,100-space shortfall through one large or several smaller facilities. a modelled shortfall of 1,100 spaces could be met through one large facility or multiple smaller facilities short/medium term not assessed qldc qldc progressively upgrade key queenstown town centre streets into safer, more accessible, people-focused spaces. street upgrades will progressively transform key streets short/medium term not assessed qldc qldc build a new arthurs point crossing to replace the end-of-life historic bridge; consider tolling it. a toll should be considered for the arthurs point crossing y1-3 ($80m in all pathways) not assessed nzta waka kotahi nzta make low-cost malaghans corridor improvements and upgrade the queenstown-arrowtown route via arthurs point, starting at gorge road. improvements to the route between queenstown and arrowtown via arthurs point should include intersection upgrades not assessed qldc qldc provide park and ride facilities at the eastern, southern and western network limits, interfacing with pt services. park and ride facilities at key network limits (eastern, southern, western) medium term (y4-10) not assessed nzta waka kotahi nzta complete key whakatipu active travel routes, address vulnerable low-use roads, and deliver network optimisation (e.g. road 10 formation, quail rise link, hawthorne dr). network optimisation will be achieved through targeted interventions medium term (y4-10) not assessed qldc qldc choose an investment pathway (reactive $120m, progressive $650m or aggressive $650m) for the transport improvement programme. three principal transport planning pathways have been identified y1-10 not assessed qldc qldc explore alternative funding: development contributions, iffa levies, time-of-use charging, tolls, and private and central government sources. significant opportunities to fund through development contributions, iffa levies, time of use charging and tolls as the capital programme is developed not assessed qldc qldc main document pdf",
    "sortDate": "2026-07-14",
    "cover": {
      "src": "/covers/QTS-123.webp",
      "srcset": "/covers/QTS-123.webp 400w, /covers/QTS-123-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-123/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-123/QTS-123-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-124",
    "code": "QTS-124",
    "title": "Queenstown Strategic Network Plan – Emerging Direction (Otago Regional Council Briefing, 15 July 2026)",
    "shortTitle": "Queenstown Strategic Network Plan – Emerging",
    "summary": "A ten-slide NZTA (Waka Kotahi) briefing to Otago Regional Council on 15 July 2026, presenting the emerging direction of the Queenstown Strategic Network Plan (QSNP). The plan sets a 30-year strategy for Queenstown's strategic network; it is 'not an investment plan', and no funding, planning or delivery decisions were sought (pp2-3). It describes extreme pressure on the network: 84% traffic growth at SH6/SH6A since 2012; peak travel times on SH6A over 80 minutes, about ten times free flow; and 2055 demand forecast at 250-300% of bridge capacity (p4). Of the strategic approaches tested, 'Balanced multi-modal' is preferred; road-led expansion and do nothing are ruled out. Optimisation, bus-focused variants and an 'Offline PT spine' are treated as enabling layers. High-capacity ferries, a Queenstown Hill back road, SH6A tunnelling or double-decking, and the Malaghans Road alternative were not taken forward (p5). For Frankton to Town Centre the response is short-term bus, access and safety improvements, with 'offline PT as the viable capacity option' in the long term (p7). Thirteen interventions are sequenced in three stages. Frankton-Queenstown and Frankton-Ladies Mile offline PT and a new Kawarau crossing fall in Stage 3, 'when triggered', with projects 'in the high hundreds of millions' (pp8-9). Next steps include advancing investigations of offline PT (p10). Published by ORC on its public event page.",
    "documentType": "Transport strategy",
    "documentForm": "Partner briefing presentation (slide deck)",
    "year": 2026,
    "publishedDate": "2026-07-15",
    "documentStatus": "Draft",
    "geographicScope": "Wakatipu Basin state highway network; SH6 and SH6A; Frankton (Frankton Flats); Queenstown Town Centre; Ladies Mile; Southern Corridor (Jack's Point to Arrow Junction); Kawarau and Shotover bridges",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Emerging Direction (Otago Regional Council Briefing, 15 July 2026) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/43eljm2y/queenstown-strategic-network-plan.pdf",
      "https://www.orc.govt.nz/get-involved/events/2026/july/presentation-nzta-queenstown-strategic-network-plan-15-july-2026"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "way-to-go-partnership"
    ],
    "searchText": "qts-124 queenstown strategic network plan – emerging direction (otago regional council briefing, 15 july 2026) queenstown strategic network plan – emerging a ten-slide nzta (waka kotahi) briefing to otago regional council on 15 july 2026, presenting the emerging direction of the queenstown strategic network plan (qsnp). the plan sets a 30-year strategy for queenstown's strategic network; it is 'not an investment plan', and no funding, planning or delivery decisions were sought (pp2-3). it describes extreme pressure on the network: 84% traffic growth at sh6/sh6a since 2012; peak travel times on sh6a over 80 minutes, about ten times free flow; and 2055 demand forecast at 250-300% of bridge capacity (p4). of the strategic approaches tested, 'balanced multi-modal' is preferred; road-led expansion and do nothing are ruled out. optimisation, bus-focused variants and an 'offline pt spine' are treated as enabling layers. high-capacity ferries, a queenstown hill back road, sh6a tunnelling or double-decking, and the malaghans road alternative were not taken forward (p5). for frankton to town centre the response is short-term bus, access and safety improvements, with 'offline pt as the viable capacity option' in the long term (p7). thirteen interventions are sequenced in three stages. frankton-queenstown and frankton-ladies mile offline pt and a new kawarau crossing fall in stage 3, 'when triggered', with projects 'in the high hundreds of millions' (pp8-9). next steps include advancing investigations of offline pt (p10). published by orc on its public event page. context and purpose. this is nzta (waka kotahi)'s 'queenstown strategic network plan – emerging direction', presented as an otago regional council briefing on 15 july 2026. the slides are marked 'in confidence' (p1). published by orc on its public event page. the partner briefing aimed to share initial findings and test alignment. 'no funding, planning or delivery decisions' were sought; the aim was 'partner confidence and comfort' (p2). the qsnp gives a 30-year direction for the queenstown strategic network, identifies major gaps, trade-offs and sequencing choices, and frames a whole-of-system response. it is 'not an investment plan' (p3). inputs include arataki, the ministry of transport outcomes framework, the one network framework, the spatial plan, masterplans and network performance. outputs include business cases, nltp and state highway investment plan inputs, a monitoring plan, and triggers and dependencies (p3). the challenge (p4): - 84% growth in traffic at sh6/sh6a since 2012. - peak travel time on sh6a over 80 minutes, around ten times free flow. - sh6a carrying 23,000 vehicles a day. - over 85% of capacity used for up to 6.5 hours a day in 2025. - 2055 demand forecast at 2.5 times capacity at shotover bridge and 2.6 times at kawarau falls bridge (250-300% overall). - the only alternative route to sh6a crosses a single-lane bridge. options tested (p5). do nothing and road-led expansion are ruled out. 'optimise existing', 'bus-focused variants' and 'offline pt spine' (described as a 'step-change in capacity') are classed as enabling layers. 'balanced multi-modal' is preferred as the 'best strategic fit and delivery pathway'. the deck says it adds people-moving capacity where road widening can't and can be staged, 'no-regrets first, bigger moves as funding and deliverability allows'. specific projects not taken forward are a queenstown hill back road, sh6a tunnelling or double-decking, high-capacity ferries ('limited catchment, niche role') and a malaghans road alternative route. preferred approach (pp6-7). it rests on three pillars: best use of infrastructure; moving more people in less space (bus services, higher-capacity pt vehicles, interchanges); and active demand management (tdm, parking, land-use integration). implementation covers the timing and sequencing of step-change improvements: 'larger interventions where triggers are met, pending funding availability', including offline public transport, an additional road bridge to the southern corridor and protection of corridors for future high-capacity transit. it also calls for innovative funding: beneficiary shares, infrastructure funding and financing, private investment partnering, and targeted visitor and growth levies (p6). two strategic corridors are defined (p7): - corridor 1, frankton to town centre: topography, property and congestion limit road capacity; short-term bus, access and safety improvements; 'long term: offline pt as the viable capacity option'. - corridor 2, jack's point to arrow junction: staged bus improvements, then offline pt when bus capacity is exceeded, with a potential southern river crossing. sequencing (pp8-9). thirteen numbered interventions plus arthurs point bridge (local road) and network-wide activities are mapped (p8). - stage 1, 'no-regret foundation', 2027-2033 over the next two nltps: frankton flats, key intersections, bus priority, pt services, active modes and tdm, at a sustained tens to low hundreds of millions, maintaining 2024-27 investment scale. - stage 2, 'incremental capacity', 2030s: bus priority into growth areas, interchanges, park and ride, signals and time-of-use charging. - stage 3, 'long-term transformation', 'when triggered | protect now': 'projects in the high hundreds of millions', with the new kawarau crossing and offline pt. the deck says to 'protect corridors; advance business cases and explore funding / financing options'. the deck states that the 'scale of the challenge warrants earlier intervention, but affordability and deliverability constraints necessitate a staged pathway'. if worse transport performance reduced visitor growth by 0.5%, the estimated impact is about $3.9b npv in lost gdp and tax revenue over 40 years (p9). next steps (p10): - seek inclusion of the first tranche in the 2027-2030 rltp and nltp. - advance investigations for ladies mile, southern corridor, offline pt and time-of-use charging. - agree partner leads, funding shares and delivery through way to go, the rltp and the regional deal. - monitor and refresh. mass rapid transit: the deck treats offline public transport as the long-term capacity answer between frankton and the town centre: 'long term: offline pt as the viable capacity option' (p7). frankton-queenstown offline pt (item 10) and frankton-ladies mile offline pt (item 11) are listed, and the kawarau crossing could be road or offline pt (item 12) (p8). all three are in stage 3, 'when triggered', in the 'high hundreds of millions', with no date (p9). corridor protection and investigations are proposed now (pp6, 9-10). no technology is named; mass rapid transit and mass rapid transit do not appear. partner briefing presentation (slide deck) nzta (waka kotahi). queenstown strategic network plan – emerging direction (otago regional council briefing, 15 july 2026) (2026). wakatipu basin state highway network; sh6 and sh6a; frankton (frankton flats); queenstown town centre; ladies mile; southern corridor (jack's point to arrow junction); kawarau and shotover bridges emerging direction (otago regional council briefing, 15 july 2026). published by orc on its public event page. offline pt is the 'viable capacity option' long term for frankton-town centre, placed in stage 3 'when triggered'; technology unspecified. offline public transport is central to the long-term direction. among the strategic approaches, an 'offline pt spine' is an 'enabling layer' giving a 'step-change in capacity' within the preferred 'balanced multi-modal' approach (p5). for corridor 1, frankton to town centre, the constraint is that 'topography, property and congestion limit road capacity'. the response is short-term bus, access and safety improvements and 'long term: offline pt as the viable capacity option' (p7). high-capacity pt is described as 'bus priority first, then offline pt as demand grows, with future extension to ladies mile and the southern corridor' (p7). the sequencing map lists '10 frankton-queenstown offline public transport', '11 frankton-ladies mile offline public transport' and '12 new kawarau river crossing (road or offline pt)', all in 'stage 3 - long-term transformation: offline high-capacity pt, river crossing when triggered and deliverable' (p8). stage 3 is timed 'when triggered | protect now', comprises 'projects in the high hundreds of millions', and calls to 'protect corridors; advance business cases and explore funding / financing options' (p9). the next steps include to 'advance investigations for ladies mile, southern corridor, offline pt and time-of-use' (p10). the deck names no technology, alignment, stop locations or trigger values. mass rapid transit and mass rapid transit do not appear. \"1. frankton to town centre / topography, property and congestion limit road capacity. / short term: bus, access and safety improvements. long term: offline pt as the viable capacity option.\" (p.7) | \"bus priority first, then offline pt as demand grows, with future extension to ladies mile and the southern corridor.\" (p.7) | \"offline pt spine / enabling layer / step-change in capacity\" (p.5) | \"stage 3 — long-term transformation offline high-capacity pt, river crossing when triggered and deliverable.\" (p.8) | \"projects in the high hundreds of millions. protect corridors; advance business cases and explore funding / financing options. new kawarau river crossing and offline pt.\" (p.9) | \"advance investigations for ladies mile, southern corridor, offline pt and time-of-use.\" (p.10) 84% growth in traffic at sh6/sh6a since 2012 (p4) >80 min peak travel time on sh6a, around 10x free flow (p4) >85% capacity for up to 6.5 hours/day in 2025 (p4) sh6a 23,000 vehicles/day (p4) shotover bridge demand 2.5x capacity and kawarau falls bridge 2.6x capacity in 2055; 250-300% travel demand vs bridge capacity by 2055 (p4) stage 1 (2027-2033): sustained programme in the tens to low hundreds of millions (p9) stage 3: projects in the high hundreds of millions (p9) 0.5% reduction in visitor growth estimated to cost around $3.9b npv in lost gdp and tax revenue over 40 years (p9) a study cost has been requested under the official information act or lgoima. no figure has been received. nzta substantive transport strategy draft 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared orc orc recipient frankton flats bus priority and active mode upgrades. 1 frankton flats bus priority and active mode upgrades stage 1 - no-regret foundation (2027-2033) not assessed nzta waka kotahi nzta frankton flats intersection and capacity upgrades. 2 frankton flats intersection and capacity upgrades stage 1 - no-regret foundation (2027-2033) not assessed nzta waka kotahi nzta ladies mile intersection upgrades. 3 ladies mile intersection upgrades not stated (map item) not assessed nzta waka kotahi nzta ladies mile bus priority and active mode upgrades. 4 ladies mile bus priority and active mode upgrades not stated (map item) not assessed nzta waka kotahi nzta southern corridor intersection upgrades and bus priority. 5 southern corridor intersection upgrades & bus priority not stated (map item) not assessed nzta waka kotahi nzta sh6a active mode and bus stop upgrades. 6 sh6a active mode and bus stop upgrades not stated (map item) not assessed nzta waka kotahi nzta queenstown town centre bus hub improvements. 7 queenstown town centre bus hub improvements not stated (map item) not assessed park and ride facilities (site tbc). 8 park and ride facilities (site tbc) stage 2 - incremental capacity (2030s) not assessed sh6a intersection upgrades. 9 sh6a intersection upgrades not stated (map item) not assessed nzta waka kotahi nzta frankton-queenstown offline public transport. 10 frankton-queenstown offline public transport stage 3 - long-term transformation (when triggered; protect now) not assessed frankton-ladies mile offline public transport. 11 frankton-ladies mile offline public transport stage 3 - long-term transformation (when triggered; protect now) not assessed new kawarau river crossing (road or offline pt). 12 new kawarau river crossing (road or offline pt) stage 3 - long-term transformation (when triggered; protect now) not assessed southern corridor capacity upgrades. 13 southern corridor capacity upgrades not stated (map item) not assessed nzta waka kotahi nzta arthurs point bridge (local road) shown in the sequencing map. shown with stage 1 marker (asterisk) not assessed network-wide: incremental bus service improvements and travel demand management (ongoing). incremental bus service improvements (ongoing); travel demand management (ongoing) ongoing not assessed network-wide: walking, cycling and first/last-mile access improvements and optimisation of signalised intersections. walking, cycling and first/last mile access improvements (stage 2 - incremental capacity) stage 2 - incremental capacity not assessed network-wide: time of use charging scheme. time of use charging scheme (stage 2 - incremental capacity) stage 2 - incremental capacity not assessed protect corridors for future high-capacity transit now; advance business cases and explore funding/financing for stage 3 major interventions. protect corridors; advance business cases and explore funding / financing options stage 3 - when triggered; protect now not assessed take the first tranche of implementation activities through the 2027-2030 rltp and nltp processes (via state highway investment proposal). take first tranche of implementation activities through 2027-2030 rltp and nltp processes 2027-2030 not assessed nzta waka kotahi nzta advance investigations for ladies mile, southern corridor, offline pt and time-of-use charging. next stage (not dated) not assessed nzta waka kotahi nzta agree partner leads, funding shares and delivery pathway through way to go, rltp and regional deal workstreams. not assessed way to go way to go track demand, network performance and growth; programme activities as context dictates. track demand, network performance, growth delivery opportunities ongoing not assessed nzta waka kotahi nzta main document pdf",
    "sortDate": "2026-07-15",
    "cover": {
      "src": "/covers/QTS-124.webp",
      "srcset": "/covers/QTS-124.webp 400w, /covers/QTS-124-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-124/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-124/QTS-124-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-125",
    "code": "QTS-125",
    "title": "Queenstown Strategic Network Plan - Emerging Direction (Otago Regional Council Briefing, 15 July 2026)",
    "shortTitle": "Queenstown Strategic Network Plan - Emerging",
    "summary": "NZTA (Waka Kotahi)'s 'Emerging Direction' briefing deck to Otago Regional Council on 15 July 2026. It is a ten-slide partner briefing on the direction then emerging for Queenstown's strategic network. It is not the Queenstown Strategic Network Plan published in August 2026, and it is not a draft of that plan. The deck describes pressure on SH6 and SH6A, a preferred balanced multi-modal approach, and offline public transport as the long-term capacity option between Frankton and the town centre. No technology is named.",
    "documentType": "Transport strategy",
    "documentForm": "Partner briefing presentation (slide deck)",
    "year": 2026,
    "publishedDate": "2026-07-15",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin state highway network; SH6 and SH6A; Frankton; Queenstown Town Centre; Ladies Mile; Southern Corridor",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan - Emerging Direction (Otago Regional Council Briefing, 15 July 2026) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/43eljm2y/queenstown-strategic-network-plan.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/43eljm2y/queenstown-strategic-network-plan.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "park-and-ride",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc"
    ],
    "searchText": "qts-125 queenstown strategic network plan - emerging direction (otago regional council briefing, 15 july 2026) queenstown strategic network plan - emerging nzta (waka kotahi)'s 'emerging direction' briefing deck to otago regional council on 15 july 2026. it is a ten-slide partner briefing on the direction then emerging for queenstown's strategic network. it is not the queenstown strategic network plan published in august 2026, and it is not a draft of that plan. the deck describes pressure on sh6 and sh6a, a preferred balanced multi-modal approach, and offline public transport as the long-term capacity option between frankton and the town centre. no technology is named. this is nzta (waka kotahi)'s slide deck 'queenstown strategic network plan - emerging direction', presented to otago regional council on 15 july 2026. the title is the name of the briefing. the deck is not the queenstown strategic network plan issued in august 2026, and it is not a draft of that plan. the briefing shares a 30-year direction for the queenstown strategic network. it is not an investment plan, and it did not seek funding, planning or delivery decisions. it records pressure on the network, including traffic growth at sh6/sh6a and peak travel times on sh6a. of the approaches tested, balanced multi-modal is preferred. for frankton to the town centre, the long-term response is offline public transport as the capacity option (p7), placed in a later stage when triggered. no technology is named. partner briefing presentation (slide deck) nzta (waka kotahi). queenstown strategic network plan - emerging direction (otago regional council briefing, 15 july 2026) (2026). wakatipu basin state highway network; sh6 and sh6a; frankton; queenstown town centre; ladies mile; southern corridor emerging direction briefing to otago regional council, 15 july 2026 offline public transport is the long-term capacity option between frankton and the town centre, in a later stage when triggered. no technology is named. the briefing says 'long term: offline pt as the viable capacity option' for frankton to the town centre (p7). frankton-queenstown offline public transport is item 10 in stage 3, 'long-term transformation' (p8). that stage is 'when triggered', with projects in the high hundreds of millions (p9). \"long term: offline pt as the viable capacity option.\" (p.7) | \"stage 3 — long-term transformation offline high-capacity pt, river crossing when triggered and deliverable.\" (p.8) costed with the parent document. https://www.orc.govt.nz/media/43eljm2y/queenstown-strategic-network-plan.pdf nzta substantive transport strategy recorded 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared orc orc recipient main document pdf",
    "sortDate": "2026-07-15",
    "cover": {
      "src": "/covers/QTS-125.webp",
      "srcset": "/covers/QTS-125.webp 400w, /covers/QTS-125-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-125/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-125/QTS-125-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-127",
    "code": "QTS-127",
    "title": "Community Survey 2026",
    "shortTitle": "Community Survey 2026",
    "summary": "Report by Shaping Our Future Charitable Trust, dated August 2026, on an independent district-wide community survey run in early 2026 across Queenstown Lakes and Upper Clutha. There were 385 participants and 342 written responses (p3). Respondents could choose up to five concerns. The top five were transport (parking, congestion and roadworks) at 48% (184 responses), population growth 42%, cost of living 39%, town planning and urban design 38%, and wastewater treatment 33%. Public and active transport and ride sharing were selected by 19% (74 responses) (pp5, 7). Written comments describe congestion affecting daily life, not just peak tourism periods, and concern that infrastructure has not kept pace with growth. One quote describes bus services that 'more than double' journey times (p7). The report groups concerns into transport, growth and urban design, cost of living and housing, wastewater, and health services, and finds these pressures compound one another (pp7-13). It notes that 82% of respondents were aged 40 or over and that participation was voluntary, so some groups are under-represented (p4). It compares themes with the trust's 2021 wellbeing forums (135 respondents) but cautions that the results are not statistically comparable (p14). The survey questionnaire is appended (pp17-21). The report does not mention mass rapid transit.",
    "documentType": "Community report",
    "documentForm": "Community survey results report",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Lakes and Upper Clutha districts (Central Lakes / Upper Clutha area)",
    "owner": "Community organisation",
    "citation": "Community Survey 2026 (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.shapingourfuture.org.nz/s/Community-Survey-report-August-2026-2.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.shapingourfuture.org.nz/s/Community-Survey-report-August-2026-2.pdf"
    ],
    "documentTypeCode": "community-report",
    "topics": [
      "active-travel",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "shaping-our-future"
    ],
    "searchText": "qts-127 community survey 2026 community survey 2026 report by shaping our future charitable trust, dated august 2026, on an independent district-wide community survey run in early 2026 across queenstown lakes and upper clutha. there were 385 participants and 342 written responses (p3). respondents could choose up to five concerns. the top five were transport (parking, congestion and roadworks) at 48% (184 responses), population growth 42%, cost of living 39%, town planning and urban design 38%, and wastewater treatment 33%. public and active transport and ride sharing were selected by 19% (74 responses) (pp5, 7). written comments describe congestion affecting daily life, not just peak tourism periods, and concern that infrastructure has not kept pace with growth. one quote describes bus services that 'more than double' journey times (p7). the report groups concerns into transport, growth and urban design, cost of living and housing, wastewater, and health services, and finds these pressures compound one another (pp7-13). it notes that 82% of respondents were aged 40 or over and that participation was voluntary, so some groups are under-represented (p4). it compares themes with the trust's 2021 wellbeing forums (135 respondents) but cautions that the results are not statistically comparable (p14). the survey questionnaire is appended (pp17-21). the report does not mention mass rapid transit. context and purpose. shaping our future, an independent charitable trust, ran a district-wide community survey in early 2026 for the queenstown lakes and upper clutha community, to inform public discussion and its own 2026-2029 strategic plan (pp3, 17). the report was prepared in august 2026 (p1). there were 385 participants, and 342 people gave written responses (p3). method. respondents chose up to five concerns from a list of 27 issues plus 'other'. percentages are the share of respondents choosing each issue and do not sum to 100% (p6, p18). respondents were also asked one open question ('what's one thing you wish decision-makers understood about our community right now?') and demographic questions (pp17-21). the report notes that participation was voluntary and skewed towards older and already-engaged residents: 82% were aged 40 or older. it calls for continued engagement with younger people, working families, migrants, renters and seasonal workers (p4). findings. the top concerns (p5) were: - transport (parking, congestion, roadworks): 48%. - population growth: 42%. - cost of living: 39%. - town planning and urban design: 38%. - wastewater treatment: 33%. - development: 32%. - health and wellbeing services: 30%. - housing affordability: 25%. - public and active transport: 19%. transport, access and congestion was 'the single most selected issue', with 184 responses (48%), and public and active transport and ride sharing had 74 responses (19%) (p7). written responses describe travel as 'more difficult, time-consuming and stressful', and congestion as affecting daily life, not just peak tourism periods. the report concludes that 'transport is not simply an infrastructure issue' but shapes daily experience, access, affordability and quality of life (p7). one quoted respondent refers to a 'huge drop in productivity' in traffic jams and a bus service that 'more than doubles their journey' (p7). growth, development and urban design are grouped as 'the strongest systemic concern' (p8). cost of living and housing (p9), wastewater (p10) and health services (p11) are discussed with quotes. recurring themes include concern about how decisions are made and compounding pressures (p12). the summary finds growth is placing pressure on transport, infrastructure, housing, healthcare and affordability (p13). themes are compared with the trust's 2021 wellbeing forums (135 respondents), with a caution that the two surveys cannot be statistically compared (p14). recommendations. no formal recommendations are made. the report stresses ongoing community participation and decision-making 'grounded in both technical evidence and lived community experience' (pp15-16). mass rapid transit: the report says nothing about mass rapid transit or offline public transport. its transport content is limited to survey responses on congestion, parking, roadworks and public and active transport. community survey results report community survey 2026 (2026). queenstown lakes and upper clutha districts (central lakes / upper clutha area) not stated not addressed; reports transport/congestion as top community concern (48%) without discussing solutions. 385 survey participants; 342 written responses (p3) transport (parking, congestion, roadworks): 184 responses, 48%, the most selected concern (pp5, 7) public transport, active transport, ride sharing: 74 responses, 19% (pp5, 7) population growth 42%; cost of living 39% (p5) / 40% (p9); town planning/urban design 38%; wastewater treatment 33% (p5) 82% of respondents aged 40 years or older (p4) 2021 shaping our future survey: 135 respondents (p14) a separate study cost was not requested. https://www.shapingourfuture.org.nz/s/community-survey-report-august-2026-2.pdf community organisation none community report not stated 2026 walking and cycling walking, cycling, trails and other active travel. parking parking supply, pricing and management. roads state highways, local roads and general traffic. shaping our future shaping our future prepared shaping our future shaping our future published anna mathieson contributor shaping our future shaping our future continue engaging with groups under-represented in traditional surveys: younger people, working families, migrants, renters and seasonal workers. highlights the importance of continuing to engage with groups whose voices may be less represented not assessed shaping our future shaping our future use survey results to focus shaping our future's 2026-2029 strategic plan. we are currently preparing our 2026-2029 strategic plan. your answers will help us to focus our work 2026-2029 not assessed shaping our future shaping our future main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-127.webp",
      "srcset": "/covers/QTS-127.webp 400w, /covers/QTS-127-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-127/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-127/QTS-127-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-128",
    "code": "QTS-128",
    "title": "Queenstown Airport Master Plan",
    "shortTitle": "Queenstown Airport Master Plan",
    "summary": "Queenstown Airport Corporation's (QAC) final Master Plan (November 2023) sets out the spatial plan for Queenstown Airport to 2032 and beyond. It keeps growth within the existing noise boundaries, with passenger movements rising from 2.4 million to 3.2 million (3.2% compound annual growth) and a terminal 15% larger. It reorganises the airport into precincts, prioritises walking, cycling and public transport (an 18% active/PT mode share target by 2032) and plans for decarbonised aviation. Its appendix reproduces QLDC's Frankton Masterplan maps, whose legends show private mass rapid transit lines and base stations at Frankton.",
    "documentType": "Masterplan",
    "documentForm": "Airport master plan",
    "year": 2023,
    "publishedDate": "2023-11",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Airport (ZQN); Frankton; Frankton Flats; Remarkables Park; Lucas Place; Hawthorne Drive; Humphrey Street; Frankton Arm / Lake Whakatipu; Kawarau River; Whakatipu Basin",
    "owner": "Queenstown Airport Corporation",
    "citation": "Queenstown Airport Corporation. Queenstown Airport Master Plan (2023).",
    "featured": true,
    "featuredOrder": 3,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/bbpocsfl/1a-final-qac-master-plan.pdf"
    ],
    "documentTypeCode": "masterplan",
    "topics": [
      "active-travel",
      "bus",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "coach",
      "aviation",
      "electric-vehicles"
    ],
    "organisationIds": [
      "queenstown-airport-corporation",
      "qldc"
    ],
    "searchText": "qts-128 queenstown airport master plan queenstown airport master plan queenstown airport corporation's (qac) final master plan (november 2023) sets out the spatial plan for queenstown airport to 2032 and beyond. it keeps growth within the existing noise boundaries, with passenger movements rising from 2.4 million to 3.2 million (3.2% compound annual growth) and a terminal 15% larger. it reorganises the airport into precincts, prioritises walking, cycling and public transport (an 18% active/pt mode share target by 2032) and plans for decarbonised aviation. its appendix reproduces qldc's frankton masterplan maps, whose legends show private mass rapid transit lines and base stations at frankton. context and weight. qac is a council controlled trading organisation; qldc is its majority shareholder and auckland international airport the minority shareholder (p56). engagement on the draft ran from 24 may to 23 june 2023, in partnership with qldc (p4). appendix a sets out the airport's district plan zoning and designations (p58). appendix b (pp59-60) identifies the regional planning documents 'of most relevance' as context for the plan. these are qldc's vision beyond 2050, 'qldc's guiding document for decision-making and planning'; the queenstown lakes spatial plan (whaiora grow well), 'intended to guide decisions and investment across local, regional and central government'; and the frankton masterplan 2020 (figure 21) and frankton flats master plan, whose preferred programme of transport interventions was endorsed in october 2020 (figure 22). the chair and ceo say the plan responds to the spatial plan, the outcomes sought by kāi tahu and the frankton master plan (p3). these are cited as context; the master plan does not adopt them. growth and airfield. between 2023 and 2032 the plan forecasts passenger movements growing from 2.4m to 3.2m, scheduled aircraft movements from 17,900 to 22,112, non-scheduled movements from 36,000 to 43,000, the terminal from 18,000 to 21,000 sqm and aircraft stands from 8 to 9 (p10). that is about 1.6 million arriving passengers by 2032, managed within the existing noise boundaries (pp23-26, 56). proposed works include emas runway-end safety areas, a parallel taxiway, an extra stand and a maintenance stand (p13), and relocating general aviation to new northern and southern precincts (pp14, 43-45). total potential investment over 10 years is $350 million, funded from working capital and debt with no shareholder contribution (p35). land transport and public transport. qac's land transport strategy prioritises walking, cycling and public transport. qac aims to be 'the world's most cycle-friendly airport' and to 'encourage, but not force, mode shift' (p36). more than half of airport trips are by private car (2019 data). the target is 18% of trips by active or public transport by 2032, aligned with the regional goal of 30% of district trips by 2045 (p37). in the terminal precinct, a forecourt plaza leads to a public transport hub, cycle hub and rental cars. public bus stops sit in front of the arrivals hall, with 'an additional bay for a proposed direct airport-queenstown express bus' and coach and regional bays (pp47-50). a green link walking and cycling path runs to the proposed frankton ferry jetty, aligned with the frankton master plan lake link (p48). the 2032 movement plan (figure 17, p49) shows a qac park & ride, the proposed ferry wharf, the frankton public transport hub and proposed frankton flats roads 'subject to further analysis'. by 2032 the forecourt allocation grows public bus bays from 2 to 3, adds 1 qac bus/shuttle bay, grows coach bays from 4 to 6 and bicycle spaces from 45 to 300, and grows public parking from 17,400 to 19,100 m2 (figure 19, p51). the park & ride stays behind mitre 10 until at least 2032, with a possible longer-term site on hawthorne drive (p54). decarbonisation and electrification. qac targets net-zero operational emissions by 2028 (pp16, 30). it says it achieved a 65% cut in absolute emissions by 2022-23 and has revised its target to an 85% reduction by 2028 (p30). its transport actions are to move the company fleet to evs, electrify the airfield, provide ev charging, support active and public transport for staff, replace the park & ride shuttle with an electric vehicle, introduce universal equipment charging for ground handlers, and install power plug-in units for aircraft (p30). it notes heavy future demand for electricity, for example from electrifying aircraft, ground fleet and rental car fleets and generating green hydrogen, and is pursuing solar opportunities (p32). future aviation. the plan supports the aviation sector's 2050 net-zero ambition (p32). it covers sustainable aviation fuel: saf is not yet produced in new zealand, and iata estimates 65% of carbon savings will come from saf (p33). the plan anticipates on-site hydrogen storage and reserves an electric aircraft precinct with a small terminal and charging, expecting such aircraft to operate from the early 2030s (pp34, 44). it also reserves a sustainable aviation area (p44) and earmarks space for evtols in the northern aviation precinct (p34). it sees opportunities for a 'renewable energy transport hub' for public, visitor and heavy transport (p34). mass rapid transit: the text does not discuss mass rapid transit, but appendix b reproduces two qldc maps whose legends include 'gondola lines/base station (private)'. figure 21 (qldc frankton masterplan 2020 land use, p59) shows a dotted mass rapid transit line with base-station markers running from beside the terminal forecourt and regional coach hub east through remarkables park, with a branch south to the quayside waterfront and jetty and a line north-east along the kawarau river to the map edge. figure 22 (frankton flats master plan, p60) shows the same legend item, with the line faintly visible beside the terminal outside the masterplan area. the same legends show public transport routes/stops (separated lanes or priority), an orbital bus route, ferry routes, park and ride, and key feature 22 'potential future public transport route', noting that dashed routes are subject to further investigation (p59). qac's own land transport plans (pp36-37, 46-54) do not mention mass rapid transit: they provide for buses, coaches, an express bus bay, park and ride, a green link and a ferry connection. airport master plan queenstown airport corporation. queenstown airport master plan (2023). queenstown airport (zqn); frankton; frankton flats; remarkables park; lucas place; hawthorne drive; humphrey street; frankton arm / lake whakatipu; kawarau river; whakatipu basin final (file name '1a-final-qac-master-plan'; finalised after the may-june 2023 consultation on the draft, p4); 'attachment a' header on p1 indicates it was attached to a qldc agenda neutral: mass rapid transit appears only in reproduced qldc frankton masterplan map legends (pp59-60). queenstown airport corporation does not plan for, support or oppose it in the text. the text does not discuss mass rapid transit, but appendix b reproduces two qldc maps whose legends include 'gondola lines/base station (private)'. figure 21 (qldc frankton masterplan 2020 land use, p59) shows a dotted mass rapid transit line with base-station markers running from beside the terminal forecourt and regional coach hub east through remarkables park, with a branch south to the quayside waterfront and jetty and a line north-east along the kawarau river to the map edge. figure 22 (frankton flats master plan, p60) shows the same legend item, with the line faintly visible beside the terminal outside the masterplan area. the same legends show public transport routes/stops (separated lanes or priority), an orbital bus route, ferry routes, park and ride, and key feature 22 'potential future public transport route', noting that dashed routes are subject to further investigation (p59). qac's own land transport plans (pp36-37, 46-54) do not mention mass rapid transit: they provide for buses, coaches, an express bus bay, park and ride, a green link and a ferry connection. \"gondola lines/base station (private)\" (figure 21 legend p59; figure 22 legend p60) | \"potential future public transport route\" (figure 21 key feature 22, p59) | \"note: dashed routes subject to further investigation\" (p59) passenger movements 2.4m (2023) to 3.2m (2032), 3.2% cagr (p10) scheduled aircraft movements 17,900 to 22,112 (p10) terminal 18,000 to 21,000 sqm, 15% larger (p10) active/pt mode share target 18% by 2032; regional target 30% by 2045 (p37) net-zero operational emissions by 2028; 85% absolute cut by 2028 (pp16, 30) $350m potential 10-year investment (p35) bus bays 2 to 3, coach bays 4 to 6, bike spaces 45 to 300 (p51) queenstown airport corporation passing masterplan final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. coach coach and visitor shuttle services. aviation airport and aviation access. electric vehicles electric and hydrogen vehicle technology. queenstown airport corporation qac prepared qldc qldc partner queenstown airport corporation qac published adrienne young-cooper chair signatory queenstown airport corporation qac glen sowry ceo signatory queenstown airport corporation qac operate within existing noise boundaries, not exceeding them before 2032; actively manage noise from all airport users. plan for modest growth within the existing queenstown airport noise boundaries and not to exceed these boundaries before 2032 to 2032 (at least next decade) not assessed queenstown airport corporation qac build an engineered materials arresting system (emas) at each end of the runway. plans to build an engineered materials arresting system (emas) at each end of the runway not assessed queenstown airport corporation qac build a parallel taxiway to improve airfield efficiency, capacity and safety. a parallel taxiway is proposed to improve operational efficiency and capacity not assessed queenstown airport corporation qac add one aircraft parking stand by 2032 and create a dedicated maintenance and resilience stand. one additional parking stand will be required by 2032 by 2032 not assessed queenstown airport corporation qac relocate general aviation (helicopters, fixed-wing, corporate jets) to new northern and southern aviation precincts; build a new airport emergency services station. relocating general aviation (helicopters, fixed-wing and corporate jet facilities). a new airport emergency services station is also planned staged; general aviation precincts developed first not assessed queenstown airport corporation qac extend and refurbish the terminal (about 15% larger, 18,000 to 21,000 sqm by 2032), including seismic strengthening. 15% larger than the current terminal by 2032 not assessed queenstown airport corporation qac achieve net-zero operational emissions by 2028 (revised target of an 85% reduction in absolute emissions by 2028). revised target to reduce absolute emissions by 85% by 2028 by 2028 not assessed queenstown airport corporation qac transition the company vehicle fleet to evs, electrify the airfield and provide ev charging facilities. transition company vehicle fleet to electric vehicles... electrify our airfield... provide ev charging facilities 2024-2028 roadmap not assessed queenstown airport corporation qac replace the park & ride shuttle with an electric vehicle; introduce universal equipment charging stations for ground handlers and power plug-in units for aircraft. replace park & ride shuttle with an electric vehicle 2024-2028 not assessed queenstown airport corporation qac increase the share of airport trips by active or public transport to 18% by 2032. our target is to increase the proportion of trips to and from the airport using active or public transport to 18% by 2032 by 2032 not assessed queenstown airport corporation qac advocate for better public transport services and explore qac's role in providing convenient, direct services to central queenstown. advocating for better public transport services; exploring our role in connecting passengers with convenient and direct services to central queenstown not assessed queenstown airport corporation qac build a land transport hub: public bus stops in front of arrivals, a bay for a proposed direct airport-queenstown express bus, and coach and regional bays. an additional bay for a proposed direct airport-queenstown express bus is allocated by 2032 not assessed queenstown airport corporation qac reallocate forecourt space by 2032: public bus bays 2 to 3, qac bus/shuttle 0 to 1, coach bays 4 to 6, bicycle spaces 45 to 300. figure 19 2032 master plan forecourt allocation plan 2022 to 2032 not assessed queenstown airport corporation qac create a 'green link' walking and cycling path from the terminal to the proposed frankton ferry jetty and the cycle network, plus a cycle hub; investigate a humphrey street extension. provide an active travel corridor linking queenstown airport to the proposed ferry jetty at frankton and the cycle network not stated (humphrey st needs further design and feasibility) not assessed queenstown airport corporation qac keep the park & ride behind mitre 10 until at least 2032; consider a relocated or additional park & ride on the hawthorne drive triangle in the longer term. it is proposed it will remain in this location until at least 2032 until at least 2032; longer term not assessed queenstown airport corporation qac reserve an electric aircraft area (small terminal, apron, charging) and a sustainable aviation area (hydrogen, solar), and earmark evtol space in the northern aviation precinct. an electric aircraft precinct has been reserved in this master plan electric aircraft expected early 2030s not assessed queenstown airport corporation qac prepare an airfield development plan, a terminal development plan and a landside development plan, including traffic modelling for public transport, buses and other modes. further traffic and commercial modelling associated with public transport, cycle facilities, taxis, shuttles, regional buses next steps not assessed queenstown airport corporation qac main document pdf",
    "sortDate": "2023-11-01",
    "cover": {
      "src": "/covers/QTS-128.webp",
      "srcset": "/covers/QTS-128.webp 400w, /covers/QTS-128-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-128/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-128/QTS-128-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-129",
    "code": "QTS-129",
    "title": "Vision Beyond 2050 - A unique place. An inspiring future | He Wāhi Tūhāhā. He Āmua Whakaohooho",
    "shortTitle": "Vision Beyond 2050 - A unique place. An inspiring",
    "summary": "QLDC's community vision, 'A unique place. An inspiring future', sets eight vision statements, each with community outcomes, that the document says 'underpin everything we do'. Transport sits under Zero carbon communities: public transport as 'the cleanest, greenest, innovative choice for district-wide connectivity', and active travel as part of 'an accessible and safe network for all'.",
    "documentType": "Community vision",
    "documentForm": "Community vision / outcomes framework",
    "year": 2019,
    "publishedDate": "2019-03",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District (district-wide; 'From Makarora to Kingston')",
    "owner": "QLDC",
    "citation": "QLDC. Vision Beyond 2050 - A unique place. An inspiring future | He Wāhi Tūhāhā. He Āmua Whakaohooho (2019).",
    "featured": true,
    "featuredOrder": 4,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/vkima43u/qldc_vision-2050_boards_sep22.pdf"
    ],
    "documentTypeCode": "community-vision",
    "topics": [
      "active-travel"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-129 vision beyond 2050 - a unique place. an inspiring future | he wāhi tūhāhā. he āmua whakaohooho vision beyond 2050 - a unique place. an inspiring qldc's community vision, 'a unique place. an inspiring future', sets eight vision statements, each with community outcomes, that the document says 'underpin everything we do'. transport sits under zero carbon communities: public transport as 'the cleanest, greenest, innovative choice for district-wide connectivity', and active travel as part of 'an accessible and safe network for all'. vision beyond 2050 is the queenstown lakes district community vision, titled 'a unique place. an inspiring future | he wāhi tūhāhā. he āmua whakaohooho'. this hosted copy is qldc's designed 11-page edition (pdf dated september 2022). the vision was adopted in 2019. page 1 says the community aspires to 'hold true to the values that collectively define what is unique about queenstown lakes district' and that 'these vision statements underpin everything we do'. the eight statements are: 1 thriving people | whakapuāwai hapori - 'ours is a community with a strong heart and whānau roots that run deep.' 2 living te ao māori | whakatinana i te ao māori - 'ours is a district that realises te tiriti o waitangi and champions equity for all our people, now and into the future.' 3 opportunities for all | he ōhaka taurikura - 'our district is a place of social, environmental and technological enterprise.' 4 breathtaking creativity | whakaohooho auahataka - 'surrounded by the endless inspiration of our landscapes, ours is a place that nurtures the arts, culture and the spirit of invention.' 5 deafening dawn chorus | waraki - 'our ecosystems flourish and are predator-free under our kaitiakitanga.' (p1 summary says 'under our guardianship') 6 zero carbon communities | parakore hapori - 'from makarora to kingston, our district sets the standard for regenerative, low-impact living, working and travel.' 7 disaster-defying resilience | he hapori aumangea - 'queenstown lakes is a place that is ready and prepared for every emergency.' 8 pride in sharing our places | kia noho tahi tātou katoa - 'our district is a place where our quality of life is enhanced by growth through innovation and thoughtful management.' pages 2 to 9 each give one statement with three to five community outcomes and a note on its design motif. transport is addressed directly under zero carbon communities (p8): 'our public transport is the cleanest, greenest, innovative choice for district-wide connectivity' and 'active travel is an integral part of an accessible and safe network for all of our people', alongside low-impact 'travel' in the headline statement. related outcomes are an accessible, barrier-free district (p2), technology connecting people 'locally, regionally and globally' (p4), resilient infrastructure (p9) and 'shared values not volume' (p10). the document does not name modes beyond public transport and active travel, and it does not mention mass rapid transit, the airport or specific projects. it is a values and outcomes framework with no actions, targets or figures. qldc's strategic framework page presents these as the district's community outcomes. community vision / outcomes framework qldc. vision beyond 2050 - a unique place. an inspiring future | he wāhi tūhāhā. he āmua whakaohooho (2019). queenstown lakes district (district-wide; 'from makarora to kingston') adopted community vision (operative guiding document); 2022 designed 'boards' edition not mentioned. the public transport and active travel outcomes are not mass rapid transit. the document does not mention mass rapid transit or specific transport projects. the public transport and active travel outcomes are not mass rapid transit. its transport outcomes (p8) call for public transport that is 'the cleanest, greenest, innovative choice for district-wide connectivity' and active travel within 'an accessible and safe network'. these are high-level outcomes that later council plans refer to. 'zero carbon communities | parakore hapori: from makarora to kingston, our district sets the standard for regenerative, low-impact living, working and travel.' (p8); 'our public transport is the cleanest, greenest, innovative choice for district-wide connectivity.' (p8); 'active travel is an integral part of an accessible and safe network for all of our people.' (p8); 'ours is the most accessible, barrier-free district in aotearoa new zealand for all people.' (p2) none (8 vision statements; 3-5 community outcomes each) qldc none community vision adopted 2019 walking and cycling walking, cycling, trails and other active travel. qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2019-03-01",
    "cover": {
      "src": "/covers/QTS-129.webp",
      "srcset": "/covers/QTS-129.webp 400w, /covers/QTS-129-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-129/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-129/QTS-129-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-130",
    "code": "QTS-130",
    "title": "Queenstown Strategic Network Plan (August 2026)",
    "shortTitle": "Queenstown Strategic Network Plan (August 2026)",
    "summary": "NZTA's final 30-year Queenstown Strategic Network Plan, published August 2026 and released publicly on 6 October 2026. It covers SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf) and sets a staged approach built on making best use of existing infrastructure, moving more people in less space and actively managing demand. It is not a funded programme; it identifies corridor activities, a trigger-based sequence and immediate development priorities, including an investment case for offline public transport between Frankton and Queenstown.",
    "documentType": "Transport strategy",
    "documentForm": "30-year strategic network plan",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan (August 2026). NZTA publication 26-EX-064 (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/Queenstown-strategic-network-plan.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "ferry",
      "park-and-ride",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-130 queenstown strategic network plan (august 2026) queenstown strategic network plan (august 2026) nzta's final 30-year queenstown strategic network plan, published august 2026 and released publicly on 6 october 2026. it covers sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf) and sets a staged approach built on making best use of existing infrastructure, moving more people in less space and actively managing demand. it is not a funded programme; it identifies corridor activities, a trigger-based sequence and immediate development priorities, including an investment case for offline public transport between frankton and queenstown. offline public transport is the plan's long-term answer for the frankton–queenstown (sh6a) corridor. activity 10 is a 'frankton–queenstown offline public transport line', a high-capacity spine 'operating outside the constrained sh6a road corridor; technology to be confirmed', with the next step to 'progress investment case or integrate aligned private proposal' (p52). figure 3 and the preferred strategic approach map show an indicative dashed 'offline public transport' line from frankton to queenstown town centre, with a dashed extension from frankton towards ladies mile (p10). in the optioneering assessment (figure 13, p36), 'gondola' is one of three pt enabling options and is marked as passing demand and feasibility under the rapid transit spine, balanced multi-modal (preferred) and resilient and future-focussed approaches. table 19 calls offline pt 'the only option for reliable high-capacity public transport between frankton and queenstown' and proposes a $1m–$2m investment case to confirm mode and alignment and the 'relationship with any private sector proposals' (p59). southern corridor offline pt is also retained as an option (activity 12, p50). the words cable car, cableway and ropeway do not appear. 30-year strategic network plan nzta (waka kotahi). queenstown strategic network plan (august 2026). nzta publication 26-ex-064 (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final. nzta publication 26-ex-064 offline high-capacity pt between frankton and queenstown is the long-term 'capacity step change' for sh6a; technology to be confirmed; gondola passes the optioneering screen under the preferred approach; aligned private proposals may be integrated. \"frankton–queenstown offline public transport line: future high-capacity public transport spine between frankton and queenstown, operating outside the constrained sh6a road corridor; technology to be confirmed through the next phase.\" (p.52) | \"progress investment case or integrate aligned private proposal.\" (p.52) | \"offline public transport is required to meet future demand and is the only option for reliable high-capacity public transport between frankton and queenstown.\" (p.59) | \"step-change later: offline pt frankton–queenstown, with triggered extensions to ladies mile / southern corridor.\" (pp.8, 35) | figure 13 'optioneering approach': pt options 'bus lane', 'busway', 'gondola'; gondola marked pass under rapid transit spine, balanced multi-modal and resilient and future-focussed (p.36) | \"frequent buses, shuttles, rapid transit or gondolas work best when supported by priority measures...\" (p.31) whakatipu ward peak-day population around 83,000 (2025) forecast to reach around 143,000 by 2055 (p5) some corridors above 85% of practical capacity for up to 6.5 hours/day on up to 361 days/year (p33) frankton flats network improvements indicative cost $250m (can be staged) (p58) arthurs point crossing $60m–$80m (p59) offline pt investment case $1m–$2m (p59) time-of-use charging development $1m–$2m (p59) not separately commissioned. this is an internal or corporate document. nzta substantive transport strategy final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-130.webp",
      "srcset": "/covers/QTS-130.webp 400w, /covers/QTS-130-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-130/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-130/QTS-130-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-131",
    "code": "QTS-131",
    "title": "Queenstown Strategic Network Plan (QSNP) – Further information sheet (August 2026)",
    "shortTitle": "Queenstown Strategic Network Plan (QSNP) – Further",
    "summary": "A four-page NZTA information sheet summarising the final Queenstown Strategic Network Plan. It explains why the plan is needed, its three pillars, the four network challenges and the staged package of improvements, from early Frankton Flats and corridor works to longer-term offline high-capacity public transport and a new Kawarau River crossing. It notes the plan is not a funded programme.",
    "documentType": "Transport strategy",
    "documentForm": "Information sheet",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan (QSNP) – Further information sheet (August 2026) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/Queenstown-strategic-network-plan-information-sheet-august-2026.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-131 queenstown strategic network plan (qsnp) – further information sheet (august 2026) queenstown strategic network plan (qsnp) – further a four-page nzta information sheet summarising the final queenstown strategic network plan. it explains why the plan is needed, its three pillars, the four network challenges and the staged package of improvements, from early frankton flats and corridor works to longer-term offline high-capacity public transport and a new kawarau river crossing. it notes the plan is not a funded programme. the sheet summarises the plan's three pillars, including a shift 'to higher capacity public transport (bus and offline)' (p1). it says longer-term projects 'may include offline high-capacity public transport and an additional kawarau river crossing', subject to further investigation (p2), and lists 'long-term transformational – offline high-capacity pt and new kawarau river crossing (road or offline pt) when triggered and deliverable' (p3). it describes the public transport approach as 'bus priority first, then offline pt as demand grows' (p4). no technology, route or gondola is named. information sheet nzta (waka kotahi). queenstown strategic network plan (qsnp) – further information sheet (august 2026) (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final longer-term offline high-capacity pt (and a new kawarau crossing 'road or offline pt') 'when triggered and deliverable'; technology not named. \"maximise the existing bus network and shift to higher capacity public transport (bus and offline).\" (p.1) | \"longer-term projects may include offline high-capacity public transport and an additional kawarau river crossing.\" (p.2) | \"long-term transformational – offline high-capacity pt and new kawarau river crossing (road or offline pt) when triggered and deliverable.\" (p.3) | \"bus priority first, then offline pt as demand grows\" (p.4) not separately commissioned. this is an internal or corporate document. nzta passing transport strategy final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-131.webp",
      "srcset": "/covers/QTS-131.webp 400w, /covers/QTS-131-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-131/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-131/QTS-131-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-132",
    "code": "QTS-132",
    "title": "Queenstown Strategic Network Plan – Growth strains its limited transport network (current transport network map)",
    "shortTitle": "Queenstown Strategic Network Plan – Growth strains",
    "summary": "A map from the NZTA Queenstown Strategic Network Plan showing Queenstown's current state highway network, the main user groups and the points where the network is constrained. It highlights the SH6 Eastern and Southern growth corridors converging on Frankton and an inset of key visitor destinations.",
    "documentType": "Transport strategy",
    "documentForm": "Map",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Growth strains its limited transport network (current transport network map) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/qsnp-growth-strains-its-limited-transport-network-map.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-132 queenstown strategic network plan – growth strains its limited transport network (current transport network map) queenstown strategic network plan – growth strains a map from the nzta queenstown strategic network plan showing queenstown's current state highway network, the main user groups and the points where the network is constrained. it highlights the sh6 eastern and southern growth corridors converging on frankton and an inset of key visitor destinations. content: state highway network, network users (residents, visitors, school, freight, employment), sh6 eastern and southern growth corridors, network constraint points (incl. arthurs point, shotover and kawarau crossings, frankton) and the airport, with an inset of key visitor destinations (milford sound, coronet peak, wānaka, town centre, remarkables, cardrona). mrt: no public transport routes shown; no offline pt or gondola route. map nzta (waka kotahi). queenstown strategic network plan – growth strains its limited transport network (current transport network map) (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final not separately commissioned. this is an internal or corporate document. nzta none transport strategy final 2026 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-132.webp",
      "srcset": "/covers/QTS-132.webp 400w, /covers/QTS-132-2x.webp 800w",
      "width": 400,
      "height": 321
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-132/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-132/QTS-132-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-133",
    "code": "QTS-133",
    "title": "Queenstown Strategic Network Plan – Geographical scope map",
    "shortTitle": "Queenstown Strategic Network Plan – Geographical",
    "summary": "A map from the NZTA Queenstown Strategic Network Plan showing its geographical scope. It places the Queenstown Basin focus area within the regional state highway network and identifies the local strategic network, including Malaghans Road and Hawthorne Drive.",
    "documentType": "Transport strategy",
    "documentForm": "Map",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Geographical scope map (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/qsnp-queesnstown-scope-map.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-133 queenstown strategic network plan – geographical scope map queenstown strategic network plan – geographical a map from the nzta queenstown strategic network plan showing its geographical scope. it places the queenstown basin focus area within the regional state highway network and identifies the local strategic network, including malaghans road and hawthorne drive. content: regional state highway network (sh6, sh6a, sh8, sh94) with the queenstown basin qsnp focus area inset, including the local strategic network (malaghans road, hawthorne drive). mrt: no public transport or offline pt route shown. map nzta (waka kotahi). queenstown strategic network plan – geographical scope map (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final not separately commissioned. this is an internal or corporate document. nzta none transport strategy final 2026 roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-133.webp",
      "srcset": "/covers/QTS-133.webp 400w, /covers/QTS-133-2x.webp 800w",
      "width": 400,
      "height": 267
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-133/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-133/QTS-133-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-134",
    "code": "QTS-134",
    "title": "Queenstown Strategic Network Plan – Growth areas are intensifying pressure on already busy corridors (planned and proposed growth areas map)",
    "shortTitle": "Queenstown Strategic Network Plan – Growth areas",
    "summary": "A map from the NZTA Queenstown Strategic Network Plan showing 2025 daily vehicle counts on SH6 and SH6A alongside planned and proposed growth areas. It shows counts ranging from 18,600 vehicles a day on the Southern Corridor to 30,400 between Frankton and the Shotover.",
    "documentType": "Transport strategy",
    "documentForm": "Map",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Growth areas are intensifying pressure on already busy corridors (planned and proposed growth areas map) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/qsnp-growth-areas-are-intensifying-pressure-on-already-busy-corridors-map.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-134 queenstown strategic network plan – growth areas are intensifying pressure on already busy corridors (planned and proposed growth areas map) queenstown strategic network plan – growth areas a map from the nzta queenstown strategic network plan showing 2025 daily vehicle counts on sh6 and sh6a alongside planned and proposed growth areas. it shows counts ranging from 18,600 vehicles a day on the southern corridor to 30,400 between frankton and the shotover. content: 2025 state highway daily vehicle counts (28,500 sh6a near queenstown; 23,000 sh6a frankton; 30,400 sh6 frankton–shotover; 20,600 lake hayes; 18,600 southern corridor) and planned/proposed growth areas (incl. queenstown hill area, frankton, kelvin heights, ladies mile, jacks point/southern corridor). mrt: no public transport or offline pt route shown. map nzta (waka kotahi). queenstown strategic network plan – growth areas are intensifying pressure on already busy corridors (planned and proposed growth areas map) (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final 2025 daily vehicle counts: 28,500; 23,000; 30,400; 20,600; 18,600 not separately commissioned. this is an internal or corporate document. nzta none transport strategy final 2026 roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-134.webp",
      "srcset": "/covers/QTS-134.webp 400w, /covers/QTS-134-2x.webp 800w",
      "width": 400,
      "height": 247
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-134/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-134/QTS-134-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-135",
    "code": "QTS-135",
    "title": "Queenstown Strategic Network Plan – Strategic response flow diagram (three-part strategic response and two-part delivery strategy)",
    "shortTitle": "Queenstown Strategic Network Plan – Strategic",
    "summary": "A one-page NZTA diagram summarising the Queenstown Strategic Network Plan's three-part strategic response and two-part delivery strategy. It lists the actions under each priority, including a later step-change to offline public transport between Frankton and Queenstown, and principles for trigger-based sequencing and alternative funding and delivery.",
    "documentType": "Transport strategy",
    "documentForm": "Diagram",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Strategic response flow diagram (three-part strategic response and two-part delivery strategy) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/qsnp-strategic-response-flow-diagram.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-135 queenstown strategic network plan – strategic response flow diagram (three-part strategic response and two-part delivery strategy) queenstown strategic network plan – strategic a one-page nzta diagram summarising the queenstown strategic network plan's three-part strategic response and two-part delivery strategy. it lists the actions under each priority, including a later step-change to offline public transport between frankton and queenstown, and principles for trigger-based sequencing and alternative funding and delivery. content: three strategic priorities (best use of infrastructure; move more people in less space; actively manage demand) and two delivery principles (sequence step-change improvements; fund and deliver differently). mrt: 'step-change later: offline pt frankton–queenstown, with triggered extensions to ladies mile / southern corridor.' 'partner where it adds value: private or partnership delivery may accelerate offline pt, park-and-ride, interchange or visitor transport components.' no technology named; no map. diagram nzta (waka kotahi). queenstown strategic network plan – strategic response flow diagram (three-part strategic response and two-part delivery strategy) (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final offline pt frankton–queenstown as later step change; technology not named. not separately commissioned. this is an internal or corporate document. nzta passing transport strategy final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-135.webp",
      "srcset": "/covers/QTS-135.webp 400w, /covers/QTS-135-2x.webp 800w",
      "width": 400,
      "height": 572
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-135/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-135/QTS-135-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-136",
    "code": "QTS-136",
    "title": "Queenstown Strategic Network Plan – Preferred strategic approach map (activities organised around four corridors and network-wide initiatives)",
    "shortTitle": "Queenstown Strategic Network Plan – Preferred",
    "summary": "A map from the NZTA Queenstown Strategic Network Plan showing the preferred strategic approach. It shows an indicative offline public transport connection from Frankton to Queenstown Town Centre, expanding in future towards Ladies Mile, alongside bus priority on SH6, Frankton Road access improvements, a new Kawarau crossing, park and ride and network-wide measures. Locations are marked as indicative only.",
    "documentType": "Transport strategy",
    "documentForm": "Map",
    "year": 2026,
    "publishedDate": "2026-08",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – Preferred strategic approach map (activities organised around four corridors and network-wide initiatives) (2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/resources/queenstown-strategic-network-plan/qsnp-preferred-strategic-approach-map.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-136 queenstown strategic network plan – preferred strategic approach map (activities organised around four corridors and network-wide initiatives) queenstown strategic network plan – preferred a map from the nzta queenstown strategic network plan showing the preferred strategic approach. it shows an indicative offline public transport connection from frankton to queenstown town centre, expanding in future towards ladies mile, alongside bus priority on sh6, frankton road access improvements, a new kawarau crossing, park and ride and network-wide measures. locations are marked as indicative only. content: indicative network components: fast, frequent buses (sh6 ladies mile–frankton–southern corridor); reliable frankton road (sh6a) access; offline public transport (dashed line, frankton to queenstown town centre, with dashed extension from frankton towards ladies mile); new kawarau crossing; park and ride east of ladies mile; arthurs point replacement bridge; active mode links; network-wide measures (bigger buses, road pricing and parking, land use, supplementary ferry services). mrt: legend: 'offline public transport – reliable connection: frankton to queenstown, expanding in future to support growth'. dashed alignment shown north of sh6a between frankton and queenstown town centre; 'indicative locations only'. technology not named. map nzta (waka kotahi). queenstown strategic network plan – preferred strategic approach map (activities organised around four corridors and network-wide initiatives) (2026). wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point final offline pt frankton–queenstown as later step change; technology not named. not separately commissioned. this is an internal or corporate document. nzta substantive transport strategy final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-01",
    "cover": {
      "src": "/covers/QTS-136.webp",
      "srcset": "/covers/QTS-136.webp 400w, /covers/QTS-136-2x.webp 800w",
      "width": 400,
      "height": 267
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-136/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-136/QTS-136-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-137",
    "code": "QTS-137",
    "title": "ORC public workshop: NZTA presentation on the Queenstown Strategic Network Plan (15 July 2026) – video recording",
    "shortTitle": "ORC public workshop: NZTA presentation",
    "summary": "Video recording of NZTA's presentation to an Otago Regional Council public workshop on the emerging Queenstown Strategic Network Plan, followed by councillors' questions. The recording is held by ORC.",
    "documentType": "Meeting recording",
    "documentForm": "Video recording (external)",
    "year": 2026,
    "publishedDate": "2026-07-15",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Frankton / Frankton Flats; SH6 (Arrow Junction–Jacks Point) and SH6A (Frankton Road); Shotover and Kawarau crossings; Ladies Mile; Southern Corridor; Cromwell (regional links)",
    "owner": "ORC",
    "citation": "Otago Regional Council. Video recording of the public workshop, 15 July 2026: NZTA presentation on the Queenstown Strategic Network Plan.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/get-involved/events/2026/july/presentation-nzta-queenstown-strategic-network-plan-15-july-2026",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.youtube.com/watch?v=AvPzKfUcbn0"
    ],
    "documentTypeCode": "meeting-recording",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management",
      "freight",
      "aviation"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-137 orc public workshop: nzta presentation on the queenstown strategic network plan (15 july 2026) – video recording orc public workshop: nzta presentation video recording of nzta's presentation to an otago regional council public workshop on the emerging queenstown strategic network plan, followed by councillors' questions. the recording is held by orc. video recording (external) otago regional council. video recording of the public workshop, 15 july 2026: nzta presentation on the queenstown strategic network plan. wakatipu basin; frankton / frankton flats; sh6 (arrow junction–jacks point) and sh6a (frankton road); shotover and kawarau crossings; ladies mile; southern corridor; cromwell (regional links) not separately commissioned. this is an internal or corporate document. orc none meeting recording recorded 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. freight freight and loading. aviation airport and aviation access. orc orc lead orc orc published",
    "sortDate": "2026-07-15",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-137/",
    "files": []
  },
  {
    "id": "qts-138",
    "code": "QTS-138",
    "title": "Strategic plan sets direction for Queenstown transport (Minister of Transport media release)",
    "shortTitle": "Strategic plan sets direction for Queenstown",
    "summary": "Minister of Transport media release, 6 October 2026, on publication of the Queenstown Strategic Network Plan. It names early priorities at Frankton Flats, Ladies Mile, the Southern Corridor, the town centre bus hub, walking and cycling, and replacement of Edith Cavell Bridge.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2026,
    "publishedDate": "2026-10-06",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "Crown",
    "citation": "Strategic plan sets direction for Queenstown transport (Minister of Transport media release) (2026-10-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.beehive.govt.nz/release/strategic-plan-sets-direction-queenstown-transport",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.beehive.govt.nz/release/strategic-plan-sets-direction-queenstown-transport"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "gondola",
      "roads"
    ],
    "organisationIds": [],
    "searchText": "qts-138 strategic plan sets direction for queenstown transport (minister of transport media release) strategic plan sets direction for queenstown minister of transport media release, 6 october 2026, on publication of the queenstown strategic network plan. it names early priorities at frankton flats, ladies mile, the southern corridor, the town centre bus hub, walking and cycling, and replacement of edith cavell bridge. the release says peak-day population is expected to grow from about 83,000 in 2025 to about 143,000 in 2055. it sets three outcomes: make best use of existing infrastructure, move more people in less space, and actively manage demand. longer-term projects may include offline high-capacity public transport and an additional kawarau river crossing. the plan is to be considered for the 2027–30 national land transport programme. media release strategic plan sets direction for queenstown transport (minister of transport media release) (2026-10-06). whakatipu basin; queenstown; frankton web page captured 18 october 2026 names gondolas or cable cars as one way to move more people, and longer-term offline high-capacity public transport. the release includes buses and gondolas or cable cars in the outcome of moving more people in less space. it says longer-term projects may include offline high-capacity public transport, such as gondolas or cable cars, with private sector proposals already under discussion. it does not identify a route or alignment. peak-day population about 83,000 in 2025 and about 143,000 in 2055 not separately commissioned. this is an internal or corporate document. crown passing media release recorded 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. main document pdf",
    "sortDate": "2026-10-06",
    "cover": {
      "src": "/covers/QTS-138.webp",
      "srcset": "/covers/QTS-138.webp 400w, /covers/QTS-138-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-138/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-138/QTS-138-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-139",
    "code": "QTS-139",
    "title": "Otago Central Lakes Deal – Final Deal Agreement and Schedule (signed)",
    "shortTitle": "Otago Central Lakes Deal – Final Deal Agreement",
    "summary": "The signed Otago Central Lakes Deal, 6 October 2026. Outcome 7 covers reliable transport, including the Whakatipu network plan, public transport and local road projects.",
    "documentType": "Statutory plan",
    "documentForm": "Regional deal agreement",
    "year": 2026,
    "publishedDate": "2026-10-06",
    "documentStatus": "Final",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "Crown",
    "citation": "Otago Central Lakes Deal – Final Deal Agreement and Schedule (signed) (2026-10-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.mcert.govt.nz/assets/Uploads/Local-government-documents/City-and-regional-deals/Otago/Otago-Central-Lakes-Deal-Final-Deal-Agreement-and-Schedule-signed.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.mcert.govt.nz/assets/Uploads/Local-government-documents/City-and-regional-deals/Otago/Otago-Central-Lakes-Deal-Final-Deal-Agreement-and-Schedule-signed.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta",
      "orc",
      "qldc"
    ],
    "searchText": "qts-139 otago central lakes deal – final deal agreement and schedule (signed) otago central lakes deal – final deal agreement the signed otago central lakes deal, 6 october 2026. outcome 7 covers reliable transport, including the whakatipu network plan, public transport and local road projects. outcome 7 says nzta will progress whakatipu strategic network plan initiatives, including offline mass rapid transit alongside bus, further river crossings, and demand management. qldc is to consult on high-priority local roads and fund a frankton structure plan. orc is to consult on high-priority public transport and prepare a business case for connections between whakatipu, wānaka, cromwell and alexandra. the agreement says no additional crown budget funding is expected in the first three years. regional deal agreement otago central lakes deal – final deal agreement and schedule (signed) (2026-10-06). whakatipu basin; queenstown; frankton signed 6 october 2026 programmes offline mass rapid transit alongside bus, and says gps 2027 public transport definitions will not exclude offline mass rapid transit or ropeways. the deal commits nzta to progress offline mass rapid transit alongside bus. it also says the gps 2027 public transport activity class will not exclude offline mass rapid transit or passenger ropeways, and that orc will update the regional public transport plan to include them if deemed necessary. it does not identify a route or alignment. no additional crown budget funding expected in the first three years not separately commissioned. this is an internal or corporate document. crown substantive statutory plan final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta partner orc orc partner qldc qldc partner main document pdf",
    "sortDate": "2026-10-06",
    "cover": {
      "src": "/covers/QTS-139.webp",
      "srcset": "/covers/QTS-139.webp 400w, /covers/QTS-139-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-139/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-139/QTS-139-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-140",
    "code": "QTS-140",
    "title": "Queenstown Package 2025 project brochure",
    "shortTitle": "Queenstown Package 2025 project brochure",
    "summary": "NZTA brochure, December 2025, on the Queenstown Package works at Frankton, including the temporary roundabout and the bus hub.",
    "documentType": "Project brief",
    "documentForm": "Project brochure",
    "year": 2025,
    "publishedDate": "2025-12",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "Queenstown Package 2025 project brochure (2025-12).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/25-Queenstown-A4-brochure-FINAL.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/25-Queenstown-A4-brochure-FINAL.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-140 queenstown package 2025 project brochure queenstown package 2025 project brochure nzta brochure, december 2025, on the queenstown package works at frankton, including the temporary roundabout and the bus hub. the brochure describes a temporary roundabout at the sh6/sh6a intersection around march 2026, the southern end of the bus hub becoming operational about may 2026, and electricity cabling progress of 6,429 metres of 6,464 metres by december 2025. project brochure queenstown package 2025 project brochure (2025-12). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2025 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta lead nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2025-12-01",
    "cover": {
      "src": "/covers/QTS-140.webp",
      "srcset": "/covers/QTS-140.webp 400w, /covers/QTS-140-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-140/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-140/QTS-140-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-141",
    "code": "QTS-141",
    "title": "Kā Huanui a Tāhuna – Huanui Pānui August 2026",
    "shortTitle": "Kā Huanui a Tāhuna – Huanui Pānui August 2026",
    "summary": "August 2026 works notice from the Kā Huanui a Tāhuna alliance for the Queenstown Package.",
    "documentType": "Project brief",
    "documentForm": "Works notice",
    "year": 2026,
    "publishedDate": "2026-08-31",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "Kā Huanui a Tāhuna – Huanui Pānui August 2026 (2026-08-31).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/ka-huanui-a-tahuna-huanui-panui-august-2026-v2.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/ka-huanui-a-tahuna-huanui-panui-august-2026-v2.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "active-travel",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-141 kā huanui a tāhuna – huanui pānui august 2026 kā huanui a tāhuna – huanui pānui august 2026 august 2026 works notice from the kā huanui a tāhuna alliance for the queenstown package. it reports the frankton village carpark and kerb and channel work, the hansen road link due to open in october 2026, and soil-nailing early works for the pūāhuru walking and cycling bridge. works notice kā huanui a tāhuna – huanui pānui august 2026 (2026-08-31). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2026 walking and cycling walking, cycling, trails and other active travel. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-31",
    "cover": {
      "src": "/covers/QTS-141.webp",
      "srcset": "/covers/QTS-141.webp 400w, /covers/QTS-141-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-141/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-141/QTS-141-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-142",
    "code": "QTS-142",
    "title": "Kā Huanui a Tāhuna – Huanui Pānui July 2026",
    "shortTitle": "Kā Huanui a Tāhuna – Huanui Pānui July 2026",
    "summary": "July 2026 works notice from the Kā Huanui a Tāhuna alliance for the Queenstown Package.",
    "documentType": "Project brief",
    "documentForm": "Works notice",
    "year": 2026,
    "publishedDate": "2026-07",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "Kā Huanui a Tāhuna – Huanui Pānui July 2026 (2026-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/ka-huanui-a-tahuna-huanui-panui-july-2026.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/ka-huanui-a-tahuna-huanui-panui-july-2026.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-142 kā huanui a tāhuna – huanui pānui july 2026 kā huanui a tāhuna – huanui pānui july 2026 july 2026 works notice from the kā huanui a tāhuna alliance for the queenstown package. a monthly construction notice for the queenstown package alliance works. works notice kā huanui a tāhuna – huanui pānui july 2026 (2026-07). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2026 roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-07-01",
    "cover": {
      "src": "/covers/QTS-142.webp",
      "srcset": "/covers/QTS-142.webp 400w, /covers/QTS-142-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-142/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-142/QTS-142-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-143",
    "code": "QTS-143",
    "title": "SH6 Ladies Mile – Howards Drive work notice, July 2026",
    "shortTitle": "SH6 Ladies Mile – Howards Drive work notice, July",
    "summary": "July 2026 notice that the SH6 Ladies Mile / Howards Drive intersection is being rebuilt as traffic signals, with a shared path, over about 18 months.",
    "documentType": "Project brief",
    "documentForm": "Works notice",
    "year": 2026,
    "publishedDate": "2026-07",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "SH6 Ladies Mile – Howards Drive work notice, July 2026 (2026-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/work-notices/sh6-ladies-mile-howards-drive-work-notice-july-2026.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/work-notices/sh6-ladies-mile-howards-drive-work-notice-july-2026.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "active-travel",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-143 sh6 ladies mile – howards drive work notice, july 2026 sh6 ladies mile – howards drive work notice, july july 2026 notice that the sh6 ladies mile / howards drive intersection is being rebuilt as traffic signals, with a shared path, over about 18 months. the notice describes a four-leg signalised intersection, 150 metres of shared path, a 50 km/h speed limit during construction, and a caption of completion early in 2028. works notice sh6 ladies mile – howards drive work notice, july 2026 (2026-07). whakatipu basin; queenstown; frankton about 18 months of construction 150 metres of shared path not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2026 walking and cycling walking, cycling, trails and other active travel. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-07-01",
    "cover": {
      "src": "/covers/QTS-143.webp",
      "srcset": "/covers/QTS-143.webp 400w, /covers/QTS-143-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-143/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-143/QTS-143-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-144",
    "code": "QTS-144",
    "title": "Queenstown Package update December 2024",
    "shortTitle": "Queenstown Package update December 2024",
    "summary": "NZTA update, December 2024, on the Queenstown Package.",
    "documentType": "Project brief",
    "documentForm": "Project update",
    "year": 2024,
    "publishedDate": "2024-12",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "Queenstown Package update December 2024 (2024-12).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/queenstown-package-update-december-2024.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/queenstown-package-update-december-2024.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-144 queenstown package update december 2024 queenstown package update december 2024 nzta update, december 2024, on the queenstown package. a project update on construction of the queenstown package at frankton. project update queenstown package update december 2024 (2024-12). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2024 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2024-12-01",
    "cover": {
      "src": "/covers/QTS-144.webp",
      "srcset": "/covers/QTS-144.webp 400w, /covers/QTS-144-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-144/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-144/QTS-144-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-145",
    "code": "QTS-145",
    "title": "NZ Upgrade Queenstown FAQs August 2024",
    "shortTitle": "NZ Upgrade Queenstown FAQs August 2024",
    "summary": "NZTA's August 2024 answers to questions about the NZ Upgrade Queenstown project, including the SH6 / Howards Drive intersection as it was described then.",
    "documentType": "Project brief",
    "documentForm": "Questions and answers",
    "year": 2024,
    "publishedDate": "2024-08",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "NZ Upgrade Queenstown FAQs August 2024 (2024-08).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/nz-upgrade-queenstown-faqs-august-2024.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/nz-upgrade-queenstown-faqs-august-2024.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-145 nz upgrade queenstown faqs august 2024 nz upgrade queenstown faqs august 2024 nzta's august 2024 answers to questions about the nz upgrade queenstown project, including the sh6 / howards drive intersection as it was described then. frequently asked questions published by nzta in august 2024 for the queenstown package. questions and answers nz upgrade queenstown faqs august 2024 (2024-08). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2024 roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2024-08-01",
    "cover": {
      "src": "/covers/QTS-145.webp",
      "srcset": "/covers/QTS-145.webp 400w, /covers/QTS-145-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-145/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-145/QTS-145-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-146",
    "code": "QTS-146",
    "title": "NZ Upgrade Queenstown newsletter April 2024",
    "shortTitle": "NZ Upgrade Queenstown newsletter April 2024",
    "summary": "NZTA newsletter, April 2024, on the NZ Upgrade Queenstown project.",
    "documentType": "Project brief",
    "documentForm": "Newsletter",
    "year": 2024,
    "publishedDate": "2024-04",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "NZ Upgrade Queenstown newsletter April 2024 (2024-04).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/assets/projects/queenstown-package/nz-upgrade-queenstown-newsletter-april-2024.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/assets/projects/queenstown-package/nz-upgrade-queenstown-newsletter-april-2024.pdf"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-146 nz upgrade queenstown newsletter april 2024 nz upgrade queenstown newsletter april 2024 nzta newsletter, april 2024, on the nz upgrade queenstown project. a project newsletter for the queenstown package. newsletter nz upgrade queenstown newsletter april 2024 (2024-04). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2024 roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2024-04-01",
    "cover": {
      "src": "/covers/QTS-146.webp",
      "srcset": "/covers/QTS-146.webp 400w, /covers/QTS-146-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-146/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-146/QTS-146-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-147",
    "code": "QTS-147",
    "title": "Green light for new SH6 walking and cycling bridge in Queenstown (media release)",
    "shortTitle": "Green light for new SH6 walking and cycling bridge",
    "summary": "Minister of Transport media release, 9 May 2026, announcing $12.6 million for the Pūāhuru walking and cycling bridge on SH6, with completion by the end of 2027.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2026,
    "publishedDate": "2026-05-09",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "Crown",
    "citation": "Green light for new SH6 walking and cycling bridge in Queenstown (media release) (2026-05-09).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.beehive.govt.nz/release/green-light-new-sh6-walking-and-cycling-bridge-queenstown",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.beehive.govt.nz/release/green-light-new-sh6-walking-and-cycling-bridge-queenstown"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "active-travel",
      "roads"
    ],
    "organisationIds": [],
    "searchText": "qts-147 green light for new sh6 walking and cycling bridge in queenstown (media release) green light for new sh6 walking and cycling bridge minister of transport media release, 9 may 2026, announcing $12.6 million for the pūāhuru walking and cycling bridge on sh6, with completion by the end of 2027. the release says the contract is awarded to the kā huanui a tāhuna alliance. the bridge is a single span of about 51.7 metres with a 3 metre shared path. sh6 at this point carries about 27,000 vehicles a day. media release green light for new sh6 walking and cycling bridge in queenstown (media release) (2026-05-09). whakatipu basin; queenstown; frankton web page captured 18 october 2026 $12.6 million approved completion by the end of 2027 about 27,000 vehicles a day on sh6 at the bridge not separately commissioned. this is an internal or corporate document. crown none media release recorded 2026 walking and cycling walking, cycling, trails and other active travel. roads state highways, local roads and general traffic. main document pdf",
    "sortDate": "2026-05-09",
    "cover": {
      "src": "/covers/QTS-147.webp",
      "srcset": "/covers/QTS-147.webp 400w, /covers/QTS-147-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-147/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-147/QTS-147-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-148",
    "code": "QTS-148",
    "title": "Mid-term review: Otago Southland Regional Land Transport Plan 2021-31",
    "shortTitle": "Mid-term review: Otago Southland Regional Land",
    "summary": "Mid-term review of the Otago Southland Regional Land Transport Plan 2021–31, published November 2024. It lists Queenstown state highway and public transport activities for the rest of that plan.",
    "documentType": "Statutory plan",
    "documentForm": "Regional land transport plan",
    "year": 2024,
    "publishedDate": "2024-11",
    "documentStatus": "Final",
    "geographicScope": "Otago; Southland; Queenstown",
    "owner": "Regional transport committee",
    "citation": "Mid-term review: Otago Southland Regional Land Transport Plan 2021-31 (2024-11).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/5vyppuxv/mid-term-review-otago-southland-rltp-21-31-nov-2024-web.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/5vyppuxv/mid-term-review-otago-southland-rltp-21-31-nov-2024-web.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "rapid-transit",
      "roads"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-148 mid-term review: otago southland regional land transport plan 2021-31 mid-term review: otago southland regional land mid-term review of the otago southland regional land transport plan 2021–31, published november 2024. it lists queenstown state highway and public transport activities for the rest of that plan. queenstown public transport service improvements are regional priority 1. the review also lists sh6 frankton flats network improvements, stanley street corridor improvements, and records that sh6/sh6a offline high-capacity public transport implementation was removed from the state highway investment proposal 2024–34. regional land transport plan mid-term review: otago southland regional land transport plan 2021-31 (2024-11). otago; southland; queenstown records that offline high-capacity public transport implementation on sh6/sh6a was removed from the 2024–34 state highway investment proposal. the review says the sh6/sh6a queenstown offline high-capacity public transport implementation project was removed from the state highway investment proposal 2024–34 because of other government policy statement priorities and the likelihood of funding in the next three years. the regional transport committees record their disappointment. it does not identify a route. not separately commissioned. this is an internal or corporate document. regional transport committee passing statutory plan final 2024 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. orc orc published main document pdf",
    "sortDate": "2024-11-01",
    "cover": {
      "src": "/covers/QTS-148.webp",
      "srcset": "/covers/QTS-148.webp 400w, /covers/QTS-148-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-148/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-148/QTS-148-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-149",
    "code": "QTS-149",
    "title": "ORC Public and Active Transport Committee 3 Sep 2025 – Agenda",
    "shortTitle": "ORC Public and Active Transport Committee 3 Sep",
    "summary": "Agenda for Otago Regional Council's Public and Active Transport Committee on 3 September 2025, including Queenstown bus and ferry patronage and the public transport business case.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2025,
    "publishedDate": "2025-09-03",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "ORC",
    "citation": "ORC Public and Active Transport Committee 3 Sep 2025 – Agenda (2025-09-03).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/ynzgr2xz/20250903-patc-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/ynzgr2xz/20250903-patc-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-149 orc public and active transport committee 3 sep 2025 – agenda orc public and active transport committee 3 sep agenda for otago regional council's public and active transport committee on 3 september 2025, including queenstown bus and ferry patronage and the public transport business case. the agenda reports queenstown bus patronage and fare revenue for 2024/25, ferry patronage, and the staging of the queenstown public transport business case, including stage 1 changes on 30 june 2025. committee agenda orc public and active transport committee 3 sep 2025 – agenda (2025-09-03). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared main document pdf",
    "sortDate": "2025-09-03",
    "cover": {
      "src": "/covers/QTS-149.webp",
      "srcset": "/covers/QTS-149.webp 400w, /covers/QTS-149-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-149/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-149/QTS-149-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-150",
    "code": "QTS-150",
    "title": "ORC Public and Active Transport Committee 7 Aug 2024 – Agenda",
    "shortTitle": "ORC Public and Active Transport Committee 7 Aug",
    "summary": "Agenda for Otago Regional Council's Public and Active Transport Committee on 7 August 2024, including Queenstown bus and ferry patronage and fare revenue.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2024,
    "publishedDate": "2024-08-07",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "ORC",
    "citation": "ORC Public and Active Transport Committee 7 Aug 2024 – Agenda (2024-08-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/srcfqwfy/20240807-patc-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/srcfqwfy/20240807-patc-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-150 orc public and active transport committee 7 aug 2024 – agenda orc public and active transport committee 7 aug agenda for otago regional council's public and active transport committee on 7 august 2024, including queenstown bus and ferry patronage and fare revenue. the agenda includes queenstown bus patronage and fare revenue, and lake whakatipu ferry patronage after the bee card fare returned to $10 in july 2023. committee agenda orc public and active transport committee 7 aug 2024 – agenda (2024-08-07). whakatipu basin; queenstown; frankton not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2024 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared main document pdf",
    "sortDate": "2024-08-07",
    "cover": {
      "src": "/covers/QTS-150.webp",
      "srcset": "/covers/QTS-150.webp 400w, /covers/QTS-150-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-150/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-150/QTS-150-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-151",
    "code": "QTS-151",
    "title": "ORC Council Meeting 26 Aug 2026 – Agenda (incl. Q4 2025/26 performance & finance; Central Lakes sub-regional PT investment case)",
    "shortTitle": "ORC Council Meeting 26 Aug 2026 – Agenda",
    "summary": "Agenda for the Otago Regional Council meeting of 26 August 2026. It includes 2025/26 public transport performance, the Queenstown transport reserve, and a Central Lakes public transport investment case.",
    "documentType": "Board or committee paper",
    "documentForm": "Council agenda",
    "year": 2026,
    "publishedDate": "2026-08-26",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "ORC",
    "citation": "ORC Council Meeting 26 Aug 2026 – Agenda (incl. Q4 2025/26 performance & finance; Central Lakes sub-regional PT investment case) (2026-08-26).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/mtjja3sj/20260826-council-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/mtjja3sj/20260826-council-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-151 orc council meeting 26 aug 2026 – agenda (incl. q4 2025/26 performance & finance; central lakes sub-regional pt investment case) orc council meeting 26 aug 2026 – agenda agenda for the otago regional council meeting of 26 august 2026. it includes 2025/26 public transport performance, the queenstown transport reserve, and a central lakes public transport investment case. queenstown bus patronage in 2025/26 is reported as 2,094,772, with bus fare revenue of $3,999,917. the agenda says bus contract units 6 and 7 are due to expire in november 2029. it also describes a preferred two-route bus trial between alexandra, cromwell, wānaka and queenstown, at an indicative operating cost of about $2.928 million a year. council agenda orc council meeting 26 aug 2026 – agenda (incl. q4 2025/26 performance & finance; central lakes sub-regional pt investment case) (2026-08-26). whakatipu basin; queenstown; frankton queenstown bus patronage 2,094,772 in 2025/26 bus fare revenue $3,999,917 in 2025/26 central lakes trial about $2.928 million a year not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2026 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared main document pdf",
    "sortDate": "2026-08-26",
    "cover": {
      "src": "/covers/QTS-151.webp",
      "srcset": "/covers/QTS-151.webp 400w, /covers/QTS-151-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-151/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-151/QTS-151-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-152",
    "code": "QTS-152",
    "title": "ORC Annual Report 2024/25",
    "shortTitle": "ORC Annual Report 2024/25",
    "summary": "Otago Regional Council annual report for 2024/25, including Queenstown public transport results and the Queenstown transport reserve.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2025,
    "publishedDate": "2025-10",
    "documentStatus": "Final",
    "geographicScope": "Otago; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2024/25 (2025-10).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/zknioziu/6-oct-2149910-annual-report-24-25-web-for-audit.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/zknioziu/6-oct-2149910-annual-report-24-25-web-for-audit.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-152 orc annual report 2024/25 orc annual report 2024/25 otago regional council annual report for 2024/25, including queenstown public transport results and the queenstown transport reserve. the report records queenstown service delivery and punctuality for 2024/25, movements through the queenstown transport reserve, and $1.521 million of nzta grants for whakatipu public transport capital works that were not received because the projects did not proceed. annual report orc annual report 2024/25 (2025-10). otago; queenstown not separately commissioned. this is an internal or corporate document. orc none accountability report final 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc prepared orc orc published main document pdf",
    "sortDate": "2025-10-01",
    "cover": {
      "src": "/covers/QTS-152.webp",
      "srcset": "/covers/QTS-152.webp 400w, /covers/QTS-152-2x.webp 800w",
      "width": 400,
      "height": 545
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-152/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-152/QTS-152-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-153",
    "code": "QTS-153",
    "title": "ORC Annual Plan 2025-26",
    "shortTitle": "ORC Annual Plan 2025-26",
    "summary": "Otago Regional Council annual plan for 2025–26, including the Whakatipu public transport targeted rate and a $1.2 million increase in Queenstown public transport costs.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2025,
    "publishedDate": "2025-06",
    "documentStatus": "Adopted",
    "geographicScope": "Otago; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2025-26 (2025-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/qsyc2gnf/annual-plan-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/qsyc2gnf/annual-plan-2025-26.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-153 orc annual plan 2025-26 orc annual plan 2025-26 otago regional council annual plan for 2025–26, including the whakatipu public transport targeted rate and a $1.2 million increase in queenstown public transport costs. the whakatipu public transport targeted rate for 2025/26 is $3.522 million. the plan says queenstown public transport costs rose by $1.2 million, funded from carried-over operating funds. annual plan orc annual plan 2025-26 (2025-06). otago; queenstown whakatipu public transport targeted rate $3.522 million in 2025/26 not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc prepared orc orc published main document pdf",
    "sortDate": "2025-06-01",
    "cover": {
      "src": "/covers/QTS-153.webp",
      "srcset": "/covers/QTS-153.webp 400w, /covers/QTS-153-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-153/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-153/QTS-153-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-154",
    "code": "QTS-154",
    "title": "ORC Long-term Plan 2024-34",
    "shortTitle": "ORC Long-term Plan 2024-34",
    "summary": "Otago Regional Council long-term plan 2024–34, including the Whakatipu public transport targeted rate and the Queenstown public transport business case.",
    "documentType": "Statutory plan",
    "documentForm": "Long-term plan",
    "year": 2025,
    "publishedDate": "2025-05",
    "documentStatus": "Adopted",
    "geographicScope": "Otago; Queenstown",
    "owner": "ORC",
    "citation": "ORC Long-term Plan 2024-34 (2025-05).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/rttlfnpg/ltp-24-34-12-may-2025-rdc-long-term-plan.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/rttlfnpg/ltp-24-34-12-may-2025-rdc-long-term-plan.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-154 orc long-term plan 2024-34 orc long-term plan 2024-34 otago regional council long-term plan 2024–34, including the whakatipu public transport targeted rate and the queenstown public transport business case. the plan sets the whakatipu public transport targeted rate at $3.707 million in 2024/25 and $5.568 million in 2026/27. it records a 20 percent general-rate allocation for public transport and repayment of existing whakatipu deficits over the first five years. long-term plan orc long-term plan 2024-34 (2025-05). otago; queenstown whakatipu public transport targeted rate $3.707 million in 2024/25 and $5.568 million in 2026/27 not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc prepared orc orc published main document pdf",
    "sortDate": "2025-05-01",
    "cover": {
      "src": "/covers/QTS-154.webp",
      "srcset": "/covers/QTS-154.webp 400w, /covers/QTS-154-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-154/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-154/QTS-154-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-155",
    "code": "QTS-155",
    "title": "ORC Transport Procurement Strategy 2024-2027",
    "shortTitle": "ORC Transport Procurement Strategy 2024-2027",
    "summary": "Otago Regional Council transport procurement strategy for 2024–2027, including the Queenstown bus contract units.",
    "documentType": "Statutory plan",
    "documentForm": "Procurement strategy",
    "year": 2024,
    "publishedDate": "2024",
    "documentStatus": "Final",
    "geographicScope": "Otago; Queenstown",
    "owner": "ORC",
    "citation": "ORC Transport Procurement Strategy 2024-2027 (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/ckgp2kx5/transport-procurement-strategy-2024-2027-v103-final.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/ckgp2kx5/transport-procurement-strategy-2024-2027-v103-final.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-155 orc transport procurement strategy 2024-2027 orc transport procurement strategy 2024-2027 otago regional council transport procurement strategy for 2024–2027, including the queenstown bus contract units. the strategy describes queenstown units 6 and 7, operated by ritchies, as nine and ten buses. procurement strategy orc transport procurement strategy 2024-2027 (2024). otago; queenstown not separately commissioned. this is an internal or corporate document. orc none statutory plan final 2024 bus scheduled bus and bus-priority public transport. orc orc prepared orc orc published main document pdf",
    "sortDate": "2024-01-01",
    "cover": {
      "src": "/covers/QTS-155.webp",
      "srcset": "/covers/QTS-155.webp 400w, /covers/QTS-155-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-155/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-155/QTS-155-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-156",
    "code": "QTS-156",
    "title": "Queenstown Electric Bus Depot Business Case – Final Draft (redacted)",
    "shortTitle": "Queenstown Electric Bus Depot Business Case",
    "summary": "Redacted final draft of a business case for a Queenstown electric bus depot, prepared for Otago Regional Council by Rationale and released on 6 March 2026.",
    "documentType": "Feasibility or modelling study",
    "documentForm": "Business case",
    "year": 2026,
    "publishedDate": "2026-03-06",
    "documentStatus": "Draft",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "ORC",
    "citation": "Queenstown Electric Bus Depot Business Case – Final Draft (redacted) (2026-03-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/5qwfhawy/electric-bus-depot-business-case-final-draft-redacted.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/5qwfhawy/electric-bus-depot-business-case-final-draft-redacted.pdf"
    ],
    "documentTypeCode": "feasibility-study",
    "topics": [
      "bus"
    ],
    "organisationIds": [
      "orc",
      "rationale"
    ],
    "searchText": "qts-156 queenstown electric bus depot business case – final draft (redacted) queenstown electric bus depot business case redacted final draft of a business case for a queenstown electric bus depot, prepared for otago regional council by rationale and released on 6 march 2026. the draft preferred leasing a queenstown airport corporation site at grant road / hawthorne drive, targeting delivery by november 2029, and joint procurement with the bus operations contract. it says resources and finances to progress delivery had not been allocated. business case queenstown electric bus depot business case – final draft (redacted) (2026-03-06). whakatipu basin; queenstown; frankton final draft, redacted. released 6 march 2026. not separately commissioned. this is an internal or corporate document. orc none feasibility or modelling study draft 2026 bus scheduled bus and bus-priority public transport. orc orc lead rationale rationale prepared main document pdf",
    "sortDate": "2026-03-06",
    "cover": {
      "src": "/covers/QTS-156.webp",
      "srcset": "/covers/QTS-156.webp 400w, /covers/QTS-156-2x.webp 800w",
      "width": 400,
      "height": 567
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-156/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-156/QTS-156-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-157",
    "code": "QTS-157",
    "title": "Private sector best placed to deliver Queenstown bus charging depot — ORC (media release)",
    "shortTitle": "Private sector best placed to deliver Queenstown",
    "summary": "Otago Regional Council media release, 6 March 2026. ORC will not lead an electric bus charging depot in Queenstown and will leave depot and charging facilities to the market.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2026,
    "publishedDate": "2026-03-06",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "ORC",
    "citation": "Private sector best placed to deliver Queenstown bus charging depot — ORC (media release) (2026-03-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/your-council/latest-news/news/2026/march/private-sector-best-placed-to-deliver-queenstown-bus-charging-depot-orc",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/your-council/latest-news/news/2026/march/private-sector-best-placed-to-deliver-queenstown-bus-charging-depot-orc"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-157 private sector best placed to deliver queenstown bus charging depot — orc (media release) private sector best placed to deliver queenstown otago regional council media release, 6 march 2026. orc will not lead an electric bus charging depot in queenstown and will leave depot and charging facilities to the market. the release records orc's decision not to lead development of an electric bus charging depot in queenstown. media release private sector best placed to deliver queenstown bus charging depot — orc (media release) (2026-03-06). whakatipu basin; queenstown; frankton web page captured 18 october 2026 not separately commissioned. this is an internal or corporate document. orc none media release recorded 2026 bus scheduled bus and bus-priority public transport. orc orc lead orc orc published main document pdf",
    "sortDate": "2026-03-06",
    "cover": {
      "src": "/covers/QTS-157.webp",
      "srcset": "/covers/QTS-157.webp 400w, /covers/QTS-157-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-157/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-157/QTS-157-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-158",
    "code": "QTS-158",
    "title": "QLDC Annual Plan 2026-2027 (adopted)",
    "shortTitle": "QLDC Annual Plan 2026-2027 (adopted)",
    "summary": "Queenstown Lakes District Council annual plan for 2026–27, year 3 of the Long Term Plan 2024–34, including Whakatipu transport projects budgeted at $500,000 or more.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2026,
    "publishedDate": "2026-06",
    "documentStatus": "Adopted",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "QLDC",
    "citation": "QLDC Annual Plan 2026-2027 (adopted) (2026-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/pobeufnf/qldcannual-plan_2026-2027-adopted.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/pobeufnf/qldcannual-plan_2026-2027-adopted.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-158 qldc annual plan 2026-2027 (adopted) qldc annual plan 2026-2027 (adopted) queenstown lakes district council annual plan for 2026–27, year 3 of the long term plan 2024–34, including whakatipu transport projects budgeted at $500,000 or more. capital expenditure is $36.8 million lower than year 3 of the long-term plan. transport projects of $500,000 or more total $22,937,954. the plan also records 131 new parking spaces and continued work on a district parking strategy. annual plan qldc annual plan 2026-2027 (adopted) (2026-06). whakatipu basin; queenstown; frankton transport projects of $500,000 or more total $22,937,954 in 2026/27 not separately commissioned. this is an internal or corporate document. qldc none statutory plan adopted 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-06-01",
    "cover": {
      "src": "/covers/QTS-158.webp",
      "srcset": "/covers/QTS-158.webp 400w, /covers/QTS-158-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-158/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-158/QTS-158-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-159",
    "code": "QTS-159",
    "title": "QLDC Annual Plan 2026-27 consultation – decision summary",
    "shortTitle": "QLDC Annual Plan 2026-27 consultation – decision",
    "summary": "Queenstown Lakes District Council's June 2026 summary of decisions on the Annual Plan 2026–27 consultation, including the adopted average rates increase.",
    "documentType": "Engagement report",
    "documentForm": "Decision summary",
    "year": 2026,
    "publishedDate": "2026-06",
    "documentStatus": "Final",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "QLDC",
    "citation": "QLDC Annual Plan 2026-27 consultation – decision summary (2026-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/lzglhw3a/qldc_annual-plan_consultation_decision-summary_jun26-final.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/lzglhw3a/qldc_annual-plan_consultation_decision-summary_jun26-final.pdf"
    ],
    "documentTypeCode": "engagement-report",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-159 qldc annual plan 2026-27 consultation – decision summary qldc annual plan 2026-27 consultation – decision queenstown lakes district council's june 2026 summary of decisions on the annual plan 2026–27 consultation, including the adopted average rates increase. after consultation, the average rates increase was reduced from 11.7 percent to 9.9 percent. decision summary qldc annual plan 2026-27 consultation – decision summary (2026-06). whakatipu basin; queenstown; frankton average rates increase reduced from 11.7 percent to 9.9 percent not separately commissioned. this is an internal or corporate document. qldc none engagement report final 2026 roads state highways, local roads and general traffic. qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-06-01",
    "cover": {
      "src": "/covers/QTS-159.webp",
      "srcset": "/covers/QTS-159.webp 400w, /covers/QTS-159-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-159/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-159/QTS-159-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-160",
    "code": "QTS-160",
    "title": "QLDC Council report 12 Dec 2024 – Transport funding options",
    "shortTitle": "QLDC Council report 12 Dec 2024 – Transport",
    "summary": "Queenstown Lakes District Council report, 12 December 2024, on transport funding options after the 2024–27 National Land Transport Programme allocation.",
    "documentType": "Board or committee paper",
    "documentForm": "Council report",
    "year": 2024,
    "publishedDate": "2024-12-12",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "QLDC",
    "citation": "QLDC Council report 12 Dec 2024 – Transport funding options (2024-12-12).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/t41divf1/4-transport-funding-options.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/t41divf1/4-transport-funding-options.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-160 qldc council report 12 dec 2024 – transport funding options qldc council report 12 dec 2024 – transport queenstown lakes district council report, 12 december 2024, on transport funding options after the 2024–27 national land transport programme allocation. the report says the nzta allocation was about $11.9 million less than the long-term plan had assumed, about $10.3 million of that in capital and about $1.6 million in operating funding. strategic projects named are a new arthurs point bridge and the capell avenue extension. council report qldc council report 12 dec 2024 – transport funding options (2024-12-12). whakatipu basin; queenstown; frankton nzta allocation about $11.9 million less than the long-term plan assumed not separately commissioned. this is an internal or corporate document. qldc none board or committee paper recorded 2024 roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared main document pdf",
    "sortDate": "2024-12-12",
    "cover": {
      "src": "/covers/QTS-160.webp",
      "srcset": "/covers/QTS-160.webp 400w, /covers/QTS-160-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-160/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-160/QTS-160-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-161",
    "code": "QTS-161",
    "title": "From the Office of the Mayor: QLDC Mayor John Glover sets up Mayoral Taskforce",
    "shortTitle": "From the Office of the Mayor: QLDC Mayor John",
    "summary": "Queenstown Lakes District Council media release, 31 July 2026, announcing a mayoral transport taskforce to work for three to six months on practical transport actions.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2026,
    "publishedDate": "2026-07-31",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "QLDC",
    "citation": "From the Office of the Mayor: QLDC Mayor John Glover sets up Mayoral Taskforce (2026-07-31).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/2026/july/from-the-office-of-the-mayor-qldc-mayor-john-glover-sets-up-mayoral-taskforce",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/2026/july/from-the-office-of-the-mayor-qldc-mayor-john-glover-sets-up-mayoral-taskforce"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-161 from the office of the mayor: qldc mayor john glover sets up mayoral taskforce from the office of the mayor: qldc mayor john queenstown lakes district council media release, 31 july 2026, announcing a mayoral transport taskforce to work for three to six months on practical transport actions. the mayor's statement says that even if every currently identified intervention is delivered, queenstown's transport network still fails. the taskforce is to agree principles, objectives, a work programme, outputs and membership. media release from the office of the mayor: qldc mayor john glover sets up mayoral taskforce (2026-07-31). whakatipu basin; queenstown; frankton web page captured 18 october 2026 not separately commissioned. this is an internal or corporate document. qldc none media release recorded 2026 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc published main document pdf",
    "sortDate": "2026-07-31",
    "cover": {
      "src": "/covers/QTS-161.webp",
      "srcset": "/covers/QTS-161.webp 400w, /covers/QTS-161-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-161/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-161/QTS-161-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-162",
    "code": "QTS-162",
    "title": "Joint Statement from Otago Central Lakes Mayors & Chair (Regional Deal signing paused)",
    "shortTitle": "Joint Statement from Otago Central Lakes Mayors &",
    "summary": "Joint statement, 27 August 2026, from the Central Otago and Queenstown Lakes mayors and the Otago Regional Council chair. The councils paused signing the Regional Deal so the accommodation-levy wording could be discussed again.",
    "documentType": "Media release",
    "documentForm": "Joint statement",
    "year": 2026,
    "publishedDate": "2026-08-27",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "Otago Central Lakes Mayors and Chair",
    "citation": "Joint Statement from Otago Central Lakes Mayors & Chair (Regional Deal signing paused) (2026-08-27).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/2026/august/joint-statement-from-otago-central-lakes-mayors-chair",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/2026/august/joint-statement-from-otago-central-lakes-mayors-chair"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "orc"
    ],
    "searchText": "qts-162 joint statement from otago central lakes mayors & chair (regional deal signing paused) joint statement from otago central lakes mayors & joint statement, 27 august 2026, from the central otago and queenstown lakes mayors and the otago regional council chair. the councils paused signing the regional deal so the accommodation-levy wording could be discussed again. the statement says the councils remain committed to the regional deal. they paused signing after a proposal to replace the commitment to explore an accommodation levy policy in 2027 with different wording. the text file is the library copy. joint statement joint statement from otago central lakes mayors & chair (regional deal signing paused) (2026-08-27). whakatipu basin; queenstown; frankton text capture, 18 october 2026 not separately commissioned. this is an internal or corporate document. otago central lakes mayors and chair none media release recorded 2026 roads state highways, local roads and general traffic. qldc qldc lead orc orc partner main document text",
    "sortDate": "2026-08-27",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-162/",
    "files": [
      {
        "label": "Main document",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-162/QTS-162-F1.txt"
      }
    ]
  },
  {
    "id": "qts-163",
    "code": "QTS-163",
    "title": "SH6 and Howards Drive intersection (project page)",
    "shortTitle": "SH6 and Howards Drive intersection (project page)",
    "summary": "NZTA project page for the SH6 and Howards Drive intersection, captured on 18 October 2026. It describes a signalised intersection expected by summer 2027/28.",
    "documentType": "Project brief",
    "documentForm": "Project page",
    "year": 2026,
    "publishedDate": "2026-10-18",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "SH6 and Howards Drive intersection (project page) (2026-10-18).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://nzta.govt.nz/projects/queenstown-package/sh6-and-howards-drive-intersection",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://nzta.govt.nz/projects/queenstown-package/sh6-and-howards-drive-intersection"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-163 sh6 and howards drive intersection (project page) sh6 and howards drive intersection (project page) nzta project page for the sh6 and howards drive intersection, captured on 18 october 2026. it describes a signalised intersection expected by summer 2027/28. the page says main construction starts in mid 2026, takes about 18 months, and the new intersection is expected to be in place by summer 2027/28. project page sh6 and howards drive intersection (project page) (2026-10-18). whakatipu basin; queenstown; frankton captured 18 october 2026 not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2026 roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-10-18",
    "cover": {
      "src": "/covers/QTS-163.webp",
      "srcset": "/covers/QTS-163.webp 400w, /covers/QTS-163-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-163/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-163/QTS-163-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-164",
    "code": "QTS-164",
    "title": "Queenstown Package (project page)",
    "shortTitle": "Queenstown Package (project page)",
    "summary": "NZTA project page for the Queenstown Package, captured on 18 October 2026. It describes the Frankton construction programme and estimated funding of $250 million.",
    "documentType": "Project brief",
    "documentForm": "Project page",
    "year": 2026,
    "publishedDate": "2026-10-18",
    "documentStatus": "Recorded",
    "geographicScope": "Whakatipu Basin; Queenstown; Frankton",
    "owner": "NZTA",
    "citation": "Queenstown Package (project page) (2026-10-18).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.nzta.govt.nz/projects/queenstown-package",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.nzta.govt.nz/projects/queenstown-package"
    ],
    "documentTypeCode": "project-brief",
    "topics": [
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta",
      "qldc"
    ],
    "searchText": "qts-164 queenstown package (project page) queenstown package (project page) nzta project page for the queenstown package, captured on 18 october 2026. it describes the frankton construction programme and estimated funding of $250 million. the page says construction is expected to take four years and is one third of the way through. the alliance is nzta, qldc, beca, wsp, downer and fulton hogan. project page queenstown package (project page) (2026-10-18). whakatipu basin; queenstown; frankton captured 18 october 2026 $250 million funding stated on the project page not separately commissioned. this is an internal or corporate document. nzta none project brief recorded 2026 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared qldc qldc partner nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-10-18",
    "cover": {
      "src": "/covers/QTS-164.webp",
      "srcset": "/covers/QTS-164.webp 400w, /covers/QTS-164-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-164/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-164/QTS-164-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-165",
    "code": "QTS-165",
    "title": "ORC Annual Report 2017/18",
    "shortTitle": "ORC Annual Report 2017/18",
    "summary": "ORC Annual Report 2017/18. Records launch of the new Wakatipu public transport network on 20 November 2017 and the Queenstown Transport Services targeted reserve movements.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2018,
    "publishedDate": "2018",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2017/18 (2018).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/8016/annual-report-2017-2018.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/8016/annual-report-2017-2018.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-165 orc annual report 2017/18 orc annual report 2017/18 orc annual report 2017/18. records launch of the new wakatipu public transport network on 20 november 2017 and the queenstown transport services targeted reserve movements. annual report orc annual report 2017/18 (2018). wakatipu basin; queenstown queenstown transport services reserve 2017/18: opening (35), in 6,642, out (6,524), closing 83 ($000) (p.89) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2018 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2018-01-01",
    "cover": {
      "src": "/covers/QTS-165.webp",
      "srcset": "/covers/QTS-165.webp 400w, /covers/QTS-165-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-165/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-165/QTS-165-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-166",
    "code": "QTS-166",
    "title": "ORC Annual Report 2018/19",
    "shortTitle": "ORC Annual Report 2018/19",
    "summary": "ORC Annual Report 2018/19, including the targeted-rate reserve note for Queenstown Transport Services.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2019,
    "publishedDate": "2019",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2018/19 (2019).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/7335/annual-report-2018-2019_digital.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/7335/annual-report-2018-2019_digital.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-166 orc annual report 2018/19 orc annual report 2018/19 orc annual report 2018/19, including the targeted-rate reserve note for queenstown transport services. annual report orc annual report 2018/19 (2019). wakatipu basin; queenstown reserve 2018/19: in 7,311, out (7,582), closing (188) ($000) (p.75) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2019 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2019-01-01",
    "cover": {
      "src": "/covers/QTS-166.webp",
      "srcset": "/covers/QTS-166.webp 400w, /covers/QTS-166-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-166/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-166/QTS-166-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-167",
    "code": "QTS-167",
    "title": "ORC Annual Report 2019/20",
    "shortTitle": "ORC Annual Report 2019/20",
    "summary": "ORC Annual Report 2019/20, including the Queenstown Transport Services reserve note.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2020,
    "publishedDate": "2020",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2019/20 (2020).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/9281/annual-report-2019-2020.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/9281/annual-report-2019-2020.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-167 orc annual report 2019/20 orc annual report 2019/20 orc annual report 2019/20, including the queenstown transport services reserve note. annual report orc annual report 2019/20 (2020). wakatipu basin; queenstown reserve 2019/20: in 7,096, out (7,267), closing (359) ($000) (p.128) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2020 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2020-01-01",
    "cover": {
      "src": "/covers/QTS-167.webp",
      "srcset": "/covers/QTS-167.webp 400w, /covers/QTS-167-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-167/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-167/QTS-167-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-168",
    "code": "QTS-168",
    "title": "ORC Annual Report 2020/21",
    "shortTitle": "ORC Annual Report 2020/21",
    "summary": "ORC Annual Report 2020/21. Reports that the Lake Wakatipu ferry trial commenced at a reduced level of service; Queenstown transport reserve note.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2021,
    "publishedDate": "2021",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2020/21 (2021).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/11089/otago-regional-council-annual-report-2020-2021.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/11089/otago-regional-council-annual-report-2020-2021.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-168 orc annual report 2020/21 orc annual report 2020/21 orc annual report 2020/21. reports that the lake wakatipu ferry trial commenced at a reduced level of service; queenstown transport reserve note. annual report orc annual report 2020/21 (2021). wakatipu basin; queenstown reserve 2020/21: in 8,029, out (8,513), closing (843) ($000) (p.102); ferry trial commenced (p.57) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2021 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2021-01-01",
    "cover": {
      "src": "/covers/QTS-168.webp",
      "srcset": "/covers/QTS-168.webp 400w, /covers/QTS-168-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-168/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-168/QTS-168-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-169",
    "code": "QTS-169",
    "title": "ORC Annual Report 2021/22",
    "shortTitle": "ORC Annual Report 2021/22",
    "summary": "ORC Annual Report 2021/22, including ferry patronage and the Queenstown transport reserve note.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2022,
    "publishedDate": "2022",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2021/22 (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/13969/annual-report-2021-2022.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/13969/annual-report-2021-2022.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-169 orc annual report 2021/22 orc annual report 2021/22 orc annual report 2021/22, including ferry patronage and the queenstown transport reserve note. annual report orc annual report 2021/22 (2022). wakatipu basin; queenstown reserve 2021/22: in 7,704, out (8,535), closing (1,674) ($000) (p.103); ferry patronage topped 60,000 (p.51) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2022 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2022-01-01",
    "cover": {
      "src": "/covers/QTS-169.webp",
      "srcset": "/covers/QTS-169.webp 400w, /covers/QTS-169-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-169/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-169/QTS-169-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-170",
    "code": "QTS-170",
    "title": "ORC Annual Report 2022/23",
    "shortTitle": "ORC Annual Report 2022/23",
    "summary": "ORC Annual Report 2022/23, including the Queenstown transport reserve note and commentary on the ferry trial net-cost arrangement.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2023,
    "publishedDate": "2023",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2022/23 (2023).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/15717/annual-report-2022-2023-web.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/15717/annual-report-2022-2023-web.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-170 orc annual report 2022/23 orc annual report 2022/23 orc annual report 2022/23, including the queenstown transport reserve note and commentary on the ferry trial net-cost arrangement. annual report orc annual report 2022/23 (2023). wakatipu basin; queenstown reserve 2022/23: in 10,281, out (10,714), closing (2,107) ($000) (p.130) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2023 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2023-01-01",
    "cover": {
      "src": "/covers/QTS-170.webp",
      "srcset": "/covers/QTS-170.webp 400w, /covers/QTS-170-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-170/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-170/QTS-170-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-171",
    "code": "QTS-171",
    "title": "ORC Annual Report 2023/24",
    "shortTitle": "ORC Annual Report 2023/24",
    "summary": "ORC Annual Report 2023/24, including the Queenstown transport reserve note.",
    "documentType": "Accountability report",
    "documentForm": "Annual report",
    "year": 2024,
    "publishedDate": "2024",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Report 2023/24 (2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/ki0nac3y/orc-signed-annual-report-2023-2024-web.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/ki0nac3y/orc-signed-annual-report-2023-2024-web.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-171 orc annual report 2023/24 orc annual report 2023/24 orc annual report 2023/24, including the queenstown transport reserve note. annual report orc annual report 2023/24 (2024). wakatipu basin; queenstown reserve 2023/24: in 11,281, out (11,408), closing (2,234) ($000) (p.130) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2024 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2024-01-01",
    "cover": {
      "src": "/covers/QTS-171.webp",
      "srcset": "/covers/QTS-171.webp 400w, /covers/QTS-171-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-171/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-171/QTS-171-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-172",
    "code": "QTS-172",
    "title": "ORC Annual Plan 2017-18",
    "shortTitle": "ORC Annual Plan 2017-18",
    "summary": "ORC Annual Plan 2017-18. Introduces subsidised Wakatipu bus services and the $2 GoCard fare trial, funded by ORC targeted rates, NZTA grants and a QLDC contribution.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2017,
    "publishedDate": "2017-07",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2017-18 (2017-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/1529/annual-plan-2017-18.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/1529/annual-plan-2017-18.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-172 orc annual plan 2017-18 orc annual plan 2017-18 orc annual plan 2017-18. introduces subsidised wakatipu bus services and the $2 gocard fare trial, funded by orc targeted rates, nzta grants and a qldc contribution. annual plan orc annual plan 2017-18 (2017-07). wakatipu basin; queenstown wakatipu passenger transport rate $690,000 allocated (p.64); +$600,000 queenstown pt targeted rate vs ltp (p.7) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2017 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2017-07-01",
    "cover": {
      "src": "/covers/QTS-172.webp",
      "srcset": "/covers/QTS-172.webp 400w, /covers/QTS-172-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-172/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-172/QTS-172-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-173",
    "code": "QTS-173",
    "title": "ORC Annual Plan 2019-20",
    "shortTitle": "ORC Annual Plan 2019-20",
    "summary": "ORC Annual Plan 2019-20 with Wakatipu public passenger transport budget, reserve forecast and targeted rate.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2019,
    "publishedDate": "2019-07",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2019-20 (2019-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/7001/annual-plan-2019-20.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/7001/annual-plan-2019-20.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-173 orc annual plan 2019-20 orc annual plan 2019-20 orc annual plan 2019-20 with wakatipu public passenger transport budget, reserve forecast and targeted rate. annual plan orc annual plan 2019-20 (2019-07). wakatipu basin; queenstown wakatipu pt expenditure $6.855m ap 2019-20 (p.36); rate $972,000 allocated (p.62) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2019 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2019-07-01",
    "cover": {
      "src": "/covers/QTS-173.webp",
      "srcset": "/covers/QTS-173.webp 400w, /covers/QTS-173-2x.webp 800w",
      "width": 400,
      "height": 556
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-173/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-173/QTS-173-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-174",
    "code": "QTS-174",
    "title": "ORC Annual Plan 2020-21",
    "shortTitle": "ORC Annual Plan 2020-21",
    "summary": "ORC Annual Plan 2020-21, including funding to trial a Lake Wakatipu passenger ferry.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2020,
    "publishedDate": "2020-06",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2020-21 (2020-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/8679/annual-plan-2020-21_digital.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/8679/annual-plan-2020-21_digital.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-174 orc annual plan 2020-21 orc annual plan 2020-21 orc annual plan 2020-21, including funding to trial a lake wakatipu passenger ferry. annual plan orc annual plan 2020-21 (2020-06). wakatipu basin; queenstown wakatipu pt expenditure $7.814m incl. ferry trial (p.37); rate $1,139,000 allocated (p.64) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2020 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2020-06-01",
    "cover": {
      "src": "/covers/QTS-174.webp",
      "srcset": "/covers/QTS-174.webp 400w, /covers/QTS-174-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-174/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-174/QTS-174-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-175",
    "code": "QTS-175",
    "title": "ORC Annual Plan 2022-23",
    "shortTitle": "ORC Annual Plan 2022-23",
    "summary": "ORC Annual Plan 2022-23 with Queenstown public transport budget and reserve forecast.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2022,
    "publishedDate": "2022-07",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2022-23 (2022-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/12708/orc-annual-plan-report-2022-23.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/12708/orc-annual-plan-report-2022-23.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-175 orc annual plan 2022-23 orc annual plan 2022-23 orc annual plan 2022-23 with queenstown public transport budget and reserve forecast. annual plan orc annual plan 2022-23 (2022-07). wakatipu basin; queenstown queenstown pt expenditure $11.261m (p.32) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2022 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2022-07-01",
    "cover": {
      "src": "/covers/QTS-175.webp",
      "srcset": "/covers/QTS-175.webp 400w, /covers/QTS-175-2x.webp 800w",
      "width": 400,
      "height": 562
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-175/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-175/QTS-175-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-176",
    "code": "QTS-176",
    "title": "ORC Annual Plan 2023-24",
    "shortTitle": "ORC Annual Plan 2023-24",
    "summary": "ORC Annual Plan 2023-24 with Wakatipu public transport budget, reserve forecast and targeted rate.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2023,
    "publishedDate": "2023-06",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2023-24 (2023-06).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/14502/ap-2023-web.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/14502/ap-2023-web.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-176 orc annual plan 2023-24 orc annual plan 2023-24 orc annual plan 2023-24 with wakatipu public transport budget, reserve forecast and targeted rate. annual plan orc annual plan 2023-24 (2023-06). wakatipu basin; queenstown pt wakatipu expenditure $10.532m (p.37); rate $2,367,052 allocated (p.62) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2023 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2023-06-01",
    "cover": {
      "src": "/covers/QTS-176.webp",
      "srcset": "/covers/QTS-176.webp 400w, /covers/QTS-176-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-176/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-176/QTS-176-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-177",
    "code": "QTS-177",
    "title": "ORC Annual Plan 2026-27 (adopted 29 Apr 2026)",
    "shortTitle": "ORC Annual Plan 2026-27 (adopted 29 Apr 2026)",
    "summary": "ORC Annual Plan 2026-27, adopted 29 April 2026. Queenstown PT targeted rate rises 23.1%; Queenstown ferry service expansion not proceeding after NZTA declined co-funding.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2026,
    "publishedDate": "2026-04-30",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Annual Plan 2026-27 (adopted 29 Apr 2026) (2026-04-30).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/liqnopkd/annual_plan_2026_final_2026-04-30.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/liqnopkd/annual_plan_2026_final_2026-04-30.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-177 orc annual plan 2026-27 (adopted 29 apr 2026) orc annual plan 2026-27 (adopted 29 apr 2026) orc annual plan 2026-27, adopted 29 april 2026. queenstown pt targeted rate rises 23.1%; queenstown ferry service expansion not proceeding after nzta declined co-funding. annual plan orc annual plan 2026-27 (adopted 29 apr 2026) (2026-04-30). wakatipu basin; queenstown whakatipu pt targeted rate $4.335m (ltp $5.568m) (p.93); $4,985,806 incl gst (p.90) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2026 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2026-04-30",
    "cover": {
      "src": "/covers/QTS-177.webp",
      "srcset": "/covers/QTS-177.webp 400w, /covers/QTS-177-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-177/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-177/QTS-177-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-178",
    "code": "QTS-178",
    "title": "ORC Long-Term Plan 2021-31",
    "shortTitle": "ORC Long-Term Plan 2021-31",
    "summary": "ORC Long-Term Plan 2021-31, with 10-year forecasts for the Wakatipu public transport targeted rate and reserve.",
    "documentType": "Statutory plan",
    "documentForm": "Long-term plan",
    "year": 2021,
    "publishedDate": "2021",
    "documentStatus": "Adopted",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Long-Term Plan 2021-31 (2021).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/10139/orc-longtermplan-web-144dpi.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/10139/orc-longtermplan-web-144dpi.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-178 orc long-term plan 2021-31 orc long-term plan 2021-31 orc long-term plan 2021-31, with 10-year forecasts for the wakatipu public transport targeted rate and reserve. long-term plan orc long-term plan 2021-31 (2021). wakatipu basin; queenstown wakatipu pt rate forecast $1.29m (2021/22) to $4.579m (2030/31) (p.73) not separately commissioned. this is an internal or corporate document. orc none statutory plan adopted 2021 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2021-01-01",
    "cover": {
      "src": "/covers/QTS-178.webp",
      "srcset": "/covers/QTS-178.webp 400w, /covers/QTS-178-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-178/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-178/QTS-178-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-179",
    "code": "QTS-179",
    "title": "ORC Rates increase summary 2022/23",
    "shortTitle": "ORC Rates increase summary 2022/23",
    "summary": "ORC summary of 2022/23 rate changes by rate type.",
    "documentType": "Accountability report",
    "documentForm": "Rates summary",
    "year": 2022,
    "publishedDate": "2022",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Rates increase summary 2022/23 (2022).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://orc.govt.nz/media/12033/otago-regional-council-rates-increase-summary.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://orc.govt.nz/media/12033/otago-regional-council-rates-increase-summary.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-179 orc rates increase summary 2022/23 orc rates increase summary 2022/23 orc summary of 2022/23 rate changes by rate type. rates summary orc rates increase summary 2022/23 (2022). wakatipu basin; queenstown queenstown transport rate $1.290m to $1.737m (+34.6%) (p.1) not separately commissioned. this is an internal or corporate document. orc none accountability report final 2022 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2022-01-01",
    "cover": {
      "src": "/covers/QTS-179.webp",
      "srcset": "/covers/QTS-179.webp 400w, /covers/QTS-179-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-179/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-179/QTS-179-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-180",
    "code": "QTS-180",
    "title": "ORC Finance and Corporate Committee 1 Aug 2019 – Agenda with attachments",
    "shortTitle": "ORC Finance and Corporate Committee 1 Aug 2019",
    "summary": "ORC Finance and Corporate Committee agenda, 1 August 2019, with Queenstown network performance and 2018/19 fare revenue and patronage.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2019,
    "publishedDate": "2019-08-01",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance and Corporate Committee 1 Aug 2019 – Agenda with attachments (2019-08-01).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/7042/finance-and-corp-w-attm-20190801.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/7042/finance-and-corp-w-attm-20190801.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-180 orc finance and corporate committee 1 aug 2019 – agenda with attachments orc finance and corporate committee 1 aug 2019 orc finance and corporate committee agenda, 1 august 2019, with queenstown network performance and 2018/19 fare revenue and patronage. committee agenda orc finance and corporate committee 1 aug 2019 – agenda with attachments (2019-08-01). wakatipu basin; queenstown 2018/19 queenstown fare revenue $3,519,571; patronage 1,467,778 (p.33) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2019 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2019-08-01",
    "cover": {
      "src": "/covers/QTS-180.webp",
      "srcset": "/covers/QTS-180.webp 400w, /covers/QTS-180-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-180/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-180/QTS-180-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-181",
    "code": "QTS-181",
    "title": "ORC Finance Committee 26 Aug 2020 – Agenda",
    "shortTitle": "ORC Finance Committee 26 Aug 2020 – Agenda",
    "summary": "ORC Finance Committee agenda, 26 August 2020, with expenditure and funding by activity for the year ended 30 June 2020.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2020,
    "publishedDate": "2020-08-26",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 26 Aug 2020 – Agenda (2020-08-26).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/8877/agenda-finance-committee-20200826.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/8877/agenda-finance-committee-20200826.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-181 orc finance committee 26 aug 2020 – agenda orc finance committee 26 aug 2020 – agenda orc finance committee agenda, 26 august 2020, with expenditure and funding by activity for the year ended 30 june 2020. committee agenda orc finance committee 26 aug 2020 – agenda (2020-08-26). wakatipu basin; queenstown pt wakatipu 2019/20: expenditure 7,003; targeted rates 854; grants 1,858; other income 4,231 ($000) (p.110) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2020 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2020-08-26",
    "cover": {
      "src": "/covers/QTS-181.webp",
      "srcset": "/covers/QTS-181.webp 400w, /covers/QTS-181-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-181/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-181/QTS-181-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-182",
    "code": "QTS-182",
    "title": "ORC Finance Committee 25 Aug 2021 – Agenda",
    "shortTitle": "ORC Finance Committee 25 Aug 2021 – Agenda",
    "summary": "ORC Finance Committee agenda, 25 August 2021, with the 2020/21 activity financial detail.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2021,
    "publishedDate": "2021-08-25",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 25 Aug 2021 – Agenda (2021-08-25).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/10180/agenda-finance-20210825.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/10180/agenda-finance-20210825.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-182 orc finance committee 25 aug 2021 – agenda orc finance committee 25 aug 2021 – agenda orc finance committee agenda, 25 august 2021, with the 2020/21 activity financial detail. committee agenda orc finance committee 25 aug 2021 – agenda (2021-08-25). wakatipu basin; queenstown pt wakatipu 2020/21: expenditure 7,424; targeted rates 998; grants 1,909; other income 4,099 ($000) (p.83) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2021 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2021-08-25",
    "cover": {
      "src": "/covers/QTS-182.webp",
      "srcset": "/covers/QTS-182.webp 400w, /covers/QTS-182-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-182/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-182/QTS-182-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-183",
    "code": "QTS-183",
    "title": "ORC Finance Committee 25 Aug 2022 – Agenda",
    "shortTitle": "ORC Finance Committee 25 Aug 2022 – Agenda",
    "summary": "ORC Finance Committee agenda, 25 August 2022, Quarterly Report to 30 June 2022, with PT Wakatipu revenue by type and variance commentary.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2022,
    "publishedDate": "2022-08-25",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 25 Aug 2022 – Agenda (2022-08-25).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/12770/agenda-finance-20220825.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/12770/agenda-finance-20220825.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-183 orc finance committee 25 aug 2022 – agenda orc finance committee 25 aug 2022 – agenda orc finance committee agenda, 25 august 2022, quarterly report to 30 june 2022, with pt wakatipu revenue by type and variance commentary. committee agenda orc finance committee 25 aug 2022 – agenda (2022-08-25). wakatipu basin; queenstown pt wakatipu 2021/22: expenditure 8,497; targeted rates 1,298; grants 4,316; other income 2,089 ($000) (pp.50–51) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2022 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2022-08-25",
    "cover": {
      "src": "/covers/QTS-183.webp",
      "srcset": "/covers/QTS-183.webp 400w, /covers/QTS-183-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-183/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-183/QTS-183-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-184",
    "code": "QTS-184",
    "title": "ORC Finance Committee 24 Aug 2023 – Agenda",
    "shortTitle": "ORC Finance Committee 24 Aug 2023 – Agenda",
    "summary": "ORC Finance Committee agenda, 24 August 2023, Quarterly Report to 30 June 2023, with PT Whakatipu revenue by type and variance commentary.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2023,
    "publishedDate": "2023-08-24",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 24 Aug 2023 – Agenda (2023-08-24).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/14854/20230824-finance-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/14854/20230824-finance-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-184 orc finance committee 24 aug 2023 – agenda orc finance committee 24 aug 2023 – agenda orc finance committee agenda, 24 august 2023, quarterly report to 30 june 2023, with pt whakatipu revenue by type and variance commentary. committee agenda orc finance committee 24 aug 2023 – agenda (2023-08-24). wakatipu basin; queenstown pt wakatipu 2022/23: expenditure 10,667; targeted rates 1,745; grants 6,094; other income 2,441 ($000) (pp.20–21) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2023 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2023-08-24",
    "cover": {
      "src": "/covers/QTS-184.webp",
      "srcset": "/covers/QTS-184.webp 400w, /covers/QTS-184-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-184/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-184/QTS-184-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-185",
    "code": "QTS-185",
    "title": "ORC Finance Committee 8 Aug 2024 – Agenda",
    "shortTitle": "ORC Finance Committee 8 Aug 2024 – Agenda",
    "summary": "ORC Finance Committee agenda, 8 August 2024, Quarterly Report to 30 June 2024.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2024,
    "publishedDate": "2024-08-08",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 8 Aug 2024 – Agenda (2024-08-08).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/m5rhltol/20240808-finance-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/m5rhltol/20240808-finance-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-185 orc finance committee 8 aug 2024 – agenda orc finance committee 8 aug 2024 – agenda orc finance committee agenda, 8 august 2024, quarterly report to 30 june 2024. committee agenda orc finance committee 8 aug 2024 – agenda (2024-08-08). wakatipu basin; queenstown pt whakatipu 2023/24: revenue 11,281; expenditure 11,257 ($000) (p.30); fares $732k above $3.5m budget (p.20) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2024 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2024-08-08",
    "cover": {
      "src": "/covers/QTS-185.webp",
      "srcset": "/covers/QTS-185.webp 400w, /covers/QTS-185-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-185/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-185/QTS-185-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-186",
    "code": "QTS-186",
    "title": "ORC Finance Committee 28 Aug 2025 – Agenda",
    "shortTitle": "ORC Finance Committee 28 Aug 2025 – Agenda",
    "summary": "ORC Finance Committee agenda, 28 August 2025, Quarterly Finance Report to 30 June 2025.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee agenda",
    "year": 2025,
    "publishedDate": "2025-08-28",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Finance Committee 28 Aug 2025 – Agenda (2025-08-28).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/s5jjqcol/20250828-finance-committee-agenda.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/s5jjqcol/20250828-finance-committee-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-186 orc finance committee 28 aug 2025 – agenda orc finance committee 28 aug 2025 – agenda orc finance committee agenda, 28 august 2025, quarterly finance report to 30 june 2025. committee agenda orc finance committee 28 aug 2025 – agenda (2025-08-28). wakatipu basin; queenstown pt wakatipu 2024/25 surplus $850k vs $331k budget; nzta subsidies $1.521m below budget (pp.10–11) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2025-08-28",
    "cover": {
      "src": "/covers/QTS-186.webp",
      "srcset": "/covers/QTS-186.webp 400w, /covers/QTS-186-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-186/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-186/QTS-186-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-187",
    "code": "QTS-187",
    "title": "ORC Draft Annual Plan 2026-27 (Revised LTP Yr3) – Council briefing slides Feb 2026",
    "shortTitle": "ORC Draft Annual Plan 2026-27 (Revised LTP Yr3)",
    "summary": "ORC Council briefing slides, February 2026, on the draft Annual Plan 2026-27 (revised LTP year 3), including PT Whakatipu revenue by type.",
    "documentType": "Board or committee paper",
    "documentForm": "Council briefing",
    "year": 2026,
    "publishedDate": "2026-02",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Draft Annual Plan 2026-27 (Revised LTP Yr3) – Council briefing slides Feb 2026 (2026-02).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/z1xpiyfy/ap-slides-for-february-2026-council-briefing_revised-timing.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/z1xpiyfy/ap-slides-for-february-2026-council-briefing_revised-timing.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-187 orc draft annual plan 2026-27 (revised ltp yr3) – council briefing slides feb 2026 orc draft annual plan 2026-27 (revised ltp yr3) orc council briefing slides, february 2026, on the draft annual plan 2026-27 (revised ltp year 3), including pt whakatipu revenue by type. council briefing orc draft annual plan 2026-27 (revised ltp yr3) – council briefing slides feb 2026 (2026-02). wakatipu basin; queenstown pt whakatipu ap 2025/26: rates 4,286; subsidies 5,126; fees 4,366; opex 13,897 ($000) (p.20) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2026 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2026-02-01",
    "cover": {
      "src": "/covers/QTS-187.webp",
      "srcset": "/covers/QTS-187.webp 400w, /covers/QTS-187-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-187/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-187/QTS-187-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-188",
    "code": "QTS-188",
    "title": "Otago Regional Public Transport Plan 2021-2031",
    "shortTitle": "Otago Regional Public Transport Plan 2021-2031",
    "summary": "Otago Regional Public Transport Plan 2021-2031, including the farebox recovery policy.",
    "documentType": "Statutory plan",
    "documentForm": "Regional public transport plan",
    "year": 2021,
    "publishedDate": "2021-07",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "Otago Regional Public Transport Plan 2021-2031 (2021-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/10128/orc_rtp_document_final-july-2021_online.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/10128/orc_rtp_document_final-july-2021_online.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-188 otago regional public transport plan 2021-2031 otago regional public transport plan 2021-2031 otago regional public transport plan 2021-2031, including the farebox recovery policy. regional public transport plan otago regional public transport plan 2021-2031 (2021-07). wakatipu basin; queenstown orc intends to ensure a 40–50% farebox recovery is met, applied flexibly (p.63) not separately commissioned. this is an internal or corporate document. orc none statutory plan final 2021 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2021-07-01",
    "cover": {
      "src": "/covers/QTS-188.webp",
      "srcset": "/covers/QTS-188.webp 400w, /covers/QTS-188-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-188/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-188/QTS-188-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-189",
    "code": "QTS-189",
    "title": "ORC Council 23 Jul 2025 – Minutes",
    "shortTitle": "ORC Council 23 Jul 2025 – Minutes",
    "summary": "ORC Council minutes, 23 July 2025. The award of the Lake Whakatipu Ferry Service Contract was taken in public-excluded session.",
    "documentType": "Board or committee paper",
    "documentForm": "Council minutes",
    "year": 2025,
    "publishedDate": "2025-07-23",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC Council 23 Jul 2025 – Minutes (2025-07-23).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/media/qeuleah0/20250723-council-minutes.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/qeuleah0/20250723-council-minutes.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-189 orc council 23 jul 2025 – minutes orc council 23 jul 2025 – minutes orc council minutes, 23 july 2025. the award of the lake whakatipu ferry service contract was taken in public-excluded session. council minutes orc council 23 jul 2025 – minutes (2025-07-23). wakatipu basin; queenstown item 3.2 award of lake whakatipu ferry service contract (public excluded) not separately commissioned. this is an internal or corporate document. orc none board or committee paper recorded 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf",
    "sortDate": "2025-07-23",
    "cover": {
      "src": "/covers/QTS-189.webp",
      "srcset": "/covers/QTS-189.webp 400w, /covers/QTS-189-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-189/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-189/QTS-189-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-190",
    "code": "QTS-190",
    "title": "LGOIMA SR.5793 PTOM patronage, fare & subsidy information (FYI request 31532) – original release, revised response xlsx, Council 25 Mar 2026 extract",
    "shortTitle": "LGOIMA SR.5793 PTOM patronage, fare & subsidy",
    "summary": "ORC LGOIMA response SR.5793 on PTOM unit patronage, fare revenue and costs 2020/21–2023/24, with a revised spreadsheet and a Council agenda extract on Q1–Q2 2025/26 PT performance.",
    "documentType": "Official information release",
    "documentForm": "LGOIMA response",
    "year": 2025,
    "publishedDate": "2025-10-13",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "LGOIMA SR.5793 PTOM patronage, fare & subsidy information (FYI request 31532) – original release, revised response xlsx, Council 25 Mar 2026 extract (2025-10-13).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://fyi.org.nz/request/31532-ptom-unit-patronage-fare-and-subsidy-information-for-otago",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://fyi.org.nz/request/31532-ptom-unit-patronage-fare-and-subsidy-information-for-otago"
    ],
    "documentTypeCode": "official-information",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-190 lgoima sr.5793 ptom patronage, fare & subsidy information (fyi request 31532) – original release, revised response xlsx, council 25 mar 2026 extract lgoima sr.5793 ptom patronage, fare & subsidy orc lgoima response sr.5793 on ptom unit patronage, fare revenue and costs 2020/21–2023/24, with a revised spreadsheet and a council agenda extract on q1–q2 2025/26 pt performance. lgoima response lgoima sr.5793 ptom patronage, fare & subsidy information (fyi request 31532) – original release, revised response xlsx, council 25 mar 2026 extract (2025-10-13). wakatipu basin; queenstown revised later queenstown bus contract costs (units 6+7) $5.65m–$7.72m 2020/21–2023/24 (revised); original release gives $5.80m–$7.96m not separately commissioned. this is an internal or corporate document. orc none official information release recorded 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf spreadsheet spreadsheet attachment pdf",
    "sortDate": "2025-10-13",
    "cover": {
      "src": "/covers/QTS-190.webp",
      "srcset": "/covers/QTS-190.webp 400w, /covers/QTS-190-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-190/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-190/QTS-190-F1.pdf"
      },
      {
        "label": "Spreadsheet",
        "kind": "xlsx",
        "url": "https://files.movequeenstown.nz/library/QTS-190/QTS-190-F2.xlsx"
      },
      {
        "label": "Attachment",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-190/QTS-190-F3.pdf"
      }
    ]
  },
  {
    "id": "qts-191",
    "code": "QTS-191",
    "title": "LGOIMA response A1421319: fare revenue, cost and patronage (FYI request 14121)",
    "shortTitle": "LGOIMA response A1421319: fare revenue, cost",
    "summary": "ORC LGOIMA response of 11 December 2020 with monthly patronage and fare revenue (Jan 2018–Dec 2020) and monthly contract payments.",
    "documentType": "Official information release",
    "documentForm": "LGOIMA response",
    "year": 2020,
    "publishedDate": "2020-12-11",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "LGOIMA response A1421319: fare revenue, cost and patronage (FYI request 14121) (2020-12-11).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://fyi.org.nz/request/14121-fare-revenue-cost-and-patronage-for-otago-pt-bus-and-rail-services",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://fyi.org.nz/request/14121-fare-revenue-cost-and-patronage-for-otago-pt-bus-and-rail-services"
    ],
    "documentTypeCode": "official-information",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-191 lgoima response a1421319: fare revenue, cost and patronage (fyi request 14121) lgoima response a1421319: fare revenue, cost orc lgoima response of 11 december 2020 with monthly patronage and fare revenue (jan 2018–dec 2020) and monthly contract payments. lgoima response lgoima response a1421319: fare revenue, cost and patronage (fyi request 14121) (2020-12-11). wakatipu basin; queenstown unit 6 monthly payment $272,500; unit 7 $156,107.67 not separately commissioned. this is an internal or corporate document. orc none official information release recorded 2020 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf spreadsheet spreadsheet",
    "sortDate": "2020-12-11",
    "cover": {
      "src": "/covers/QTS-191.webp",
      "srcset": "/covers/QTS-191.webp 400w, /covers/QTS-191-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-191/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-191/QTS-191-F1.pdf"
      },
      {
        "label": "Spreadsheet",
        "kind": "xlsx",
        "url": "https://files.movequeenstown.nz/library/QTS-191/QTS-191-F2.xlsx"
      }
    ]
  },
  {
    "id": "qts-192",
    "code": "QTS-192",
    "title": "ORC launches expanded Queenstown Ferries service (media release)",
    "shortTitle": "ORC launches expanded Queenstown Ferries service",
    "summary": "ORC media release: expanded Queenstown Ferries service under new operator Watersports Ltd.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2025,
    "publishedDate": "2025-09-22",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC launches expanded Queenstown Ferries service (media release) (2025-09-22).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/your-council/latest-news/news/2025/september/orc-launches-expanded-queenstown-ferries-service",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/your-council/latest-news/news/2025/september/orc-launches-expanded-queenstown-ferries-service"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-192 orc launches expanded queenstown ferries service (media release) orc launches expanded queenstown ferries service orc media release: expanded queenstown ferries service under new operator watersports ltd. media release orc launches expanded queenstown ferries service (media release) (2025-09-22). wakatipu basin; queenstown contract awarded to watersports ltd july 2025; 2024/25 ferry patronage 71,123 not separately commissioned. this is an internal or corporate document. orc none media release recorded 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf text capture text",
    "sortDate": "2025-09-22",
    "cover": {
      "src": "/covers/QTS-192.webp",
      "srcset": "/covers/QTS-192.webp 400w, /covers/QTS-192-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-192/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-192/QTS-192-F1.pdf"
      },
      {
        "label": "Text capture",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-192/QTS-192-F1.txt"
      }
    ]
  },
  {
    "id": "qts-193",
    "code": "QTS-193",
    "title": "ORC to consult on Lake Wakatipu public ferry service trial (media release)",
    "shortTitle": "ORC to consult on Lake Wakatipu public ferry",
    "summary": "ORC media release: consultation on an 18-month Lake Wakatipu public ferry trial and targeted-rate options.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2020,
    "publishedDate": "2020-04-09",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC to consult on Lake Wakatipu public ferry service trial (media release) (2020-04-09).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/your-council/latest-news/news/2020/april/orc-to-consult-on-lake-wakatipu-public-ferry-service-trial",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/your-council/latest-news/news/2020/april/orc-to-consult-on-lake-wakatipu-public-ferry-service-trial"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-193 orc to consult on lake wakatipu public ferry service trial (media release) orc to consult on lake wakatipu public ferry orc media release: consultation on an 18-month lake wakatipu public ferry trial and targeted-rate options. media release orc to consult on lake wakatipu public ferry service trial (media release) (2020-04-09). wakatipu basin; queenstown proposed january 2021 start; three targeted rate options not separately commissioned. this is an internal or corporate document. orc none media release recorded 2020 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf text capture text",
    "sortDate": "2020-04-09",
    "cover": {
      "src": "/covers/QTS-193.webp",
      "srcset": "/covers/QTS-193.webp 400w, /covers/QTS-193-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-193/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-193/QTS-193-F1.pdf"
      },
      {
        "label": "Text capture",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-193/QTS-193-F1.txt"
      }
    ]
  },
  {
    "id": "qts-194",
    "code": "QTS-194",
    "title": "ORC's Bee Card links buses and boats – QT style (media release)",
    "shortTitle": "ORC's Bee Card links buses and boats – QT style",
    "summary": "ORC media release: Bee Card accepted on Queenstown Ferries from 26 October 2022; ORC part-subsidising RealNZ since mid-2021.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2022,
    "publishedDate": "2022-10-25",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "ORC's Bee Card links buses and boats – QT style (media release) (2022-10-25).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/your-council/latest-news/news/2022/october/orc-s-bee-card-links-buses-and-boats-qt-style",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/your-council/latest-news/news/2022/october/orc-s-bee-card-links-buses-and-boats-qt-style"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-194 orc's bee card links buses and boats – qt style (media release) orc's bee card links buses and boats – qt style orc media release: bee card accepted on queenstown ferries from 26 october 2022; orc part-subsidising realnz since mid-2021. media release orc's bee card links buses and boats – qt style (media release) (2022-10-25). wakatipu basin; queenstown bee card ferry fare $5 (half price) not separately commissioned. this is an internal or corporate document. orc none media release recorded 2022 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf text capture text",
    "sortDate": "2022-10-25",
    "cover": {
      "src": "/covers/QTS-194.webp",
      "srcset": "/covers/QTS-194.webp 400w, /covers/QTS-194-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-194/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-194/QTS-194-F1.pdf"
      },
      {
        "label": "Text capture",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-194/QTS-194-F1.txt"
      }
    ]
  },
  {
    "id": "qts-195",
    "code": "QTS-195",
    "title": "Wakatipu bus network subsidies confirmed (media release)",
    "shortTitle": "Wakatipu bus network subsidies confirmed",
    "summary": "ORC media release: ORC and QLDC confirm funding for the subsidised Wakatipu bus network and $2 fare trial, alongside NZTA funding.",
    "documentType": "Media release",
    "documentForm": "Media release",
    "year": 2017,
    "publishedDate": "2017-06-29",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "ORC",
    "citation": "Wakatipu bus network subsidies confirmed (media release) (2017-06-29).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.orc.govt.nz/your-council/latest-news/news/2017/june/wakatipu-bus-network-subsidies-confirmed",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/your-council/latest-news/news/2017/june/wakatipu-bus-network-subsidies-confirmed"
    ],
    "documentTypeCode": "media-release",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-195 wakatipu bus network subsidies confirmed (media release) wakatipu bus network subsidies confirmed orc media release: orc and qldc confirm funding for the subsidised wakatipu bus network and $2 fare trial, alongside nzta funding. media release wakatipu bus network subsidies confirmed (media release) (2017-06-29). wakatipu basin; queenstown $2 fare trial funded by orc and qldc targeted rates plus nzta not separately commissioned. this is an internal or corporate document. orc none media release recorded 2017 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. orc orc lead orc orc prepared orc orc published main document pdf text capture text",
    "sortDate": "2017-06-29",
    "cover": {
      "src": "/covers/QTS-195.webp",
      "srcset": "/covers/QTS-195.webp 400w, /covers/QTS-195-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-195/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-195/QTS-195-F1.pdf"
      },
      {
        "label": "Text capture",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-195/QTS-195-F1.txt"
      }
    ]
  },
  {
    "id": "qts-196",
    "code": "QTS-196",
    "title": "QLDC dishes out $1.35m in parking fines in four months (Crux)",
    "shortTitle": "QLDC dishes out $1.35m in parking fines in four",
    "summary": "Crux news article on QLDC parking fines, quoting QLDC that parking revenue covers a $700k contribution to ORC for the bus subsidy.",
    "documentType": "Community report",
    "documentForm": "News article",
    "year": 2024,
    "publishedDate": "2024-06-07",
    "documentStatus": "Recorded",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "Community organisation",
    "citation": "QLDC dishes out $1.35m in parking fines in four months (Crux) (2024-06-07).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://crux.org.nz/crux-news/2-3-million-collected-in-queenstown-parking-fines-in-2023",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://crux.org.nz/crux-news/2-3-million-collected-in-queenstown-parking-fines-in-2023"
    ],
    "documentTypeCode": "community-report",
    "topics": [
      "bus",
      "parking"
    ],
    "organisationIds": [
      "crux-publishing"
    ],
    "searchText": "qts-196 qldc dishes out $1.35m in parking fines in four months (crux) qldc dishes out $1.35m in parking fines in four crux news article on qldc parking fines, quoting qldc that parking revenue covers a $700k contribution to orc for the bus subsidy. news article qldc dishes out $1.35m in parking fines in four months (crux) (2024-06-07). wakatipu basin; queenstown qldc contribution to orc $700k for bus subsidy (as quoted) not separately commissioned. this is an internal or corporate document. community organisation none community report recorded 2024 bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. crux publishing crux publishing prepared crux publishing crux publishing published main document text",
    "sortDate": "2024-06-07",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-196/",
    "files": [
      {
        "label": "Main document",
        "kind": "txt",
        "url": "https://files.movequeenstown.nz/library/QTS-196/QTS-196-F1.txt"
      }
    ]
  },
  {
    "id": "qts-197",
    "code": "QTS-197",
    "title": "QLDC submission on ORC draft Regional Public Transport Plan",
    "shortTitle": "QLDC submission on ORC draft Regional Public",
    "summary": "QLDC submission on ORC's draft Regional Public Transport Plan (April 2025), including its position on fares and farebox recovery.",
    "documentType": "Engagement report",
    "documentForm": "Submission",
    "year": 2025,
    "publishedDate": "2025-04",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown",
    "owner": "QLDC",
    "citation": "QLDC submission on ORC draft Regional Public Transport Plan (2025-04).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/afmpgs4d/2025-04-final-qldc-submission-orc-rptp-1.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/afmpgs4d/2025-04-final-qldc-submission-orc-rptp-1.pdf"
    ],
    "documentTypeCode": "engagement-report",
    "topics": [
      "bus",
      "ferry"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-197 qldc submission on orc draft regional public transport plan qldc submission on orc draft regional public qldc submission on orc's draft regional public transport plan (april 2025), including its position on fares and farebox recovery. submission qldc submission on orc draft regional public transport plan (2025-04). wakatipu basin; queenstown qldc asks orc to retain the $2 base fare or minimise fare increases (pp.5–6) not separately commissioned. this is an internal or corporate document. qldc none engagement report final 2025 bus scheduled bus and bus-priority public transport. ferry ferry and water transport. qldc qldc lead qldc qldc prepared main document pdf",
    "sortDate": "2025-04-01",
    "cover": {
      "src": "/covers/QTS-197.webp",
      "srcset": "/covers/QTS-197.webp 400w, /covers/QTS-197-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-197/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-197/QTS-197-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-200",
    "code": "QTS-200",
    "title": "QLDC Transport Network Monitoring Snapshot Report – Quarter 1 2025/26 (1 July to 30 September 2025), full report",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Report",
    "summary": "QLDC's full quarterly transport monitoring slide pack for July–September 2025. It reports active travel counter totals, Orbus bus and ferry patronage and reliability for 2024/25 (as reported by ORC on 3 September 2025), NZTA state highway daily traffic counts at Whakatipu and Upper Clutha sites, Bluetooth travel times on SH6/SH6A, visitor mode share, e-scooter trips, EV chargers, crash (DSI) data, regional emissions, Census mode share, Quality of Life survey results, parking occupancy and vehicle occupancy.",
    "documentType": "Accountability report",
    "documentForm": "Monitoring report",
    "year": 2025,
    "publishedDate": "2025-10-31",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Report – Quarter 1 2025/26 (1 July to 30 September 2025), full report (2025-10-31).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://climateaction.qldc.govt.nz/media/trwlnrvx/monitoring-report-q1-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://climateaction.qldc.govt.nz/media/trwlnrvx/monitoring-report-q1-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-200 qldc transport network monitoring snapshot report – quarter 1 2025/26 (1 july to 30 september 2025), full report qldc transport network monitoring snapshot report qldc's full quarterly transport monitoring slide pack for july–september 2025. it reports active travel counter totals, orbus bus and ferry patronage and reliability for 2024/25 (as reported by orc on 3 september 2025), nzta state highway daily traffic counts at whakatipu and upper clutha sites, bluetooth travel times on sh6/sh6a, visitor mode share, e-scooter trips, ev chargers, crash (dsi) data, regional emissions, census mode share, quality of life survey results, parking occupancy and vehicle occupancy. monitoring report qldc transport network monitoring snapshot report – quarter 1 2025/26 (1 july to 30 september 2025), full report (2025-10-31). queenstown lakes district the report does not discuss mass rapid transit. queenstown bus patronage 2024/25: 1,966,086 (+4% on 2023/24) ferry 2024/25: 71,123 (-4%) on slide 16 (overall statement prints 77,123) bus reliability 91.1% in q4 2024/25 vs 88.03% in q4 2023/24 q1 2025/26 cycle counts 77,523; pedestrian 113,376 peak-season frankton road volumes reaching and exceeding theoretical capacity not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2025-10-31",
    "cover": {
      "src": "/covers/QTS-200.webp",
      "srcset": "/covers/QTS-200.webp 400w, /covers/QTS-200-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-200/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-200/QTS-200-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-201",
    "code": "QTS-201",
    "title": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 2 2025/26 (1 October to 31 December 2025)",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Summary",
    "summary": "QLDC's summary quarterly transport monitoring pack for October–December 2025. It reports active travel counts, Orbus bus patronage for the first half of 2025/26 (ORC data), bus reliability, NZTA state highway traffic counts and SH6/SH6A travel times. Traffic counts are reported as continuing to rise, especially at SH6 between the BP roundabout and the airport, Kawarau Falls Bridge and SH6 south of Peninsula Road.",
    "documentType": "Accountability report",
    "documentForm": "Summary report",
    "year": 2026,
    "publishedDate": "2026-02-11",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 2 2025/26 (1 October to 31 December 2025) (2026-02-11).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/wlccr4sb/summary-monitoring-report-q2-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/wlccr4sb/summary-monitoring-report-q2-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-201 qldc transport network monitoring snapshot summary report – quarter 2 2025/26 (1 october to 31 december 2025) qldc transport network monitoring snapshot summary qldc's summary quarterly transport monitoring pack for october–december 2025. it reports active travel counts, orbus bus patronage for the first half of 2025/26 (orc data), bus reliability, nzta state highway traffic counts and sh6/sh6a travel times. traffic counts are reported as continuing to rise, especially at sh6 between the bp roundabout and the airport, kawarau falls bridge and sh6 south of peninsula road. summary report qldc transport network monitoring snapshot summary report – quarter 2 2025/26 (1 october to 31 december 2025) (2026-02-11). queenstown lakes district the report does not discuss mass rapid transit. bus patronage q1 2025/26: 528,285 (+6.5%); q2: 502,790 (+4.9%); q1+q2: 1,031,075 (+5.7%) bus reliability q2 average 89.5% (no change on q2 2024/25) cycle counts q2 145,715; pedestrian 151,445 not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-02-11",
    "cover": {
      "src": "/covers/QTS-201.webp",
      "srcset": "/covers/QTS-201.webp 400w, /covers/QTS-201-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-201/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-201/QTS-201-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-202",
    "code": "QTS-202",
    "title": "QLDC Transport Network Monitoring Snapshot Report – Quarter 3 2025/26 (1 January to 31 March 2026), full report",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Report",
    "summary": "QLDC's full quarterly transport monitoring slide pack for January–March 2026. It covers active travel counts, Orbus bus and ferry patronage, reliability and route changes (ORC data presented 25 March 2026), NZTA daily traffic counts, SH6/SH6A travel times and, for the first time, travel times on the Arthurs Point–Malaghans Road route, plus survey, visitor and parking data carried over from earlier reports.",
    "documentType": "Accountability report",
    "documentForm": "Monitoring report",
    "year": 2026,
    "publishedDate": "2026-04-21",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Report – Quarter 3 2025/26 (1 January to 31 March 2026), full report (2026-04-21).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://climateaction.qldc.govt.nz/media/3hqmo1pq/monitoring-report-q3-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://climateaction.qldc.govt.nz/media/3hqmo1pq/monitoring-report-q3-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-202 qldc transport network monitoring snapshot report – quarter 3 2025/26 (1 january to 31 march 2026), full report qldc transport network monitoring snapshot report qldc's full quarterly transport monitoring slide pack for january–march 2026. it covers active travel counts, orbus bus and ferry patronage, reliability and route changes (orc data presented 25 march 2026), nzta daily traffic counts, sh6/sh6a travel times and, for the first time, travel times on the arthurs point–malaghans road route, plus survey, visitor and parking data carried over from earlier reports. monitoring report qldc transport network monitoring snapshot report – quarter 3 2025/26 (1 january to 31 march 2026), full report (2026-04-21). queenstown lakes district the report does not discuss mass rapid transit. kawarau falls bridge q3 average 23,460 vehicles/day (+10%) sh6 south of peninsula rd q3 average 19,664 (+13%) 8 of 9 count sites show a sharper-than-usual fall from march 2026, attributed by qldc to fuel prices bus q1–q2 2025/26 1,031,075 (+5.7%); july 2025 record month 180,526 ferry q1–q2 2025/26 41,514 (+29%) cycle trips q3 198,105 not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-04-21",
    "cover": {
      "src": "/covers/QTS-202.webp",
      "srcset": "/covers/QTS-202.webp 400w, /covers/QTS-202-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-202/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-202/QTS-202-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-203",
    "code": "QTS-203",
    "title": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 3 2025/26 (1 January to 31 March 2026)",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Summary",
    "summary": "Summary version of QLDC's January–March 2026 transport monitoring report. It sets out active travel counts, ORC-reported Orbus bus patronage, reliability, child-concession trends and ferry patronage for the first half of 2025/26, NZTA traffic counts for the quarter, travel times, Quality of Life survey transport results and visitor mode of transport.",
    "documentType": "Accountability report",
    "documentForm": "Summary report",
    "year": 2026,
    "publishedDate": "2026-04-21",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 3 2025/26 (1 January to 31 March 2026) (2026-04-21).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/kuqn5jm0/summary-monitoring-report-q3-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/kuqn5jm0/summary-monitoring-report-q3-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-203 qldc transport network monitoring snapshot summary report – quarter 3 2025/26 (1 january to 31 march 2026) qldc transport network monitoring snapshot summary summary version of qldc's january–march 2026 transport monitoring report. it sets out active travel counts, orc-reported orbus bus patronage, reliability, child-concession trends and ferry patronage for the first half of 2025/26, nzta traffic counts for the quarter, travel times, quality of life survey transport results and visitor mode of transport. summary report qldc transport network monitoring snapshot summary report – quarter 3 2025/26 (1 january to 31 march 2026) (2026-04-21). queenstown lakes district the report does not discuss mass rapid transit. bus q1–q2 2025/26 1,031,075 (+5.7%); reliability 90.0%; operated trips 58,223 (52,102 a year earlier); punctuality 63.7% (38.2%) child concession patronage −22% in q2 after free child fares ended ferry q1–q2 41,514 (+29%) kawarau falls bridge q3 23,460/day; sh6 south of peninsula rd 19,664/day not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-04-21",
    "cover": {
      "src": "/covers/QTS-203.webp",
      "srcset": "/covers/QTS-203.webp 400w, /covers/QTS-203-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-203/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-203/QTS-203-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-204",
    "code": "QTS-204",
    "title": "QLDC Transport Network Monitoring Snapshot Report – Quarter 4 2025/26 (1 April to 30 June 2026), full report",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Report",
    "summary": "QLDC's full quarterly transport monitoring slide pack for April–June 2026, the last quarter of 2025/26. It reports year totals for active travel, Orbus bus patronage by quarter and reliability, NZTA traffic counts at 10 Whakatipu and 4 Upper Clutha sites, and monthly Bluetooth travel-time charts for SH6/SH6A and the Arthurs Point–Malaghans Road route, with less frequently updated data carried over.",
    "documentType": "Accountability report",
    "documentForm": "Monitoring report",
    "year": 2026,
    "publishedDate": "2026-07-23",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Report – Quarter 4 2025/26 (1 April to 30 June 2026), full report (2026-07-23).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://climateaction.qldc.govt.nz/media/p5ohlpkx/monitoring-report-q4-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://climateaction.qldc.govt.nz/media/p5ohlpkx/monitoring-report-q4-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-204 qldc transport network monitoring snapshot report – quarter 4 2025/26 (1 april to 30 june 2026), full report qldc transport network monitoring snapshot report qldc's full quarterly transport monitoring slide pack for april–june 2026, the last quarter of 2025/26. it reports year totals for active travel, orbus bus patronage by quarter and reliability, nzta traffic counts at 10 whakatipu and 4 upper clutha sites, and monthly bluetooth travel-time charts for sh6/sh6a and the arthurs point–malaghans road route, with less frequently updated data carried over. monitoring report qldc transport network monitoring snapshot report – quarter 4 2025/26 (1 april to 30 june 2026), full report (2026-07-23). queenstown lakes district the report does not discuss mass rapid transit. bus q4 2025/26 518,840 (+9.3%); 2025/26 total over 2 million bus reliability q4 91.5%; 2025/26 90.1%; 114,916 operated trips (103,549 in 2024/25); 2,014 cancelled; punctuality 63.0% (51.0%) kawarau falls bridge q4 21,431/day (+6.3%; +99% on 2019) sh6 south of peninsula rd q4 17,673/day (+6.2%) cycle 2025/26 511,002; pedestrian 541,033 not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-07-23",
    "cover": {
      "src": "/covers/QTS-204.webp",
      "srcset": "/covers/QTS-204.webp 400w, /covers/QTS-204-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-204/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-204/QTS-204-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-205",
    "code": "QTS-205",
    "title": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 4 2025/26 (1 April to 30 June 2026)",
    "shortTitle": "QLDC Transport Network Monitoring Snapshot Summary",
    "summary": "Summary version of QLDC's April–June 2026 transport monitoring report, covering active travel year totals, Orbus bus patronage and reliability, NZTA state highway traffic counts and SH6/SH6A and Arthurs Point–Malaghans Road travel times.",
    "documentType": "Accountability report",
    "documentForm": "Summary report",
    "year": 2026,
    "publishedDate": "2026-07-23",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Transport Network Monitoring Snapshot Summary Report – Quarter 4 2025/26 (1 April to 30 June 2026) (2026-07-23).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.qldc.govt.nz/media/wqrpiwcy/summary-monitoring-report-q4-2025-26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/wqrpiwcy/summary-monitoring-report-q4-2025-26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-205 qldc transport network monitoring snapshot summary report – quarter 4 2025/26 (1 april to 30 june 2026) qldc transport network monitoring snapshot summary summary version of qldc's april–june 2026 transport monitoring report, covering active travel year totals, orbus bus patronage and reliability, nzta state highway traffic counts and sh6/sh6a and arthurs point–malaghans road travel times. summary report qldc transport network monitoring snapshot summary report – quarter 4 2025/26 (1 april to 30 june 2026) (2026-07-23). queenstown lakes district the report does not discuss mass rapid transit. bus q4 2025/26 518,840 (+9.3%) bus reliability q4 91.5% kawarau falls bridge q4 21,431/day (+6.3%) sh6 south of peninsula rd q4 17,673/day (+6.2%) not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-07-23",
    "cover": {
      "src": "/covers/QTS-205.webp",
      "srcset": "/covers/QTS-205.webp 400w, /covers/QTS-205-2x.webp 800w",
      "width": 400,
      "height": 310
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-205/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-205/QTS-205-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-206",
    "code": "QTS-206",
    "title": "QLDC Climate Action Plan – Transport Network Snapshot, Q3 Highlights (1 January to 31 March 2026)",
    "shortTitle": "QLDC Climate Action Plan – Transport Network",
    "summary": "Two-page QLDC infographic summarising the January–March 2026 transport monitoring results for the Climate and Biodiversity Plan: active travel growth, bus and ferry patronage, traffic patterns including a March fall linked to fuel prices, and the new Arthurs Point–Malaghans Road travel-time monitoring.",
    "documentType": "Accountability report",
    "documentForm": "Infographic",
    "year": 2026,
    "publishedDate": "2026-09-11",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Climate Action Plan – Transport Network Snapshot, Q3 Highlights (1 January to 31 March 2026) (2026-09-11).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://climateaction.qldc.govt.nz/media/nsxpv1rl/qldc_climate-action-plan-transport-network-snapshot_q3_apr26.pdf",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://climateaction.qldc.govt.nz/media/nsxpv1rl/qldc_climate-action-plan-transport-network-snapshot_q3_apr26.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "ferry",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-206 qldc climate action plan – transport network snapshot, q3 highlights (1 january to 31 march 2026) qldc climate action plan – transport network two-page qldc infographic summarising the january–march 2026 transport monitoring results for the climate and biodiversity plan: active travel growth, bus and ferry patronage, traffic patterns including a march fall linked to fuel prices, and the new arthurs point–malaghans road travel-time monitoring. infographic qldc climate action plan – transport network snapshot, q3 highlights (1 january to 31 march 2026) (2026-09-11). queenstown lakes district the report does not discuss mass rapid transit. 198,105 cycle trips in q3 lakeside road 47,460 bike and 82,430 pedestrian trips bus q1–q2 1,031,075 (+5.7%); reliability 90% ferry 41,514 (+29%) frankton road peak volumes reach or exceed theoretical capacity not separately commissioned. this is an internal or corporate document. qldc none accountability report final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. ferry ferry and water transport. roads state highways, local roads and general traffic. qldc qldc lead qldc qldc prepared qldc qldc published main document pdf",
    "sortDate": "2026-09-11",
    "cover": {
      "src": "/covers/QTS-206.webp",
      "srcset": "/covers/QTS-206.webp 400w, /covers/QTS-206-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-206/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-206/QTS-206-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-207",
    "code": "QTS-207",
    "title": "The South Island's contribution to the New Zealand economy",
    "shortTitle": "The South Island's contribution to the New Zealand",
    "summary": "Report by economist Benje Patterson for the South Island Regional Transport Committee Chairs Group comparing the South Island's and each region's shares of population, GDP, exports, visitor spending and vehicle kilometres travelled with their shares of National Land Transport Fund (NLTF) spending. It finds the South Island had 27% of national VKT in the June 2025 year but received 11% of NLTF road expenditure (12.0% over three years). Otago had 5.7% of national VKT and received 2.9% of NLTF expenditure, while accounting for 21.2% of international visitor spending.",
    "documentType": "Economic report",
    "documentForm": "Economic report",
    "year": 2026,
    "publishedDate": "2026-08-13",
    "documentStatus": "Final",
    "geographicScope": "South Island; Otago; Canterbury; Southland; West Coast; Nelson; Tasman; Marlborough",
    "owner": "Regional transport committee",
    "citation": "Benje Patterson, The South Island's contribution to the New Zealand economy (July 2026, V3, released 13 August 2026). Prepared for the South Island Regional Transport Committee Chairs Group.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": "https://www.ecan.govt.nz/document/download?uri=6037309",
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.ecan.govt.nz/document/download?uri=6037309"
    ],
    "documentTypeCode": "economic-report",
    "topics": [
      "roads",
      "funding",
      "nltf",
      "vkt"
    ],
    "organisationIds": [
      "south-island-rtc-chairs",
      "benje-patterson-ltd",
      "environment-canterbury"
    ],
    "searchText": "qts-207 the south island's contribution to the new zealand economy the south island's contribution to the new zealand report by economist benje patterson for the south island regional transport committee chairs group comparing the south island's and each region's shares of population, gdp, exports, visitor spending and vehicle kilometres travelled with their shares of national land transport fund (nltf) spending. it finds the south island had 27% of national vkt in the june 2025 year but received 11% of nltf road expenditure (12.0% over three years). otago had 5.7% of national vkt and received 2.9% of nltf expenditure, while accounting for 21.2% of international visitor spending. economic report benje patterson, the south island's contribution to the new zealand economy (july 2026, v3, released 13 august 2026). prepared for the south island regional transport committee chairs group. south island; otago; canterbury; southland; west coast; nelson; tasman; marlborough july 2026 (v3, 4 august 2026); released 13 august 2026 not discussed the report does not discuss mass rapid transit. south island: 26.8% of nz vkt (13,529m of 50,434m vkt, june 2025 yr) [p.10, table 8] south island: $1,086m of $9,551m nltf road expenditure = 11.4% (june 2025 yr) [p.11, table 9; p.10] south island: 12.0% of nltf expenditure over three years to june 2025 [p.10 fn 5; p.11 fn 6] otago: 2,892m vkt = 5.7% of nz total [p.10, table 8] otago: $277m nltf expenditure = 2.9% of nz total [p.11, table 9] otago + southland: 8.4% of vkt, 4.0% of nltf spend [pp.10-11] otago: population 253,900 = 4.8% of nz [p.6, table 2]; goods exports $4,155m = 5.4% [p.7]; international visitor spending $4,209m = 21.2% [p.9] queenstown airport 2,601,900 passengers (944,200 international), june 2025 yr [p.14, table 11] south island: 24% of population, 22% of gdp, 33% of goods exports, 40% of international visitor spending [p.2] not stated regional transport committee none economic report final 2026 roads state highways, local roads and general traffic. funding transport funding and investment. nltf national land transport fund expenditure. vkt vehicle kilometres travelled. south island regional transport committee chairs group south island rtc chairs commissioned benje patterson ltd (people & places) benje patterson ltd prepared environment canterbury environment canterbury published benje patterson economist author benje patterson ltd (people & places) benje patterson ltd main document pdf",
    "sortDate": "2026-08-13",
    "cover": {
      "src": "/covers/QTS-207.webp",
      "srcset": "/covers/QTS-207.webp 400w, /covers/QTS-207-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-207/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-207/QTS-207-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-208",
    "code": "QTS-208",
    "title": "Frankton to Queenstown / Queenstown Town Centre Business Case – EY peer review (17 November 2020)",
    "shortTitle": "Frankton to Queenstown / Queenstown Town Centre",
    "summary": "EY's peer review for NZTA (Waka Kotahi) of the Wider Economic Benefit (WEB) analysis in the Frankton to Queenstown / Queenstown Town Centre business case, dated 17 November 2020. EY concludes the WEB analysis is 'robust and defensible' and aligned with NZTA guidance, using prudent alternatives where specified data was not available. The report covers methodology, pedestrian amenity benefits, unmet demand and sensitivity testing, and is a later standalone version of the EY review held in QTS-042.",
    "documentType": "Assessment and assurance",
    "documentForm": "Peer review report (redacted)",
    "year": 2020,
    "publishedDate": "2020-11-17",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Frankton to Queenstown / Queenstown Town Centre Business Case – EY peer review (17 November 2020) (2020). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "assessment",
    "topics": [
      "bus",
      "rapid-transit",
      "funding"
    ],
    "organisationIds": [
      "ey",
      "nzta"
    ],
    "searchText": "qts-208 frankton to queenstown / queenstown town centre business case – ey peer review (17 november 2020) frankton to queenstown / queenstown town centre ey's peer review for nzta (waka kotahi) of the wider economic benefit (web) analysis in the frankton to queenstown / queenstown town centre business case, dated 17 november 2020. ey concludes the web analysis is 'robust and defensible' and aligned with nzta guidance, using prudent alternatives where specified data was not available. the report covers methodology, pedestrian amenity benefits, unmet demand and sensitivity testing, and is a later standalone version of the ey review held in qts-042. context: transmittal letter dated 17 november 2020 to nzta under an ipa contract of 14 august 2020 (p.1). ey reviewed web analysis prepared by qldc, nzta and advisors; conventional transport benefits were reviewed separately by flow transportation specialists, and the two reviews are to be read together (p.1). the signatory's name is withheld under section 9(2)(a). peer review report (redacted) nzta (waka kotahi). frankton to queenstown / queenstown town centre business case – ey peer review (17 november 2020) (2020). released under oia-23524. wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) does not mention mass rapid transit. web analysis described as 'robust and defensible' (p.3) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none assessment and assurance final 2020 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. funding transport funding and investment. ey ey prepared nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2020-11-17",
    "cover": {
      "src": "/covers/QTS-208.webp",
      "srcset": "/covers/QTS-208.webp 400w, /covers/QTS-208-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-208/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-208/QTS-208-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-209",
    "code": "QTS-209",
    "title": "Queenstown Business Case – Independent Challenge Team presentation (final)",
    "shortTitle": "Queenstown Business Case – Independent Challenge",
    "summary": "Slides from an independent challenge team review of the draft Queenstown Business Case. The reviewers ask whether the investment story sets out the problems clearly, noting this matters 'when significant investments (e.g. gondola) are proposed'. They describe the mode shift forecasts as 'extremely optimistic', ask whether patronage figures are forecasts or targets, and seek more transparency on the model and on how competitive public transport would be against private vehicles. The slides are marked 'Draft & Confidential' and were released with reviewer names withheld.",
    "documentType": "Assessment and assurance",
    "documentForm": "Challenge team review slide deck (redacted)",
    "year": 2020,
    "publishedDate": "2020",
    "documentStatus": "Draft",
    "geographicScope": "Wakatipu Basin; Queenstown Town Centre; Frankton to Queenstown (SH6A Frankton Road); Frankton (SH6, Frankton Flats, BP roundabout); Ladies Mile (SH6)",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Business Case – Independent Challenge Team presentation (final) (2020). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "assessment",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-209 queenstown business case – independent challenge team presentation (final) queenstown business case – independent challenge slides from an independent challenge team review of the draft queenstown business case. the reviewers ask whether the investment story sets out the problems clearly, noting this matters 'when significant investments (e.g. gondola) are proposed'. they describe the mode shift forecasts as 'extremely optimistic', ask whether patronage figures are forecasts or targets, and seek more transparency on the model and on how competitive public transport would be against private vehicles. the slides are marked 'draft & confidential' and were released with reviewer names withheld. context: undated; nzta's oia-23524 schedule lists the date as n/a. the deck reviews material from the 2020 queenstown business case programme and is therefore dated c. 2020 here. reviewer names are withheld under section 9(2)(a). challenge team review slide deck (redacted) nzta (waka kotahi). queenstown business case – independent challenge team presentation (final) (2020). released under oia-23524. wakatipu basin; queenstown town centre; frankton to queenstown (sh6a frankton road); frankton (sh6, frankton flats, bp roundabout); ladies mile (sh6) marked 'final' in the file name; slides marked 'draft & confidential' questions the evidence for the public transport strategy and the gondola option in the draft business case. the reviewers note the problem statement matters 'when significant investments (e.g. gondola) are proposed' and comment that the gondola 'has higher patronage than alternatives, but is slower, has few pick-up points, and requires more transfers', and 'may be attractive for visitors, but probably less so for residents needing to commute'. \"this is important when significant investments (e.g. gondola) are proposed\" | \"mode shift forecasts appear extremely optimistic\" | \"gondola may be attractive for visitors, but probably less so for residents needing to commute\" not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive assessment and assurance draft 2020 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2020-01-01",
    "cover": {
      "src": "/covers/QTS-209.webp",
      "srcset": "/covers/QTS-209.webp 400w, /covers/QTS-209-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-209/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-209/QTS-209-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-210",
    "code": "QTS-210",
    "title": "NZUP Queenstown Package – final business case cost estimates (spreadsheet)",
    "shortTitle": "NZUP Queenstown Package – final business case cost",
    "summary": "NZTA spreadsheet of the business case cost estimates for each activity in the NZ Upgrade Programme Queenstown Package. It lists activities on SH6 Frankton, SH6A Frankton Road and SH6 Ladies Mile with priorities and base and contingency amounts for property, design, MSQA and construction. The expected estimates total about $107.6 million, the figure NZTA's OIA-23524 response gives as the compilation of the package's individual activity costs.",
    "documentType": "Design and engineering report",
    "documentForm": "Cost estimate spreadsheet",
    "year": 2020,
    "publishedDate": "2020",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Queenstown Package – final business case cost estimates (spreadsheet) (2020). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "design-report",
    "topics": [
      "active-travel",
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-210 nzup queenstown package – final business case cost estimates (spreadsheet) nzup queenstown package – final business case cost nzta spreadsheet of the business case cost estimates for each activity in the nz upgrade programme queenstown package. it lists activities on sh6 frankton, sh6a frankton road and sh6 ladies mile with priorities and base and contingency amounts for property, design, msqa and construction. the expected estimates total about $107.6 million, the figure nzta's oia-23524 response gives as the compilation of the package's individual activity costs. context: undated (oia-23524 schedule: 'unknown'); derived from the 2020 queenstown business case. subtotals: sh6 frankton about $64.5m expected estimate; sh6a frankton road about $30.4m; sh6 ladies mile about $12.7m. released in full. cost estimate spreadsheet nzta (waka kotahi). nzup queenstown package – final business case cost estimates (spreadsheet) (2020). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown does not mention mass rapid transit. total expected estimate $107,632,867 sh6 frankton subtotal $64,490,163 sh6a frankton road subtotal $30,413,908 sh6 ladies mile subtotal $12,728,797 not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none design and engineering report not stated 2020 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published spreadsheet spreadsheet",
    "sortDate": "2020-01-01",
    "cover": {
      "src": "/covers/QTS-210.webp",
      "srcset": "/covers/QTS-210.webp 400w, /covers/QTS-210-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-210/",
    "files": [
      {
        "label": "Spreadsheet",
        "kind": "xlsx",
        "url": "https://files.movequeenstown.nz/library/QTS-210/QTS-210-F1.xlsx"
      }
    ]
  },
  {
    "id": "qts-211",
    "code": "QTS-211",
    "title": "NZUP Queenstown – briefing memo to the General Manager Transport Services (10 March 2023)",
    "shortTitle": "NZUP Queenstown – briefing memo to the General",
    "summary": "Internal NZTA (Waka Kotahi) memo of 10 March 2023 on the status of the NZ Upgrade Programme Queenstown package. It reports a significant gap between the Alliance's estimate at 30% design and the independent estimate (figures withheld), and concludes that continuing the reconciliation has no merit given the scale of the difference. It identifies a likely preferred reduced option: the SH6/SH6A (BP) intersection, the Frankton bus hub expansion and the Howards Drive roundabout.",
    "documentType": "Board or committee paper",
    "documentForm": "Internal briefing memo (redacted)",
    "year": 2023,
    "publishedDate": "2023-03-10",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Queenstown – briefing memo to the General Manager Transport Services (10 March 2023) (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-211 nzup queenstown – briefing memo to the general manager transport services (10 march 2023) nzup queenstown – briefing memo to the general internal nzta (waka kotahi) memo of 10 march 2023 on the status of the nz upgrade programme queenstown package. it reports a significant gap between the alliance's estimate at 30% design and the independent estimate (figures withheld), and concludes that continuing the reconciliation has no merit given the scale of the difference. it identifies a likely preferred reduced option: the sh6/sh6a (bp) intersection, the frankton bus hub expansion and the howards drive roundabout. context: the target outturn cost exchange in february 2023 showed a significant difference between the kā huanui a tāhuna alliance and independent estimator bond cm (p.1). the memo attaches a preliminary reconciliation and a bond cm letter (both withheld in full) and a prioritisation table (qts-212). dollar figures are withheld under section 9(2)(j). internal briefing memo (redacted) nzta (waka kotahi). nzup queenstown – briefing memo to the general manager transport services (10 march 2023) (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown does not mention mass rapid transit. likely preferred option 5: sh6/sh6a (bp) intersection, frankton bus hub expansion, howards drive roundabout (p.1) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none board or committee paper final 2023 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-03-10",
    "cover": {
      "src": "/covers/QTS-211.webp",
      "srcset": "/covers/QTS-211.webp 400w, /covers/QTS-211-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-211/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-211/QTS-211-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-212",
    "code": "QTS-212",
    "title": "NZUP Queenstown – Appendix C: proposed prioritisation table (March 2023)",
    "shortTitle": "NZUP Queenstown – Appendix C: proposed",
    "summary": "Options table attached to the 10 March 2023 NZUP Queenstown memo. It compares six scope options, from the full scope (Zones 1 to 6) down to Zone 3 only, with pros and cons for each. It states the Alliance estimate 'significantly exceeds the allocated baseline budget of $115m' and that the programme was forecast to run at least three years beyond its baseline. Some content is withheld under sections 9(2)(j) and 9(2)(g)(i).",
    "documentType": "Board or committee paper",
    "documentForm": "Briefing appendix: options table (redacted)",
    "year": 2023,
    "publishedDate": "2023-03-10",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Queenstown – Appendix C: proposed prioritisation table (March 2023) (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-212 nzup queenstown – appendix c: proposed prioritisation table (march 2023) nzup queenstown – appendix c: proposed options table attached to the 10 march 2023 nzup queenstown memo. it compares six scope options, from the full scope (zones 1 to 6) down to zone 3 only, with pros and cons for each. it states the alliance estimate 'significantly exceeds the allocated baseline budget of $115m' and that the programme was forecast to run at least three years beyond its baseline. some content is withheld under sections 9(2)(j) and 9(2)(g)(i). briefing appendix: options table (redacted) nzta (waka kotahi). nzup queenstown – appendix c: proposed prioritisation table (march 2023) (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown does not mention mass rapid transit. baseline budget $115m (p.1) programme forecast to extend at least three years beyond baseline, to 2027 (p.1) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none board or committee paper final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-03-10",
    "cover": {
      "src": "/covers/QTS-212.webp",
      "srcset": "/covers/QTS-212.webp 400w, /covers/QTS-212-2x.webp 800w",
      "width": 400,
      "height": 283
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-212/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-212/QTS-212-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-213",
    "code": "QTS-213",
    "title": "NZ Upgrade Programme (Queenstown) – Focused Scope Review report (final, 6 April 2023)",
    "shortTitle": "NZ Upgrade Programme (Queenstown) – Focused Scope",
    "summary": "Two-page focused scope review dated 6 April 2023, following a cost workshop with the Kā Huanui a Tāhuna Alliance, the independent estimator Bond CM and NZTA. It finds the business case estimate, a P50 without escalation approved at $115m in November 2020, is no longer appropriate, noting escalation of about 22% from November 2020 to September 2022 and scope changes such as the move from a signalised roundabout to a fully signalised intersection. It identifies delay to designation, consenting, property and decisions as the main cost risk.",
    "documentType": "Assessment and assurance",
    "documentForm": "Cost review report",
    "year": 2023,
    "publishedDate": "2023-04-06",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZ Upgrade Programme (Queenstown) – Focused Scope Review report (final, 6 April 2023) (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "assessment",
    "topics": [
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-213 nz upgrade programme (queenstown) – focused scope review report (final, 6 april 2023) nz upgrade programme (queenstown) – focused scope two-page focused scope review dated 6 april 2023, following a cost workshop with the kā huanui a tāhuna alliance, the independent estimator bond cm and nzta. it finds the business case estimate, a p50 without escalation approved at $115m in november 2020, is no longer appropriate, noting escalation of about 22% from november 2020 to september 2022 and scope changes such as the move from a signalised roundabout to a fully signalised intersection. it identifies delay to designation, consenting, property and decisions as the main cost risk. cost review report nzta (waka kotahi). nz upgrade programme (queenstown) – focused scope review report (final, 6 april 2023) (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown does not mention mass rapid transit. business case estimate $115m approved november 2020 (p.1) escalation about 22% nov 2020 to sept 2022 (p.1) project duration 36 months over three seasons (p.2) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none assessment and assurance final 2023 roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-04-06",
    "cover": {
      "src": "/covers/QTS-213.webp",
      "srcset": "/covers/QTS-213.webp 400w, /covers/QTS-213-2x.webp 800w",
      "width": 400,
      "height": 518
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-213/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-213/QTS-213-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-214",
    "code": "QTS-214",
    "title": "GHD memo – SH6/SH6A intersection review (Rev 4, 16 August 2023)",
    "shortTitle": "GHD memo – SH6/SH6A intersection review",
    "summary": "GHD's review for NZTA (Waka Kotahi) of the traffic modelling and design for the SH6/SH6A intersection at Frankton. It records the change from the business case's signalised roundabout to conventional signals, partly to limit land take. It concludes the design adds some capacity and supports the mode shift strategy, and is appropriate 'if implemented in the context of a wider programme of interventions'.",
    "documentType": "Assessment and assurance",
    "documentForm": "Technical review memo (redacted)",
    "year": 2023,
    "publishedDate": "2023-08-16",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). GHD memo – SH6/SH6A intersection review (Rev 4, 16 August 2023) (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "assessment",
    "topics": [
      "active-travel",
      "bus",
      "roads",
      "its"
    ],
    "organisationIds": [
      "ghd",
      "nzta"
    ],
    "searchText": "qts-214 ghd memo – sh6/sh6a intersection review (rev 4, 16 august 2023) ghd memo – sh6/sh6a intersection review ghd's review for nzta (waka kotahi) of the traffic modelling and design for the sh6/sh6a intersection at frankton. it records the change from the business case's signalised roundabout to conventional signals, partly to limit land take. it concludes the design adds some capacity and supports the mode shift strategy, and is appropriate 'if implemented in the context of a wider programme of interventions'. technical review memo (redacted) nzta (waka kotahi). ghd memo – sh6/sh6a intersection review (rev 4, 16 august 2023) (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown rev 4 does not mention mass rapid transit. not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none assessment and assurance final 2023 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. traffic systems intelligent transport systems and traffic signals. ghd ghd prepared nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-08-16",
    "cover": {
      "src": "/covers/QTS-214.webp",
      "srcset": "/covers/QTS-214.webp 400w, /covers/QTS-214-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-214/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-214/QTS-214-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-215",
    "code": "QTS-215",
    "title": "NZ Upgrade Programme – Waka Kotahi Board workshop (27 September 2023), extract",
    "shortTitle": "NZ Upgrade Programme – Waka Kotahi Board workshop",
    "summary": "Extract from a 27 September 2023 Waka Kotahi Board workshop on the NZ Upgrade Programme. The Queenstown slide records a $130 million funding allocation, a funding shortfall of '$100 million+' on the revised scope, and scope, funding and contract decisions required by late 2023. Material on other projects is removed as out of scope.",
    "documentType": "Board or committee paper",
    "documentForm": "Board workshop slides (extract)",
    "year": 2023,
    "publishedDate": "2023-09-27",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZ Upgrade Programme – Waka Kotahi Board workshop (27 September 2023), extract (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-215 nz upgrade programme – waka kotahi board workshop (27 september 2023), extract nz upgrade programme – waka kotahi board workshop extract from a 27 september 2023 waka kotahi board workshop on the nz upgrade programme. the queenstown slide records a $130 million funding allocation, a funding shortfall of '$100 million+' on the revised scope, and scope, funding and contract decisions required by late 2023. material on other projects is removed as out of scope. board workshop slides (extract) nzta (waka kotahi). nz upgrade programme – waka kotahi board workshop (27 september 2023), extract (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown does not mention mass rapid transit. funding allocation $130 million (p.17) scale of funding shortfall $100 million+ (revised scope) (p.17) contingency of $116 million across nzup to be prioritised (p.9) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none board or committee paper not stated 2023 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-09-27",
    "cover": {
      "src": "/covers/QTS-215.webp",
      "srcset": "/covers/QTS-215.webp 400w, /covers/QTS-215-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-215/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-215/QTS-215-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-216",
    "code": "QTS-216",
    "title": "NZUP Governance Group – NZ Upgrade Programme monthly report for September 2023, extract",
    "shortTitle": "NZUP Governance Group – NZ Upgrade Programme",
    "summary": "Extract from the NZ Upgrade Programme monthly report for September 2023, issued 24 October 2023. The Queenstown Package is shown at red because updated cost estimates exceed the budget allocation, and the Alliance is pricing a re-prioritised package of works. The report describes the unreconciled Alliance estimate and the focus on the SH6/6A intersection, the Frankton bus hub and Howards Drive.",
    "documentType": "Accountability report",
    "documentForm": "Programme monthly report (extract)",
    "year": 2023,
    "publishedDate": "2023-10-24",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZUP Governance Group – NZ Upgrade Programme monthly report for September 2023, extract (2023). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "accountability-report",
    "topics": [
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-216 nzup governance group – nz upgrade programme monthly report for september 2023, extract nzup governance group – nz upgrade programme extract from the nz upgrade programme monthly report for september 2023, issued 24 october 2023. the queenstown package is shown at red because updated cost estimates exceed the budget allocation, and the alliance is pricing a re-prioritised package of works. the report describes the unreconciled alliance estimate and the focus on the sh6/6a intersection, the frankton bus hub and howards drive. programme monthly report (extract) nzta (waka kotahi). nzup governance group – nz upgrade programme monthly report for september 2023, extract (2023). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown issued 24 october 2023 does not mention mass rapid transit. not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none accountability report final 2023 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2023-10-24",
    "cover": {
      "src": "/covers/QTS-216.webp",
      "srcset": "/covers/QTS-216.webp 400w, /covers/QTS-216-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-216/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-216/QTS-216-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-217",
    "code": "QTS-217",
    "title": "Queenstown Package – Benefits Realisation Plan (version 1, 21 August 2024)",
    "shortTitle": "Queenstown Package – Benefits Realisation Plan",
    "summary": "The Benefits Realisation Plan for the Queenstown Package, now a Road of Regional Significance. It sets 2024 baselines and 2030 targets, monitored every two years after construction (expected about 2028): peak-hour bus movements through the Frankton bus hub from 20 to 40; AM peak-hour public transport passengers on SH6A from 260 to 970; bus reliability from 79% to 95%; bus punctuality from 41% to 95%; and maximum daily vehicle movements through the SH6/SH6A intersection from 42,000 to 48,000.",
    "documentType": "Accountability report",
    "documentForm": "Benefits realisation plan",
    "year": 2024,
    "publishedDate": "2024-08-21",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Package – Benefits Realisation Plan (version 1, 21 August 2024) (2024). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "accountability-report",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-217 queenstown package – benefits realisation plan (version 1, 21 august 2024) queenstown package – benefits realisation plan the benefits realisation plan for the queenstown package, now a road of regional significance. it sets 2024 baselines and 2030 targets, monitored every two years after construction (expected about 2028): peak-hour bus movements through the frankton bus hub from 20 to 40; am peak-hour public transport passengers on sh6a from 260 to 970; bus reliability from 79% to 95%; bus punctuality from 41% to 95%; and maximum daily vehicle movements through the sh6/sh6a intersection from 42,000 to 48,000. benefits realisation plan nzta (waka kotahi). queenstown package – benefits realisation plan (version 1, 21 august 2024) (2024). released under oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown version 1 does not mention mass rapid transit. peak hour pt bus movements through frankton bus hub: 20 (2024) to 40 (2030) am peak hour pt passengers on sh6a: 260 to 970 bus reliability: 79% to 95% bus punctuality: 41% to 95% maximum daily vehicle movements through sh6/sh6a intersection: 42,000 to 48,000 (all p.2) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none accountability report final 2024 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2024-08-21",
    "cover": {
      "src": "/covers/QTS-217.webp",
      "srcset": "/covers/QTS-217.webp 400w, /covers/QTS-217-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-217/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-217/QTS-217-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-218",
    "code": "QTS-218",
    "title": "Strategic Transport Planning – NZTA Board workshop pre-read pack (12 June 2026), Queenstown excerpt",
    "shortTitle": "Strategic Transport Planning – NZTA Board workshop",
    "summary": "The Queenstown section of the pre-read pack for the NZTA Board's 12 June 2026 strategic transport planning workshop. It sets out Queenstown's challenges, a 'balanced hybrid' preferred strategic approach and phasing. For the Frankton to Town Centre corridor it states 'Long term: Offline PT (e.g. gondola) is the only remaining viable option'. It estimates the GDP and tax impact of a 0.5% a year reduction in visitor growth at NPV $5.4b over 40 years.",
    "documentType": "Board or committee paper",
    "documentForm": "Board pre-read pack (extract)",
    "year": 2026,
    "publishedDate": "2026-06-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Strategic Transport Planning – NZTA Board workshop pre-read pack (12 June 2026), Queenstown excerpt (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-218 strategic transport planning – nzta board workshop pre-read pack (12 june 2026), queenstown excerpt strategic transport planning – nzta board workshop the queenstown section of the pre-read pack for the nzta board's 12 june 2026 strategic transport planning workshop. it sets out queenstown's challenges, a 'balanced hybrid' preferred strategic approach and phasing. for the frankton to town centre corridor it states 'long term: offline pt (e.g. gondola) is the only remaining viable option'. it estimates the gdp and tax impact of a 0.5% a year reduction in visitor growth at npv $5.4b over 40 years. board pre-read pack (extract) nzta (waka kotahi). strategic transport planning – nzta board workshop pre-read pack (12 june 2026), queenstown excerpt (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point marked in confidence; released under oia 1982 describes offline public transport (e.g. gondola) as the only remaining viable long-term option for the frankton to town centre corridor. the two-corridor slide lists, for corridor 1 (frankton to town centre), 'short term: bus for local access; interim safety, access and capacity improvements' and 'long term: offline pt (e.g. gondola) is the only remaining viable option' (p.8). for corridor 2 (jack's point to arrow junction) it lists 'long term: offline pt when demand exceeds bus capacity; potential additional river crossing to south (not east)'. \"long term: offline pt (e.g. gondola) is the only remaining viable option\" (p.8) | \"long term: offline pt when demand exceeds bus capacity\" (p.8) 0.5% p.a. reduction in visitor growth: npv $5.4b over 40 years (p.5) 83,500 peak-day visitors by 2055, up from 48,000 (p.5) time of use could reduce volumes by 10-15% (p.9) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive board or committee paper final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-06-12",
    "cover": {
      "src": "/covers/QTS-218.webp",
      "srcset": "/covers/QTS-218.webp 400w, /covers/QTS-218-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-218/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-218/QTS-218-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-219",
    "code": "QTS-219",
    "title": "Strategic Transport Plans – NZTA Board workshop paper (12 June 2026)",
    "shortTitle": "Strategic Transport Plans – NZTA Board workshop",
    "summary": "Cover paper for the NZTA Board's 12 June 2026 strategic transport plans workshop. For Queenstown, management sought Board support for the recommended strategic approach and a mandate to engage local elected members, as the basis for NZTA's position in Regional Deal negotiations. It says recent work shows 'it is neither practical nor feasible to provide enough network capacity for private vehicles'.",
    "documentType": "Board or committee paper",
    "documentForm": "Board workshop cover paper (redacted extract)",
    "year": 2026,
    "publishedDate": "2026-06-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Strategic Transport Plans – NZTA Board workshop paper (12 June 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "rapid-transit",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-219 strategic transport plans – nzta board workshop paper (12 june 2026) strategic transport plans – nzta board workshop cover paper for the nzta board's 12 june 2026 strategic transport plans workshop. for queenstown, management sought board support for the recommended strategic approach and a mandate to engage local elected members, as the basis for nzta's position in regional deal negotiations. it says recent work shows 'it is neither practical nor feasible to provide enough network capacity for private vehicles'. board workshop cover paper (redacted extract) nzta (waka kotahi). strategic transport plans – nzta board workshop paper (12 june 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point marked in confidence; released under oia 1982 does not mention mass rapid transit. not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta none board or committee paper final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-06-12",
    "cover": {
      "src": "/covers/QTS-219.webp",
      "srcset": "/covers/QTS-219.webp 400w, /covers/QTS-219-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-219/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-219/QTS-219-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-220",
    "code": "QTS-220",
    "title": "Strategic Transport Planning – NZTA Board workshop slides (June 2026)",
    "shortTitle": "Strategic Transport Planning – NZTA Board workshop",
    "summary": "Slides used at the NZTA Board's June 2026 strategic transport planning workshop, covering Queenstown's challenges, the preferred strategic approach (best use of infrastructure, moving more people in less space, active demand management, and innovative funding and delivery) and phasing. The two-corridor slide states 'Long term: Offline PT (e.g. gondola) is the only remaining viable option' for the Frankton to Town Centre corridor, and the phasing slide notes modelling that time-of-use charging could reduce volumes by 10–15%.",
    "documentType": "Board or committee paper",
    "documentForm": "Board workshop slides",
    "year": 2026,
    "publishedDate": "2026-06-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Strategic Transport Planning – NZTA Board workshop slides (June 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-220 strategic transport planning – nzta board workshop slides (june 2026) strategic transport planning – nzta board workshop slides used at the nzta board's june 2026 strategic transport planning workshop, covering queenstown's challenges, the preferred strategic approach (best use of infrastructure, moving more people in less space, active demand management, and innovative funding and delivery) and phasing. the two-corridor slide states 'long term: offline pt (e.g. gondola) is the only remaining viable option' for the frankton to town centre corridor, and the phasing slide notes modelling that time-of-use charging could reduce volumes by 10–15%. board workshop slides nzta (waka kotahi). strategic transport planning – nzta board workshop slides (june 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point same wording as the pre-read pack: offline pt (e.g. gondola) the only remaining viable long-term option for frankton to town centre. \"long term: offline pt (e.g. gondola) is the only remaining viable option\" (p.6) time of use could reduce volumes by 10-15% (p.7) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive board or committee paper final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-06-12",
    "cover": {
      "src": "/covers/QTS-220.webp",
      "srcset": "/covers/QTS-220.webp 400w, /covers/QTS-220-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-220/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-220/QTS-220-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-221",
    "code": "QTS-221",
    "title": "Queenstown Strategic Network Plan – optioneering approach and longlist (technical memo, final, 12 June 2026)",
    "shortTitle": "Queenstown Strategic Network Plan – optioneering",
    "summary": "The QSNP team's final technical memo on how strategic approaches and 'fundamental interventions' were developed and assessed. Strategic approaches, including an offline public transport spine, bus-based options, road capacity expansion and a balanced multi-modal approach, were scored by multi-criteria assessment, with the balanced multi-modal approach preferred. The memo finds road-led approaches perform poorly because of downstream SH6A constraints, and describes offline public transport as 'the most credible long-term way of increasing capacity on the Frankton to Queenstown corridor', with no technology specified. Indicative costs are $500m–1.0bn for an offline public transport spine within a total capital programme of about $1.4–2.6bn.",
    "documentType": "Feasibility or modelling study",
    "documentForm": "Options assessment technical memo",
    "year": 2026,
    "publishedDate": "2026-06-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – optioneering approach and longlist (technical memo, final, 12 June 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "feasibility-study",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-221 queenstown strategic network plan – optioneering approach and longlist (technical memo, final, 12 june 2026) queenstown strategic network plan – optioneering the qsnp team's final technical memo on how strategic approaches and 'fundamental interventions' were developed and assessed. strategic approaches, including an offline public transport spine, bus-based options, road capacity expansion and a balanced multi-modal approach, were scored by multi-criteria assessment, with the balanced multi-modal approach preferred. the memo finds road-led approaches perform poorly because of downstream sh6a constraints, and describes offline public transport as 'the most credible long-term way of increasing capacity on the frankton to queenstown corridor', with no technology specified. indicative costs are $500m–1.0bn for an offline public transport spine within a total capital programme of about $1.4–2.6bn. options assessment technical memo nzta (waka kotahi). queenstown strategic network plan – optioneering approach and longlist (technical memo, final, 12 june 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point offline public transport performs strongly in the options assessment as the long-term capacity step change for frankton–queenstown; technology-agnostic. section 8.4 says offline public transport options 'performed strongly because they provide a genuine step change in people-moving capacity while avoiding the main constraints of the live road network', and that the plan 'does not specify a preferred technology, alignment or operating model'. later business case work is to test technology, alignment, operating cost, commercial risk, integration and benefit-cost performance. \"the most credible long-term way of increasing capacity on the frankton to queenstown corridor once surface bus operations reach practical limits\" (s8.4) | \"the plan does not specify a preferred technology, alignment or operating model.\" (s8.4) offline public transport spine $500m–1.0bn additional kawarau crossing $380–565m arthurs point crossing $60–80m park & ride $20–50m total capital programme ~$1.4–2.6bn pt services ~$11m pa rising to ~$20–25m pa not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive feasibility or modelling study final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-06-12",
    "cover": {
      "src": "/covers/QTS-221.webp",
      "srcset": "/covers/QTS-221.webp 400w, /covers/QTS-221-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-221/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-221/QTS-221-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-222",
    "code": "QTS-222",
    "title": "NZTA Value, Outcomes & Scope Committee – minutes excerpt on the Queenstown Strategic Network Plan (9 July 2026)",
    "shortTitle": "NZTA Value, Outcomes & Scope Committee – minutes",
    "summary": "Excerpt from the minutes of NZTA's Value, Outcomes & Scope Committee of 9 July 2026, which recommended that the Board endorse the Queenstown Strategic Network Plan. The committee supported the balanced multi-modal direction, including provision for a future offline public transport solution, and noted order-of-magnitude costs of $1.5–2.5 billion over 30 years. It recorded assurance feedback seeking stronger integration of land-use levers, clearer evidence of effectiveness and a more robust rationale for sequencing, and asked that Board material include indicative investment ranges and stage timing.",
    "documentType": "Board or committee paper",
    "documentForm": "Committee minutes (extract)",
    "year": 2026,
    "publishedDate": "2026-07-09",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZTA Value, Outcomes & Scope Committee – minutes excerpt on the Queenstown Strategic Network Plan (9 July 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "rapid-transit",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-222 nzta value, outcomes & scope committee – minutes excerpt on the queenstown strategic network plan (9 july 2026) nzta value, outcomes & scope committee – minutes excerpt from the minutes of nzta's value, outcomes & scope committee of 9 july 2026, which recommended that the board endorse the queenstown strategic network plan. the committee supported the balanced multi-modal direction, including provision for a future offline public transport solution, and noted order-of-magnitude costs of $1.5–2.5 billion over 30 years. it recorded assurance feedback seeking stronger integration of land-use levers, clearer evidence of effectiveness and a more robust rationale for sequencing, and asked that board material include indicative investment ranges and stage timing. committee minutes (extract) nzta (waka kotahi). nzta value, outcomes & scope committee – minutes excerpt on the queenstown strategic network plan (9 july 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point minutes approved 13 july 2026 records provision for a future offline public transport solution in the preferred strategy. order-of-magnitude cost $1.5–2.5 billion over 30 years (p.3) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta passing board or committee paper final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-07-09",
    "cover": {
      "src": "/covers/QTS-222.webp",
      "srcset": "/covers/QTS-222.webp 400w, /covers/QTS-222-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-222/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-222/QTS-222-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-223",
    "code": "QTS-223",
    "title": "Queenstown Strategic Network Plan – NZTA Board paper for endorsement (12 August 2026)",
    "shortTitle": "Queenstown Strategic Network Plan – NZTA Board",
    "summary": "NZTA management paper asking the Board on 12 August 2026 to endorse the Queenstown Strategic Network Plan. It states that in 2025 demand exceeded 85% of network capacity for up to 6.5 hours a day and peak SH6A journeys exceeded 80 minutes, and that peak-day population is forecast to grow from 83,000 to more than 143,000 by 2055. The plan identifies $1.4–2.6b of potential capital activities over 30 years plus $11–25m a year in public transport operating costs, and does not seek funding for a specific programme. The paper says an off-line public transport system will be required, with technology to be settled in a later investment case, and describes private gondola proposals, including a market-led cable car proposal.",
    "documentType": "Board or committee paper",
    "documentForm": "Board paper (for endorsement)",
    "year": 2026,
    "publishedDate": "2026-08-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – NZTA Board paper for endorsement (12 August 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-223 queenstown strategic network plan – nzta board paper for endorsement (12 august 2026) queenstown strategic network plan – nzta board nzta management paper asking the board on 12 august 2026 to endorse the queenstown strategic network plan. it states that in 2025 demand exceeded 85% of network capacity for up to 6.5 hours a day and peak sh6a journeys exceeded 80 minutes, and that peak-day population is forecast to grow from 83,000 to more than 143,000 by 2055. the plan identifies $1.4–2.6b of potential capital activities over 30 years plus $11–25m a year in public transport operating costs, and does not seek funding for a specific programme. the paper says an off-line public transport system will be required, with technology to be settled in a later investment case, and describes private gondola proposals, including a market-led cable car proposal. board paper (for endorsement) nzta (waka kotahi). queenstown strategic network plan – nzta board paper for endorsement (12 august 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point marked in confidence; released in full under oia 1982 states that an off-line public transport system will be required; the plan is technology-agnostic. \"the qsnp identifies that demand will exceed the capacity provided by other modes, and that an off-line public transport system will be required. the qsnp is agnostic to the technology.\" (p.2) demand exceeded 85% of capacity for up to 6.5 hours/day in 2025 (p.1) peak sh6a travel times over 80 minutes (p.1) peak-day population 83,000 to 143,000+ by 2055 (p.1) $1.4–$2.6b capital over 30 years plus $11m–$25m annual pt opex (p.2) 0.5% lower visitor growth: $3.9b npv gdp loss over 40 years (p.2) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive board or committee paper final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-12",
    "cover": {
      "src": "/covers/QTS-223.webp",
      "srcset": "/covers/QTS-223.webp 400w, /covers/QTS-223-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-223/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-223/QTS-223-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-224",
    "code": "QTS-224",
    "title": "Queenstown Strategic Network Plan – summary (Attachment 1 to the August 2026 Board paper)",
    "shortTitle": "Queenstown Strategic Network Plan – summary",
    "summary": "The six-slide QSNP summary attached to the August 2026 Board paper. It sets out the key challenges, including 2055 demand forecast at 2.5–3.0 times capacity and 95th-percentile SH6A travel times up 97% between 2021 and 2025, the three-part strategic approach, and a three-stage intervention sequence ending with Frankton–Queenstown and Frankton–Ladies Mile offline public transport and a new Kawarau River crossing. It lists interventions tested but not progressed: a Queenstown Hill back road, SH6A tunnelling or double-decking, high-capacity ferries and a Malaghans Road alternative route.",
    "documentType": "Board or committee paper",
    "documentForm": "Board paper attachment (summary slides)",
    "year": 2026,
    "publishedDate": "2026-08-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). Queenstown Strategic Network Plan – summary (Attachment 1 to the August 2026 Board paper) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "active-travel",
      "bus",
      "rapid-transit",
      "ferry",
      "park-and-ride",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-224 queenstown strategic network plan – summary (attachment 1 to the august 2026 board paper) queenstown strategic network plan – summary the six-slide qsnp summary attached to the august 2026 board paper. it sets out the key challenges, including 2055 demand forecast at 2.5–3.0 times capacity and 95th-percentile sh6a travel times up 97% between 2021 and 2025, the three-part strategic approach, and a three-stage intervention sequence ending with frankton–queenstown and frankton–ladies mile offline public transport and a new kawarau river crossing. it lists interventions tested but not progressed: a queenstown hill back road, sh6a tunnelling or double-decking, high-capacity ferries and a malaghans road alternative route. board paper attachment (summary slides) nzta (waka kotahi). queenstown strategic network plan – summary (attachment 1 to the august 2026 board paper) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point marked in confidence; released in full under oia 1982 stage 3 includes frankton–queenstown and frankton–ladies mile offline public transport; corridor protection listed as an implementation action. \"offline public transport\" and \"protect future high-capacity corridors\" listed under 'sequence step-change improvements' (p.3) 2055 demand 2.5–3.0x capacity (p.2) 95th percentile travel times +97% 2021–2025 (p.2) 0.5% lower visitor growth: $3.9b npv over 40 years (pp.2, 5) high-level costs $1.5–$2.5b (p.5) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive board or committee paper final 2026 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. ferry ferry and water transport. park and ride park-and-ride sites and services. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-12",
    "cover": {
      "src": "/covers/QTS-224.webp",
      "srcset": "/covers/QTS-224.webp 400w, /covers/QTS-224-2x.webp 800w",
      "width": 400,
      "height": 225
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-224/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-224/QTS-224-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-225",
    "code": "QTS-225",
    "title": "NZTA Board minute excerpt – Queenstown Strategic Network Plan endorsed (12 August 2026)",
    "shortTitle": "NZTA Board minute excerpt – Queenstown Strategic",
    "summary": "Excerpt from the minutes of the NZTA Board meeting of 12 August 2026, recording that 'The Board endorsed the Queenstown Strategic Network Plan'. The discussion noted that 'the landscape is moving, with various alternative proposals, including gondolas', that 'the plan signals that we will engage with private sector options', and NZTA's approach 'to get ready to participate in the assessment of the gondola proposals'. It also noted work with the Council on the only alternative access bridge and the importance of communicating the plan to the community.",
    "documentType": "Board or committee paper",
    "documentForm": "Board minutes (extract; image scan)",
    "year": 2026,
    "publishedDate": "2026-08-12",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin; SH6 (Arrow Junction to Drift Bay) and SH6A (Frankton to Steamer Wharf); Frankton; Queenstown town centre; Ladies Mile; Southern Corridor (Hanley's Farm, Jacks Point); Kawarau and Shotover crossings; Arthurs Point",
    "owner": "NZTA",
    "citation": "NZTA (Waka Kotahi). NZTA Board minute excerpt – Queenstown Strategic Network Plan endorsed (12 August 2026) (2026). Released under OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "board-paper",
    "topics": [
      "rapid-transit",
      "gondola",
      "roads"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-225 nzta board minute excerpt – queenstown strategic network plan endorsed (12 august 2026) nzta board minute excerpt – queenstown strategic excerpt from the minutes of the nzta board meeting of 12 august 2026, recording that 'the board endorsed the queenstown strategic network plan'. the discussion noted that 'the landscape is moving, with various alternative proposals, including gondolas', that 'the plan signals that we will engage with private sector options', and nzta's approach 'to get ready to participate in the assessment of the gondola proposals'. it also noted work with the council on the only alternative access bridge and the importance of communicating the plan to the community. board minutes (extract; image scan) nzta (waka kotahi). nzta board minute excerpt – queenstown strategic network plan endorsed (12 august 2026) (2026). released under oia-23524. wakatipu basin; sh6 (arrow junction to drift bay) and sh6a (frankton to steamer wharf); frankton; queenstown town centre; ladies mile; southern corridor (hanley's farm, jacks point); kawarau and shotover crossings; arthurs point minute excerpt dated 23 september 2026 in the oia-23524 schedule notes alternative gondola proposals and nzta readiness to participate in their assessment. \"the landscape is moving, with various alternative proposals, including gondolas.\" | \"the plan signals that we will engage with private sector options.\" | \"nzta's approach to get ready to participate in the assessment of the gondola proposals.\" not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta passing board or committee paper final 2026 rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-08-12",
    "cover": {
      "src": "/covers/QTS-225.webp",
      "srcset": "/covers/QTS-225.webp 400w, /covers/QTS-225-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-225/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-225/QTS-225-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-226",
    "code": "QTS-226",
    "title": "OIA-23524 response: NZ Upgrade Programme Queenstown Package and Queenstown Strategic Network Plan",
    "shortTitle": "OIA-23524 response: NZ Upgrade Programme",
    "summary": "NZTA (Waka Kotahi) response of 16 October 2026 to an Official Information Act request from a requester (name withheld) about the NZ Upgrade Programme Queenstown Package and the Queenstown Strategic Network Plan. It states that no Treasury Gateway reviews and no IQA of the reduced-scope package exist, that monetised benefits were not re-evaluated when the scope was reduced, and explains the $107.6m, $115m, $130m and $250m figures, including a breakdown of the $250m budget. On the QSNP it states 'there has been no consideration to protecting or designating corridors' and that new delivery, funding and financing approaches 'have not been investigated'.",
    "documentType": "Official information release",
    "documentForm": "OIA response letter with document schedule",
    "year": 2026,
    "publishedDate": "2026-10-16",
    "documentStatus": "Final",
    "geographicScope": "Frankton; SH6/SH6A intersection (BP roundabout); Frankton bus hub; SH6 Ladies Mile / Howards Drive; SH6A corridor Frankton to Queenstown; Wakatipu Basin",
    "owner": "NZTA",
    "citation": "OIA-23524 response: NZ Upgrade Programme Queenstown Package and Queenstown Strategic Network Plan (2026). OIA-23524.",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": null,
    "publicSourceConfidence": "",
    "sourceNote": "",
    "oiaRelease": "Released under OIA 1982 (NZTA OIA-23524, 16 Oct 2026)",
    "sourceUrls": [],
    "documentTypeCode": "official-information",
    "topics": [
      "bus",
      "rapid-transit",
      "gondola",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "nzta"
    ],
    "searchText": "qts-226 oia-23524 response: nz upgrade programme queenstown package and queenstown strategic network plan oia-23524 response: nz upgrade programme nzta (waka kotahi) response of 16 october 2026 to an official information act request from a requester (name withheld) about the nz upgrade programme queenstown package and the queenstown strategic network plan. it states that no treasury gateway reviews and no iqa of the reduced-scope package exist, that monetised benefits were not re-evaluated when the scope was reduced, and explains the $107.6m, $115m, $130m and $250m figures, including a breakdown of the $250m budget. on the qsnp it states 'there has been no consideration to protecting or designating corridors' and that new delivery, funding and financing approaches 'have not been investigated'. context: response dated 16 october 2026 (ref oia-23524) to a requester (name withheld), whose request of 28 august 2026 covered assurance reviews, the reduced-scope decision record, benefits re-evaluation, benefits realisation, cost estimates, the effect of descoping, and the qsnp. nzta released 18 documents (qts-208 to qts-225 and the assurance process copy now used for qts-063), withheld attachments 8a and 8b under section 9(2)(j), and refused attachments 11 and 14 (the qsnp itself) as publicly available. the $250m budget comprises $2.217m business case and pre-programme costs, $14.451m property, $35.324m pre-implementation, $188.446m implementation and $9.56m nzta indirect costs (pp.4-5). the requester's details on page 1 are redacted by move queenstown. oia response letter with document schedule oia-23524 response: nz upgrade programme queenstown package and queenstown strategic network plan (2026). oia-23524. frankton; sh6/sh6a intersection (bp roundabout); frankton bus hub; sh6 ladies mile / howards drive; sh6a corridor frankton to queenstown; wakatipu basin states the mass rapid transit gondola was not part of the nzup queenstown package, and that no consideration has been given to protecting or designating corridors for future high-capacity transit. \"please note that the mass rapid transit gondola was not part of the nzup queenstown package and so could not be a part of any scope reduction consideration.\" (p.3) | \"regarding the last bullet point of question 7, there has been no consideration to protecting or designating corridors.\" (p.6) $250m budget: $2.217m business case and pre-programme; $14.451m property; $35.324m pre-implementation; $188.446m implementation; $9.56m nzta indirect (pp.4-5) $107.6m compilation of activity costs; $115m original allocation incl. nzta indirect costs; $130m after $15m escalation allocation (p.4) not separately commissioned. this is an internal or corporate document. released under oia 1982 (nzta oia-23524, 16 oct 2026) nzta substantive official information release final 2026 bus scheduled bus and bus-priority public transport. rapid transit mass rapid transit, light rail, trackless tram and offline public transport. gondola gondola or cable car discussed as public transport. roads state highways, local roads and general traffic. funding transport funding and investment. nzta waka kotahi nzta prepared nzta waka kotahi nzta published main document pdf",
    "sortDate": "2026-10-16",
    "cover": {
      "src": "/covers/QTS-226.webp",
      "srcset": "/covers/QTS-226.webp 400w, /covers/QTS-226-2x.webp 800w",
      "width": 400,
      "height": 566
    },
    "pageUrl": "https://movequeenstown.nz/evidence/qts-226/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-226/QTS-226-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-227",
    "code": "QTS-227",
    "title": "Tomorrow's Queenstown – Vision, issues and directions",
    "shortTitle": "Tomorrow's Queenstown – Vision, issues",
    "summary": "Tomorrow's Queenstown records the community vision from the May 2002 workshops, including directions for growth, access and the local transport network. It covers Queenstown, Frankton and the wider Wakatipu Basin.",
    "documentType": "Community vision",
    "documentForm": "Community vision",
    "year": 2002,
    "publishedDate": "2002-07",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown; Frankton; Wakatipu Basin",
    "owner": "QLDC",
    "citation": "Tomorrow's Queenstown – Vision, issues and directions (2002).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/qtil10q2/pc21_tomorrows_queenstown.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/qtil10q2/pc21_tomorrows_queenstown.pdf"
    ],
    "documentTypeCode": "community-vision",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-227 tomorrow's queenstown – vision, issues and directions tomorrow's queenstown – vision, issues tomorrow's queenstown records the community vision from the may 2002 workshops, including directions for growth, access and the local transport network. it covers queenstown, frankton and the wider wakatipu basin. community vision tomorrow's queenstown – vision, issues and directions (2002). queenstown; frankton; wakatipu basin no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/qtil10q2/pc21_tomorrows_queenstown.pdf qldc none community vision not stated 2002 roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2002-07-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-227/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-227/QTS-227-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-228",
    "code": "QTS-228",
    "title": "Queenstown and Wanaka Growth Management Options Study – Stage One",
    "shortTitle": "Queenstown and Wanaka Growth Management Options",
    "summary": "Hill Young Cooper's study for QLDC sets out how Queenstown and Wanaka might look and function over 20 years, and the transport effects of those options. The copy is marked final draft and is dated 6 February 2004.",
    "documentType": "Spatial plan",
    "documentForm": "Growth options study (stage one)",
    "year": 2004,
    "publishedDate": "2004-02-06",
    "documentStatus": "Draft",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin; Queenstown; Wanaka",
    "owner": "QLDC",
    "citation": "Queenstown and Wanaka Growth Management Options Study – Stage One (2004).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/f44fgfrg/pc16_growth_options_study_final.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/f44fgfrg/pc16_growth_options_study_final.pdf"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "hill-young-cooper"
    ],
    "searchText": "qts-228 queenstown and wanaka growth management options study – stage one queenstown and wanaka growth management options hill young cooper's study for qldc sets out how queenstown and wanaka might look and function over 20 years, and the transport effects of those options. the copy is marked final draft and is dated 6 february 2004. growth options study (stage one) queenstown and wanaka growth management options study – stage one (2004). queenstown lakes district; wakatipu basin; queenstown; wanaka final draft no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/f44fgfrg/pc16_growth_options_study_final.pdf qldc none spatial plan draft 2004 roads state highways, local roads and general traffic. qldc qldc commissioned hill young cooper ltd hill young cooper prepared main document pdf",
    "sortDate": "2004-02-06",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-228/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-228/QTS-228-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-229",
    "code": "QTS-229",
    "title": "Wakatipu Trails Strategy",
    "shortTitle": "Wakatipu Trails Strategy",
    "summary": "The May 2004 Wakatipu Trails Strategy sets priorities, estimated costs and an implementation plan for walking and cycling trails across the Wakatipu Basin. Tourism Resource Consultants prepared it with Natural Solutions for Nature and Beca, for the Wakatipu Trails Trust.",
    "documentType": "Transport strategy",
    "documentForm": "Trails strategy",
    "year": 2004,
    "publishedDate": "2004-05",
    "documentStatus": "Not stated",
    "geographicScope": "Wakatipu Basin; Queenstown; Frankton",
    "owner": "Community organisation",
    "citation": "Wakatipu Trails Strategy (2004).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/laulheqj/wakatipu_trails_trust_strategy_-_may_2004.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/laulheqj/wakatipu_trails_trust_strategy_-_may_2004.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel"
    ],
    "organisationIds": [
      "wakatipu-trails-trust",
      "tourism-resource-consultants",
      "beca",
      "natural-solutions-for-nature"
    ],
    "searchText": "qts-229 wakatipu trails strategy wakatipu trails strategy the may 2004 wakatipu trails strategy sets priorities, estimated costs and an implementation plan for walking and cycling trails across the wakatipu basin. tourism resource consultants prepared it with natural solutions for nature and beca, for the wakatipu trails trust. trails strategy wakatipu trails strategy (2004). wakatipu basin; queenstown; frankton no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/laulheqj/wakatipu_trails_trust_strategy_-_may_2004.pdf community organisation none transport strategy not stated 2004 walking and cycling walking, cycling, trails and other active travel. wakatipu trails trust wakatipu trails trust commissioned tourism resource consultants tourism resource consultants prepared beca beca partner natural solutions for nature ltd natural solutions for nature partner main document pdf",
    "sortDate": "2004-05-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-229/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-229/QTS-229-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-230",
    "code": "QTS-230",
    "title": "A Growth Management Strategy for the Queenstown Lakes District",
    "shortTitle": "A Growth Management Strategy for the Queenstown",
    "summary": "QLDC's April 2007 growth management strategy sets out how the district will manage where urban growth goes and how it is serviced, including transport. The published strategy is marked final.",
    "documentType": "Spatial plan",
    "documentForm": "Growth management strategy",
    "year": 2007,
    "publishedDate": "2007-04",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin; Queenstown; Wanaka",
    "owner": "QLDC",
    "citation": "A Growth Management Strategy for the Queenstown Lakes District (2007).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/t3xhtmjt/pc16_growth_management_study.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/t3xhtmjt/pc16_growth_management_study.pdf"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-230 a growth management strategy for the queenstown lakes district a growth management strategy for the queenstown qldc's april 2007 growth management strategy sets out how the district will manage where urban growth goes and how it is serviced, including transport. the published strategy is marked final. growth management strategy a growth management strategy for the queenstown lakes district (2007). queenstown lakes district; wakatipu basin; queenstown; wanaka final no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/t3xhtmjt/pc16_growth_management_study.pdf qldc none spatial plan final 2007 roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2007-04-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-230/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-230/QTS-230-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-231",
    "code": "QTS-231",
    "title": "Plan Change 19 Frankton Flats B: section 32, transport and infrastructure reports (2007–2008)",
    "shortTitle": "Plan Change 19 Frankton Flats B",
    "summary": "These are the section 32, transport and infrastructure reports for Plan Change 19 at Frankton Flats (B), prepared between 2007 and the June 2008 hearing. They cover roads, parking, buses, travel demand and how the Frankton Flats infrastructure could be funded. The section 32 report has no printed month, so that file is dated circa 2007.",
    "documentType": "Policy review",
    "documentForm": "Plan change transport and infrastructure reports",
    "year": 2007,
    "publishedDate": "2007-06",
    "documentStatus": "Not stated",
    "geographicScope": "Frankton Flats; Five Mile; Queenstown; State Highway 6; Eastern Access Road",
    "owner": "QLDC",
    "citation": "Plan Change 19 Frankton Flats B: section 32, transport and infrastructure reports (2007–2008).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/dklfh251/pc19_appendix_8_s32__five_mile_plan_change_final_transport.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/dklfh251/pc19_appendix_8_s32__five_mile_plan_change_final_transport.pdf",
      "https://www.qldc.govt.nz/media/wapgewps/pc19_appendix_5_ff_infrastructure_report_07.pdf",
      "https://www.qldc.govt.nz/media/qsrhvcjo/plan_change_19_section_32_report.pdf",
      "https://www.qldc.govt.nz/media/lxojpue2/pc_19_appendix_4_-_summary_of_recent_progress_-_transporation.pdf",
      "https://www.qldc.govt.nz/media/wyxdmivc/pc_19_officers_report.pdf"
    ],
    "documentTypeCode": "policy-review",
    "topics": [
      "bus",
      "parking",
      "roads",
      "demand-management",
      "funding"
    ],
    "organisationIds": [
      "qldc",
      "consultant",
      "ghd",
      "hill-young-cooper",
      "rationale"
    ],
    "searchText": "qts-231 plan change 19 frankton flats b: section 32, transport and infrastructure reports (2007–2008) plan change 19 frankton flats b these are the section 32, transport and infrastructure reports for plan change 19 at frankton flats (b), prepared between 2007 and the june 2008 hearing. they cover roads, parking, buses, travel demand and how the frankton flats infrastructure could be funded. the section 32 report has no printed month, so that file is dated circa 2007. plan change transport and infrastructure reports plan change 19 frankton flats b: section 32, transport and infrastructure reports (2007–2008). frankton flats; five mile; queenstown; state highway 6; eastern access road no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/dklfh251/pc19_appendix_8_s32__five_mile_plan_change_final_transport.pdf qldc none policy review not stated 2007 bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. funding transport funding and investment. qldc qldc commissioned consultant (unnamed) consultant (unnamed) prepared ghd ghd prepared hill young cooper ltd hill young cooper prepared qldc qldc prepared rationale rationale prepared s32 report for draft district plan change – 5 mile frankton flats: transportation pdf consultant (unnamed) https://www.qldc.govt.nz/media/dklfh251/pc19_appendix_8_s32__five_mile_plan_change_final_transport.pdf frankton flats infrastructure servicing and funding (draft for stakeholder consultation) pdf rationale ltd https://www.qldc.govt.nz/media/wapgewps/pc19_appendix_5_ff_infrastructure_report_07.pdf plan change 19 (frankton flats b) – section 32 report pdf qldc c. 2007 https://www.qldc.govt.nz/media/qsrhvcjo/plan_change_19_section_32_report.pdf pc19 appendix 4 – summary of recent progress: transportation (other related transport activities) pdf qldc https://www.qldc.govt.nz/media/lxojpue2/pc_19_appendix_4_-_summary_of_recent_progress_-_transporation.pdf plan change 19 frankton flats (b) – hearing committee officers' report pdf qldc https://www.qldc.govt.nz/media/wyxdmivc/pc_19_officers_report.pdf",
    "sortDate": "2007-06-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-231/",
    "files": [
      {
        "label": "S32 Report for Draft District Plan Change – 5 Mile Frankton Flats: Transportation",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-231/QTS-231-F1.pdf"
      },
      {
        "label": "Frankton Flats Infrastructure Servicing and Funding (draft for stakeholder consultation)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-231/QTS-231-F2.pdf"
      },
      {
        "label": "Plan Change 19 (Frankton Flats B) – Section 32 Report",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-231/QTS-231-F3.pdf"
      },
      {
        "label": "PC19 Appendix 4 – Summary of Recent Progress: Transportation (Other Related Transport Activities)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-231/QTS-231-F4.pdf"
      },
      {
        "label": "Plan Change 19 Frankton Flats (B) – Hearing Committee Officers' Report",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-231/QTS-231-F5.pdf"
      }
    ]
  },
  {
    "id": "qts-232",
    "code": "QTS-232",
    "title": "QLDC Full Council Agenda, 29 February 2008 (incl. WTS implementation/steering group progress report)",
    "shortTitle": "QLDC Full Council Agenda, 29 February 2008",
    "summary": "The agenda for the QLDC meeting of 29 February 2008 includes a progress report on implementing the Wakatipu Transportation Strategy and its steering group. Transport is one item on a full council agenda.",
    "documentType": "Board or committee paper",
    "documentForm": "Full council agenda",
    "year": 2008,
    "publishedDate": "2008-02-29",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin",
    "owner": "QLDC",
    "citation": "QLDC Full Council Agenda, 29 February 2008 (incl. WTS implementation/steering group progress report) (2008).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://qldc.serve2.net/assets/Uploads/Planning/District-Plan-Changes/7/FULL-COUNCIL-AGENDA-29-FEB-2008.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://qldc.serve2.net/assets/Uploads/Planning/District-Plan-Changes/7/FULL-COUNCIL-AGENDA-29-FEB-2008.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-232 qldc full council agenda, 29 february 2008 (incl. wts implementation/steering group progress report) qldc full council agenda, 29 february 2008 the agenda for the qldc meeting of 29 february 2008 includes a progress report on implementing the wakatipu transportation strategy and its steering group. transport is one item on a full council agenda. full council agenda qldc full council agenda, 29 february 2008 (incl. wts implementation/steering group progress report) (2008). queenstown lakes district; wakatipu basin no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://qldc.serve2.net/assets/uploads/planning/district-plan-changes/7/full-council-agenda-29-feb-2008.pdf qldc none board or committee paper recorded 2008 roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2008-02-29",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-232/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-232/QTS-232-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-233",
    "code": "QTS-233",
    "title": "QLDC Annual Plan 2008/09",
    "shortTitle": "QLDC Annual Plan 2008/09",
    "summary": "QLDC's Annual Plan 2008/09 sets the council's transport and roading budgets for the year after the Wakatipu Transportation Strategy was published. It is the council's plan for that financial year.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2008,
    "publishedDate": "2008",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin; Wanaka",
    "owner": "QLDC",
    "citation": "QLDC Annual Plan 2008/09 (2008).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/5eidutib/annual_plan_2008-09.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/5eidutib/annual_plan_2008-09.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "roads",
      "funding"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-233 qldc annual plan 2008/09 qldc annual plan 2008/09 qldc's annual plan 2008/09 sets the council's transport and roading budgets for the year after the wakatipu transportation strategy was published. it is the council's plan for that financial year. annual plan qldc annual plan 2008/09 (2008). queenstown lakes district; wakatipu basin; wanaka no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/5eidutib/annual_plan_2008-09.pdf qldc none statutory plan not stated 2008 roads state highways, local roads and general traffic. funding transport funding and investment. qldc qldc prepared main document pdf",
    "sortDate": "2008-01-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-233/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-233/QTS-233-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-234",
    "code": "QTS-234",
    "title": "PC25 Kingston – Transportation Assessment",
    "shortTitle": "PC25 Kingston – Transportation Assessment",
    "summary": "Traffic Design Group's October 2008 assessment considers the traffic effects of Plan Change 25 at Kingston, on State Highway 6 south of Queenstown. It finds that wider traffic effects would be minor and that local effects can be addressed at subdivision.",
    "documentType": "Assessment and assurance",
    "documentForm": "Transportation assessment",
    "year": 2008,
    "publishedDate": "2008-10-24",
    "documentStatus": "Final",
    "geographicScope": "Kingston; State Highway 6; Queenstown",
    "owner": "Private sector",
    "citation": "PC25 Kingston – Transportation Assessment (2008).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/iyob0tof/pc_25_traffic_report.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/iyob0tof/pc_25_traffic_report.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "traffic-design-group"
    ],
    "searchText": "qts-234 pc25 kingston – transportation assessment pc25 kingston – transportation assessment traffic design group's october 2008 assessment considers the traffic effects of plan change 25 at kingston, on state highway 6 south of queenstown. it finds that wider traffic effects would be minor and that local effects can be addressed at subdivision. transportation assessment pc25 kingston – transportation assessment (2008). kingston; state highway 6; queenstown final no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/iyob0tof/pc_25_traffic_report.pdf private sector none assessment and assurance final 2008 roads state highways, local roads and general traffic. traffic design group traffic design group prepared main document pdf",
    "sortDate": "2008-10-24",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-234/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-234/QTS-234-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-235",
    "code": "QTS-235",
    "title": "Shotover Country Proposed Private Plan Change – Transportation Assessment Report",
    "shortTitle": "Shotover Country Proposed Private Plan Change",
    "summary": "Traffic Design Group's 11 February 2010 assessment considers traffic effects of the Shotover Country plan change on State Highway 6 at Ladies Mile. The report is marked final.",
    "documentType": "Assessment and assurance",
    "documentForm": "Transportation assessment",
    "year": 2010,
    "publishedDate": "2010-02-11",
    "documentStatus": "Final",
    "geographicScope": "Shotover Country; Ladies Mile; State Highway 6; Queenstown",
    "owner": "Private sector",
    "citation": "Shotover Country Proposed Private Plan Change – Transportation Assessment Report (2010).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/tpzpv2uj/pc41_attachment_j.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/tpzpv2uj/pc41_attachment_j.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "traffic-design-group"
    ],
    "searchText": "qts-235 shotover country proposed private plan change – transportation assessment report shotover country proposed private plan change traffic design group's 11 february 2010 assessment considers traffic effects of the shotover country plan change on state highway 6 at ladies mile. the report is marked final. transportation assessment shotover country proposed private plan change – transportation assessment report (2010). shotover country; ladies mile; state highway 6; queenstown final no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/tpzpv2uj/pc41_attachment_j.pdf private sector none assessment and assurance final 2010 roads state highways, local roads and general traffic. traffic design group traffic design group prepared main document pdf",
    "sortDate": "2010-02-11",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-235/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-235/QTS-235-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-236",
    "code": "QTS-236",
    "title": "PC43 s32 Appendix J – Transportation Assessment",
    "shortTitle": "PC43 s32 Appendix J – Transportation Assessment",
    "summary": "Traffic Design Group's March 2011 assessment for Shotover Property Investments Ltd considers traffic effects of a private plan change beside Ladies Mile. The report is marked final and is dated 29 March 2011.",
    "documentType": "Assessment and assurance",
    "documentForm": "Transportation assessment",
    "year": 2011,
    "publishedDate": "2011-03-29",
    "documentStatus": "Final",
    "geographicScope": "Ladies Mile; Hansen Road; State Highway 6; Queenstown",
    "owner": "Private sector",
    "citation": "PC43 s32 Appendix J – Transportation Assessment (2011).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/e0llmehg/pc43_s32_appendix_j_-transportation_assessment.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/e0llmehg/pc43_s32_appendix_j_-transportation_assessment.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "shotover-property-investments",
      "traffic-design-group"
    ],
    "searchText": "qts-236 pc43 s32 appendix j – transportation assessment pc43 s32 appendix j – transportation assessment traffic design group's march 2011 assessment for shotover property investments ltd considers traffic effects of a private plan change beside ladies mile. the report is marked final and is dated 29 march 2011. transportation assessment pc43 s32 appendix j – transportation assessment (2011). ladies mile; hansen road; state highway 6; queenstown final no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/e0llmehg/pc43_s32_appendix_j_-transportation_assessment.pdf private sector none assessment and assurance final 2011 roads state highways, local roads and general traffic. shotover property investments ltd shotover property investments commissioned traffic design group traffic design group prepared main document pdf",
    "sortDate": "2011-03-29",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-236/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-236/QTS-236-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-237",
    "code": "QTS-237",
    "title": "PC34 Annexure H – Transportation Assessment",
    "shortTitle": "PC34 Annexure H – Transportation Assessment",
    "summary": "Traffic Design Group's transportation assessment for Remarkables Park Limited considers traffic effects of private plan change 34 on Frankton Flats. The assessment itself is dated 22 December 2010.",
    "documentType": "Assessment and assurance",
    "documentForm": "Transportation assessment",
    "year": 2011,
    "publishedDate": "2011-04",
    "documentStatus": "Final",
    "geographicScope": "Frankton Flats; Remarkables Park; State Highway 6; Queenstown",
    "owner": "Private sector",
    "citation": "PC34 Annexure H – Transportation Assessment (2011).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/nwglyu0r/09_pc34_-_annexure_h_-_transp-nt_-_traffic_design_group.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/nwglyu0r/09_pc34_-_annexure_h_-_transp-nt_-_traffic_design_group.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "remarkables-park-limited",
      "traffic-design-group"
    ],
    "searchText": "qts-237 pc34 annexure h – transportation assessment pc34 annexure h – transportation assessment traffic design group's transportation assessment for remarkables park limited considers traffic effects of private plan change 34 on frankton flats. the assessment itself is dated 22 december 2010. transportation assessment pc34 annexure h – transportation assessment (2011). frankton flats; remarkables park; state highway 6; queenstown final. assessment dated 22 december 2010. no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/nwglyu0r/09_pc34_-_annexure_h_-_transp-nt_-_traffic_design_group.pdf private sector none assessment and assurance final 2011 roads state highways, local roads and general traffic. remarkables park limited remarkables park commissioned traffic design group traffic design group prepared main document pdf",
    "sortDate": "2011-04-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-237/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-237/QTS-237-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-238",
    "code": "QTS-238",
    "title": "QLDC 10 Year Plan 2012–22, Volume 1",
    "shortTitle": "QLDC 10 Year Plan 2012–22, Volume 1",
    "summary": "Volume 1 of QLDC's 10 Year Plan 2012–22, adopted on 13 July 2012, summarises the council's activities, including the transport programme for that decade. Transport is one of the activities covered in this volume.",
    "documentType": "Statutory plan",
    "documentForm": "Long-term plan (volume 1)",
    "year": 2012,
    "publishedDate": "2012-07-13",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Wakatipu Basin; Wanaka",
    "owner": "QLDC",
    "citation": "QLDC 10 Year Plan 2012–22, Volume 1 (2012).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/dbsitmgg/volume-1_adopted-13-july2012_print-version.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/dbsitmgg/volume-1_adopted-13-july2012_print-version.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "roads",
      "funding"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-238 qldc 10 year plan 2012–22, volume 1 qldc 10 year plan 2012–22, volume 1 volume 1 of qldc's 10 year plan 2012–22, adopted on 13 july 2012, summarises the council's activities, including the transport programme for that decade. transport is one of the activities covered in this volume. long-term plan (volume 1) qldc 10 year plan 2012–22, volume 1 (2012). queenstown lakes district; wakatipu basin; wanaka adopted 13 july 2012 no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/dbsitmgg/volume-1_adopted-13-july2012_print-version.pdf qldc none statutory plan adopted 2012 roads state highways, local roads and general traffic. funding transport funding and investment. qldc qldc prepared main document pdf",
    "sortDate": "2012-07-13",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-238/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-238/QTS-238-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-239",
    "code": "QTS-239",
    "title": "District Plan Monitoring Report: Section 14 Transport",
    "shortTitle": "District Plan Monitoring Report: Section 14",
    "summary": "QLDC's August 2012 monitoring report reviews whether the District Plan's transport rules are working, ahead of the review of the district plan. It finds the provisions are largely working, with room to align them to later strategies.",
    "documentType": "Accountability report",
    "documentForm": "District plan monitoring report",
    "year": 2012,
    "publishedDate": "2012-08",
    "documentStatus": "Final",
    "geographicScope": "Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "District Plan Monitoring Report: Section 14 Transport (2012).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://qldcarchive.serve2.net/assets/OldImages/Files/Monitoring_Reports/Transport_Monitoring_Report_final_-_07_08_2012.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://qldcarchive.serve2.net/assets/OldImages/Files/Monitoring_Reports/Transport_Monitoring_Report_final_-_07_08_2012.pdf"
    ],
    "documentTypeCode": "accountability-report",
    "topics": [
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-239 district plan monitoring report: section 14 transport district plan monitoring report: section 14 qldc's august 2012 monitoring report reviews whether the district plan's transport rules are working, ahead of the review of the district plan. it finds the provisions are largely working, with room to align them to later strategies. district plan monitoring report district plan monitoring report: section 14 transport (2012). queenstown lakes district final no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://qldcarchive.serve2.net/assets/oldimages/files/monitoring_reports/transport_monitoring_report_final_-_07_08_2012.pdf qldc none accountability report final 2012 parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2012-08-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-239/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-239/QTS-239-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-240",
    "code": "QTS-240",
    "title": "Henley Downs Plan Change – Transportation Assessment Report",
    "shortTitle": "Henley Downs Plan Change – Transportation",
    "summary": "Traffic Design Group's 21 December 2012 assessment considers traffic effects of the Henley Downs plan change on the Kingston Road corridor. It was prepared for RCL Queenstown Ltd.",
    "documentType": "Assessment and assurance",
    "documentForm": "Transportation assessment",
    "year": 2012,
    "publishedDate": "2012-12-21",
    "documentStatus": "Final",
    "geographicScope": "Henley Downs; Jacks Point; Kingston Road; State Highway 6",
    "owner": "Private sector",
    "citation": "Henley Downs Plan Change – Transportation Assessment Report (2012).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/jyadkq1g/pc44_henley_downs_plan_change_appendix_i_-_transport_assessment.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/jyadkq1g/pc44_henley_downs_plan_change_appendix_i_-_transport_assessment.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "rcl-queenstown",
      "traffic-design-group"
    ],
    "searchText": "qts-240 henley downs plan change – transportation assessment report henley downs plan change – transportation traffic design group's 21 december 2012 assessment considers traffic effects of the henley downs plan change on the kingston road corridor. it was prepared for rcl queenstown ltd. transportation assessment henley downs plan change – transportation assessment report (2012). henley downs; jacks point; kingston road; state highway 6 final no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/jyadkq1g/pc44_henley_downs_plan_change_appendix_i_-_transport_assessment.pdf private sector none assessment and assurance final 2012 roads state highways, local roads and general traffic. rcl queenstown ltd rcl queenstown commissioned traffic design group traffic design group prepared main document pdf",
    "sortDate": "2012-12-21",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-240/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-240/QTS-240-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-241",
    "code": "QTS-241",
    "title": "Otago Regional Public Transport Plan 2014 (including addendums)",
    "shortTitle": "Otago Regional Public Transport Plan 2014",
    "summary": "The Otago Regional Public Transport Plan 2014 sets the region's bus services, including those in the Wakatipu Basin, and includes later addendums. The May 2017 Wakatipu Basin addendum is also held as QTS-005.",
    "documentType": "Statutory plan",
    "documentForm": "Regional public transport plan, including addendums",
    "year": 2014,
    "publishedDate": "2014",
    "documentStatus": "Adopted",
    "geographicScope": "Otago; Wakatipu Basin; Queenstown; Dunedin",
    "owner": "ORC",
    "citation": "Otago Regional Public Transport Plan 2014 (including addendums) (2014).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/6034/rptp-2014-including-addendums.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/6034/rptp-2014-including-addendums.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus"
    ],
    "organisationIds": [
      "orc"
    ],
    "searchText": "qts-241 otago regional public transport plan 2014 (including addendums) otago regional public transport plan 2014 the otago regional public transport plan 2014 sets the region's bus services, including those in the wakatipu basin, and includes later addendums. the may 2017 wakatipu basin addendum is also held as qts-005. regional public transport plan, including addendums otago regional public transport plan 2014 (including addendums) (2014). otago; wakatipu basin; queenstown; dunedin includes later addendums no mass rapid transit reference. ordinary bus services are not mass rapid transit. not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/6034/rptp-2014-including-addendums.pdf orc none statutory plan adopted 2014 bus scheduled bus and bus-priority public transport. orc orc prepared main document pdf",
    "sortDate": "2014-01-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-241/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-241/QTS-241-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-242",
    "code": "QTS-242",
    "title": "Plan Change 50 Lakeview: transport assessment and traffic experts' joint statement (2014–2015)",
    "shortTitle": "Plan Change 50 Lakeview",
    "summary": "These documents are the transport evidence for Plan Change 50 at Lakeview, from the August 2014 integrated assessment to the February 2015 joint statement. They cover traffic and parking for the town-centre plan change. Traffic Design Group prepared the assessment for QLDC, and the joint statement records where the traffic experts agreed and disagreed.",
    "documentType": "Assessment and assurance",
    "documentForm": "Plan change transport assessment and joint statement",
    "year": 2014,
    "publishedDate": "2014-08-12",
    "documentStatus": "Final",
    "geographicScope": "Lakeview; Queenstown town centre",
    "owner": "QLDC",
    "citation": "Plan Change 50 Lakeview: transport assessment and traffic experts' joint statement (2014–2015).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/4ggk0ua4/pc50_12-appendix-i-traffic-design-group.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/4ggk0ua4/pc50_12-appendix-i-traffic-design-group.pdf",
      "https://www.qldc.govt.nz/media/ecynn1um/pc50_final-traffic-joint-statement.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "abley",
      "tim-kelly-transportation-planning",
      "traffic-design-group",
      "independent-hearing-panel"
    ],
    "searchText": "qts-242 plan change 50 lakeview: transport assessment and traffic experts' joint statement (2014–2015) plan change 50 lakeview these documents are the transport evidence for plan change 50 at lakeview, from the august 2014 integrated assessment to the february 2015 joint statement. they cover traffic and parking for the town-centre plan change. traffic design group prepared the assessment for qldc, and the joint statement records where the traffic experts agreed and disagreed. plan change transport assessment and joint statement plan change 50 lakeview: transport assessment and traffic experts' joint statement (2014–2015). lakeview; queenstown town centre no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/4ggk0ua4/pc50_12-appendix-i-traffic-design-group.pdf qldc none assessment and assurance final 2014 parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc commissioned abley abley prepared qldc qldc prepared tim kelly transportation planning ltd tim kelly transportation planning prepared traffic design group traffic design group prepared independent hearing panel independent hearing panel recipient lakeview plan change – integrated transportation assessment pdf traffic design group https://www.qldc.govt.nz/media/4ggk0ua4/pc50_12-appendix-i-traffic-design-group.pdf pc50 lakeview – joint statement of traffic experts pdf traffic design group, abley and tim kelly transportation planning https://www.qldc.govt.nz/media/ecynn1um/pc50_final-traffic-joint-statement.pdf",
    "sortDate": "2014-08-12",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-242/",
    "files": [
      {
        "label": "Lakeview Plan Change – Integrated Transportation Assessment",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-242/QTS-242-F1.pdf"
      },
      {
        "label": "PC50 Lakeview – Joint Statement of Traffic Experts",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-242/QTS-242-F2.pdf"
      }
    ]
  },
  {
    "id": "qts-243",
    "code": "QTS-243",
    "title": "Queenstown Trails for the Future 2015–2025",
    "shortTitle": "Queenstown Trails for the Future 2015–2025",
    "summary": "Queenstown Trails for the Future 2015–2025, prepared by TRC Tourism for the Queenstown Trails Trust, sets a ten-year plan for the Whakatipu trail network. It succeeds the 2004 Wakatipu Trails Strategy.",
    "documentType": "Transport strategy",
    "documentForm": "Trails strategy",
    "year": 2015,
    "publishedDate": "2015",
    "documentStatus": "Not stated",
    "geographicScope": "Whakatipu; Queenstown; Frankton",
    "owner": "Community organisation",
    "citation": "Queenstown Trails for the Future 2015–2025 (2015).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/udwpbrae/queenstown-trails-strategy-2015-2025.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/udwpbrae/queenstown-trails-strategy-2015-2025.pdf"
    ],
    "documentTypeCode": "transport-strategy",
    "topics": [
      "active-travel"
    ],
    "organisationIds": [
      "queenstown-trails-trust",
      "trc-tourism"
    ],
    "searchText": "qts-243 queenstown trails for the future 2015–2025 queenstown trails for the future 2015–2025 queenstown trails for the future 2015–2025, prepared by trc tourism for the queenstown trails trust, sets a ten-year plan for the whakatipu trail network. it succeeds the 2004 wakatipu trails strategy. trails strategy queenstown trails for the future 2015–2025 (2015). whakatipu; queenstown; frankton no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/udwpbrae/queenstown-trails-strategy-2015-2025.pdf community organisation none transport strategy not stated 2015 walking and cycling walking, cycling, trails and other active travel. queenstown trails trust queenstown trails trust commissioned trc tourism ltd trc tourism prepared main document pdf",
    "sortDate": "2015-01-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-243/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-243/QTS-243-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-244",
    "code": "QTS-244",
    "title": "Otago Southland Regional Land Transport Plans 2015–2021",
    "shortTitle": "Otago Southland Regional Land Transport Plans",
    "summary": "The Otago Southland Regional Land Transport Plans 2015–2021 set funding priorities for the two regions, including Queenstown transport projects. The plans were prepared by the Otago and Southland regional transport committees.",
    "documentType": "Statutory plan",
    "documentForm": "Regional land transport plan",
    "year": 2015,
    "publishedDate": "2015-06",
    "documentStatus": "Adopted",
    "geographicScope": "Otago; Southland; Queenstown; Frankton",
    "owner": "Regional transport committee",
    "citation": "Otago Southland Regional Land Transport Plans 2015–2021 (2015).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/3622/otago-southland-regional-land-transport-plans-2015-2021-june-15.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/3622/otago-southland-regional-land-transport-plans-2015-2021-june-15.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "bus",
      "roads",
      "funding"
    ],
    "organisationIds": [
      "regional-transport-committees",
      "environment-southland",
      "orc"
    ],
    "searchText": "qts-244 otago southland regional land transport plans 2015–2021 otago southland regional land transport plans the otago southland regional land transport plans 2015–2021 set funding priorities for the two regions, including queenstown transport projects. the plans were prepared by the otago and southland regional transport committees. regional land transport plan otago southland regional land transport plans 2015–2021 (2015). otago; southland; queenstown; frankton no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/3622/otago-southland-regional-land-transport-plans-2015-2021-june-15.pdf regional transport committee none statutory plan adopted 2015 bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. funding transport funding and investment. regional transport committees regional transport committees prepared environment southland environment southland partner orc orc partner main document pdf",
    "sortDate": "2015-06-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-244/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-244/QTS-244-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-245",
    "code": "QTS-245",
    "title": "Proposed District Plan s32 – Chapter 12 Queenstown Town Centre",
    "shortTitle": "Proposed District Plan s32 – Chapter 12 Queenstown",
    "summary": "QLDC's August 2015 section 32 report evaluates the Queenstown Town Centre chapter, including parking, access and how land use and transport fit together. Transport is considered where it affects the town centre zone.",
    "documentType": "Policy review",
    "documentForm": "Section 32 evaluation",
    "year": 2015,
    "publishedDate": "2015-08",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown town centre",
    "owner": "QLDC",
    "citation": "Proposed District Plan s32 – Chapter 12 Queenstown Town Centre (2015).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/i4wbmsyf/pdp-s32-chapter-12-queenstown-town-centre-aug-2015.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/i4wbmsyf/pdp-s32-chapter-12-queenstown-town-centre-aug-2015.pdf"
    ],
    "documentTypeCode": "policy-review",
    "topics": [
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-245 proposed district plan s32 – chapter 12 queenstown town centre proposed district plan s32 – chapter 12 queenstown qldc's august 2015 section 32 report evaluates the queenstown town centre chapter, including parking, access and how land use and transport fit together. transport is considered where it affects the town centre zone. section 32 evaluation proposed district plan s32 – chapter 12 queenstown town centre (2015). queenstown town centre no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/i4wbmsyf/pdp-s32-chapter-12-queenstown-town-centre-aug-2015.pdf qldc none policy review not stated 2015 parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2015-08-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-245/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-245/QTS-245-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-246",
    "code": "QTS-246",
    "title": "Queenstown Traffic and Parking (Council report, item 2A)",
    "shortTitle": "Queenstown Traffic and Parking",
    "summary": "QLDC's report of 30 June 2016 recommends parking, loading and bus-stop changes in the town centre under the Queenstown Town Centre Transport Strategy. The report was prepared for the council meeting that day.",
    "documentType": "Board or committee paper",
    "documentForm": "Council report",
    "year": 2016,
    "publishedDate": "2016-06-30",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown town centre",
    "owner": "QLDC",
    "citation": "Queenstown Traffic and Parking (Council report, item 2A) (2016).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://qldc.serve2.net/assets/Uploads/Council-Documents/Full-Council-Agendas/2016/30-June-2016/2a-Queenstown-Traffic-and-Parking.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://qldc.serve2.net/assets/Uploads/Council-Documents/Full-Council-Agendas/2016/30-June-2016/2a-Queenstown-Traffic-and-Parking.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-246 queenstown traffic and parking (council report, item 2a) queenstown traffic and parking qldc's report of 30 june 2016 recommends parking, loading and bus-stop changes in the town centre under the queenstown town centre transport strategy. the report was prepared for the council meeting that day. council report queenstown traffic and parking (council report, item 2a) (2016). queenstown town centre no mass rapid transit reference. ordinary bus services are not mass rapid transit. not separately commissioned. this is an internal or corporate document. https://qldc.serve2.net/assets/uploads/council-documents/full-council-agendas/2016/30-june-2016/2a-queenstown-traffic-and-parking.pdf qldc none board or committee paper recorded 2016 bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2016-06-30",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-246/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-246/QTS-246-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-247",
    "code": "QTS-247",
    "title": "Queenstown Town Centre Transport Strategy Implementation Plan (Council report, item 2B)",
    "shortTitle": "Queenstown Town Centre Transport Strategy",
    "summary": "QLDC's report of 30 June 2016 sets the implementation plan and indicative timing for the Queenstown Town Centre Transport Strategy work programme. It notes a $420,000 investigations budget in the 2016/17 annual plan.",
    "documentType": "Board or committee paper",
    "documentForm": "Council report",
    "year": 2016,
    "publishedDate": "2016-06-30",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown town centre",
    "owner": "QLDC",
    "citation": "Queenstown Town Centre Transport Strategy Implementation Plan (Council report, item 2B) (2016).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://qldc.serve2.net/assets/Uploads/Council-Documents/Full-Council-Agendas/2016/30-June-2016/2b-Queenstown-Town-Centre-Transport-Strategy-Implementation-Plan.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://qldc.serve2.net/assets/Uploads/Council-Documents/Full-Council-Agendas/2016/30-June-2016/2b-Queenstown-Town-Centre-Transport-Strategy-Implementation-Plan.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "bus",
      "parking",
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-247 queenstown town centre transport strategy implementation plan (council report, item 2b) queenstown town centre transport strategy qldc's report of 30 june 2016 sets the implementation plan and indicative timing for the queenstown town centre transport strategy work programme. it notes a $420,000 investigations budget in the 2016/17 annual plan. council report queenstown town centre transport strategy implementation plan (council report, item 2b) (2016). queenstown town centre no mass rapid transit reference. $420,000 investigations budget in the annual plan 2016/17 not separately commissioned. this is an internal or corporate document. https://qldc.serve2.net/assets/uploads/council-documents/full-council-agendas/2016/30-june-2016/2b-queenstown-town-centre-transport-strategy-implementation-plan.pdf qldc none board or committee paper recorded 2016 bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2016-06-30",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-247/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-247/QTS-247-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-248",
    "code": "QTS-248",
    "title": "QLDC Annual Plan 2016/17",
    "shortTitle": "QLDC Annual Plan 2016/17",
    "summary": "QLDC's Annual Plan 2016/17 sets that year's funding for transport, including investigations into the Inner Links project in Queenstown town centre. The plan raises the Inner Links business-case budget to $232,000 and allocates a further $420,000 to designation options.",
    "documentType": "Statutory plan",
    "documentForm": "Annual plan",
    "year": 2016,
    "publishedDate": "2016",
    "documentStatus": "Adopted",
    "geographicScope": "Queenstown Lakes District; Queenstown town centre; Frankton",
    "owner": "QLDC",
    "citation": "QLDC Annual Plan 2016/17 (2016).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/if3bbanu/qldc-annual-plan-2016-adopted-1.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/if3bbanu/qldc-annual-plan-2016-adopted-1.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "roads",
      "funding"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-248 qldc annual plan 2016/17 qldc annual plan 2016/17 qldc's annual plan 2016/17 sets that year's funding for transport, including investigations into the inner links project in queenstown town centre. the plan raises the inner links business-case budget to $232,000 and allocates a further $420,000 to designation options. annual plan qldc annual plan 2016/17 (2016). queenstown lakes district; queenstown town centre; frankton adopted no mass rapid transit reference. inner links business case budget increased to $232,000; a further $420,000 allocated to designation options not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/if3bbanu/qldc-annual-plan-2016-adopted-1.pdf qldc none statutory plan adopted 2016 roads state highways, local roads and general traffic. funding transport funding and investment. qldc qldc prepared main document pdf",
    "sortDate": "2016-01-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-248/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-248/QTS-248-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-249",
    "code": "QTS-249",
    "title": "Wakatipu Basin Land Use Planning Study – Final Report",
    "shortTitle": "Wakatipu Basin Land Use Planning Study – Final",
    "summary": "The March 2017 Wakatipu Basin Land Use Planning Study, prepared for QLDC, describes rural landscape capacity and growth, with limited comment on roads. The report is marked final.",
    "documentType": "Spatial plan",
    "documentForm": "Land use planning study",
    "year": 2017,
    "publishedDate": "2017-03",
    "documentStatus": "Final",
    "geographicScope": "Wakatipu Basin",
    "owner": "QLDC",
    "citation": "Wakatipu Basin Land Use Planning Study – Final Report (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/jx0lgnno/wakatipu-basin-land-use-study-march-2017.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/jx0lgnno/wakatipu-basin-land-use-study-march-2017.pdf"
    ],
    "documentTypeCode": "spatial-plan",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "bridget-gilbert"
    ],
    "searchText": "qts-249 wakatipu basin land use planning study – final report wakatipu basin land use planning study – final the march 2017 wakatipu basin land use planning study, prepared for qldc, describes rural landscape capacity and growth, with limited comment on roads. the report is marked final. land use planning study wakatipu basin land use planning study – final report (2017). wakatipu basin final no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/jx0lgnno/wakatipu-basin-land-use-study-march-2017.pdf qldc none spatial plan final 2017 roads state highways, local roads and general traffic. qldc qldc commissioned bridget gilbert landscape architecture bridget gilbert landscape architecture prepared main document pdf",
    "sortDate": "2017-03-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-249/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-249/QTS-249-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-250",
    "code": "QTS-250",
    "title": "Proposed District Plan s32 Evaluation – Chapter 29 Transport",
    "shortTitle": "Proposed District Plan s32 Evaluation – Chapter 29",
    "summary": "QLDC's section 32 evaluation of 1 November 2017 assesses the Proposed District Plan transport chapter, covering parking, travel demand and roads. The report is dated 1 November 2017.",
    "documentType": "Policy review",
    "documentForm": "Section 32 evaluation",
    "year": 2017,
    "publishedDate": "2017-11-01",
    "documentStatus": "Not stated",
    "geographicScope": "Queenstown Lakes District; Queenstown; Wakatipu Basin",
    "owner": "QLDC",
    "citation": "Proposed District Plan s32 Evaluation – Chapter 29 Transport (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/gk3hw51k/pdp-s32-chapter-29-transport-2017.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/gk3hw51k/pdp-s32-chapter-29-transport-2017.pdf"
    ],
    "documentTypeCode": "policy-review",
    "topics": [
      "active-travel",
      "bus",
      "parking",
      "roads",
      "demand-management"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-250 proposed district plan s32 evaluation – chapter 29 transport proposed district plan s32 evaluation – chapter 29 qldc's section 32 evaluation of 1 november 2017 assesses the proposed district plan transport chapter, covering parking, travel demand and roads. the report is dated 1 november 2017. section 32 evaluation proposed district plan s32 evaluation – chapter 29 transport (2017). queenstown lakes district; queenstown; wakatipu basin report dated 1 november 2017 no mass rapid transit reference. ordinary bus services are not mass rapid transit. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/gk3hw51k/pdp-s32-chapter-29-transport-2017.pdf qldc none policy review not stated 2017 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. parking parking supply, pricing and management. roads state highways, local roads and general traffic. travel demand travel demand management, pricing and time-of-use charging. qldc qldc prepared main document pdf",
    "sortDate": "2017-11-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-250/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-250/QTS-250-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-251",
    "code": "QTS-251",
    "title": "Queenstown Town Centre Arterials Business Case",
    "shortTitle": "Queenstown Town Centre Arterials Business Case",
    "summary": "Rationale's November 2017 business case for QLDC assesses a town-centre arterial and notes that mass rapid transit may be required later. It does not assess a mass rapid transit mode.",
    "documentType": "Indicative business case",
    "documentForm": "Indicative business case",
    "year": 2017,
    "publishedDate": "2017-11",
    "documentStatus": "Final",
    "geographicScope": "Queenstown town centre; Frankton Road (SH6A); Frankton",
    "owner": "QLDC",
    "citation": "Queenstown Town Centre Arterials Business Case (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/bjvj1vnv/arterials-qt-town-centre-business-case.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/bjvj1vnv/arterials-qt-town-centre-business-case.pdf"
    ],
    "documentTypeCode": "indicative-business-case",
    "topics": [
      "rapid-transit",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "rationale",
      "nzta"
    ],
    "searchText": "qts-251 queenstown town centre arterials business case queenstown town centre arterials business case rationale's november 2017 business case for qldc assesses a town-centre arterial and notes that mass rapid transit may be required later. it does not assess a mass rapid transit mode. indicative business case queenstown town centre arterials business case (2017). queenstown town centre; frankton road (sh6a); frankton qldc/nzta revision, november 2017 (rev 3.4) notes that a mass rapid transit solution may be required on the sh6a corridor from as early as 2038. it does not assess a mode. the business case is for a town-centre arterial road. its demand forecast for the sh6a corridor notes that a mass rapid transit solution may be required from as early as 2038. it does not assess a mode. \"the graphic below demonstrates this demand and highlights that a mass rapid transit solution may be required from as early as 2038 onwards.\" (p.59) a separate study cost was not requested. https://www.qldc.govt.nz/media/bjvj1vnv/arterials-qt-town-centre-business-case.pdf qldc passing indicative business case final 2017 rapid transit mass rapid transit, light rail, trackless tram and offline public transport. roads state highways, local roads and general traffic. qldc qldc commissioned rationale rationale prepared nzta waka kotahi nzta partner main document pdf",
    "sortDate": "2017-11-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-251/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-251/QTS-251-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-252",
    "code": "QTS-252",
    "title": "Prioritised activities – Otago and Southland (RLTP)",
    "shortTitle": "Prioritised activities – Otago and Southland",
    "summary": "This November 2017 list sets out Otago and Southland transport activities that already had funding approved, including projects in the Queenstown area. The tables are stated as at 1 November 2017.",
    "documentType": "Statutory plan",
    "documentForm": "Regional land transport plan programme list",
    "year": 2017,
    "publishedDate": "2017-11-01",
    "documentStatus": "Draft",
    "geographicScope": "Otago; Southland; Queenstown; Frankton",
    "owner": "Regional transport committee",
    "citation": "Prioritised activities – Otago and Southland (RLTP) (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.orc.govt.nz/media/4215/prioritised-activities-otago-and-southland.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.orc.govt.nz/media/4215/prioritised-activities-otago-and-southland.pdf"
    ],
    "documentTypeCode": "statutory-plan",
    "topics": [
      "roads",
      "funding"
    ],
    "organisationIds": [
      "regional-transport-committees",
      "orc"
    ],
    "searchText": "qts-252 prioritised activities – otago and southland (rltp) prioritised activities – otago and southland this november 2017 list sets out otago and southland transport activities that already had funding approved, including projects in the queenstown area. the tables are stated as at 1 november 2017. regional land transport plan programme list prioritised activities – otago and southland (rltp) (2017). otago; southland; queenstown; frankton proposed variations; tables at 1 november 2017 no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.orc.govt.nz/media/4215/prioritised-activities-otago-and-southland.pdf regional transport committee none statutory plan draft 2017 roads state highways, local roads and general traffic. funding transport funding and investment. regional transport committees regional transport committees prepared orc orc published main document pdf",
    "sortDate": "2017-11-01",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-252/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-252/QTS-252-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-253",
    "code": "QTS-253",
    "title": "QLDC Full Council Agenda, 14 December 2017",
    "shortTitle": "QLDC Full Council Agenda, 14 December 2017",
    "summary": "The agenda for QLDC's meeting of 14 December 2017 includes reports on the town centre masterplan and the Queenstown town centre arterials business case. The document is the meeting agenda, which includes those reports for decision.",
    "documentType": "Board or committee paper",
    "documentForm": "Full council agenda",
    "year": 2017,
    "publishedDate": "2017-12-14",
    "documentStatus": "Recorded",
    "geographicScope": "Queenstown town centre; Queenstown Lakes District",
    "owner": "QLDC",
    "citation": "QLDC Full Council Agenda, 14 December 2017 (2017).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/h0wjyqzx/2017-dec-14-council-agenda.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/h0wjyqzx/2017-dec-14-council-agenda.pdf"
    ],
    "documentTypeCode": "board-paper",
    "topics": [
      "roads"
    ],
    "organisationIds": [
      "qldc"
    ],
    "searchText": "qts-253 qldc full council agenda, 14 december 2017 qldc full council agenda, 14 december 2017 the agenda for qldc's meeting of 14 december 2017 includes reports on the town centre masterplan and the queenstown town centre arterials business case. the document is the meeting agenda, which includes those reports for decision. full council agenda qldc full council agenda, 14 december 2017 (2017). queenstown town centre; queenstown lakes district no mass rapid transit reference. not separately commissioned. this is an internal or corporate document. https://www.qldc.govt.nz/media/h0wjyqzx/2017-dec-14-council-agenda.pdf qldc none board or committee paper recorded 2017 roads state highways, local roads and general traffic. qldc qldc prepared main document pdf",
    "sortDate": "2017-12-14",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-253/",
    "files": [
      {
        "label": "Main document",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-253/QTS-253-F1.pdf"
      }
    ]
  },
  {
    "id": "qts-254",
    "code": "QTS-254",
    "title": "Te Pūtahi Ladies Mile Plan Variation: transport evidence and reports (2022–2024)",
    "shortTitle": "Te Pūtahi Ladies Mile variation",
    "summary": "These documents are the transport evidence for the Te Pūtahi Ladies Mile variation, from the 2022 strategy through to the 2024 hearing panel report. They cover State Highway 6, bus priority, trip caps and staging development against transport upgrades. The set includes the council strategy, hearing evidence and the panel's recommendations.",
    "documentType": "Expert evidence",
    "documentForm": "Plan variation transport evidence",
    "year": 2022,
    "publishedDate": "2022-03-08",
    "documentStatus": "Not stated",
    "geographicScope": "Te Pūtahi Ladies Mile; State Highway 6; Queenstown; Frankton",
    "owner": "QLDC",
    "citation": "Te Pūtahi Ladies Mile Plan Variation: transport evidence and reports (2022–2024).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.qldc.govt.nz/media/kdkkzpka/appendix-d-ii-tplm-masterplan-transportation-strategy.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.qldc.govt.nz/media/kdkkzpka/appendix-d-ii-tplm-masterplan-transportation-strategy.pdf",
      "https://www.qldc.govt.nz/media/qk2gl5oh/appendix-d-i-tplm-section-32-report.pdf",
      "https://www.qldc.govt.nz/media/tclpreir/section-42a-report.pdf",
      "https://www.qldc.govt.nz/media/lwwhugny/evidence-of-tony-pickard-transport.pdf",
      "https://www.qldc.govt.nz/media/av4gk1y4/evidnece-of-colin-shields-transport.pdf",
      "https://www.qldc.govt.nz/media/1pymejrf/ahft-j-bartlett-and-d-mckenzie-transport-submitter-107-138-20-oct-2023.pdf",
      "https://www.qldc.govt.nz/media/5ykdrcfg/andy-carr-traffic-ladies-mile-pet-lodge-limited-20-oct-2023.pdf",
      "https://www.qldc.govt.nz/media/pr0h34vl/leo-hills-traffic-winter-miles-airstream-ltd-20-oct-2023.pdf",
      "https://www.qldc.govt.nz/media/autd2wm4/parlane-transport-submitter-77-20-oct-2023.pdf",
      "https://www.qldc.govt.nz/media/vbdnjoza/jason-bartlett-transport-glenpanel-developments-ltd-20-oct-2023.pdf",
      "https://www.qldc.govt.nz/media/rwnonadq/ladies-mile-joint-witness-statement-transport-30102023-signature-version.pdf",
      "https://www.qldc.govt.nz/media/0gsfxr2n/rebuttal-evidence-of-colin-shields-transport-dated-10-november-2023-appendix-a-included.pdf",
      "https://www.qldc.govt.nz/media/ldlh5qn5/response-to-questions-colin-shields.pdf",
      "https://www.qldc.govt.nz/media/yucjwu4t/tplm_jws-_urban_design_transport_24_nov_final.pdf",
      "https://www.qldc.govt.nz/media/dn1gbyzo/colin-shields-summary-of-evidence.pdf",
      "https://www.qldc.govt.nz/media/ajbn0rnh/tony-pickard-summary-of-evidence.pdf",
      "https://www.qldc.govt.nz/media/gecop4tx/mr-shields-response-to-panel-questions-5-and-6-dec-2023-7-dec-2023.pdf",
      "https://www.qldc.govt.nz/media/34jgp011/summary-of-evidence-don-mckenzie-ahft-11122023.pdf",
      "https://www.qldc.govt.nz/media/ettj4aon/summary-of-evidence-jason-bartlett-glenpanel-and-ahft-11122023.pdf",
      "https://www.qldc.govt.nz/media/t5vgne3i/summary-of-evidence-leo-hills-wmal-submitter-94-134-11122023.pdf",
      "https://www.qldc.govt.nz/media/gmbjctby/summary-ladies-mile-property-syndicate-j-parlane-12122023.pdf",
      "https://www.qldc.govt.nz/media/0gmfcjys/dave-smith-response-to-tplm-hearing-panel-transportation-questions-141223.pdf",
      "https://www.qldc.govt.nz/media/rp1jsrj4/ladies-mile-response-of-colin-shields-26jan24.pdf",
      "https://www.qldc.govt.nz/media/cvtkq04h/section-42a-reply-report-dated-30-january-2024.pdf",
      "https://www.qldc.govt.nz/media/ok2n2jak/final-report-and-recommendations.pdf"
    ],
    "documentTypeCode": "expert-evidence",
    "topics": [
      "active-travel",
      "bus",
      "roads"
    ],
    "organisationIds": [
      "qldc",
      "nzta",
      "independent-hearing-panel"
    ],
    "searchText": "qts-254 te pūtahi ladies mile plan variation: transport evidence and reports (2022–2024) te pūtahi ladies mile variation these documents are the transport evidence for the te pūtahi ladies mile variation, from the 2022 strategy through to the 2024 hearing panel report. they cover state highway 6, bus priority, trip caps and staging development against transport upgrades. the set includes the council strategy, hearing evidence and the panel's recommendations. plan variation transport evidence te pūtahi ladies mile plan variation: transport evidence and reports (2022–2024). te pūtahi ladies mile; state highway 6; queenstown; frankton no mass rapid transit reference. a separate study cost was not requested. https://www.qldc.govt.nz/media/kdkkzpka/appendix-d-ii-tplm-masterplan-transportation-strategy.pdf qldc none expert evidence not stated 2022 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. qldc qldc commissioned qldc qldc prepared nzta waka kotahi nzta partner independent hearing panel independent hearing panel recipient te pūtahi ladies mile masterplan transport strategy (v2, 8 march 2022) – s32 appendix 3a(i) pdf candor3 (author c shields), with abley/wsp modelling note https://www.qldc.govt.nz/media/kdkkzpka/appendix-d-ii-tplm-masterplan-transportation-strategy.pdf te pūtahi ladies mile variation – section 32 evaluation report pdf qldc https://www.qldc.govt.nz/media/qk2gl5oh/appendix-d-i-tplm-section-32-report.pdf te pūtahi ladies mile – section 42a hearing report (jeffrey brown) pdf brown & company planning group for qldc https://www.qldc.govt.nz/media/tclpreir/section-42a-report.pdf statement of evidence of anthony (tony) pickard – transport pdf qldc (transport strategy manager) https://www.qldc.govt.nz/media/lwwhugny/evidence-of-tony-pickard-transport.pdf statement of evidence of colin shields – transport pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/av4gk1y4/evidnece-of-colin-shields-transport.pdf joint statement of evidence of jason bartlett and don mckenzie – transport (anna hutchinson family trust, submitter 107/138) pdf bartlett consulting; don mckenzie consulting https://www.qldc.govt.nz/media/1pymejrf/ahft-j-bartlett-and-d-mckenzie-transport-submitter-107-138-20-oct-2023.pdf statement of evidence of andy carr – traffic (ladies mile pet lodge ltd) pdf carriageway consulting https://www.qldc.govt.nz/media/5ykdrcfg/andy-carr-traffic-ladies-mile-pet-lodge-limited-20-oct-2023.pdf statement of evidence of leo hills – traffic (winter miles airstream ltd) pdf commute transportation consultants https://www.qldc.govt.nz/media/pr0h34vl/leo-hills-traffic-winter-miles-airstream-ltd-20-oct-2023.pdf statement of evidence of john parlane – transport (ladies mile property syndicate, submitter 77) pdf parlane and associates https://www.qldc.govt.nz/media/autd2wm4/parlane-transport-submitter-77-20-oct-2023.pdf statement of evidence of jason bartlett – transport (glenpanel developments ltd) pdf bartlett consulting https://www.qldc.govt.nz/media/vbdnjoza/jason-bartlett-transport-glenpanel-developments-ltd-20-oct-2023.pdf joint witness statement of traffic experts – 30 october 2023 pdf transport experts: shields, smith, mckenzie, bartlett, carr and others (expert conferencing) https://www.qldc.govt.nz/media/rwnonadq/ladies-mile-joint-witness-statement-transport-30102023-signature-version.pdf rebuttal evidence of colin shields – transport (appendix a included) pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/0gsfxr2n/rebuttal-evidence-of-colin-shields-transport-dated-10-november-2023-appendix-a-included.pdf response to questions – colin shields (transport) pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/ldlh5qn5/response-to-questions-colin-shields.pdf joint witness statement of urban design and transport experts – 24 november 2023 pdf urban design and transport experts (incl. shields, smith, mckenzie, bartlett) https://www.qldc.govt.nz/media/yucjwu4t/tplm_jws-_urban_design_transport_24_nov_final.pdf summary of evidence – colin shields (traffic) pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/dn1gbyzo/colin-shields-summary-of-evidence.pdf summary of evidence – tony pickard (traffic) pdf qldc (transport strategy manager) https://www.qldc.govt.nz/media/ajbn0rnh/tony-pickard-summary-of-evidence.pdf colin shields – response to panel questions of 5 and 6 december 2023 pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/gecop4tx/mr-shields-response-to-panel-questions-5-and-6-dec-2023-7-dec-2023.pdf summary of evidence – don mckenzie (transport, ahft) pdf don mckenzie consulting https://www.qldc.govt.nz/media/34jgp011/summary-of-evidence-don-mckenzie-ahft-11122023.pdf summary of evidence – jason bartlett (transport, glenpanel and ahft) pdf bartlett consulting https://www.qldc.govt.nz/media/ettj4aon/summary-of-evidence-jason-bartlett-glenpanel-and-ahft-11122023.pdf summary of evidence – leo hills (traffic, winter miles airstream) pdf commute transportation consultants https://www.qldc.govt.nz/media/t5vgne3i/summary-of-evidence-leo-hills-wmal-submitter-94-134-11122023.pdf summary of evidence – john parlane (transport, ladies mile property syndicate) pdf parlane and associates https://www.qldc.govt.nz/media/gmbjctby/summary-ladies-mile-property-syndicate-j-parlane-12122023.pdf dave smith – response to tplm hearing panel transportation questions (14 december 2023) pdf abley (dave smith) for waka kotahi https://www.qldc.govt.nz/media/0gmfcjys/dave-smith-response-to-tplm-hearing-panel-transportation-questions-141223.pdf response of colin shields (traffic) – 26 january 2024 pdf tonkin + taylor (colin shields) https://www.qldc.govt.nz/media/rp1jsrj4/ladies-mile-response-of-colin-shields-26jan24.pdf te pūtahi ladies mile – section 42a reply report pdf brown & company planning group for qldc https://www.qldc.govt.nz/media/cvtkq04h/section-42a-reply-report-dated-30-january-2024.pdf te pūtahi ladies mile variation – hearing panel final report and recommendations to the minister pdf independent hearing panel (d allen, chair) https://www.qldc.govt.nz/media/ok2n2jak/final-report-and-recommendations.pdf",
    "sortDate": "2022-03-08",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-254/",
    "files": [
      {
        "label": "Te Pūtahi Ladies Mile Masterplan Transport Strategy (V2, 8 March 2022) – s32 Appendix 3A(i)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F1.pdf"
      },
      {
        "label": "Te Pūtahi Ladies Mile Variation – Section 32 Evaluation Report",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F2.pdf"
      },
      {
        "label": "Te Pūtahi Ladies Mile – Section 42A Hearing Report (Jeffrey Brown)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F3.pdf"
      },
      {
        "label": "Statement of Evidence of Anthony (Tony) Pickard – Transport",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F4.pdf"
      },
      {
        "label": "Statement of Evidence of Colin Shields – Transport",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F5.pdf"
      },
      {
        "label": "Joint Statement of Evidence of Jason Bartlett and Don McKenzie – Transport (Anna Hutchinson Family Trust, submitter 107/138)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F6.pdf"
      },
      {
        "label": "Statement of Evidence of Andy Carr – Traffic (Ladies Mile Pet Lodge Ltd)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F7.pdf"
      },
      {
        "label": "Statement of Evidence of Leo Hills – Traffic (Winter Miles Airstream Ltd)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F8.pdf"
      },
      {
        "label": "Statement of Evidence of John Parlane – Transport (Ladies Mile Property Syndicate, submitter 77)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F9.pdf"
      },
      {
        "label": "Statement of Evidence of Jason Bartlett – Transport (Glenpanel Developments Ltd)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F10.pdf"
      },
      {
        "label": "Joint Witness Statement of Traffic Experts – 30 October 2023",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F11.pdf"
      },
      {
        "label": "Rebuttal Evidence of Colin Shields – Transport (Appendix A included)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F12.pdf"
      },
      {
        "label": "Response to Questions – Colin Shields (Transport)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F13.pdf"
      },
      {
        "label": "Joint Witness Statement of Urban Design and Transport Experts – 24 November 2023",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F14.pdf"
      },
      {
        "label": "Summary of Evidence – Colin Shields (Traffic)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F15.pdf"
      },
      {
        "label": "Summary of Evidence – Tony Pickard (Traffic)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F16.pdf"
      },
      {
        "label": "Colin Shields – Response to Panel Questions of 5 and 6 December 2023",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F17.pdf"
      },
      {
        "label": "Summary of Evidence – Don McKenzie (Transport, AHFT)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F18.pdf"
      },
      {
        "label": "Summary of Evidence – Jason Bartlett (Transport, Glenpanel and AHFT)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F19.pdf"
      },
      {
        "label": "Summary of Evidence – Leo Hills (Traffic, Winter Miles Airstream)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F20.pdf"
      },
      {
        "label": "Summary of Evidence – John Parlane (Transport, Ladies Mile Property Syndicate)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F21.pdf"
      },
      {
        "label": "Dave Smith – Response to TPLM Hearing Panel Transportation Questions (14 December 2023)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F22.pdf"
      },
      {
        "label": "Response of Colin Shields (Traffic) – 26 January 2024",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F23.pdf"
      },
      {
        "label": "Te Pūtahi Ladies Mile – Section 42A Reply Report",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F24.pdf"
      },
      {
        "label": "Te Pūtahi Ladies Mile Variation – Hearing Panel Final Report and Recommendations to the Minister",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-254/QTS-254-F25.pdf"
      }
    ]
  },
  {
    "id": "qts-255",
    "code": "QTS-255",
    "title": "Homestead Bay fast-track application: transport reports, comments and decision (2025–2026)",
    "shortTitle": "Homestead Bay fast-track",
    "summary": "These documents cover the Homestead Bay fast-track application's transport reports, comments and the February 2026 decision. They address the State Highway 6 access, bus services, walking and cycling, and the conditions the panel set. Comments from NZTA, QLDC and the Otago Regional Council sit with the applicant's assessment.",
    "documentType": "Assessment and assurance",
    "documentForm": "Fast-track transport reports and decision",
    "year": 2025,
    "publishedDate": "2025-03-10",
    "documentStatus": "Not stated",
    "geographicScope": "Homestead Bay; State Highway 6; Southern Corridor; Jack Hanley Drive; Queenstown",
    "owner": "Private sector",
    "citation": "Homestead Bay fast-track application: transport reports, comments and decision (2025–2026).",
    "featured": false,
    "featuredOrder": null,
    "externalUrl": null,
    "publicSourceUrl": "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0030/19569/12c.Jack-Hanley-Drive-State-Highway-6-to-Spur-Ridge-Rise-20250310.pdf",
    "publicSourceConfidence": "exact",
    "sourceNote": "",
    "oiaRelease": "",
    "sourceUrls": [
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0030/19569/12c.Jack-Hanley-Drive-State-Highway-6-to-Spur-Ridge-Rise-20250310.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0027/19566/12.b-Jack-Hanley-Drive-State-Highway-6-to-Spur-Ridge-Rise-20250317.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0020/3719/Appendix-GG-Transportation-analysis-summary.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/3744/Appendix-V-Integrated-Transport-Assessment.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0014/3731/Appendix-MM-State-highway-renders.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0022/12577/AEE-Homestead-Bay-updated-clean-version_Redacted.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0014/14081/34I.ORC_AppendixI.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0016/14056/32.28October2025_NZTA_comments-received.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0013/14026/7.23October2025_MinisterSouthIsland_AssocMinisterTransport_comments-received.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/14058/33.28October2025_QLDC_comments-received.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0019/14059/33A.28October2025_QLDCAppendix-1.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0011/14060/33B.28October2025_QLDCAppendix2.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0011/14501/Response-to-comments-Appendix-E-Homestead-Bay-Road-connection.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0015/14505/Response-to-comments.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0025/17629/Draft-decision-17Dec.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0023/19562/9a.-RCLHomestead-Bay-Ltd,-NZTA-Memo-for-Comments-on-Draft-Conditions-FINAL-21-January-2026.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0029/19568/12a.s70-QLDC-Feedback-on-Proposed-Draft-Consent-Conditions.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/21285/Signed-Decision-final.pdf",
      "https://www.fasttrack.govt.nz/__data/assets/pdf_file/0017/22436/Appendix-A-final-4_53pm-18-Feb.pdf"
    ],
    "documentTypeCode": "assessment",
    "topics": [
      "active-travel",
      "bus",
      "roads",
      "freight"
    ],
    "organisationIds": [
      "rcl-homestead-bay",
      "nzta",
      "orc",
      "qldc",
      "independent-hearing-panel"
    ],
    "searchText": "qts-255 homestead bay fast-track application: transport reports, comments and decision (2025–2026) homestead bay fast-track these documents cover the homestead bay fast-track application's transport reports, comments and the february 2026 decision. they address the state highway 6 access, bus services, walking and cycling, and the conditions the panel set. comments from nzta, qldc and the otago regional council sit with the applicant's assessment. fast-track transport reports and decision homestead bay fast-track application: transport reports, comments and decision (2025–2026). homestead bay; state highway 6; southern corridor; jack hanley drive; queenstown no mass rapid transit reference. a separate study cost was not requested. https://www.fasttrack.govt.nz/__data/assets/pdf_file/0030/19569/12c.jack-hanley-drive-state-highway-6-to-spur-ridge-rise-20250310.pdf private sector none assessment and assurance not stated 2025 walking and cycling walking, cycling, trails and other active travel. bus scheduled bus and bus-priority public transport. roads state highways, local roads and general traffic. freight freight and loading. rcl homestead bay ltd rcl homestead bay prepared nzta waka kotahi nzta partner orc orc partner qldc qldc partner independent hearing panel independent hearing panel recipient jack hanley drive (sh6 to spur ridge rise) – traffic count, 10–16 march 2025 pdf qldc (traffic count data) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0030/19569/12c.jack-hanley-drive-state-highway-6-to-spur-ridge-rise-20250310.pdf jack hanley drive (sh6 to spur ridge rise) – traffic count, 17–23 march 2025 pdf qldc (traffic count data) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0027/19566/12.b-jack-hanley-drive-state-highway-6-to-spur-ridge-rise-20250317.pdf homestead bay – transportation analysis summary report (appendix gg) pdf wsp (m gatenby; reviewed r gibson) marked 'confidential' on the cover; published by the epa on the fast-track website. https://www.fasttrack.govt.nz/__data/assets/pdf_file/0020/3719/appendix-gg-transportation-analysis-summary.pdf homestead bay fast track approvals application – integrated transport assessment (appendix v) pdf stantec new zealand https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/3744/appendix-v-integrated-transport-assessment.pdf homestead bay – state highway renders (appendix mm) pdf rcl homestead bay ltd (applicant) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0014/3731/appendix-mm-state-highway-renders.pdf homestead bay – assessment of environmental effects (updated, clean version) pdf rcl homestead bay ltd (applicant planners) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0022/12577/aee-homestead-bay-updated-clean-version_redacted.pdf orc transport feedback on the rcl homestead bay fast-track application (orc comments appendix i) pdf otago regional council https://www.fasttrack.govt.nz/__data/assets/pdf_file/0014/14081/34i.orc_appendixi.pdf memorandum of nz transport agency waka kotahi on the rcl homestead bay development (s53 comments) pdf nz transport agency waka kotahi https://www.fasttrack.govt.nz/__data/assets/pdf_file/0016/14056/32.28october2025_nzta_comments-received.pdf comments of hon james meager (minister for the south island; associate minister of transport) on homestead bay pdf office of hon james meager https://www.fasttrack.govt.nz/__data/assets/pdf_file/0013/14026/7.23october2025_ministersouthisland_assocministertransport_comments-received.pdf queenstown lakes district council comments on the homestead bay application (s53) pdf qldc https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/14058/33.28october2025_qldc_comments-received.pdf qldc strategic growth team report – te tapuae southern corridor structure plan assessment of homestead bay (qldc comments appendix 1) pdf qldc strategic growth team https://www.fasttrack.govt.nz/__data/assets/pdf_file/0019/14059/33a.28october2025_qldcappendix-1.pdf qldc property & infrastructure input – rcl homestead bay (qldc comments appendix 2) pdf qldc property & infrastructure (r powell) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0011/14060/33b.28october2025_qldcappendix2.pdf road 01 / homestead bay road intersection – concept layout (fig. r008) (response to comments appendix e) pdf stantec https://www.fasttrack.govt.nz/__data/assets/pdf_file/0011/14501/response-to-comments-appendix-e-homestead-bay-road-connection.pdf rcl homestead bay ltd – response to written comments pdf rcl homestead bay ltd (counsel and experts) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0015/14505/response-to-comments.pdf homestead bay – expert panel draft decision pdf expert panel (ftaa) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0025/17629/draft-decision-17dec.pdf nzta memorandum – comments on the draft conditions (homestead bay) pdf nz transport agency waka kotahi https://www.fasttrack.govt.nz/__data/assets/pdf_file/0023/19562/9a.-rclhomestead-bay-ltd,-nzta-memo-for-comments-on-draft-conditions-final-21-january-2026.pdf qldc feedback on proposed draft consent conditions (s70) pdf qldc https://www.fasttrack.govt.nz/__data/assets/pdf_file/0029/19568/12a.s70-qldc-feedback-on-proposed-draft-consent-conditions.pdf homestead bay – expert panel decision (signed) pdf expert panel (ftaa) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0018/21285/signed-decision-final.pdf homestead bay – conditions of consent (amended appendix a, final 18 february 2026) pdf expert panel (ftaa) https://www.fasttrack.govt.nz/__data/assets/pdf_file/0017/22436/appendix-a-final-4_53pm-18-feb.pdf",
    "sortDate": "2025-03-10",
    "cover": null,
    "pageUrl": "https://movequeenstown.nz/evidence/qts-255/",
    "files": [
      {
        "label": "Jack Hanley Drive (SH6 to Spur Ridge Rise) – Traffic Count, 10–16 March 2025",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F1.pdf"
      },
      {
        "label": "Jack Hanley Drive (SH6 to Spur Ridge Rise) – Traffic Count, 17–23 March 2025",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F2.pdf"
      },
      {
        "label": "Homestead Bay – Transportation Analysis Summary Report (Appendix GG)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F3.pdf"
      },
      {
        "label": "Homestead Bay Fast Track Approvals Application – Integrated Transport Assessment (Appendix V)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F4.pdf"
      },
      {
        "label": "Homestead Bay – State Highway Renders (Appendix MM)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F5.pdf"
      },
      {
        "label": "Homestead Bay – Assessment of Environmental Effects (updated, clean version)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F6.pdf"
      },
      {
        "label": "ORC Transport Feedback on the RCL Homestead Bay Fast-track Application (ORC comments Appendix I)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F7.pdf"
      },
      {
        "label": "Memorandum of NZ Transport Agency Waka Kotahi on the RCL Homestead Bay Development (s53 comments)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F8.pdf"
      },
      {
        "label": "Comments of Hon James Meager (Minister for the South Island; Associate Minister of Transport) on Homestead Bay",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F9.pdf"
      },
      {
        "label": "Queenstown Lakes District Council Comments on the Homestead Bay Application (s53)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F10.pdf"
      },
      {
        "label": "QLDC Strategic Growth Team Report – Te Tapuae Southern Corridor Structure Plan Assessment of Homestead Bay (QLDC comments Appendix 1)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F11.pdf"
      },
      {
        "label": "QLDC Property & Infrastructure Input – RCL Homestead Bay (QLDC comments Appendix 2)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F12.pdf"
      },
      {
        "label": "Road 01 / Homestead Bay Road Intersection – Concept Layout (Fig. R008) (Response to comments Appendix E)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F13.pdf"
      },
      {
        "label": "RCL Homestead Bay Ltd – Response to Written Comments",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F14.pdf"
      },
      {
        "label": "Homestead Bay – Expert Panel Draft Decision",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F15.pdf"
      },
      {
        "label": "NZTA Memorandum – Comments on the Draft Conditions (Homestead Bay)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F16.pdf"
      },
      {
        "label": "QLDC Feedback on Proposed Draft Consent Conditions (s70)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F17.pdf"
      },
      {
        "label": "Homestead Bay – Expert Panel Decision (signed)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F18.pdf"
      },
      {
        "label": "Homestead Bay – Conditions of Consent (amended Appendix A, final 18 February 2026)",
        "kind": "pdf",
        "url": "https://files.movequeenstown.nz/library/QTS-255/QTS-255-F19.pdf"
      }
    ]
  }
]
